Proposals and Process 2017 National Electrical Code

Similar documents
Reference Information:

2017 NEC Changes for Renewable Energy Systems Session one by Christopher LaForge

NY State Unified Solar Permit

NY State Unified Solar Permit

NY State Unified Solar Permit

NY State Unified Solar Permit

NY State Unified Solar Permit

Small Scale Solar Permit Application

Inspection Guide for PV Systems in One- and Two- Family Dwellings (For Rooftop Photovoltaic Systems meeting the Standard Plan)

NY State Unified Solar Permit

NY State Unified Solar Permit

NY State Unified Solar Permit

Address of Installation Building Permit #

NY State Unified Solar Permit

Photovoltaic System Inspector Job Task Analysis Guide April 2017

NY State Unified Solar Permit

1. The plan needs to show compliance with the 2013 CEC, 2013 CBC and 2013 CRC. [ CBC] RESPONSE:

Residential Rooftop PV

Canadian Electrical Code, Part I Full Impact Assessment

Top Changes 2014 NEC

COUNTY OF RIVERSIDE BUILDING AND SAFETY DEPARTMENT PHOTOVOLTAIC PERMITTING GUIDELINES

PHOTOVOLTAIC (PV) SUBMITTAL REQUIREMENTS

Bulletin Grounding and bonding of solar photovoltaic systems Rules , , , and

CITY & COUNTY OF DENVER COMMUNITY PLANNING & DEVELOPMENT BUILDING PERMIT POLICY

PRIOR TO ISSUE OF THIS PERMIT APPLICATION, REVIEW AND WRITTEN APPROVAL BY THE FOLLOWING TOWN DIVISIONS AND LISTED ALTERNATE AGENCIES ARE REQUIRED.

About Matt Piantedosi

Solar Photovoltaic (PV) Systems Questions and Answers Revised July 1, 2017

PV Codes and Standards 101

NY State Unified Solar Permit

Solar PV System Code Compliance Best Practices, 2017 NEC Updates, and Opportunities for Improvement

Building Codes in Effect: 2010 California Building, Residential, Fire, Energy and Electrical Codes, including Article 690.

Code Change Alert: Permitting of Solar Photovoltaic Systems in Washington State

Building and Safety Division Public Information

City of Rome, NY Site Plan Review Application Checklist Consult Chapter 80 of the City of Rome Code of Ordinances.

For the 2008 Code, the minimum clear distances were revised to reflect an accurate metric conversion (also known as a soft conversion).

CONSULTATION MEETING: Adoption of the 2015 edition of the Canadian Electrical Code

ELECTRICAL BULLETIN

PV System Permitting and Inspection. PV Codes and Standards Uniform Solar Energy Code

Objectives and Task Analysis for the Installer of Grid Connect Photovoltaic System

Grounding & Bounding. 1. Bonded Connected to establish electrical continuity and conductivity.

SOUTHERN NEVADA AMENDMENTS TO THE 2017 NATIONAL ELECTRICAL CODE

Guideline for Fire Safety. Elements of Solar. Photovoltaic Systems

SECTION AUTOMATIC TRANSFER SWITCH

SECTION FIELD PANELS

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 11/10/10 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

WITH THE TITLE 24. replacement. story. stories, etc. R disconnects. to, PV. unit and any. supporting frame. conditions. greater than the main

Guidelines for Solar Photovoltaic Installation

What to Look for When Conducting Plan Reviews and Inspections of Solar PV

Santa Monica Fire Department SOLAR PHOTOVOLTAIC INSTALLATION GUIDELINE 2008 TABLE OF CONTENTS

Beverly Hills Fire Department SOLAR PHOTOVOLTAIC INSTALLATION GUIDELINE 2008 TABLE OF CONTENTS

PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES

Solar PV Standard Plan Simplified Microinverter and ACM Systems for One- and Two-Family Dwellings

City of Santa Monica Building and Safety Division Submittal Requirements Expedited Solar Photovoltaic (10 kw or Less)

