Strategic purchasing from project-related collaboration to sustainable strategic collaboration

Similar documents
E-procurement: supporting opportunities

An Introduction to Oracle Identity Management. An Oracle White Paper June 2008

28 MARCH Doc. CoRD 047. Use of the internet in Statistics Finland s data collection

Advancement Framework Planning

Purchasing and Supply Chain Management. Supplier Evaluation and Selection

Partnering: A good approach to dispute resolution in construction management

Chapter 3 Creating and Managing Supplier Relationships

CONSTRUCTION INDUSTRY INSTITUTE MODEL FOR PARTNERING EXCELLENCE. Research Summary Model for Partnering Excellence.

Industrial and Technological Benefits Policy: Value Proposition

PMBOK Guide Fifth Edition Pre Release Version October 10, 2012

FUNDAMENTAL STAGES IN DESIGNING PROCEDURE OF STATISTICAL SURVEY

Internal self assessment

Re-engineering of the Project Planning Process

Waarde creëren met het juiste Sourcing Business Model

Trusted KYC Data Sharing Framework Implementation

Strategic Sourcing in the New Economy:

What Lies Ahead. Mike Jacoutot, Founder & Managing Partner Butler Street February 3, 2015

PROFI-SEC Group. UN Global Compact Communication on Progress Author: L.D. Thompson Date: 07 July 2014 Version: 1.0

Achieving Organisational Goals. Accomplishing Strategic Initiatives. Implementation of Organisational Objectives. Stakeholder Management

MINDING THE GAP BETWEEN PROCUREMENT AND FINANCE Reducing loss of savings and adding value

IMPLEMENTING NEW PRODUCT DEVELOPMENT BEST PRACTICES IN HOUSE-BUILDING DEVELOPMENT PROCESSES

JD Edwards EnterpriseOne Business Accelerator for Engineering and Construction General Contractors

LIFE CYCLE MANAGEMENT CONCEPT AND PRACTICAL POSSIBILITIES OF IMPLEMENTATION IN ORGANIZATIONS

Epicor Partner Network

COM M. Maoz, E. Kolsky

Fair and equitable benefit sharing

RANKING CONSTRUCTION PROJECT CHARACTERISTICS

Appendix to the MN CSR annual report gri table. On the basis of the GRI guidelines (version G4.0)

QUALITY MANAGEMENT PRINCIPLES

The ESCO sales network that works for you PROGRAM

Request for Proposal For: 2018 American Bar Association Temporary Services

BRAND PERFORMANCE CHECK. MADNESS THE NATURE TEXTILE COMPANY GmbH. this report covers the evaluation period to

***I POSITION OF THE EUROPEAN PARLIAMENT

AUSTRALIAN ENGINEERING COMPETENCY STANDARDS STAGE 2 - EXPERIENCED PROFESSIONAL ENGINEER IN LEADERSHIP AND MANAGEMENT

A Complex SPIN Memorandum of Understanding model

A Conversation with J. Christopher Mihm Managing Director, Strategic Issues Government Accountability Office

Oracle Accelerate for Food and Beverage. An Oracle White Paper November 2007

Transaction Costs for Design-Build-Finance-Maintain Contracts Favie, R.; Beelen, W.A.; Maas, G.J.

0 Introduction Test strategy A Test Strategy for single high-level test B Combined testing strategy for high-level tests...

GLOSSARY OF TERMS ENTREPRENEURSHIP AND BUSINESS INNOVATION

Purpose Objectives Values

Blaise at Statistics Netherlands

bluesign system Version 1.0 April 01, 2014

PROJECT MANAGEMENT PROCESSES AND THE ACHIEVEMENT OF ORGANIZATIONAL STRATEGIES THE CASE OF TELECOMM. OPERATOR

BRAND PERFORMANCE CHECK. Anchor Workwear BV. this report covers the evaluation period to

AIDN. SME policy position for defence and national security

Corporate Social Responsibility Policy

BRAND PERFORMANCE CHECK. Haglöfs Scandinavia AB. this report covers the evaluation period to

6 Steps To Stakeholder Advocates

OUR GUIDING PRINCIPLES

WHITE PAPER. Guiding principles and dimensions of testing transformation

4.1 Supply Chain Risk Management

BUILDING RIVANS WORKSHOP Boosting VALUE by Building RIVANS (Relationally Integrated Value Networks)

Developing the Ingredients Necessary for Successful Cross-Sector Collaboration: Where Research Meets Practice

