CURRICULUM VITAE KATHERINE DE JONG

Similar documents
Terms of Reference for Business Process Re-engineering Consultant to Re-validate Requirements of e-local Government Phase II System Development

CURRICULUM VITAE NANDIPHA MBALI MABUZA

A draft reply to the above question by Mr G R Morgan (DA) is attached for your consideration.

CURRICULUM VITAE (CV) FOR PROPOSED PROFESSIONAL STAFF

Application for the PPP Experts. 1. Advertisement published in newspapers 2. Remuneration and Qualification 3. CV Format for Applicants

LICENCE FOR THE CONSTRUCTION OF A PETROLEUM STORAGE FACILITY AND AN AUXILIARY PIPELINE

Terms of Reference for Business Analyst to Re-validate Requirements of e-local Government Phase II System Development ICTA/SG2/GOSL/CON/IC/2018/002

13 July

REQUEST FOR EXPRESSIONS OF INTEREST( EOI)

Figure 1.1: Location of Majuba Power Station within the Pixley Ka Seme Local Municipality

COMBINED LICENCE FOR THE CONSTRUCTION OF A PETROLEUM STORAGE FACILITY, LOADING FACILITIES AND PETROLEUM PIPELINES

BACKGROUND INFORMATION DOCUMENT SEPTEMBER 2014 MDEDET REF NUMBER: 17/2/3N-389

BIODATA PLEASE SEE EXPLANATION NOTES AT THE END OF THE DOCUMENT. Key words describing the expert:

Appendix A: Details of EAP

CURRICULUM VITAE. Permanent Address : Lekhnath Municipality-09, Begnas,Kaski, Nepal.

EcoPartners COMPANY PROFILE

Purpose of this Document

SOUTH AFRICAN COAL ROADMAP

International trade what lies in store for global hard coal trade & what fundamentals will drive developments?

1 INTRODUCTION 1.1 PROJECT APPLICANT

Philip van Vuuren. Mining Engineer / Mindset Associate. Overview

National Infrastructure Plan NIP July 2009

Coal now and in the future

Click to edit Master title style

CURRICULUM VITAE. Eng. Dr. Anania Mbabazi

Bihar Integrated Social Protection Strengthening (BISPS) project. Terms of Reference for

ALAN R. CARTER Curriculum Vitae

Air Quality and Acoustic Services

Background Information Document

APPENDIX H DETAILS OF EAP & EXPERTISE

Transnet delivers a sterling set of financial results

Eskom Holdings Ltd. Coal Presentation: A Presentation to the Portfolio Committee on Public Enterprises. 28 January 2010

Chandigarh Smart City Limited (CSCL) Advertisement No :- CSCL/RECT/SPV/2017/0001

Background Information Document

SOUTH AFRICAN COAL ROADMAP

Update on the Power System and the Build Programme: A Presentation to the Media

Environmental Assessment Practitioner

Energy Balance for South Africa

LEGISLATION, REGULATION AND PARLIAMENTARY UPDATE

Amanda Pyper-Rocher Principal Environmental Consultant

MANAGEMENT. Session 2.1 The South African Industrial Emission Profile

COMMENT AND RESPONSE REPORT (CRR) VERSION 2

Green Power for the WSSD

ANGLO AMERICAN THERMAL COAL LANDAU COLLIERY

BIHAR STATE ELECTRONICS DEVELOPMENT CORPORATION LTD. Beltron Bhawan, Shastri Nagar, Patna

Charles Murove Curriculum Vitae (January 2016) Zimbabwe Institution of Engineers. Oradea Institute, Oradea, Baccalaureate Diploma

Sri Lanka Tourism Development Authority REQUEST FOR PROPOSALS (RFP) Hiring a Training Company for the Conducting Training Programs Homestay Owners

