Module 4 Regulatory requirements for Land Disturbing Activities

Similar documents
Module 3. Module 3a. As of July : A lot of local ESC ordinances are out of date! Virginia Erosion & Sediment Control Program

CHAPTER 8 EROSION AND SEDIMENT CONTROL PLAN REQUIREMENTS

Town of Friday Harbor PO Box 219 / Friday Harbor / WA / (360) / fax (360) /

SITE PLAN Scale 1"= 10'

LOCATION AND DESIGN DIVISION

EROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY

APPENDIX I. Plan Reviewer Checklist

Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014

Water Resources Management Plan

SUDAS Revision Submittal Form

Storm Water Permitting Requirements for Construction Activities. John Mathews Storm Water Program Manager Division of Surface Water

Performance Standards Compliance Checklist

CITY OF JENKS EARTH CHANGE PERMIT APPLICATION

SACHSE EROSION CONTROL GUIDELINES

Annual Standards and Specifications. Stormwater Management. Erosion and Sediment Control

Step 1. Determine if a Small Utility GESC Permit is Applicable and if a Project Specific GESC Plan is Required.

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS)

GRADING, EROSION AND SEDIMENTATION CONTROL

Building Better Storm Water Quality

CHAPTER 9 EROSION AND SEDIMENT CONTROL DESIGN

Chapter CONSTRUCTION SITE EROSION CONTROL

COON CREEK WATERSHED DISTRICT PERMIT REVIEW Mississippi Dr Coon Rapids, MN SQ FT Residence on 0.64 Acre Lot

EXISTING CENTERLINE PROFILE

Earth Dikes and Drainage Swales

2-16 EROSION, SEDIMENT & STORM WATER CONTROL REGULATIONS APPENDIX B1

STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY

Stormwater Pollution Prevention Plan Engineering Department Requirements

City of Glendale Stormwater Management Plan Checklist

Erosion Control Inspection Form

Memo. To: From: cc: For further assistance please contact Ben Ruzowicz, GSWCC Technical Specialist at (706)

E. STORMWATER MANAGEMENT

D EROSION AND SEDIMENT CONTROL. Table of Contents

Good Housekeeping. Phones Weather related emergencies Breaks and facilities. Introductions

Typical Local Erosion Control Requirements (Storm Water Management Authority, Inc.)

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES

Regulatory Requirements

COON CREEK WATERSHED DISTRICT PERMIT REVIEW

Description. Installation and Implementation Requirements

City of Doral 8401 NW 53 rd Ter. Doral, FL 33166

B. Install storm drain inlet protection to prevent clogging of the stormsewer and sediment loads to downstream stormwater facilities or waterbodies.

Lake Elmo, MN Code of Ordinances STORM WATER AND EROSION AND SEDIMENT CONTROL

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432

Suggested Stormwater Management Practices For Individual House Lots

SWPPP Development. What are Storm Water Pollution Prevention Plans. Jerald S. Fifield, Ph.D., CISEC HydroDynamics Incorporated Parker, CO

Erosion & Sedimentation Control Policy

Annual Standards and Specifications

Single Family Residential Construction Erosion/Sediment Control Standards

PART 1 GENERAL REQUIREMENTS

Erosion and Sediment Pollution Control Guidelines for Residential Lots with soil disturbance of less than 1 acre (see exceptions)

DESIGN GRADING AND EROSION CONTROL A. Slope Criteria

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION

FACT SHEET GENERAL KPDES PERMIT FOR STORM WATER POINT SOURCE DISCHARGES CONSTRUCTION ACTIVITIES

Sediment Control Practices

2.1 MINIMUM WATER QUALITY PROTECTION REQUIREMENTS FOR DEVELOPMENT CONSTRUCTION PROJECTS

901 STORMWATER POLLUTION MANAGEMENT SECTION 901 STORMWATER POLLUTION MANAGEMENT

Stormwater Management Permit Application LESS Than One Acre. Public Works Department st Ave East Kalispell, Montana (406)

CCSD#1 Stormwater Standards

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

E & S Plan Approved. Not required but may be a municipal requirement** Not required but may be a. municipal. requirement** Not required but may be a

GRASS-LINED CHANNEL (acre) CODE 840

CHAPTER 11 Grading, Erosion and Sediment Control

Chapter 2: Selecting Best Management Practices (BMPs)

