Value Stream Mapping Train the Trainer

Similar documents
"Value Stream Mapping How does Reliability play a role in making Lean Manufacturing a Success " Presented by Larry Akre May 17, 2007

Pull Systems: Overview, Challenges and Success Factors

PLUS VALUE STREAM MAPPING

The Quality Group. All Rights Reserved

The Future State Map. Future State. Map

IT 470a Six Sigma Chapter X

Finished goods available to meet Takt time when variations in customer demand exist.

Instructor Info: Bruce Gladwin, PMP, 6σBB VP, Commercial Products Office:

LEAN ADMINISTRATION.

Hybrid Manufacturing Methods

Materials Management. Implementation Process. Marek Piatkowski. December Marek Piatkowski FSP Consulting

Generic Case Study. Initial Condition. 1. Stability

Implementation of Kanban based Pull Production in Finish Match Grinding Lines

How to Value Stream Map

Chapter 17. Synchronizing and Balancing Processes. Level the master production schedule. Production. Time

Value Stream Mapping Tune-Up

Flow and Pull Systems

Virtual Pull Systems. Don Guild, Synchronous Management INTRODUCTION

LEAN MANUFACTURING & TPM.

INTRODUCTION 1. When manufacturing processes of products being examine through customer s perspective, we will be able to identify 2 types of processe

INTRODUCTION 1. When manufacturing processes of products being examine through customer s perspective, we will be able to identify 2 types of processe

Energy Savings through Lean Thinking. Learning to See through Value Stream Mapping

Level & Stable Operations

Value Stream Mapping

Ch 26 Just-In-Time and Lean Production. What is Lean Production? Structure of Lean Production System. Activities in Manufacturing.

Transforming Your Value Streams Workbook

Outline. Pull Manufacturing. Push Vs. Pull Scheduling. Inventory Hides Problems. Lowering Inventory Reveals Problems

Certification Workshop: Mastering the Essential Tools of Value Stream Mapping, A3 Writing and Kata

Seradex White Paper. ERP for Engineer to Order. A Discussion of High Performance Manufacturing Issues

NextGen Lean Fast Track Business Growth with OpEx

JUST IN TIME. Manuel Rincón, M.Sc. October 22nd, 2004

MAS BEST PRACTICE SKILLS EVENT LEAN AWARENESS WORKSHOP

LEAN PRODUCTION FACILITY LAYOUT.

Similarities Between Job-Order and Process Costing

Subbu Ramakrishnan. Manufacturing Finance with SAP. ERP Financials. Bonn Boston

Lecture 9 MBF2213 Operations Management Prepared by Dr Khairul Anuar. L9: Lean synchronization

Online library of Quality, Service Improvement and Redesign tools. Value stream mapping. collaboration trust respect innovation courage compassion

Lean and Agile Systems. Rajiv Gupta FORE School of Management October 2013 Session 6

CAD/CAM CHAPTER ONE INTRODUCTION. Dr. Ibrahim Naimi

TEN STEPS to Lean Electrical Controls

Value Stream Mapping in the Converting Industry. Lance Cullen October 22 nd, 2012

7/8/2017 CAD/CAM. Dr. Ibrahim Al-Naimi. Chapter one. Introduction

Lean 101: An Introduction

PRINCIPLES OF LEAN MANUFACTURING. Purdue Manufacturing Extension Partnership (800)

JIT AND Lean Operations 14-1

Harley Davidson Walking SAP Tour Guide

OM (Fall 2016) Outline

lean value assessment Creating Higher Profi ts by Reducing Waste

Eliminating Flow Wastes!

A Case Study Analysis of a Plastic Packaging Company Using Value Stream Mapping Technique

Quick Manufacturing Stencil

Accounting for Lean: Adopting Lean Accounting to Promote Lean Behaviors

The Value of Strategically Sourced Sub-Assembly. Outsourced sub-assembly creates measurable savings and fulfillment flexibility.

