SUPPLIER QUALITY CODES

Similar documents
PROCUREMENT DOCUMENT QUALITY ASSURANCE REQUIREMENTS

Purchase Order Quality Clauses These quality clauses are in addition to the Standard Ameriflex Inc.Terms & Conditions

Quality Flow-Down Requirements to Suppliers

STRAN Technologies Quality Notes

QUALITY CLAUSES. Real Time Logic, Inc Academy Ridge View, Colorado Springs, CO Phone: (719) Fax: (719)

Supplier Quality Clauses

PP Quality Assurance Procurement Clauses for Suppliers

TT Electronics Integrated Manufacturing Services Supplement to Purchase Order Quality Clauses TT Electronics Purchase Order

SUPPLIER REQUIREMENTS FOR QUALITY, DESIGN & MANUFACTURING

PO QUALITY CLAUSES PRODUCT MUST COMPLY WITH DFARS PREFERENCE FOR DOMETIC SPECIALTY METALS. MELTED IN USA OR QUALIFYING COUNTRY.

Special Purchase Order Clauses

UNIVERSAL QUALITY NOTE

PROCUREMENT QUALITY PROVISIONS Revision G January 9, 2017

Quality Flow-Down Requirements to Suppliers

Atrenne Computing Solutions Quality Clauses

PURCHASE ORDER QUALITY SYSTEM REQUIREMENTS

Controlled By: QA Mgr. / Gen. Mgr. Effective Date: 3/31/2014 FORM-70

CTM. SUBJECT: Quality Clauses (Q Clauses) WI The purpose of this work instruction is to control the content of the CTM Quality clauses.

PURCHASE ORDER QUALITY CLAUSES

Requirements for Suppliers

Rosen Aviation Supplier Quality Assurance Requirements

Form Fit & Function Engineering, LLC 350 Seminole Drive Spartanburg, SC Supplementary Quality Assurance Clauses

SQR Supplier Quality Requirements TRANSLINE TECHNOLOGY, INC. (TTI) SQRs SUPPLIER QUALITY REQUIREMENTS

Supplier Quality Clauses

002 Supplier Quality System Compliance with Rocker Quality System for Suppliers is required for this Purchase Order.

Purchase Order Quality Clause SCC20 Revision E, Effective 1/20/2015

Trident Precision Manufacturing

Supplier Quality Clauses

ALVA MANUFACTURING PURCHASE ORDER QUALITY CLAUSES

Revision Date Change Author Change Summary A 04/23/2015 S. Oluwole

Quality Management System

PURCHASE ORDER PROCUREMENT CLAUSES QA25 Rev N Date: 11/13/2016

QUALITY CONTROL INSTRUCTION

TITLE: TEKTRONIX COMPONENT SOLUTIONS SUPPLIER QUALITY MANUAL

Purchase Order Quality Requirement Clauses

Supplier Quality Codes

Purchase Order Quality Terms and Conditions

HILLPRO LLC PURCHASE ORDER TERMS AND CONDITIONS

SUPPLIER QUALITY ASSURANCE REQUIREMENTS

Quality System Document DOC #

VOLTAGE MULTIPLIERS, INC. QUALITY SUPPLEMENT TO PURCHASE ORDERS

2. GENERAL REQUIREMENTS

Satellite Aerospace, Inc. TERMS & CONDITIONS Page 1 of 5

Supplier Quality Requirements (ASQR)

Orbital ATK Alliant Techsystems Defense Electronic Systems Special Mission Aircraft Fort Worth

Purchasing/Quality Clauses

PPI/TZ Standard Quality Requirements for Suppliers -SQRS-

GKN Aerospace Advanced Composite Structure

PROCUREMENT QUALITY REQUIREMENTS

SUPPLIER QUALITY PROCUREMENT REQUIREMENTS

ThinKom Purchase Order Quality Provisions Number: Q4000 Revision: D

L-3 PHOTONICS QUALITY CODES Reference

1.1 Wesco Aircraft Supplier Quality Flow Down Requirements to Subtier Sources.

PROCUREMENT QUALITY REQUIREMENTS

The Following Clauses are applicable only as noted on the Purchase Order, either by Quality Clause Code or Itemized Quality Clauses:

