PricewaterhouseCoopers Building Oslo, Norway

Similar documents
Proposal. PricewaterhouseCoopers Oslo, Norway

Fairfield Inn and Suites Pittsburgh, PA

Structural Technical Report 3 Lateral System Analysis and Confirmation Design

Table of Contents.2. Introduction...3 Gravity Loading and Deflections..4. Existing Structural System..8

Temecula Medical Center Temecula, CA

Danielle Shetler - Structural option Courtyard by Marriott Lancaster, PA

Christopher McCune Structural Option 2006 Senior Thesis Penn State Architectural Engineering. Eight Tower Bridge Conshohocken, Pennsylvania

Technical Report #2. Matthew R Peyton

Structural Option Indiana Regional Medical Center Indiana, PA

Structural Technical Report 1 Structural Concepts / Existing Conditions

John Jay College Expansion Project

TECHNICAL REPORT II STRUCTURAL STUDY OF ALTERNATE FLOOR SYSTEMS

ARCHITECTURAL ENGINEERING THE PENNSYLVANIA STATE UNIVERISITY THESIS PROJECT

151 First Side. Technical Assignment 2 November 16 th, William J. Buchko. AE 481w Senior Thesis The Pennsylvania State University

Crossroads at Westfields Building II

Outline. Introduction. Structural Redesign Gravity System Floor System Lateral System Weight Comparison Seismic Comparison

ECMC Skilled Nursing Facility

ORANGE REGIONAL MEDICAL CENTER

Traci Peterson Option: Structural Faculty Consultant: Memari. Executive Summary

DAVID GEIGER BAE STRUCTURAL OPTION

OVERALL STRUCTURAL SYSTEM

John Jay College Expansion Project

[TECHNICAL REPORT 3] Lateral System Analysis

Technical Report 1 Bed Tower Addition at Appleton Medical Center Appleton, WI

These systems are evaluated on the basis of serviceability issues such as:

Structural Technical Report 1 Structural Concepts / Structural Existing Conditions Report

Best Buy Corporate Building D (4) Richfield, MN

Structural Technical Report #2 Pro/Con Study of Alternate Floor Systems

Global Village Rochester Institute of Technology Rochester, New York

BUILDING INTRODUCTION

The Harry and Jeanette Weinberg Center Mercy Hospital Medical Office Building Baltimore, MD. Thesis Proposal

Erie on the Park. Timothy Moore Penn State University Architectural Engineering Structural Emphasis Advisor: Prof. Ali Memari

Pro-Con Structural Study for Alternative Floor Systems October 27, 2004

THE FORENSIC MEDICAL CENTER

Technical Report #1. Indiana Regional Medical Center Indiana, PA. Cody A. Scheller. Structural Concepts & Existing Conditions Report

1000 CONTINENTAL SQUARE

Technical Assignment 3 December 3, 2007

William W. Wilkins Professional Building

OF THREE NEW BUILDINGS BEING CONSTRUCTED TO REPLACE THE EXISTING COMPLEX. THE FLOOR SYSTEM OF GEORGE READ HALL IS A HAMBRO COMPOSITE SYSTEM

Design- Lateral System:

Technical Report 1. Seneca Allegany Casino Hotel Addition. Salamanca, NY

Structural Engineering, Mechanics, and Materials. Preliminary Exam - Structural Design

Caitlin Ferrell Structural Option Dr. Boothby, AE Faculty Consultant. Erie Convention Center and Sheraton Hotel

Southwest Housing, Arizona State University

Technical Report #2. Virginia Advanced Shipbuilding & Carrier Integration Center Newport News, VA

FINAL REPORT. Structural Redesign of Hershey Medical Center Children s Hospital. Penn State Hershey Medical Center Children s Hospital

North Mountain IMS Medical Office Building

MOUNTAIN STATE BLUE CROSS BLUE SHIELD HEADQUARTERS

Dead Loads (psf): Concrete Floor Slab on Metal Deck 45 psf Mechanical and Ceiling 7 psf Miscellaneous 5 psf Exterior Wall 80 psf

Rutgers University Law School Building Addition and Renovation Camden, NJ

PRESENTATION OUTLINE. Proposal. Design of Chevron and Diagonal Braced Frames STRUCTURAL DEPTH STUDY I. Ting Wall Façade STRUCTURAL DEPTH STUDY II

La Jolla Commons Phase II Office Tower

Technical Report #3. Matthew R Peyton

Kevin Wigton Structural Option. Technical Report III. Simmons College School of Management, Boston, Ma

Thesis Proposal. Matthew R Peyton

Franklin Square Hospital Center Patient Tower

Thesis Proposal. Student Health Center Penn State University. Prepared By: Jacob Brambley (Structural Option) Prepared For: Dr.