A Lean Analysis Methodology Using Simulation

Just-In-Time (JIT) Manufacturing. Overview

Sharing Your Lean System For Total Success

PHYSICIAN SERVICES ALIGN. IMPROVE. ENGAGE. SUSTAIN.

The Realities of Modern Manufacturing

Outline. Push-Pull Systems Global Company Profile: Toyota Motor Corporation Just-in-Time, the Toyota Production System, and Lean Operations

The basic concept of waste

Process design Push-pull boundary 35C03000 Process Analysis and Management Max Finne, Assistant Professor of Information and Service management

Dial-in Number: Access code: # Go to: Use the JOIN A SESSION button Enter the Access Code:

MANUFACTURING ERP SOFTWARE NEEDS ASSESSMENT CHECKLIST BY SHELDON NEEDLE

QMRP Base System. Highlights:

Virtual Training Workbook

MMOG/LE Evaluation. Data Collection Process Improvement

Lean Manufacturing 1

Value Stream Integration Webinar Series

Manufacturing Transformation: From Push to Pull

Connecting S&OP to the Shop Floor: Here s How!

Understanding Manufacturing Execution Systems (MES)

Lean Principles. Jerry D. Kilpatrick. This article was originally written for and published by MEP Utah in 2003 (

Using Outside Processing in Oracle Supply Chain Management Cloud

Development of Lean Enterprise Simulation Tools

Lean Leader Manual. How to Manage Operations in a Lean Environment

GETTING LEAN WITH GLOVIA CONSULTING

Chapter 6. The Production Process

Lean Is a Journey, Not a Destination. Phillip Poston Director of Communications Hytrol

Manufacturing Functionlity in Microsoft Dynamics GP. Gain complete control over your inventory, production and orders.

Real Lean vs Pretend Lean

Production Management and Scheduling

10 SECRETS EVERY SOFTWARE BUYER SHOULD KNOW

TYPICAL FACTORY LAYOUT vs THE TOYOTA APPROACH

History IE 376 PRODUCTION INFORMATION SYSTEMS. Course Notes Lecture #2.A Material Requirements Planning

Sage 200 Manufacturing Datasheet

P11 Handling and Storage E212 - Facilities Planning and Design

Set-up Reduction for Lean Cells and Multi- Machine Situations

Historical Phases of Production

Microsoft Dynamics GP. Manufacturing Core Functions

Sharing Your Lean System For Total Success

Chapter 11. In-Time and Lean Production

Increasing Your Competitiveness in PCB Assembly

Value Stream Mapping

Priority for MRP. Run MRP based on actual orders, forecasts or static requirements. Run MRP simulations until you re satisfied with the plans

FEATURES IN TRIMIT FURNITURE 2017

Lean manufacturing concept: the main factor in improving manufacturing performance a case study

Using Simulation in the Process Industries. Bennett Foster Sr. Consultant, DuPont Co.

Job Manager for Aerospace and Defense

LeanView. User s Guide. For use with versions of LeanView.

Compute the cost of goods transferred out and the cost of goods in ending work-in-process using both the Weighted-Average and the FIFO methods.

Transcription:

Value Stream Mapping Train the Trainer

Information For A Process Data Box (to be collected on the shop floor) Cycle time Changeover time Process reliability (uptime) Scrap/Rework/Defect rate Number of product variations Number of operators Production batch sizes Working time (minus breaks) Pack size

Typical Steps to Complete a Current State Drawing Document customer information Complete a quick walk through to identify the main processes (i.e., how many process boxes) Fill in data boxes, draw inventory triangles, and count inventory Document supplier information Establish information flow: how does each process know what to make next? Identify where material is being pushed Quantify production leadtime vs. processing time

Frequently Asked Questions: Make to Order and Engineer to Order Shops Many shops have a combination of repetitive and non repetitive products (indicating product families) Product families might be difficult to see focus on machines/operations and work content time Engineering might be included in the information flow for leadtime impact, etc. Pitch is typically arbitrary to the manager Employment of pitch requires detailed knowledge of work content and routings for jobs

FAQ: Distribution Centers Example (Information flow on top) I RECEIVE STOCK PICK PACK SHIP I I I I

FAQ: Parallel Manufacturing Flows Keep it simple, and make sure to leave room for the data boxes!

