Flip Flop. Equipment Manufacturer 350-FF

Similar documents
Knobs. Equipment Manufacturer QB-1608

Metal PlayCubes 1.0. Equipment Manufacturer PLAYCUBES-1M

Blockfield. Equipment Manufacturer QB-1604

Islands. Equipment Manufacturer QB-1601

PlayCubes 7.0. Equipment Manufacturer PLAYCUBES-7. Designed by Richard Dattner, Architect and Playworld

Rocky Ridge. Equipment Manufacturer RB-1200

Wonderfalls. Equipment Manufacturer RB-1005

Equipment Manufacturer

Boulder Hill Slide. Equipment Manufacturer CB-1300

Adventure Canyon. Equipment Manufacturer RB-1015

INET Equipment Manufacturer

Rock-N-Slide. Equipment Manufacturer PSD-1103-FTD

PlayForm 7 W/ Sheet Plastic Panels (SM)

Equipment Manufacturer

Unity Connect UC-1710

The Squire s Fortress

Eagle Summit. Equipment Manufacturer PSD-1105

Equipment Manufacturer

Swerve. Equipment Manufacturer

FirstPlay Toddler Design #3

Eagle Summit. Equipment Manufacturer PSD-1105-FTD

INET Equipment Manufacturer

High Rise. Equipment Manufacturer

FirstPlay Toddler Design #7

Fun Centers Design #5 (2in. Surf) w/ Roof

Fire Rescue. Equipment Manufacturer IDEA-1603

Free Standing Pikes Peak 350-PP

Power Junction. Equipment Manufacturer FUN-1486

Station 5. Stair Exercises Overhead Press Exercises Standing Stretches & Yoga

Off the Grid. Equipment Manufacturer

Fun Centers Design #5 (12in. Surf) w/ Roof

Superhero. Equipment Manufacturer

Jolly Roger. Equipment Manufacturer

Equipment Manufacturer

Rise Above. Equipment Manufacturer FUN-1487

Slither. Equipment Manufacturer

Green Terrace. Equipment Manufacturer

Classic Walkup. Equipment Manufacturer IDEA-1505

Ramp Up. Equipment Manufacturer FUN-1492

Fort Wildwood Equipment Manufacturer

Fort Wilderness. Equipment Manufacturer

Titan Tower. Equipment Manufacturer WIN-1651

Hide & Slide. Equipment Manufacturer

Ahoy Matey. Equipment Manufacturer

Equipment Manufacturer

Sensory Center. Equipment Manufacturer

Station 5. Stair Exercises Overhead Press Exercises Standing Stretches & Yoga

Fun Factory. Equipment Manufacturer

Station 2. Push-Up Exercises Wobble Exercises Hip Lift & Thigh Squeeze Exercises

Design Number: D - Bill Of Material. Ref. Part No. Description

Welcome Sign provides helpful instructions on how to use LifeTrail Advanced Wellness System, and how to maintain proper form.

Roundabout. Equipment Manufacturer

Unity Connect UC-1750

Thicket. Equipment Manufacturer

Clubhouse Junction. Equipment Manufacturer

PNF & Leg Extension Exercises (ADA)

Pirate s Cove. Equipment Manufacturer

LAWS-1R-SM. Design Number: LAWS-1R-SM - Bill Of Material. Ref. Part No. Description

ENERGI Prime Complete 5-Station System

FC Design Number: FC02-709E - Bill Of Material. Ref. Part No. Description

Castaway Cove. Equipment Manufacturer

FP-525. Design Number: FP-525H - Bill Of Material. Ref. Part No. Description

FC Design Number: FC12-709E - Bill Of Material. Ref. Part No. Description

Unit ASTM Status. Total Weight (lbs)

Unit CSA Status. Total Weight (lbs)

Dragon s Lair. Equipment Manufacturer

PSD-1103-FTD. Design Number: PSD-1103A-FTD - Bill Of Material. Ref. Part No. Description

HIDE-AWAY HUT. Design Number: PD-HUT_I - Bill Of Material. Ref. Part No. Description

Sky High. Equipment Manufacturer

Timber Towers. Equipment Manufacturer

PSD Design Number: PSD-1101A - Bill Of Material. Ref. Part No. Description 1 ZZEL0001 PLAY SIMPLE MODULE #1

Neverland. Equipment Manufacturer

Twin Peaks Tunnel. Equipment Manufacturer

Noah s Ark. Equipment Manufacturer

Maclyn Park WIN Equipment Manufacturer

3-Ring Action Equipment Manufacturer

Sea Battle Equipment Manufacturer

Sky High. Equipment Manufacturer

Carpenter preserve park neenah, WI OptIOn #1 view B view a view C

Madison, Wi Option #2. View B

Shiver Me Timbers. Equipment Manufacturer

Johnson Elementary School Denver, CO June 12 th, 2008

Thursday, January 05, 2012

TotTurf EPDM Product Specification

TotTurf Bonded TotTurf Bonded Poured in Place Product Specifications TOTTURF a PLAYCORE company May 2011