STANDARD QUALITY ASSURANCE PROVISIONS FOR PURCHASED MATERIALS

Satellite Aerospace, Inc. TERMS & CONDITIONS Page 1 of 6

Supplier Quality Requirements

PI Purchase Order QC Codes

QUALITY DEPT request to have FORM 1135 for REVIEW/APPROVAL Cycle everytime form will be updated/revised.

Purchase Order Quality Clause SCC40 Revision G, Effective 1/20/2015

Q NOTE Revision Date Sheet BF 1 8/20/13 1 of 8. Revised / Date Approval / Date: Description: UNIVERSAL QUALITY NOTE

Purchase Order Quality Clauses

Compliance with YFTFC001 Quality System for Manufacturers is required for this Purchase Order.

BC Systems, Inc. Quality Assurance Department. Q.A. Provisions. (Clauses are incorporated in and part of the Contract or Purchase Order.

NAMMO TALLEY INC QUALITY CODES

Orbel Corporation Quality Assurance Provisions (QAP) for Suppliers

TABLE 1 PCB IPC-A 600 PCB IPC- 6012, 6018

Purchase Order Quality Requirement Clauses

Document Title: Icore Supplier Quality Requirements Revision: D Released Date:

APPENDIX A QUALITY ASSURANCE REQUIREMENTS FOR SUPPLIERS

PCB IPC-A 600 PCB IPC- 6012, 6018

Supply Chain Quality Assurance (SCQA) Page 1 of 6

IKHANA Aircraft Services, Fabrication Division PO Quality Clauses

THE FOLLOWING GENERAL REQUIREMENTS APPLY ON ALL ORDERS

Helical Products Company

SUPPLIER QUALITY REQUIREMENTS

Apex Industries Inc. 100 Millennium Blvd. Moncton, New Brunswick, Canada E1E 2G8 Purchase Order Quality Assurance Clauses

SUPPLIER QUALITY CLAUSES

APPENDIX - A L-3 Communications Corporation Link Simulation & Training Division

FIDELITY TECHNOLOGIES CORPORATION QUALITY CLAUSES

In addition to specific quality clauses listed in the body of the Purchase Order, the following General Clauses apply

Procedure Documentation

Purchase Order and Quality Clauses

ZODIAC INTERCONNECT US

Title: PROCUREMENT QUALITY REQUIREMENTS CWCDS Dayton, OH

GOODRICH LIGHTING SYSTEMS

ZODIAC INTERCONNECT US

The Supplier shall have a quality management system that conforms to any one of the following, as applicable:

Printed versions may not be the latest. Suppliers shall utilize the latest version which can be found on our website at

Control Document Number: ATK OP Rev. S

STRAN Technologies Quality Notes

Intro Corporation Purchase Order General Terms and Conditions

A1 The supplier shall operate and maintain an approved Quality System that is subject to approval by Curtiss Wright Defense Solutions Dayton.

SUPPLIER QUALITY ASSURANCE REQUIREMENTS - EMEA

Orbel Corporation Quality Assurance Provisions (QAP) for Suppliers

Supplier Quality Requirements (Including Terms & Conditions)

2.1. The Seller s Quality Management System shall ensure all relevant Purchase Order requirements are flowed down to their sub-tier sellers.