BACKGROUND INFORMATION DOCUMENT

INTEGRATED FREIGHT AND LOGISTICS STRATEGIC FRAMEWORK AND ACTION PLAN FOR THE ETHEKWINI MUNICIPALITY

Terms of Reference. June 2010

ENVIRONMENTAL IMPACT ASSESSMENT (BASIC ASSESSMENT) PROCESS: PROPOSED REVERSE OSMOSIS PLANT, IRON ORE HANDLING FACILITY, PORT OF SALDANHA

FIRESTONE ENERGY/ SEKOKO PARTNERSHIP

Appendix A: EIA Project Team CV s Declaration of Independence, and Qualifications

EDGE SEMINAR SIP2 Logistics and Industrial Corridor. 19 February 2015

ELECTRICITY GENERATION: INDEPENDENT TECHNICAL AUDITS CONDUCTED ON TWELVE SOUTH AFRICAN POWER STATIONS

The Need for Expansion of the Durban Container Terminal

COMMENTS AND RESPONSE REPORT SUBMITTED AS PART OF THE FINAL BASIC ASSESSMENT REPORT

THOMAS O BRIEN PERSONAL INFORMATION DIRECTOR: GEOTECH

FUTURE PLANS AND DEVELOPMENT OF SOUTH AFRICA S PORTS. - Logan Naidoo, GM Capital Projects, Transnet Port Terminals

Saldanha B2B Engagement MDS Execution Journey 11 February 2015

The following section summarises the present conditions related to transportation for the proposed development of the PSS in the Steelpoort area.

RESUME OF SAGREE INDRANI CHETTY

Customer Conference --Infrastructure Development in the South African Ports

FOSKOR. Phosphoric Acid Plant SIMULATOR

BCom Honours Transport Economics

BCom Honours (Transport Economics)

The Centre for Environmental Management (CEM) offers the following Environmental and Occupational Health & Safety Management Courses

APPENDIX A: EXPERTISE OF THE EAP

1 INTRODUCTION. Figure 1.1: Steve Tshwete Local Municipality

JSE Showcase February 2013 Vernon Harvey COO: Ferrum Crescent Ltd. Moonlight Iron Ore Project Update and future plans

PREFEASIBILITY STUDY COMPLETED FOR MMAMABULA WEST

Background Information Document

PROPOSED VOLSPRUIT MINE, MOKOPANE DISTRICT, LIMPOPO PROVINCE. Background Information Document (BID) ESCIENCE ASSOCIATES (PTY) LTD.

ELECTRICITY AND MINING IN SOUTH AFRICA

Advanced Short Learning Programme on MANAGEMENT STRATEGY. (Proposed NQF 7)

THE GREAT DROUGHT OF 1895

FIELD OF PRACTICE Wetland Science. Preamble

KUYASA MINING (PTY) LTD KIPOWER IPP PROJECT INTEGRATED WATER USE LICENSE APPLICATION METHOD STATEMENT WORK IN WETLAND AREAS AND RIVERS

Basic Assessment for the Vopak Efficiency (Growth 4) Project, Durban, South Africa

SOUTH AFRICA S NEWEST COAL MINER. Paul Miller, Managing Director 2nd BAC Indaba Natural Resources Day October 2008

Founded by Rutendo Mining and the Pouroulis family in Two advanced development projects, pipeline of exploration prospects

Construction of a 600 MW independent power plant and associated infrastructure. BACKGROUND INFORMATION DOCUMENT July 2011

INTERGRATED INFRASTRUCTURE PROGRAMME- Limpopo Coalfields Conference-18 October Fhatuwani Ramagwede

Draft Amendment Application Report, Agni Steels SA February 2011 Executive Summary EXECUTIVE SUMMARY

WASTE & TAILINGS CAPABILITY STATEMENT

The important role that coal has played in South Africa s

APPENDIX C OTHER KUYASA MINING DELMAS COAL ENVIRONMENTAL IMPACT ASSESSMENT DRAFT SCOPING REPORT. Report: JW215/13/D910-Rev 1