William W. Wilkins Professional Building Columbus, Ohio

Nasser Marafi. Alternate Floor Systems. Pro Con Structural Study of. Technical Report 2. Center & Facility Service Building

MITRE 3 Building McLean VA

Kaleida Health Global Heart and Vascular Institute University at Buffalo CTRC/Incubator. Buffalo, New York. Revised Thesis Proposal

Design Criteria. Analysis and Design of a High Rise Steel Braced Frame Core 22

Pennsylvania College Of Technology Dauphin Hall Williamsport, Pennsylvania

Technical Report #1. Matthew R Peyton

January 14, 2006 Structural Thesis Proposal: Structural and Breadth Redesign Options

HOTEL NORTHEAST U.S. JORDAN RUTHERFORD STRUCTURAL OPTION FACULTY ADVISOR DR. THOMAS BOOTHBY AE SENIOR THESIS APRIL 8, 2013

Peggy Ryan Williams Center. Ithaca, New York. AE Senior Thesis April 14, Angela Mincemoyer. Structural Option. Advisor Dr.

Hyatt Place North Shore. Pittsburgh, PA T. Technical Assignment #1. Kyle Tennant. Kyle Tenn. Structural (IP) [Type the document subtitle]

Biobehavioral Health Building

Executive Summary Building Description: Introduction... 13

Office Building-G. Thesis Proposal. Carl Hubben. Structural Option. Advisor: Dr. Ali Memari

Jonathan R. Torch Technical Report 2 Columbia University. Technical Report 2. Pro-Con Structural Study of Alternate Floor Systems

La Jolla Commons Phase II Office Tower

Stephan Northrop Structural Option Dr. Linda Hanagan. North Shore Equitable Building Pittsburgh, PA Senior Thesis Proposal

Technical Report 1. Kingstowne Section 36A 5680 King Center Drive Kingstowne, VA James Chavanic. Structural Option. Advisor: Dr.

State Street New Haven CT Structural Sabrina Duk T. Boothby

Hilton Baltimore Convention Center Hotel Western Podium

Thesis Proposal Structural Redesign / Cost, Schedule and Coordination Analysis / Architectural Impact

TECHNICAL REPORT III LATERAL STRUCTURAL SYSTEM ANALYSIS

Technical Report 3. Alyssa Stangl Structural Option Advisor Dr. Linda Hanagan L A J O L L A C O M M O N S P H A S E I I O F F I C E T O W E R

Simplified Building Schematic for Typical Floor (Levels 9 through 22):

Simplified Building Schematic for Typical Floor (Levels 9 through 22):

Brent Ellmann Structural Option 200 Minuteman Park, Andover, MA Structural Consultant: Dr. Hanagan

Kaleida Health Global Heart and Vascular Institute University at Buffalo CTRC/Incubator. Buffalo, New York. Technical Report #2

Trump Taj Mahal Hotel

Boyds Bear Country Pigeon Forge, TN

Drexel University Race Street Dormitory REVISED THESIS PROPOSAL Doug Tower Structural Advisor: Kevin Parfitt 2/7/07

CBD Chemical. Production Building Virginia, USA. Christina DiPaolo Structural Option

Park Potomac Office Building E

TEMECULA MEDICAL CENTER PRESENTATION OUTLINE

Corporate Headquarters

LEARNING OF ETABS. 15 ft

THESIS PROPOSAL. christopher m. shipper

Thesis Proposal 12/13/06

Executive Summary. Non-Composite Steel system 2- Way Flat Concrete Slab Wood Beam with Form Deck Pre-Cast Hollow Core Plank

This report investigates alternative floor systems for the building. A brief summary of each system is as follows:

Thesis Proposal. Nasser Marafi. Center & Facility Service Building. St. Joseph Hospital of Orange Patient Care. Proposal

La Jolla Commons Office Tower. Appendix Slides. Architecture Breadth. Dual Systems Check. Lateral System. Shear Wall Modeling. Verification.