Daker DK kva. Parallel installation quick start. Part. LE08927AA-09/15-01 GF

The following chapters or articles of the New Jersey electrical subcode are amended as follows:

Sections through of Chapter 5 of the Victoria City Code are amended to read as follows: ARTICLE IX. NATIONAL ELECTRICAL CODE

National Capital Region Recommendations for Residential Solar PV Systems

CITY OF LA MESA FIRE DEPARTMENT SOLAR PHOTOVOLTAIC INSTALLATION GUIDELINE

BULLETIN SUBJECT: GENERAL BULLETIN, 2015 SASK INTERPRETATIONS CORRECTIONS, AND ELECTRIC SERVICE REQUIREMENT CHANGES OR ADDITIONS

Photovoltaic power systems are a rapidly growing

LECTURE 15 PHOTOVOLTAIC MATERIALS. ECE 371 Sustainable Energy Systems

Solar Standards Development

UNIFIED FACILITIES GUIDE SPECIFICATIONS

SOUTHERN NEVADA AMENDMENTS TO THE 2017 NATIONAL ELECTRICAL CODE AS AMENDMEND BY THE CITY OF NORTH LAS VEGAS

SOUTHERN NEVADA AMENDMENTS TO THE 2018 NATIONAL ELECTRICAL CODE

BURBANK FIRE DEPARTMENT 311 East Orange Grove Avenue, Burbank CA Fax

SOUTHERN NEVADA AMENDMENTS TO THE 2017 NATIONAL ELECTRICAL CODE AS AMENDMEND BY THE CITY OF NORTH LAS VEGAS

SECTION 16496A MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number

ATTACHMENT A - TECHNICAL SPECIFICATIONS 1.1 GENERAL REQUIREMENTS

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING NETWORK SYSTEMS SECTION

Permitting and Inspecting PV Systems. PV Codes and Standards 101. Photovoltaic System Basics

Revisions for the 2011 National Electrical Code - Part 2

Click here to get back to 2011 NEC Code Updates Part 1

TallSlateTM Grandee Installation Manual

DOWNTOWN UNDERGROUND NETWORK SECONDARY SERVICES GUIDELINES

Standard of Practice - Campus Electrical Distribution System

Proposal Data. Submittal Form

Course Title: Advanced PV Design (PV201) (NRG 220) 5 credits (55 hours)

Temporary Wiring. Low-Voltage Electrical Safety Orders

EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD

Now we come to an important power electronic device that makes the modern PV system widely usable.

Expedited Permit Process for PV Systems Micro-Inverter

*************************************************************************** SECTION G40 SITE ELECTRICAL UTILITIES 02/18

Revisions for the 2014 National Electrical Code Part 2

PHOTOVOLTAICS HISTORY OF PHOTOVOLTAICS

Utility Connections, Safety & Code Issues

NEC 2014 Code Changes

Request for Proposals for Photovoltaic System Installation

EASTERN ARIZONA COLLEGE Photovoltaic Design and Application

Procedures for Photovoltaic System Design Review and Approval

EFFECTIVE DATE: November 1, 2011, unless a later date is cited at the end of a section. [ NMAC - Rp,

ARCHITECTURAL DESIGN ASSOCIATES, P.C O STREET, SUITE 105 LINCOLN, NE

5.5kw AC and 6.05kw DC Roof Mounted Photovoltaic System

IMPORTANT CODE UPDATE ENFORCEMENT DATE FOR NEW NATIONAL ELECTRIC CODE IS SET FOR MAY 1, 2013

Duquesne Light Company FACILITY INTERCONNECTION REQUIREMENTS (FAC 001) GENERATION FACILITIES TRANSMISSION FACILITIES END USER FACILITIES 12/30/2015

Manitoba Electrical Code

SECTION BUSWAYS

Emergency, Legally Required, and Optional Standby Power Systems

Article 10 - ADMINISTRATIVE SECTION

MARBLEHEAD FIRE DEPARTMENT Standard Operating Guideline Draft for Photovoltaic/Solar Installations

Transcription:

Proposals and Process 2017 National Electrical Code for Solar America Board for Codes and Standards Stakeholder Meeting; October 23, 2014 Ward Bower Ward Bower Innovations LLC