Application form. To,

Proposed Expansion of the existing Natal Solvent Recovery facility on ERF 7590, Pinetown (10 Clubhouse Place, Westmead) REF: 12/9/11/L44704/4

Provincial Review 2016: Introduction

An overview of the Energy Efficiency Strategy of the Republic of South Africa. Approved by Minister on 1 April 2005

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS AND WASTE MANAGEMENT LICENSE APPLICATION PROPOSED EXTENSION OF ASH DAMS AT HENDRINA POWER STATION, MPUMALANGA

MSc Forest Management and the Environment (Coursework) ( )

(Reg. No. 2007/003002/08) NPO NUMBER NPO PBO No. (TAX EXEMPT) Postnet Suite 87 Private Bag X033 RIVONIA 2128

30-YEAR LONG-TERM PLANNING FRAMEWORK

Eskom Coal Supply and the Role of Emerging Miners. May 2015

Background Information Document

LEGISLATION, REGULATION AND PARLIAMENTARY UPDATE

Company Focus. Company History. Company Directors. An EOH Company

TECHNICAL INDICATOR DESCRIPTIONS 2012/ /15

Transcription:

1. PROPOSED POSITION : Environmental Scientist 2. NAME OF FIRM : GIBB (Pty) Ltd 3. NAME OF STAFF : Katherine DE JONG 4. DATE OF BIRTH : 15.05.1986 NATIONALITY : South African 5. YEARS WITH FIRM : 1 6. SUMMARY OF QUALIFICATIONS: An environmental scientist with just over two years of consulting experience, Katherine de Jong specialises in environmental impact assessments, environmental auditing and other environmental related projects. She was employed as an environmental scientist at Jones & Wagener Consulting Civil Engineers before joining GIBB's Environmental Division. Her key experience includes: Environmental impact assessment, including basic assessments, public participation and coordination of specialist studies for a variety of services infrastructure, industrial and mining developments Environmental auditing, including environmental compliance audits of mines and industries Integrated waste management planning, for a power station and platinum mine Integrated water use licence applications for coal mines 7. EDUCATION: Institution: Qualification: Year Obtained: University of KwaZulu-Natal Bachelor of Science (Honours) 2009 University of KwaZulu-Natal Bachelor of Science 2008 8. MEMBERSHIPS OF PROFESSIONAL ASSOCIATIONS: Member of the Responsible Packaging Management Association of Southern Africa (RPMASA) Member of the International Association of Impact Assessors South Africa (IAIASA) 9. OTHER TRAINING: RPMASA SANS 10406: Transport of dangerous goods, reprocessing of previously certified packaging (3 day course) RPMASA Conference Ward Karlson Air Quality Workshop Environmental Law Workshop Responsible Care Workshop - Air Quality WasteCon SABS Environmental Management Systems: Understanding and Implementation of ISO 14001:2004 Module One 10. COUNTRIES OF WORK EXPERIENCE: South Africa 11. LANGUAGES: Speaking: Reading: Writing: English Excellent Excellent Excellent Afrikaans Some ability Good Some ability 12. EMPLOYMENT RECORD: From: Jan 2012 To: Date GIBB (Pty) Ltd Environmental Scientist, Environmental

