Nova Scotia 2009 Pavement Preservation. Jim Chisholm Highway Construction Services

Similar documents
THIN ASPHALT OVERLAYS FOR PAVEMENT PRESERVATION

2010 Midwestern Pavement Preservation Partnership Conference

THIN ASPHALT OVERLAYS FOR PAVEMENT PRESERVATION

Choosing the Right Preservation Treatment for Flexible Pavements

Combining Preservation Treatments

Pavement Preservation: Theory and Treatments. APWA Norcal Conference Presented by: Telfer Pavement Technologies,LLC Cesar Lara

NJDOT STATE REPORT NORTHEAST PAVEMENT PRESERVATION PARTNERSHIP ANNUAL MEETING APRIL 29 MAY 1, 2015 NEWARK, DELAWARE

Comparing 10 Year Performance of Cold In-Place Recycling (CIR) with Emulsion versus CIR with Expanded Asphalt on Highway 7, Perth, Ontario

The California Asphalt Pavement Association. February 2, 2017 WRAPP Pavement Preservation Workshop Doubletree Ontario Airport, Ontario, CA

Pavement Maintenance Best Practices. Thomas J. Wood

Puerto Rico. Pavement Preservation Conference and Technology Implementation. US. Department of Transportation Federal Highway Administration

Thin Asphalt Overlays for Pavement Preservation

IDOT HMA Update. Illinois Asphalt Paving Association Annual Meeting March 17, 2008

2016 County Engineer s Workshop

Overview. Preventive Maintenance Concepts. What are thin and ultra thin mixes. Experience in Michigan with ultra thin

Roadway Base Stabilization Current Practice

CONSTRUCTION SPECIFICATION FOR COLD IN-PLACE RECYCLED MIX

2014 International & Western States In-Place Recycling Conference. Denver, Colorado August 5-7, 2014

Special Provision No. 335S03 April 2015

MICRO-SURFACING - OPSS 336

Advantages of Full Depth Recycling

Warm Mix Asphalt in Minnesota Tim Clyne Mn/DOT

ITEM 404LVT (Low Volume Traffic) ASPHALT CONCRETE Revised June 5, 2015

(Flexible Pavements) From Maintenance Technical

SOM August 2009 Alaska

Using Perpetual Pavement Concepts. John Hickey Asphalt Pavement Association of Oregon

History, Performance and Benefits of Cold Recycling. Stephen A. Cross, Ph.D., P.E. Technical Director Asphalt Recycling & Reclaiming Assoc.

Maintenance & Rehabilitation. Treatments. Crack Sealing. Sealant Types. Asphalt Pavement Preservation: Identification of Alternative Treatments

Partial Depth Reclamation with Emulsified Asphalt Stabilization [PDR-Emulsion] Method Specification 2018

Design Criteria and Testing for Cold In-Place Recycling. Todd Thomas Technical Services Engineer Colas Solutions, Inc.

Yesterday. Today. Tomorrow

Efforts to Improve Micro Surfacing Performance

SECTION ASPHALT PAVING

Cold In-Place Recycling with Expanded Asphalt B-335 COLD IN-PLACE RECYCLING WITH EXPANDED ASPHALT OPSS 335

Materials for Civil and Construction Engineers

What s MnDOT s Working. Thomas Wood MnDOT Office of Materials & Road Research

Thin Lift Overlays. Pavement Preservation 2/13/2013. Definition. A Maintenance Alternative

Cold In-place Recycling (CIR) It s Easy to be Green

THINLAY ASPHALT FOR PAVEMENT PRESERVATION

INDEX Warrant for Reclaiming Asphalt Pavement - Partial Depth Warrant for Reclaiming Asphalt Pavement - Full Depth

PAVEMENT PRESERVATION A SOLUTION FOR SUSTAINABILITY

How to Select the Appropriate Pavement Rehabilitation Option. David Rettner, PE American Engineering Testing, Inc.

Full Depth Reclamation

Pavement Rehabilitation Options in Indiana. Dave Holtz Tommy E. Nantung Lisa Egler-Kellems Indiana Department of Transportation

550 Surface Treatments

GOODHUE COUNTY DEPARTMENT OF PUBLIC WORKS

313-1 HOT MIX ASPHALT - OPSS.PROV 313

Partial Depth Reclamation with Expanded Asphalt Mix [PDR-EAM] Method Specification 2018

RIDOT. Rhode Island - State of Pavement Preservation. NEPPP 2011 Boston, MA

Protect Your Pavement Asset Like the Rest! Is Pavement on your Radar Screen? Parking Lots & Low Volume Facilities

Extraction and Sieve Analysis ( µm minus) Forming Marshall Specimens, Field Method