Diversion Dikes. Fe=0.95

SECTION EROSION AND SEDIMENTATION CONTROLS

Module 2: Selection of Controls and Site Planning

902 TEMPORARY EROSION AND SEDIMENT CONTROL SECTION 902 TEMPORARY EROSION AND SEDIMENT CONTROL

Re: Erosion Control Report and Drawings Requirements Accompanying Document

COMMONWEALTH of VIRGINIA

LAMINATE AND POST AT JOB SITE NOTICE MUST BE VISIBLE FROM STREET

STANDARD GRADING AND SOIL EROSION & SEDIMENT CONTROL PLAN FOR SINGLE LOT SINGLE FAMILY RESIDENTIAL CONSTRUCTION AND MINOR EARTH DISTURBANCES

BUREAU OF CLEAN WATER

LAMINATE AND POST AT JOB SITE NOTICE MUST BE VISIBLE FROM STREET

The Good, The Bad, and The Ugly

SWPPP Inspection Procedures and Form 247 Instructions

APPENDIX C EROSION AND SEDIMENTATION CONTROL STANDARDS

SECTION EROSION AND SEDIMENTATION CONTROLS

WAKULLA SITE PLANNING

DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY FACT SHEET

2010 California Green Building Standards Code. Residential and Non-Residential Development

PART 3 STORM WATER TECHNICAL MANUAL

Project Information. Check all that are applicable to the construction project site: RIPDES CGP (construction) RIPDES RGP (dewatering)

METROPOLITAN UTILITIES DISTRICT No Page: 1 of 10

Figure Inlet protection (Source: Minnesota DOT)

Minnesota Pollution Control Agency requires that the City of Brainerd develop written procedures for

1.2 REGULATORY REQUIREMENTS

Town of Fortville Utility Street Standards

Construction Site Runoff Inspections and Enforcement

Appendix B Construction SWPPP Short Form

Table Related Arlington County Standards, Specification and Policies

Construction Stormwater

GENERAL SOIL EROSION AND SEDIMENT CONTROL NOTES FOR HUNTERDON COUNTY, NJ

SOIL EROSION AND SEDIMENT CONTROL

APPROVED FOR ISSUANCE REFER TO ENCROACHMENT AND/OR CONSTRUCTION PERMIT AND PLAN COVER SHEET FOR SPECIAL CONDITIONS AND PERMIT NUMBERING

PHASE 1 UPDATES TO DESIGN AND CONSTRUCTION STANDARDS INITIAL DRAFT FOR. Chapter 6 EROSION PREVENTION AND SEDIMENT CONTROL

CITY UTILITIES DESIGN STANDARDS MANUAL

Town of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL


Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR SLOPE PROTECTION STRUCTURES. Definition

Construction Site Erosion Control and Phase II of the Stormwater Permit Program

Transcription:

Module 4 Regulatory requirements for Land Disturbing Activities MODULE 4 REGULATORY REQUIREMENTS FOR A LDA

Module 4a Overview MODULE 4A REGULATORY REQUIREMENTS FOR A LDA

ESC Regulations Overview 1990 First Adopted 1995 Revised 2012 Integration Bill (House Bill 1065) Aligned with VSMP Law and Regulations 2013 DEQ Move & re-codification

Minimum Standards Provide better understanding between the inspector, plan reviewer, and program administrator.

ESC Regulations Intended to be used as a clear-cut system to provide uniformity in the application of E&S standards on plans and in the field. Help to make enforcement more consistent statewide.

Purpose of the Minimum Standards The intent of this chapter is to establish the framework for compliance with the Act while at the same time providing flexibility for innovative solutions to erosion and sediment control concerns MODULE 4 REGULATORY REQUIREMENTS FOR A LDA PAGE 3

Scope and Applicability VESCPs Plans Submitted to DEQ Linear Projects State Agencies with Annual Specifications Federal Agencies State Institutions of Higher Learning MODULE 4 REGULATORY REQUIREMENTS FOR A LDA PAGE 4

Module 4b Minimum Standards 1-18 MODULE 4 REGULATORY REQUIREMENTS FOR A LDA PAGE 5