From: Oct 2010 To: Dec 2011 Jones & Wagener Civil Engineers Environmental Scientist, Environmental From: Feb 2009 To: June 2010 University of KwaZulu-Natal Junior Lecturer, Geography Department From: June 2009 To: Sept 2009 Tourism Transformations Research Assistant, Tourism 13. DETAILED TASKS ASSIGNED (tasks to be performed under this assignment): 14. WORK UNDERTAKEN THAT BEST ILLUSTRATES CAPABILITY TO HANDLE THE TASKS ASSIGNED: NAME OF ASSIGNMENT/PROJECT: PORT OF DURBAN PASSENGER TERMINAL EIA (BASIC ASSESSMENT) Transnet National Ports Authority MAIN PROJECT FEATURES: Construction of a new 3-storey world class passenger terminal building for about 5 000 passengers and a new 6-storey administration building for 400 TNPA staff on Berth AB in the Port of Durban. The buildings would take care of present and future needs. Green Design will be incorporated in the buildings. ACTIVITIES PERFORMED: - Public Participation; - Coordination of specialist studies; - Liaison with authorities and report compilation. NAME OF ASSIGNMENT/PROJECT: RICHARDS BAY MINERALS (RBM) TO RICHARDS BAY CBD LINK ROAD EIA (BASIC ASSESSMENT) Richards Bay, South Africa Richards Bay Minerals MAIN PROJECT FEATURES: RBM in collaboration with the City of Mhlathuze, Mondi and Sappi and the Kwambonambi Municipality are proposing to link the East Central Arterial Road to the RBM Smelting and Processing Site. Two alternative road options of approximately 10 km each are being considered; these road options are located along Mondi and Sappi timber plantations through to the Birdswood residential area ACTIVITIES PERFORMED: - Public Participation; - Coordination of specialist studies; - Liaison with authorities and report compilation. Page 2 Rev 3/November 2012

NAME OF ASSIGNMENT/PROJECT: FOSKOR ROCKPHOSPHATE STORAGE FACILITY EIA (BASIC ASSESSMENT) Richards Bay, South Africa Foskor (Pty) Ltd MAIN PROJECT FEATURES: Foskor s acid division at Richards Bay undertakes the beneficiation of phosphate rock into either phosphoric acid or phosphate-based granular fertilizers for export. Foskor proposes a new 200 ton storage facility at their industrial production facility in Richards Bay ACTIVITIES PERFORMED: - Public Participation; - Coordination of specialist studies; - Liaison with authorities and report compilation. NAME OF ASSIGNMENT/PROJECT: KIPOWER 600 MW INDEPENDENT POWER PLANT AND ASSOCIATED INFRASTRUCTURE EIA YEAR: From: 2010 To: 2011 Delmas, South Africa KiPower (Pty) Ltd MAIN PROJECT FEATURES: The construction of a 600 MW Independent Power Plant and associated infrastructure POSITIONS HELD: Junior Environmental Scientist ACTIVITIES PERFORMED: - Project assistant - Co-ordinating test burning of coal and all ash testing, co-ordinating specialist studies for the EIA NAME OF ASSIGNMENT/PROJECT: PROPOSED PILLAR MINING PROJECT AT OPTIMUM COLLIERY S EIKEBOOM SECTION (BASIC ASSESSMENT) YEAR: From: 2010 To: 2011 Middleburg, South Africa Optimum Colliery MAIN PROJECT FEATURES: Optimum Colliery intend on mining the existing pillars of their underground mines at their Eikeboom Section. POSITIONS HELD: Junior Environmental Scientist ACTIVITIES PERFORMED: Report Compilation and Public Participation NAME OF ASSIGNMENT/PROJECT: DRUMPAL RPMASA AUDIT YEAR: From: 2012 To: 2012 Drumpal MAIN PROJECT FEATURES: Audit of the Drumpal drum dealers and reconditioners using the audit protocol from Responsible Packaging Management of South Africa POSITIONS HELD: Junior Auditor ACTIVITIES PERFORMED: Trainee and note taker NAME OF ASSIGNMENT/PROJECT: SASOL SYNFUELS WASTE ASH SITE ENVIRONMENTAL COMPLIANCE AUDIT Secunda, South Africa Sasol Synfuels MAIN PROJECT FEATURES: Audit of the Sasol Synfuels Waste Ash Site against their Waste Licence Conditions. POSITIONS HELD: Junior Auditor ACTIVITIES PERFORMED: Data Capture and Report Compiler Page 3 Rev 3/November 2012