NATIONAL HARBOR BUILDING M

Final Report. Seneca Allegany Casino Hotel Addition. Salamanca, NY

Transcription:

PricewaterhouseCoopers Building Oslo, Norway James Wilson Structural Option Senior Thesis Presentation 2009 The Pennsylvania State University

Location Bjørvika B10 A Oslo, Norway

BARCODE

Building Data Occupant: PricewaterhouseCoopers Professional Services Occupancy: Office building Size: 150 000ft 2 Number of stories: 12 stories above grade 2 stories below grade Cost: 300 mill NOK $43mill Date of completion: November 2008 Project delivery method: DBB with CM as agent

Spaces 1 Section 1-1 Display Room / Shops 154 Person Auditorium / Lobby Office / Conference Rooms Cafeteria / Outdoor Patio 1 N 1 st Floor Plan Vert. Transportation / Tech. Zone N 9 th Floor Plan

Thesis Goals Learn about Norwegian building construction Existing structural system

Floor System Precast Hollow Core Concrete Plank 4 wide 11 deep + 2 Topping N

Floor System N Images Courtesy of Norsk Stålforbund and Betongelement foreningen

Floor System N Images Courtesy of Norsk Stålforbund and Betongelement foreningen

Floor System N Images Courtesy of Norsk Stålforbund and Betongelement foreningen

Columns N

LFRS - Cast in Place Concrete Shear Walls N

Transfer Truss 273 x 16mm = 10.7 x.63 in 323.9 x 6.3 mm = 12.75 x.63.25 in Ø323.9 x 6.3 Ø273 x 16 Ø273 x 16 HSQ 56 HSQ 56 N

Materials Steel: Item Euronorm ASTM Fy (ksi) Fu (ksi) Ea (ksi) Va Density (Ib/ft 3 ) Columns S355 A572Gr50 51 74 30 500.3 50 Beams S355 A572Gr50 51 74 30 500.3 50 Reinforcing B500C - - 72 30 500 - - Concrete: Item Norwegian Standard Eurocode CEN f ck (ksi) f ctm (ksi) E cm (ksi) Cast in place B35 C35/45 5 0.46 4 850 Prefabricated B45 C45/55 6.5 0.55 5 222 Columns B45 C45/55 6.5 0.55 5 222

Proposal Existing structural solution optimal for Oslo, Norway If the PwC building were located in the US it is likely design and construction methods would be different How would structural solutions change if the PwC Building were hypothetically relocated to Boston, MA?

Proposal Major variables: Local labor and design expertise Design codes Local material availability Talent pool of contractors Design loads Goal: Produce a design suitable for an office building in the Boston area

Redesign Gravity System: Composite concrete deck with composite steel beams and girders In comparison to concrete plank, it provides more flexibility for future modifications because it is not limited by cutting of prestressed strands Composite concrete deck is potentially lighter than concrete plank and therefore reduces seismic loads, yielding a more economic structure Lateral System: Steel braced frames Compatibility with steel framing the of proposed floor system Allow for potential reduction in schedule due to the simultaneous construction of gravity and lateral system Explore steel as an alternative to the existing concrete design

Proposal Considered, but not designed: Transfer truss that allows for opening at the center of the façade Connections Structure of the auditorium Substructure

Relocation Dorchester Ave., Boston, MA Boston Arial images courtesy of Google Earth

Framing Plan Beams span East-West direction Beams spaced at 7.8ft Columns kept at the same locations as existing design Deck Span 5 story opening in facade Beams @. 2.4m (7.8ft) spacing 11.7m (38ft) 4.7m (15ft) 5.8m (19.1ft) 21.2m (70ft) 31.2m (100ft) N

Deck Design Live Load: 80 psf SIMP Dead Load: 15psf Span: 7.8ft Results using United Steel Deck Manual: 20 gage 2 LOK FLOOR composite deck 3.25 thk. Lightweight concrete slab Provides 2hr fire rating without the need for fireproofing WWF: 6 x 6 W2.0 x2.0 reinforcing 2 5.25 36 cover 12

Beam / Girder Design Composite or Non-composite? Composite Non Composite Most Economical Span Key Member (ft) Least Wt. Mem. # Studs Equivalent Wt. Least Wt. Mem. Wt by Equiv. Wt. Typical Int. Beam 19.14 W12x14 8 348 W12x19 364 Composite Typical Ext. Girder 23.6 W14x22 12 639 W14x30 708 Composite Long span beam 38.5 W14x53 23 2271 W14x68 2618 Composite Long Span Ext. Girder 23.9 W14x30 22 937 W14x43 1028 Composite