MS-1 Stabilization Not at Final Grade Stabilize in 14 days Temporary seeding + Mulch Mulch Permanent stabilization if dormant > 1 year At Final Grade Stabilize in 7 days Permanent or Temporary Seeding + Mulch Mulch MODULE 4 REGULATORY REQUIREMENTS FOR A LDA PAGE 6

MS-2 Stockpiles and borrow areas Soil stockpiles and borrow areas shall be stabilized or protected with sediment trapping measures Applies to on and off-site stockpiles and borrow areas MODULE 4 REGULATORY REQUIREMENTS FOR A LDA PAGE 7

MS-3 Permanent Vegetation A permanent vegetative cover shall be established on areas not otherwise stabilized Permanent vegetation shall not be considered established until it is uniform, mature enough to survive and will inhibit erosion MODULE 4 REGULATORY REQUIREMENTS FOR A LDA PAGE 8

MS-4 First Step Measures (Perimeter controls) Sediment basins, traps, dikes and sediment barriers intended to trap sediment shall be installed as a first step measure They must be made functional before up-slope disturbance takes place MODULE 4 REGULATORY REQUIREMENTS FOR A LDA PAGE 9

MS-5 Earthen structures Stabilization measures shall be applied to earthen structures immediately after installation MODULE 4 REGULATORY REQUIREMENTS FOR A LDA PAGE 10

MS-6 (Traps and basins) Sediment traps and sediment basins shall be designed and constructed based on the total drainage area served by the trap or basin Sediment Trap < 3 acre Sediment Basin 3 acre MODULE 4 REGULATORY REQUIREMENTS FOR A LDA PAGE 11

MS-7 Cut and fill slopes Cut and fill slopes shall be designed and constructed in a manner to minimize erosion Slopes found to be eroding excessively within one year shall have additional stabilization applied MODULE 4 REGULATORY REQUIREMENTS FOR A LDA PAGE 12

MS-8 Concentrated runoff on slopes Concentrated runoff shall not flow down cut or fill slopes unless contained in a temporary or permanent channel, flume or pipe MODULE 4 REGULATORY REQUIREMENTS FOR A LDA PAGE 13

MS-9 Water seeps Whenever water seeps from a slope face, adequate drainage or other protection shall be applied MODULE 4 REGULATORY REQUIREMENTS FOR A LDA PAGE 14

MS-10 Inlet protection All storm sewer inlets made operational during construction shall be protected so that sediment laden water cannot enter without first being filtered or treated to remove sediment MODULE 4 REGULATORY REQUIREMENTS FOR A LDA PAGE 15

IP

MS-11 Outlet protection Before newly constructed stormwater channels or pipes are made operational, adequate outlet protection, and any temporary or permanent channel lining shall be installed MODULE 4 REGULATORY REQUIREMENTS FOR A LDA PAGE 16

MS-12 (Working in a live watercourse) When working in a live watercourse, precautions shall be made to minimize encroachment Non-erodible materials shall be used Earthen fill may be used if armored by non-erodible materials MODULE 4 REGULATORY REQUIREMENTS FOR A LDA PAGE 17

MS-13 Stream crossings When a live watercourse must be crossed by construction vehicles more than twice in a six month period, a temporary stream crossing shall be provided MODULE 4 REGULATORY REQUIREMENTS FOR A LDA PAGE 18

MS-14 Other applicable regulations All applicable federal, state and local regulations pertaining to working in watercourses shall be met MODULE 4 REGULATORY REQUIREMENTS FOR A LDA PAGE 19

MS-15 Stream bank stabilization The bed and banks of a watercourse shall be stabilized immediately after work in the watercourse is complete MODULE 4 REGULATORY REQUIREMENTS FOR A LDA PAGE 20

MS-16 Underground utility lines Underground utility lines shall be installed in accordance with the following standards in addition to other applicable criteria: No more than 500 feet of open trench at one time Excavated material shall be placed on the up-hill side of the trench MODULE 4 REGULATORY REQUIREMENTS FOR A LDA PAGE 21

MS-16 Utility Construction Effluent from de-watering shall be filtered or passed through an approved sediment trapping device Material used for backfilling shall be compacted to minimize erosion Re-stabilization shall be accomplished in accordance with these regulations Applicable safety regulations shall be complied with MODULE 4 REGULATORY REQUIREMENTS FOR A LDA PAGE 21