Supplier Requirements Manual

Supplier Quality Requirements Manual AEC-300

Transcription:

Supplier Quality s D07-00125 Rev A APPROVALS NAME AND TITLE SIGNATURE DATE M.G. Blankenship Senior Director, Operations I. Jimenez Materials Manager D07-00125-02 Page 1 of 5

SQC 1 SQC 2 SQC 3 SQC 4 SQC 5 FIRST ARTICLE INSPECTION (FAI) First Article Inspection (FAI) is required on the first shipment of a lot. One production part shall be identified with a tag as First Article and accompanied by a verifiable qualitative and quantitative test/inspection data, and submitted to DAYLIGHT SOLUTIONS, INC., for approval prior to shipment of the remaining parts of a lot. The DAYLIGHT SOLUTIONS, INC., Buyer shall notify the Supplier, in writing, of First Article disposition and information regarding shipment of the remaining parts. SOURCE INSPECTION is required prior to shipment from your plant. Notify the cognizant Daylight Solutions, buyer four (4) days in advance of the date material is ready for our inspection/test. The supplier shall have in place the requirements and training for a zero ESD control program in accordance with ANSI/ESD-2-20.20 to eliminate the effects of ESD on parts, assemblies and equipment. MIL-STD-1681 CERTIFICATES OF CONFORMANCE Required from the supplier stating that the shipment of articles on this order conform to applicable material and/or process specifications. Supplier must retain on file, material test results and process records, as applicable, including his supplier and their supplier certifications. These records must be maintained for ten (10) years, and available upon request or as required on the purchase order. TEST/INSPECTION DATA Supplier shall provide a complete set of Test/Inspection Data as recorded during acceptance test for the purpose of quality analysis, with each shipment. SQC 6 FIRST PIECE INSPECTION Supplier first piece inspection is required on three (3) pieces of the first lot to be shipped on this order. Vendor is to submit a complete inspection report with the parts. SQC 7 SQC 8 SQC 9 CONFIGURATION CONTROL No changes to product drawings or processes are to be made without Daylight Solutions, Inc. approval. STATISTICAL PROCESS CONTROL Supplier shall provide with each shipment, evidence of variable or attribute measurements, as applicable, for the purpose of quality analysis. SHELF LIFE MATERIAL The supplier shall mark material, space permitting, or if bulk material, the containers of the items, of this Order with the shelf life expiration date and/or cure date as applicable. Include on packing list, the temperature at which the product(s) should be stored and maintained. A minimum of seventy-five percent (75%) of shelf life must be remaining on unit at date of shipment. MSDS required. D07-00125-02 Page 2 of 5

SQC 10 SQC 11 SQC 12 SQC 13 SQC 14 SQC 15 SQC 16 SQC 17 CERTIFIED PROCESSES Contract manufacturers shall have personnel performing special processes, such as Soldering and Bonding, certified for proof of proficiency. The suggested method by Daylight Solutions, Inc., of shipping/storing of raw piece parts is to use anti-static bags, metal in, type bags. The bag(s) shall meet or exceed the requirements of MIL-STD-1686, ANSI/ESD-S20.20, and EOS/ESD standards. All product packaging shall prevent damage to the product, physically and environmentally. PREFERENCE FOR DOMESTIC SPECIALTY METALS This purchase order incorporates Daylight Solutions, Inc., Purchase Order Terms and Conditions, which impose requirements with which you must comply when filling this purchase order. These terms reference and this purchase order incorporates the contract clause at DFARS 252.225-7009, modified to represent the proper relationship of the parties. You must flow down this clause to all of your vendors that supply any articles delivered under this purchase order that include specialty metals. The clause prohibits Daylight Solutions, Inc., and all of its suppliers at every tier from incorporating specialty metals into military parts, components and end item deliverables unless the specialty metals have been melted or produced in the United States, its outlying areas, or a qualifying country listed in DFARS 225.003. Exemptions outlined in the clause may apply to you. If you believe an exemption applies, please provide Daylight Solutions, Inc., with documents and information sufficient to demonstrate the exemption. Solder Composition used shall be 63% Tin and 37% Lead. The use of pure tin as a finish is prohibited. Finishes containing tin must have a minimum of no less than 3% lead. All components, equipment or materials used in the procurement of stated purchased items must not result in the evidence of fungus growth on any surface. This requirement must be verified by analysis and/or test. The analysis is to include supplier certifications of potentially fungus-nutrient materials. If supplier certifications are unavailable, a representative sample of exposed coatings, cables, gaskets, and other potentially fungus-nutrient materials shall be subjected to MIL-STD-810, Method 508.5. The Supplier shall establish and maintain an effective Foreign Object Damage (FOD) Prevention Program to reduce FOD, using NAS412 as a guideline. The material supplied on this PO shall be manufactured in an environment free of foreign objects. Additionally, the material supplied shall be free of foreign objects. Where applicable, a current calibration tag is required. D07-00125-02 Page 3 of 5