Beam / Girder Design Criteria Strength ASCE 7-05 sec2.3 LRFD load combinations: 1. 1.4 Dead 2. 1.2 Dead + 1.6Live + 0.5 Roof Live 3. 1.2 Dead + 1.6 Roof Live + 0.5 Live Serviceability - Deflection: Composite: Construction Dead Load.... l/360 Post Composite Live Load... l/360 Post Composite Superimposed.. l/240 Net Total Load... l/240 Economy Camber Do not camber: Beams less than 25ft Beams that require less than 3/4 of camber Beams in braced frames No shoring Member Depth limited to 14

Beam / Girder Design Optimal members were determined by RAM and checked with hand calculations Example Typical Beam and Girder Hand Calc RAM Member L (ft) Mu I Req Deflection (in 4 ) LL T PC Least Wt. Member IPC (in 4 ) ILB (in 4 ) Beam 19.14 70.5 103 116.4 67.5 W12x14 88.6 101 Girder 23.62 126.3 203 268.8 108.36 W14x22 199 424 Beam 19.14 72.4 W12x14 88.6 101 Girder 23.62 154 W14x22 199 424

Final Framing Plan 3 rd Floor Framing Plan **Members which are part of the lateral system are not labeled

Column Design Perimeter columns resisting gravity loads only: Level 1-12: W10 Columns resisting gravity + lateral load: Level 1-12: W14 Columns Spliced every 2 stories Hand Calc. Column E 6 Design Summary Floor Pu (kips) KL (ft) Least Wt. Mem. ΦPn (kips) Pu < ΦPn 1 157 12 W10x33 292 OK 5 293 12 W10x39 351 OK 9 424 12 W10x49 513 OK RAM 1 155 12 W10x33 292 OK 5 287 12 W10x39 351 OK 9 429 12 W10x49 513 OK

Brace Location Study Braced frames at the perimeter Bring technological expression to facade Lobby / Auditorium 1 st and second floor Circulation All floors 5 Story opening in facade

Architectural Study Braced Frames at Perimeter Existing Existing Existing Existing Proposed Proposed Proposed Proposed

Floor System Braced Frames at the core Lobby / Auditorium 1 st and second floor Circulation / Social Area All floors 5 Story opening in facade

ETABS Model - Preliminary Design Model of lateral system only was constructed in ETABS to determine optimal framing layout Wind load application: ASCE 7 05 Analytical Procedure Wind loads applied at the center of pressure of diaphragm at each level L L L L Levels 5-12 L L L L L L Level s 1-4

ETABS Model - Preliminary Design Seismic load application: ASCE 7 05: Equivalent Lateral Force Procedure Seismic loads applied at the center of mass at each level = Center of Mass Levels 5-12 Level s 1-4

Preliminary Design Results Very large axial forces were induced in the columns towards the base of the structure due to the narrow shape of the core

Outriggers Braced Frames Moment Frames Lobby / Auditorium 1 st and second floor Circulation / Social area All floors 5 Story opening in facade

RAM Members checked under combined loading in an integrated RAM model 1. 1.4(D + F) 2. 1.2(D + F + T ) + 1.6(L + H) + 0.5(Lr or S or R) 3. 1.2D + 1.6(Lr or S or R) + (L or 0.8W) 4. 1.2D + 1.6W + L + 0.5(Lr or S or R) 5. 1.2D + 1.0E + L + 0.2S 6. 0.9D + 1.6W + 1.6H 7. 0.9D + 1.0E + 1.6H

C D 12 th floor 12 th floor 12 th floor 12 th floor 3 4 5 6.8 7 8 9 5 th floor 5 th floor 5 th floor 5 th floor Elevation 3 Elevation 4 Elevation 5 Elevation 6.8 1 st floor 1 st floor 1 st floor 1 st floor Elevation 3 Elevation 4 Elevation 5 Elevation 6.8

C D 12 th floor 12 th floor 12 th floor 12 th floor 3 4 5 6.8 7 8 9 5 th floor 5 th floor 5 th floor 5 th floor Elevation 7 Elevation 8 Elevation 9 Elevation A 1 st floor 1 st floor Elevation 7 Elevation 8 Elevation 9 1 st floor 1 st floor Elevation A