FAQ: Including Subassemblies FAQ: Including Subassemblies Focus on major subassemblies first Select one or two which might represent different types of situations Generic vs. specific to the product family Outsourced tasks within assembly Follow the format for parallel flow, and always include the main assembly process! For large fabricating and assembly operations, consider maps for each major subassembly with a macro map indicating the entire product family

FAQ: Do We Really Have a Supermarket (or FIFO lane)? Supermarkets (and FIFO lanes) control production between points of flow without a written schedule. What is the trigger for production in this area of the value stream? Is the upstream process overproducing? If there is a scheduling system present outside of a pure pull, chances are that there is no supermarket.

FAQ: Outsourcing FAQ: Outsourcing I Mon + Wed XYZ Corporation Mon + Wed I 300 pieces C/T = 1 hour 100 pieces L/T = 3 days Batch = Min. Batch = 2 days 3 Days.7 days 60 min.

FAQ: Long Processing Times vs. Production Leadtimes I 300 pieces CURE I 100 pieces C/T = 8 hours C/O = 25 min. Rel. = 100% Batch = 100 pcs. 3 days 8 hours 1 day 8 hours

FAQ: Cycle Times vs. Work Content Work content is important to understand costs and in balancing flow Consider all machine and manual work content, regardless of the cycle time Accumulate all parallel operations in the processing timeline ASSEMBLY C/T = 30 sec. C/O = 25 min. = 5 Cycle Time = 30 sec Work Content 150 sec.

FAQ: Different Changeover & Cycle Times, etc. Current state mapping might uncover: Several different machines performing the same operation Different products within the family with different data box characteristics for a specific process Capture the range of values as opposed to an average value

FAQ: Mapping Final Inspection/ Repair/Rework Judgment counts! Minimal repair/rework might be captured as a data attribute at the final step. If nearly every part needs assessment or extra work, consider a separate process box.

FAQ: Supplier Data Boxes FAQ: Supplier Data Boxes Data attributes are dependent on the value stream and supplier. Minimum information might include: XYZ Supplier L/T = 3 weeks Batch = 3 Tons Min. Batch = 2T 2% Scrap

FAQ: Pull Within an MRP Environment A combination push and pull is usually just a push system! Multiple production triggers typically lead to overproduction.

FAQ: Assemble to Order Options in a Future State Finished goods supermarkets can be expensive in value streams which have many finished part numbers within a product family To minimize inventory costs, try to find the upstream location where the value stream has very few variations and consider a supermarket of WIP at that point. Customers orders can drop to this location, with FIFO lanes controlling production into shipping.

FAQ: Assemble to Order Options in a Future State OXOX Customer Orders CUT max 20 pieces ASSEMBLE max 20 pieces SHIP F I F O F I F O

FAQ: Why Not Just Start Pulling Tomorrow? Initiating a pull system without first attempting to flow will result in lots of supermarkets, and may increase your inventory levels. Design your future state with the following sequence: Flow wherever you can (while still pushing) Produce to the TAKT (while still pushing) Implement a pull system

FAQ: Administrative Mapping: Part 1: Integrated Include functions such as engineering, purchasing, and order entry for product families which have routine activities prior to scheduling Place the process boxes between the customer and the scheduling function Minimize the data collection to the basics of cycle time or quality, and document the impact on leadtime

FAQ: Administrative Mapping: Part 2: Separate Maps Better for redesigning overhead and administrative support areas touching value streams Order processing Warranty activities Job quotes Not useful for activities outside a value stream Data boxes must have attributes focusing on cost, quality, and service Inventory is typically paperwork Information flow is typically informal