NAME OF ASSIGNMENT/PROJECT: DOUGLAS COLLIERY S OLIFANTS RIVER BACKFILL PROJECT WATER USE LICENCE COMPLIANCE AUDIT Witbank, South Africa Douglas Colliery MAIN PROJECT FEATURES: Audit of Douglas Colliery s Olifants River Back Fill Project, against their Water Use Licence Conditions. POSITIONS HELD: Junior Assistant Auditor ACTIVITIES PERFORMED: Data Capture and Report Compiler NAME OF ASSIGNMENT/PROJECT: GOEDEHOOP NORTH (BANK) COLLIERY WATER USE LICENCE COMPLIANCE AUDIT Witbank, South Africa Anglo American Thermal Coal MAIN PROJECT FEATURES: Audit of the operations at Goedehoop North Bank Colliery, against their Water Use Licence Conditions. POSITIONS HELD: Assistant Auditor ACTIVITIES PERFORMED: Pre-audit document compilation and Data Capture NAME OF ASSIGNMENT/PROJECT: MEDUPI POWER STATION INTEGRATED WASTE MANAGEMENT PLAN YEAR: From: 2010 To: 2011 Lephalale, South Africa Eskom (Pty) Ltd MAIN PROJECT FEATURES: Integrated Waste Management Plan for the Medupi Power Station. ACTIVITIES PERFORMED: Information gathering and assisting with report writing and review of documents NAME OF ASSIGNMENT/PROJECT: LONMIN PLATINUM MINE INTEGRATED WASTE MANAGEMENT PLAN Marikana, South Africa Lonmin Platinum MAIN PROJECT FEATURES: Lonmin Platinum Mine Integrated Waste Management Plan. ACTIVITIES PERFORMED: Gap analysis and status quo investigation. NAME OF ASSIGNMENT/PROJECT: INTEGRATED WATER USE LICENCE APPLICATION Breyten, South Africa Xstrata Coal MAIN PROJECT FEATURES: Assisting the Spitzkop Colliery mine with their Integrated Water Use Licence Application for DWA ACTIVITIES PERFORMED: NAME OF ASSIGNMENT/PROJECT: PASSENGER RAIL AGENCY OF SOUTH AFRICA (PRASA) DURBAN YARD DEPOT AND WORKSHOP ENVIRONMENTAL SCREENING. YEAR: From: 2012 To: 2012 PRASA Rail Agency MAIN PROJECT FEATURES: PRASA has embarked on a major fleet renewal program in order to replace all its metro trains during the next 20 years. The new technology and improved maintenance practices envisaged for the new fleet will require new or refurbished maintenance depots. A site selection study was undertaken to identify and recommend the most appropriate depot site in Durban for this modern depot Page 4 Rev 3/November 2012

ACTIVITIES PERFORMED: Site Visit and Environmental Screening Report Compilation Page 5 Rev 3/November 2012

NAME OF ASSIGNMENT/PROJECT: DRAFT DURBAN BACK OF PORT LOCAL AREA PLAN STAKEHOLDER ENGAGEMENT. ethekwini Municipality MAIN PROJECT FEATURES: ethekwini Municipality developed the Plan which proposes changes to the future land use and zoning in the Back of Port area between the existing Port of Durban and the proposed new dig-out Port in the Durban South Basin. The Plan accommodates and plans for the existing and expected market related pressures on the Durban South Basin. The stakeholder engagement consisted inter alia of developing an easy reader and newspaper tabloid and assisting the Municipality with stakeholder and public meetings and facilitation thereof POSITIONS HELD: Stakeholder Engagement Coordinator ACTIVITIES PERFORMED: Note Taker, Toll-free Call Line Operator, Facilitator and Report Compiler Certification I, the undersigned, certify that to the best of my knowledge and belief, this CV correctly describes myself, my qualifications and my experience. I understand that any wilful misstatement described herein may lead to my disqualification or dismissal, if engaged. [Signature of staff member or authorized representative of the staff] Date: Day/Month/Year Full Name of Authorized Representative: Page 6 Rev 3/November 2012