Introduction The New NFPA Input Process for the NEC Sneak Preview-The most significant PVrelated changes proposed for 2017NEC The SEIA/Solar ABCs Proposed 2017 PV Changes Impacts of major changes (safety, economics, reliability, hardware)

New NFPA Input/Comment Process

New NFPA Input/Comment Process Important Dates Public Input Closing Date for Paper Submittal 10/3/2014 Public Input Closing Date for Online Submittal (e PI) 11/7/2014 Final date for First Draft Meeting 1/12 24/2015 Posting of First Draft and Panel Ballot 3/13/2015 Final date for Receipt of CC First Draft ballot 7/3/2015 Final date for Receipt of CC First Draft ballot recirc 7/10/2015 Post Final First Draft for Public Comment 7/17/2015 Public Comment Closing Date for Paper Submittal 8/21/2015 Public Comment Closing Date for Online Submittal 9/25/2015 Final date for Second Draft Meeting 11/2 14/2015 Post Final Second Draft 4/8/2016

Quick Overview of epi http//:www.nfpa.org Click on Codes and Standards Proceed to Standards Development Process Then proceed to Submitting Public Input (and Comments in Comment Stage) Select Choose a Document (NFPA70) Choose Next Edition and Sign In Follow Step-by-Step instructions You will have to establish and account!

Inverter Input Circuit Building Integrated PV Article 690 Definitions Green: Underline is New or Change, Red Cross-out is Deleted DC-DC Converter Source Circuit DC-DC Converter Output Circuit Photovoltaic Circuit Photovoltaic Modules/Shingles Reference Grounded PV System Proposed for 2017 Inverter Output Circuit Engineering Supervision Generating Capacity Generating Station Stand-alone System Utility Distribution System Utility Transmission System NEW DRAWINGS and NOTES Fig 1(a) and (b)

690.4 Installation General Requirements 690.4(D) Multiple Inverters PV Systems. Multiple PV Systems shall be permitted to be installed in or on a single building or structure. (Requirements for directories deleted)

THE PV SYSTEM BOUNDARIES Not part of PV system Not part of PV system Not part of PV system

690.5(A) Ground-Fault Detection and Interruption Referenced Grounded NOT HARD GROUNDED Proposed for 2017 Fuse or Resistor Circuit Breaker Listed Electronic GFP Non-isolated Grounded Ckt NOT UNGROUNDED 690.5 MOVED TO 690.41(B)

690.11. Arc-Fault Circuit Protection For 2017 the requirements {PV Systems with >80V must be protected with AFP Includes ground mount systems} (1) The system shall detect and interrupt arcing faults resulting from a failure in the intended continuity of a conductor, connection, module, or other system components in the dc PV source & dc PV output circuits. (2) The disabled or disconnected equipment must be manually restarted. (3) There is an annunciator that provides a visual indication that the circuit interrupter has operated. Indication shall not reset automatically. Exception: DC output circuits installed in listed raceway or enclosed cable tray, or cables listed for direct buried, are permitted to be omitted from arc fault circuit protection.

690.12 Rapid Shutdown of PV Systems on Buildings PV system circuits installed on or in buildings shall include a rapid shutdown function that controls specific conductors of a PV system. A) Controlled Conductors: 1) PV & dc-to-dc converter output ckts 2) PV & dc-to-dc converter source circuit conductors more than 30 cm (1 ft) from the array in all directions, and more than 1 m (3 ft) from the point of entry inside a building. Exception: PV and dc-to-dc converter source circuit conductors within 30 cm (1 ft) of a rapid shutdown device enclosure where a portion of the enclosure is located within 30 cm (1 ft) of the array. (3) PV inverter output circuits

Rapid Shutdown Boundaries

690.12 Rapid Shutdown of PV Systems on Buildings Controlled Limits: <30V within 10s of initiation Initiation: 1) Loss of Util Voltage- bldg disconnect initiates 2) Loss of Util Voltage- PV disconnect initiates 3) Readily accessible with indication (S-A) Sign at Initiator for Rapid Shutdown Required Equipment: RSD listed, Initiator not listed Guarding: On or in building (not controlled) must be guarded. Less than 2 ft above roof and behind modules is guarded. Exception: Module interconnection conductors <5ft and limited to Single Module by RSD.