What s New in Pavement Preservation? Tom Wood Pavement Specialist

Benefits of Pavement Preservation

ARRA Semi-Annual Meeting Minneapolis, MN October 16-19, 2017

OFFICE OF MATERIALS & SURFACING DOT. Connecting South Dakota and the Nation. Asphalt Conference. April 6, Rick Rowen. SDDOT Bituminous Engineer

Specifying Asphalt Pavement the ODOT Way

Session TH83. Using In-Place Recycling Technologies to address the needs of the Owner Agencies FHWA and ARRA Advances 2014

Life Cycle Cost Analysis of Full Depth Reclamation versus Traditional Maintenance and Rehabilitation Strategies

Mix Design Issues for. In-Place Recycling Products

FEATURE CORE INNOVATION AREA (CIA) TEAM PRESENTATION:

Using Pavement Management Data to Determine Asphalt Pavement Performance Cycles

Thinlay Asphalt for Pavement Preservation

TABLE OF CONTENTS. Contents. Tables. Federal Aid Condition Maps

Guide to the Investigation and Remediation of Distress in Flexible Pavements

Austin District s New PM Overlay Program

Construction of Cold Central Plant Recycling Sections at MnROAD

CONSTRUCTION SPECIFICATION FOR COLD IN-PLACE RECYCLED MIX

Flexible Pavement Preservation Industry Perspective Rod Birdsall, P.E. PRDOT PP Conference

Section 502. HMA CRACK TREATMENT

CONSTRUCTION SPECIFICATION FOR COLD IN-PLACE RECYCLING

Thinlay Asphalt for Pavement Preservation

Pavement Preservation-ODOT Leading the Way

Pavement Management Systems

2008 Michigan Seminar on Maintenance of Asphalt Pavements. Mount Pleasant, Michigan. January 8 th & 9 th, 2008

Chris Robinette September 14, 2009 APWA International Public Works Congress & Exposition 1 XXXXXXXXXX

INDEX FOR SPECIFICATIONS FOR AGGREGATE FOR BITUMINOUS PAVEMENT SCOPE... 2

Quantifying the Sustainable Benefits of Flexible Pavement Preservation Techniques in Canada

As the United States goes green, asphalt is keeping pace with the times. Warm mix is an important step in sustainable development, simultaneously

Asphaltic Concrete Pavements Crack Treatments. A Pavement Preservation Process. Why Crack Treatment? Crack Treatments Overview and Objective

GUIDELINES FOR ASSESSING PAVEMENT PRESERVATION TREATMENTS AND STRATEGIES

*Originating pavement shall be in accordance with FRICTION SURFACE AGGREGATE (D1), the most recently dated.

Andrew Hipolit, PE, PP, CME. What s New in Paving? 14 th Annual Public Works Continuing Education Conference

Long Term Performance of Full Depth Reclamation with Expanded Asphalt on the Trans-Canada Highway near Wawa, Ontario

FEDERAL AID ROAD CONDITION REPORT FOR BRANCH COUNTY 2018

Thin Hot Mix Asphalt Overlays

Application of Warm Mix Asphalt on Non- Typical Paving Projects. Steve Jackson NB West Contracting St. Louis, MO

Using Perpetual Pavement Concepts. John Hickey Asphalt Pavement Association of Oregon

Micro-Surface Premature Distress SH 19 Hopkins County, Paris District

Hot Applied Chip Seal Design and Construction. NWPMA Vancouver, WA 2017

Strawser Construction Inc.

Warm Mix Asphalt (WMA) Guide Specification for Highway Construction

VDOT S PREVENTIVE MAINTENANCE TECHNIQUES & EXPECTATIONS

Renae Kuehl, PE, SRF Consulting Group Dan Wegman, PE, Braun Intertec Corporation November 2, 2017

Platinum Edition MMCD Supplemental Update Page 1 of 7

City of Regina Standard Construction Specification SECTION 2350 PLACEMENT OF ASPHALTIC PAVEMENT Section 2300 Asphaltic Primer or Tack

Full Depth Pavement Reclamation

The Eco-efficiency of Pavement Preservation Technologies

CONSTRUCTION SPECIFICATION FOR STOCKPILING OF PATCHING MATERIALS AND PATCHING OF ASPHALT PAVEMENT

Pavement Preservation ODOT Leading the Way

B HOT MIX ASPHALT - OPSS.PROV 313

Transcription:

Nova Scotia 2009 Pavement Preservation Jim Chisholm Highway Construction Services

2009 Construction Overview Pavement Preservation Hot Mix Asphalt Overlays Cold in Place Recycling Pulverization/Graveling/HMA Overlays Trial Projects New Construction Construction Issues

Pavement Preservation Overview Three main treatments in use: Micro-Surfacing Seal Coat (Single & Double Chip) Crack Sealing Minor treatments: Thin Lift Overlays Sand Reseal