TotTurf Pigmented Poured in Place Product Specifications TOTTURF a PLAYCORE company July 2011

Construction and Demolition Waste Management at UVM

Installation Instructions

TotTurf TPV (1-4mm) Product Specification

TotTurf TPV Supreme (.5-1.5mm) Product Specification

BUILDING PRODUCTS DIVISION

SECTION PLAYGROUND PROTECTIVE SURFACING

No Fault Safety Surface & SAF DEK for Playgrounds Product Specification

TotTurf EPDM STANDARD PIP Product Specification

SECTION CRL70 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

DETAIL SPECIFICATION PIPE, ALUMINUM ALLOY, DRAWN OR EXTRUDED

Model # PR /21/2018 Page 1 of 10

Model # 95-S8. Page 1 of 8

Cate Square Playground Surfacing

Transcription:

Flip Flop Equipment Manufacturer 350-FF

18'-2" [5.55M] FLIP FLOP PLAYWORLD SYSTEMS, INC. 1000 Buffalo Road Lewisburg, PA 17837-9795 USA EQUIPMENT SIZE: 3" x 4" x 5'6" 1,91M x 1,93M x 1,68M USE ZONE: 18'2" x 18'4" 5,60M x 5,55M 18'-4" [5.60M] [1.82M] AREA: PERIMETER: 303 SqFt. 63 Ft. 28,15 SqM. 19,2M FALL HEIGHT: 2 Ft. 0,61M USER CAPACITY: AGE GROUP: 4 2-12 FLIP FLOP CATALOG PRE-DESIGN ASTM F1487-11 CPSC #325 0 5' 10' PROJECT NO: 350-FF_N SCALE: 3/8"=1'-0" *PLAYGROUND SUPERVISION REQUIRED 0.5 1.0 2.0 3.0 Meters DRAWN BY: M. MERTZ DATE: 08-OCT-16 Paper Size B

18'-2" [5.55M] 2 PLAYWORLD SYSTEMS, INC. 1000 Buffalo Road Lewisburg, PA 17837-9795 USA EQUIPMENT SIZE: 3" x 4" x 5'6" 1,91M x 1,93M x 1,68M USE ZONE: 18'2" x 18'4" 5,60M x 5,55M 18'-4" [5.60M] [1.82M] AREA: PERIMETER: 303 SqFt. 63 Ft. 28,15 SqM. 19,2M FALL HEIGHT: 2 Ft. 0,61M USER CAPACITY: AGE GROUP: 4 2-12 FLIP FLOP CATALOG PRE-DESIGN ASTM F1487-11 CPSC #325 0 5' 10' PROJECT NO: 350-FF_N SCALE: 3/8"=1'-0" *PLAYGROUND SUPERVISION REQUIRED 0.5 1.0 2.0 3.0 Meters DRAWN BY: M. MERTZ DATE: 08-OCT-16 Paper Size B

COMPONENT FOOTING (DETAIL 3) SPIRAL SLIDE CENTER POST FOOTING (DETAIL1) SUPPORT POST FOOTING (DETAIL 1 or 4) (112" INDICATES POST LENGTH) CANTILEVER, "T" POST, AND COMPONENT POST FOOTING (DETAIL 2) (ZZCH1850 INDICATES PART NUMBER) GROUND ZERO POST FOOTING (DETAIL 2) (144" INDICATES POST LENGTH) SCALE: DRAWN BY: DATE:

PLAYWORLD SYSTEMS, INC. 1000 Buffalo Road Lewisburg, PA 17837-9795 USA FOOTING LEGEND 110" COMPONENT FOOTING (DETAIL 3) 74" 112" GZ 70" FLIP FLOP 112" GZ 74" SPIRAL SLIDE CENTER POST FOOTING (DETAIL1) 112" SUPPORT POST FOOTING (DETAIL 1 or 4) (112" INDICATES POST LENGTH) FLIP FLOP CATALOG PRE-DESIGN 110" ZZCH 1850 CANTILEVER, "T" POST, AND COMPONENT POST FOOTING (DETAIL 2) (ZZCH1850 INDICATES PART NUMBER) 144" GZ GROUND ZERO POST FOOTING (DETAIL 2) (144" INDICATES POST LENGTH) *PLAYGROUND SUPERVISION REQUIRED PROJECT NO: 350-FF_N DRAWN BY: M. MERTZ DATE: 08-OCT-16 SCALE: 3/8"=1'-0" Paper Size B