690.13 PV System Disconnecting Means Disconnect PV system from ALL other systems Location: Readily Accessible but Permitted to be Remote from Point of Entry into Buildings (690.12) Marking: Marked to ID it is Disconnect. Indicate OPEN OR CLOSED. Marked with warning if energized from both sides. Suitable for Use: Not required as service equipment Max Disconnects: Single PV disconnect for combined output of inverters or AC Modules Interrupting Rating: Sufficient for maximums at terminals of the PV System disconnect Grouping: Deleted but covered in main paragraph above Type: Simultaneous disconnect from all conductors of other circuits and suitable for backfeed.

690.15 Disconnection of PV Equipment The section has been rewritten to include: Isolating Devices or Disconnecting Means as installed for 1. Location- Isolating devices required for all equipment from conductors not solidly grounded 2. Interrupt Rating- Isolating devices(not required) Disconnecting Means (required) 3. Isolating Device not required to simultaneously disconnect all current carrying conductors 4. Equipment Disconnecting Means disconnects all conductors not solidly grounded. Externally operable -no personnel expose 690.16 and 690.17 Deleted Fuse Servicing and list of disconnect types

690.41(A) System Grounding (A)PV System Grounding Configurations. One or more of the following employed: (1) Reference grounded 2-wire PV systems with one conductor referenced to ground. (2) Reference grounded bipolar PV systems with the reference (center tap) conductor referenced to ground (3) PV systems not isolated from the inverter output circuit. (4) Ungrounded PV systems (5) Solidly grounded PV systems as permitted in 690.41(B) Exception. (6) PV systems that use other methods that accomplish equivalent system protection in accordance with 250.4(A) with equipment listed and identified for the use.

690.41(B) Ground-Fault Protection DC PV arrays shall be provided with dc ground-fault protection: Exception: Ground-mounted or pole-mounted PV arrays with not more than two paralleled source circuits and isolated from buildings shall be permitted without GFP PV systems w/no GFP shall be solidly grounded. 1)GFP Shall detect in current carrying conductors, interrupt in Ref Grd systems, isolate GF, indicate, be listed for PV GFP. 2)Isolate by disconnecting current-carrying wires or automatically disconnecting inverters / charge controllers

690.47 Grounding Electrode System A building or structure supporting a PV system shall have a grounding electrode system installed in accordance with Part III of Article 250. The PV system equipment grounding conductor be connected to the grounding electrode conductor of the grounding electrode system for the building or structure supporting the PV system in addition to any other EGC requirements in 690.43(F). For solidly grounded PV systems the grounded conductor shall be connected to a GES with a GEC sized in accordance with 250.166.

690.71, 690.72, 690.74(B)(3) Modernized the NEC to specify 50V nominal and removed the references of 2V cells at 48V nominal. Battery Systems > 50V required to have provisions to segment to 50V or less >50 V Battery Systems now requires to include ground fault detection and indication Remove the Hard Service listing requirement 19

690.100 Large Scale PV Electric Supply Stations Accessible only to qualified personnel for maintenance/ops Access restricted (fencing or structure compliant with NEC) Dedicated connection to the Utility. Electrical loads limited to auxiliary equipment for the generation of the PV power. Large-scale PV electric supply stations not installed on buildings. Systems < 5MW ac are not Large-Scale Engineering Supervision. Designed and approved by a professional engineer competent in the specific area under supervision

Impacts for Proposed Changes for the 2017 NEC* More clarity for AHJs, Designers and Installers Better Organization for Requirements Improved Safety - First Responders - Rapid Shutdown Defined Requirements for How PV Systems were Really Grounded- (Reference Grounding) Improved Arc-fault & Ground-fault requirements Referred GES to the common locations in NEC Defined and allowed Engineering Supervision Design for Large Scale PV