2009 Pavement Preservation Budget $ 7.1 Million between 5 Districts $ 1.5 Million dedicated to Micro Surfacing $ 4.1 Million dedicated to Seal Coats $700,000 dedicated to Sand Reseal $810,000 dedicated to Thin Lift Overlay $ 0 dedicated to Crack Sealing Budget allocated to micro and seal coats

Micro-Surfacing Applied to 100 Series Highways Sections that exhibit raveling, moderate rutting PM emulsified asphalt (CSS-1H) 5 mm minus stone (1/4 in.) Rut fill, scratch course, surface course 2 yr. warranty period

Seal Coats Type A (Single Seal Coat): Applied to non 100 Series asphalt roads PM emulsified asphalt (CRS-2P) 14 mm minus stone (3/4 in.) Fog Seal applied (protects from plow damage) 1 yr. warranty period

Seal Coats Type B (Double Seal Coat): Applied to gravel roads Emulsified asphalt (HF-150s, HP-200 or CRS) 1st course stone: 14 mm minus (3/4 in.) 2nd course stone: 10 mm minus (1/2 in.) 1 yr. warranty period

Crack Sealing Hot poured rubberized asphalt compound Hot air lance clean crack prior to placement Cracks > 3 mm, < 20 mm routed to 40 mm Longitudinal joint cracks not routed 1 yr. warranty period

2009 Preservation Summary Micro: 2 contracts, 36 km (22 miles) Seal Coat Type A: 8 contracts, 110 km (70 mi) Seal Coat Type B: 3 contracts, 4 km (2.5 mi) Crack Sealing: 0 contracts Thin Lift Overlay: 3 contracts, 22 km (14 mi) Sand Reseal: 2 contracts, 54 km (34 mi)

Hot Mix Asphalt Overlays End Product (EPS) & Method Specifications Based on contract tonnage (EPS > 6000 tonnes) EPS Contracts Bonus/penalty spec. dependent on QA results (gradation, density, binder content, smoothness) Method Contracts - Department QC, 1 yr. Warranty Spec.

Hot Mix Asphalt Overlays Type B-HF (20 mm), Type C-HF (14mm) Type C Used on low volume local roads PG 58-28 Binder, PG 64-28 used in high truck traffic areas (climbing lanes) on 100 Series Highways

Hot Mix Asphalt Overlays 106 Repaving Contracts 82 EPS Contracts, 460 kms (290 mi.) 24 Method Contracts, 57 kms (35 mi.)

Cold in Place Recycling Full & Partial Depth dependent on existing thickness Emulsified or Expanded (foamed) Asphalt Binder, Portland Cement Cold Planing (40-50 mm) to improve profile prior to recycling if required Millings either incorporated into mix or hauled off site

Cold in Place Recycling 20 Cold In Place Contracts Full Depth Recycling (Expanded Asphalt): 4 Contracts, 27 kms (17 mi.) Full Depth Recycling (Cement Stabilized): 5 Contracts, 27 kms (17 mi.) Partial Depth Rec. (Expanded or Emulsified): 11Contracts, 72 kms (45 mi.)

Pulverization / Graveling / HMA Severely deteriorated roads Pulverize full depth of asphalt Type I Gravel to 150 mm Single or 2 lift overlay depending on traffic loadings

Pulverization / Graveling / HMA Pulverize/Gravel/Overlays: 7 Contracts, 43 km (28 mi.) Gravel Interlayer/Overlays: 8 Contracts, 53 km (33 mi.) Pulverize/Overlays: 2 Contracts, 14 km (9 mi.)

2009 Trial Projects Reclaimed Asphalt 1 Contract Warm Mix Asphalt 1 Contract Both projects awarded to same contractor (Basin Contracting Limited)

Reclaimed Asphalt 9 km project completed in September 15 % Fractionated RAP added to base lift (BHF) Overlaid by C-HF surface course Reduction in production of aggregate No visible issues with mix during placement

Warm Mix Asphalt 5 km project (2.5 km conventional C-HF mix, 2.5 km warm mix) started October 22 McAsphalt Industries Evotherm 3G liquid blended with asphalt at loading rack Reduced plant production temp. (120 o C vs. 140 o C). Decrease in plant fuel costs

Warm Mix Asphalt Maintains temperature Increase haul / placement time Stiffer asphalt little shoving under rollers Placement temp 100 to 110 o C Compaction met or exceeded spec. (92.5%) Odour similar to liquid anti strip

New Construction Continuation of twinning 100 Series Highways 30 km total, 10 km section ready for paving

Construction Issues Provincial election in July New Gov t put hold on new tender calls for 2 months (new budget had to be approved) Poor weather during June /July High moisture contents in recycled material delayed paving Excessive degradation of recycled material due to time left open to traffic/elements

Construction Issues Late season paving As of end of Oct. 150, 000 tonnes of HMA to be placed Possibility of carry over into 2010 program Same problems for next fall New Executive Director & Chief Engineer in November Possible changes to construction methods & budgets

Question? Thank You