MS-17 Construction entrance Where construction vehicle access routes intersect public or paved roads, provisions shall be made to minimize transport of sediment onto the paved surface MODULE 4 REGULATORY REQUIREMENTS FOR A LDA PAGE 22

MS-17 Construction entrance When sediment is deposited on the road surface, it shall be removed by: Shoveling & sweeping Then disposal Street washing is only done after shoveling and sweeping Applies to single family dwelling lots! MODULE 4 REGULATORY REQUIREMENTS FOR A LDA PAGE 21

MS-18 Control Removal All temporary erosion and sediment control measures shall be removed within 30 days of final stabilization or when no longer needed MODULE 4 REGULATORY REQUIREMENTS FOR A LDA PAGE 23

MS-19 Continuing downstream adverse effects from increased runoff volume and velocity. MODULE 4 REGULATORY REQUIREMENTS FOR A LDA PAGE 24

MODULE 4 REGULATORY REQUIREMENTS FOR A LDA PAGE 24

MS-19 What you should know Natural Channel 2-year storm cannot overtop channel banks nor erode channel bed or banks Man-Made Channel 10-year storm cannot overtop channel banks 2-year storm cannot errode bed or banks Stormwater Infrastructure (pipes) 10-year storm must be contained within pipe or system MODULE 4 REGULATORY REQUIREMENTS FOR A LDA PAGE 25

MS-19 What you should know Remember: For ESC plans approved on and after July 1, 2014, designs must use the flow rate capacity and velocity requirements of the stormwater management regulations to satisfy compliance with the water quantity requirements in the Stormwater Management Act ( 62.1-44.15:24 et seq.) and attendant regulations, unless such landdisturbing activities are in accordance with the grandfathering provisions of the Virginia Stormwater Management Program (VSMP) Regulation (9VAC25-87048). In other words, grandfathered projects will need to meet the Part II C requirements or MS-19. MODULE 4 REGULATORY REQUIREMENTS FOR A LDA PAGE 25

MS-19 What you should know On and after July 1, 2014, projects subject to the Virginia Stormwater Management Act must meet the water quality and quantity requirements in Part II B of the Virginia Stormwater Management Program (VSMP) Regulation (9VAC25-870-62). MODULE 4 REGULATORY REQUIREMENTS FOR A LDA PAGE 25

MS-19-Revised (l.) For projects approved before July 1, 2014, if they can comply with the SWM energy balance equation in the stormwater regulations you satisfy MS-19

MS-19-Revised (m.) Projects approved after July 1, 2014, must comply with the Virginia Stormwater Management Act including the Grandfathering provisions.

MS-19-Revised (n.) Meeting the requirements of the Virginia Stormwater Management Act satisfies MS-19.

SWM Regulation Requirements Designers to demonstrate that the energy or the post developed discharge rates of a LDA provide channel protection by use of the Energy Balance method. The Energy Balance method is intended to achieve a balance between the energy exerted on the stream by the pre- and post-developed peak discharge.

Variance Procedure Request Review At time of plan submittal During construction when field conditions/situations changes Must be done in writing Cannot be granted for economic reasons (i.e. too expensive) 10 days After 10 days, it is automatically denied Review must be judicious MODULE 4 REGULATORY REQUIREMENTS FOR A LDA PAGE 25

9VAC-840-80 Criteria for determining land disturbance activity The program administrator shall determine the validity of a claim of exempt status by a property owner who disturbs 10,000 square feet or more or 2,500 square feet or more in all areas of jurisdictions designated as subject to the Chesapeake Bay Preservation Area Designation and Management Regulations (9VAC25-830). As soon as a nonexempt status is determined, the requirements of the Act shall be immediately enforced. MODULE 4 REGULATORY REQUIREMENTS FOR A LDA PAGE 26

9VAC-840-80 Criteria for determining land disturbance activity Should a land-disturbing activity not begin during the 180-day period following plan approval or cease for more than 180 days, the VESCP authority may evaluate the existing approved erosion and sediment control plan to determine whether the plan still satisfies local and state erosion and sediment control criteria and to verify that all design factors are still valid. If the VESCP authority finds the previously filed plan to be inadequate, a modified plan shall be submitted and approved prior to the resumption of land-disturbing activity. MODULE 4 REGULATORY REQUIREMENTS FOR A LDA PAGE 26

End of Module 4