SQC 18 SQC 19 SQC 20 SQC 21 SQC 22 SQC 23 SQC 24 SQC 25 SQC 26 SQC 27 SQC 28 Protective coating and proper packaging to prevent damage is required for sheet metal products. Material Safety Data Sheet (MSDS) If an MSDS is required for this material, the SELLER shall include one copy of the MSDS, and it shall be identifiable and provided with each shipment of the items furnished under this order. Hazardous materials shipped in cans must have a lid locking device. All documentation must be numerically linked to maintain full traceability. Numerical link can be established by referencing either a common PO/job/lot/batch or work order number on all documents provided with each shipment. A part number is not considered a numerical link. PROPER REVISION LEVELS In the event there is a conflict from the stated purchase order drawing revision level and the drawing supplied to your facility, immediately notify the Buyer for resolution. SUPPLIER SUB-TIER CONTROL The Supplier is responsible for insuring all items produced from its subcontractors conform to all requirements of the purchase order. Supplier shall ensure all applicable provisions of this document are flowed down to its subcontractors. Product and process change approval Supplier shall obtain approval from Daylight Solutions, Inc., of changes in product and/or process definitions. Supplier shall notify Daylight Solutions, Inc., 90 days prior to any intended change of location. FINAL INSPECTION AND/OR TEST Final inspection and/or test shall be performed prior to shipment in accordance with applicable drawings, product specifications, Purchase Order requirements, or other applicable documentation. CERTIFIED TEST REPORTS Certified Test Reports are required for each item of this purchase order per attachment form D05-00089-01 (Supplier can use own format if equivalent). These reports shall be signed by a Quality Representative; this representative shall also state their title. The report shall bear the lot number and a separate report shall be forwarded for each lot. TENSILE TEST REPORT Supplier shall furnish with shipment of material, a report of tensile testing of three (3) test bars cast for each casting heat lot and heat treated with the castings. Test bars shall be as described in the material specification and may be cast separately. SPECIAL PROCESSES CERTIFICATIONS Any special processing performed, e.g., heat treatments, plating, paint, welding, etc., shall be certified individually and completely, including related data such as thickness of plating, paints, temperatures, hardness results, etc. D07-00125-02 Page 4 of 5

SQC 29 SQC 30 SQC 31 LOT SERIALIZATION Parts shall be lot serialized. Supplier s configuration record shall be maintained at all times by lot number. ITAR COMPLIANT PROGRAM - Requires supplier submission of a copy of their ITAR registration letter to Daylight Solutions ISO 9001- ISO 9001 registration is required. If not registered then Daylight Solutions reserves the right to conduct an insight quality audit to ensure minimum quality requirements are met. SQC 32 FAR and DFAR - Supplier must conform to all designated FAR and DFAR regulations specified in the purchase order. SQC 33 CERTIFIED TEST REPORTS Certified Test Reports are required for each item of this purchase order per attachment form D05-00090-01 (Supplier can use own format if equivalent). These reports shall be signed by a Quality Representative; this representative shall also state their title. The report shall bear the lot number and a separate report shall be forwarded for each lot. SQC 34 NO COUNTERFEIT PARTS all components must be procured from the manufacturer or from a Tier 1 distributor that certifies the authenticity of components. Supplier must get written prior approval from Daylight prior to using parts that are used or procured from a broker or Non-Tier 1 distributor. D07-00125-02 Page 5 of 5