C D 12 th floor 12 th floor 3 4 5 6.8 7 8 9 5 th floor 5 th floor 1 st floor 1 st floor Elevation C Elevation D Elevation C Elevation D

N Drift and Torsion Building Deflection at 12 th story: Wind Larger deflection at south end = 2.4 in = 3.7 in Wind load from East Seismic Larger deflection at North end = 2.7 in = 1.5 in Seismic load from East H / 400 = 4.38in > 3.7 OK N Tensional irregularity type 1a x < Cd x / I ( ASCE7-05 sec 12.8-15) N

Foundations Concrete substructure acts as a base to distribute loads to pile foundations Outriggers help distribute loads to the perimeter

Architecture Elevator relocated Duct shaft relocated Wall increase from 11.8 to 15 Elongated stairwell Proposed Design Existing Design

Cost Comparison Summary: Presentation Outline Cost comparison Composite Concrete Deck vs. Precast Concrete Plank Composite Concrete Deck on Composite Steel Frame Quantity Extended Cost ($) Description Material Labor Equipment Total 150000 S.F. Metal Decking 279,000 69,000 6,000 354,000 660 Ton Structural Steel 1,518,000 250,800 87,120 1,855,920 1500 C.S.F WWF 6 x 6 23,475 33,000-56,475 1960 C.Y. L.W. Concrete 286,160 - - 286,160 14871 Ea. Studs - 3/4" 8,030 11,153 5,651 24,835 150000 S.F. Concrete Finish - 73,500 3,000 76,500 Total = $ 2,653,889.57 Precast Concrete Plank on Steel Frame Quantity Extended Cost ($) Description Material Labor Equipment Total 430 Ton Structural Steel 989,000 163,400 56,760 1,209,160 150000 S.F. Precast Plank, 10" thick 1,147,500 126,000 78,000 1,351,500 923 C.Y. 2" Concrete Topping 97,838 - - 97,838 150000 S.F. Concrete Finish - 52,500 6,000 58,500 2758 Ea. Shear Stud - 3/4" 1,489 2,069 1,048 4,606 Total = $ 2,721,603.86

Cost Comparison Summary: Presentation Outline Schedule comparison Construction schedule for composite concrete deck and precast concrete plank created in Microsoft Project Results for Construction of structure : + Composite steel deck = 52 days + Precast Concrete Plank = 40 days 23% schedule reduction with use of precast plank

Cost Comparison Summary: Presentation Outline Conclusions Gravity System Composite concrete deck on composite steel beams and girders is the most viable floor system for the PwC building if located in Boston However, precast concrete plank has potential to be more economical due to cost saving incurred by reduction of construction schedule

Cost Comparison Summary: Presentation Outline Conclusions Lateral System An efficient steel lateral system was not achieved due to large axial forces in the columns induced by the narrow core Given more time to explore alternative steel solutions,a more economic steel result could likely be achieved

Cost Comparison Summary: Presentation Outline Acknowledgements I would like to thank the following for their generous support and assistance on this senior thesis: + Prof. M. Kevin Parfitt - Thesis Consultant +Pareto Investments - for granting me permission to use the PwC-building as the subject of this year long project. +All the Professors at The Pennsylvania State University - for their assistance over the past five years. + Friends and family - for their patients and support

Cost Comparison Summary: Questions?

Irregularity 12.3-1 Horizontal Structural Irregularities Must Comply with Reference Section: 12.7.3 16.2.2 1a Torsional Irregularity Δ1 (in.) = 1.53 Δ2 (in.) = 2.67 1.2((Δ1 + Δ2)/2) = 2.52 < Δ2 3 Diaphragm Discontinuity Irregularity Slit diaphragm at the bottom four stories 5 Nonparallel Systems-Irregularity Vertical lateral force resisting elements are not parallel or symmetric about major orthogonal axes. 12.7.3 16.2.2 12.7.3 16.2.2

Outriggers Members Braces = HSS10x10x.5 Beams = W18x86 Columns = W14x132 1/3 of deflection Δ = 9.2in Δ = 26.39in

Next Step Moment Frames at the perimeter Braced frames Moment frames Reduce large axial forces at the core Special Steel Plate Shear Walls 3 4 5 6.8 7 C 8 9 D