Flip Flop Design Number: 350-FF_N - Bill Of Material Ref. No. Part No. Description Quantity Posts 1 ZZCH0009GZ 3.5in OD x 112in GROUND ZERO POST 2 Balance 2 ZZCH6906 FLIP FLOP 1 Additional Tool & Maintenance Kits 3 ZZCHGUID CHALLENGER GUIDELINES 1 4 ZZUN9910 SURFACING WARNING LABEL KIT 1 5 ZZUN9936 MAINTENANCE BOOK 1 Saturday, October 08, 2016 Page 1 of 1 Playworld.com

Flip Flop Design Number: 350-FF_N - Compliance and Technical Data Reference Document: ASTM F1487 Ref. No. Part No. Qty. Description Unit ASTM Status Total Weight (lbs) Pre- Post- Consumer Recycled Content (lbs) CO2e Footprint (kgs) Users Install Hours Concrete (Yds3) Active Play Events 1 ZZCH0009GZ 2 3.5in OD x 112in GROUND ZERO POST Certified 70.22 98 0 2.00 0.36 0 2 ZZCH6906 1 FLIP FLOP Certified 263.14 717 4 2.00 0.00 1 3 ZZCHGUID 1 CHALLENGER GUIDELINES N/A 0.00 1 0 0.25 0.00 0 4 ZZUN9910 1 SURFACING WARNING LABEL KIT Certified 0.05 1 0 0.25 0.00 0 5 ZZUN9936 1 MAINTENANCE BOOK N/A 1.00 TBD 0 0.25 0.00 0 Totals: 334.41 22 44 816 4 4.75 0.36 1 150.48 Kg 10 Kg 20 Kg 1 Metric Tons 0.27 m3 Saturday, October 08, 2016 Page 1 of 2 Playworld.com

Flip Flop Design Number: 350-FF_N - Compliance and Technical Data Reference Document: ASTM F1487 Ref. No. Part No. Qty. Description Unit ASTM Status Total Weight (lbs) Pre- Post- Consumer Recycled Content (lbs) CO2e Footprint (kgs) Users Install Hours Concrete (Yds3) Active Play Events ASTM F1487 The lay-out for this custom playscape, design number 350-FF_N, has been configured to meet the requirements of the ASTM F1487 standard. In addition, each of the above components listed as "Certified" have been tested and are IPEMA certified. Components listed as "Not Applicable" do not fall within the scope of the ASTM F1487 standard and have not been tested. IPEMA certification can be verified on the IPEMA website, www.ipema.org. In the interest of playground safety, IPEMA provides a Third Party Certification Service which validates compliance. 2010 ADA Standards for Accessible Design The lay-out was also designed to meet the 2010 Standards published 15-Sep-2010, by the Department of Justice when installed over a properly maintained surfacing material that is in compliance with ASTM F1951 "Accessibility of Surface Systems Under and Around Playground Equipment" as well as ASTM F1292, "Impact Attenuation of Surfacing Materials Within the Use Zone of Playground Equipment", appropriate for the fall height of the structure. Installation Times Installation times are based on one experienced installer. A crew of three experienced individuals can perform the installation within the given time, each member working 1/3 of the given hours. [Eg. Installation Time = 30 hours. For a crew of three, each member will work 10 hours on the installation for a total of 30 hours on the project.] Carbon Footprint The CO2e (carbon footprint given in Kilograms and Metric Tons) listed above is a measure of the environmental impact this play structure represents from harvesting raw materials to the time it leaves our shipping dock. Playworld Systems nurtures a total corporate culture that is focused on eliminating carbon producing processes and products, reducing our use of precious raw materials, reusing materials whenever possible and recycling materials at every opportunity. Playworld Systems elected to adopt the Publicly Available Specification; PAS 2050 as published by the British Standards Institute and sponsored by Defra and the Carbon Trust. The PAS 2050 has gained international acceptance as a specification that measures the greenhouse gas emissions in services and goods throughout their entire life cycle. Pre-Consumer Recycle Content A measurement, in pounds, that qualifies the amount of material that was captured as waste and diverted from landfill during an initial manufacturing process and is being redirected to a separate manufacturing process to become a different product. E.g. 100% of our Aluminum Tubing is made from captured waste material during the manufacturing process of extruded Aluminum products such as rods, flat bars and H-channels. Post-Consumer Recycle Content A measurement, in pounds, that qualifies the amount of material that was once another product that has completed its lifecycle and has been diverted from a landfill as a solid waste through recycling and is now being used in a Playworld Systems' product. E.g. **20% to 40% of the steel in our steel tubing and sheet steel have been diverted from landfills. Automobiles are scrapped and recyclable steel is purchased by the steel mill that produces our raw product. ** The amount of Post-Consumer recycled steel fluctuates daily based on the availability of the recycled steel. Saturday, October 08, 2016 Page 2 of 2 Playworld.com