EUROPEAN GUIDE TO INDUSTRIAL INNOVATION

CORPORATE SOCIAL RESPONSIBILITY POLICY OF THE EBRO FOODS GROUP

A sustainable built environment: the institutional challenges

Implementation of the CO BIT -3 Maturity Model in Royal Philips Electronics

Organisational tools for SME Partnerships for Innovative Energy Services

BBA VIII Semester. Strategic Management. POST RAJ POKHAREL M.Phil. (TU) 01/2010), Ph.D. in Progress

ES. EXECUTIVE SUMMARY FOR NON-RESIDENTIAL LIGHTING PROGRAMS (NR1)

Research on Enterprises Vertical Merger Based on Transaction Cost Theory

Job Description. Details. Our Vision and Mission. Key Relationships

2018 European Payment Processing Platform Customer Value Leadership Award

Building Policies for a Better World. ESCO models for the retrofit of existing buildings in China. GBPN November 2013

2.4.3 How to deal with. customers

Sponsor/CRO Partnership Optimization

PMI Scheduling Professional (PMI-SP)

Auditing Open Source Applications by Using COBIT 4.1

A Model for CAS Self Assessment

UPMC Health Plan Extends CRM Through Brokers

THE POWER OF BEING UNDERSTOOD

Project Procedure 1.0 PURPOSE 2.0 SCOPE 3.0 REFERENCES. No.: P /21/2012 PAGE 1 OF 12 PROJECT RECORDS MANAGEMENT

ITServices Strategic Plan

2010, David Lupberger

Customer Relationship Management Solutions for Vehicle Captive Finance. An Oracle White Paper October 2003

ALTERNATE FORMS OF PROJECT DELIVERY

Committed to Consulting Excellence

Sustainable Seafood Coalition (SSC) Members meeting minutes

An innovative, smart, BIM-enabled product specification tool which streamlines collaboration and information sharing

Supply Management Three-Year Strategic Plan

An Employee-Centric Approach. Adrian King

AUSTRALIAN ENGINEERING COMPETENCY STANDARDS STAGE 2 - EXPERIENCED PROFESSIONAL ENGINEER

Interoperability of business registers in the European Statistical System: the Eurostat VIP.ESBRs project

Our strategy 14 NOKIA IN 2017

Attitude of Flemish Farmers Towards Alternative Business Governance Structures

Pillar II. Institutional Framework and Management Capacity

Farm Succession Planning

RECRUITMENT AND APPOINTMENTS POLICY

T E A L C O N S U L T I N G L T D I S O A G U I D E

Tax Incremental Financing Policy & Application

BPM. Business Process Management

TRAVEL ADVISOR CAREER GUIDE

THE PAYMENT SERVICES DIRECTIVE II (PSD II) Liberalisation of electronic payment transactions

The Ultimate. Guide to JDF. in the printing industry

Streamlining processes and increasing value for the oil and gas supply chain

Oracle Revenue Management Cloud

Category Management Needs New Life

I. Apprenticeship Basics What is Registered Apprenticeship? How is an apprenticeship different from other job training, education and

SWIFT for Corporates Get ready for a truly global treasury

Transcription:

CIB World Building Congress 2007 475 CIB2007-306 Strategic purchasing from project-related collaboration to sustainable strategic collaboration Jeroen van de Water 2, Ruben Favié, Joost Mulder 1, B. van Eekelen 2, G.J. Maas 2 ABSTRACT Collaboration is a keyword because there are so many companies active in the building sector. Once a building project is finished, the collaboration between the parties stops. As a result, know-how and experience are wasted.. Collaborations such as strategic partnerships that are unrelated to specific projects are better forms of cooperation. From the perspective of supply chain management theory, a supplier becomes a preferred supplier, a World Class Supplier and then a strategic partner. Partnership is a form of collaboration that enables the partners to learn for and from one another and improve in a range of areas in the long term. They use tools and instruments jointly in the process to supplement one another s capacities. Surprisingly, management of integral costs in collaboration with suppliers does not have the highest priority, which is why an effective purchasing strategy is essential. The aim of this study is to develop an assessment system to make it possible to select the best subcontractors from the pool of suppliers so that the purchasing department can develop a strategic partnership. The assessment system is an automatic questionnaire that generates a score based on internal calculations. 1 Heijmans Bouw B.V. 2 Eindhoven University of Technology, Department of Building Architecture and Planning, Construction Management and Engineering Research Group, P.O. Box 513, 5600 MB Eindhoven, the Netherlands, g.j.maas@bwk.tue.nl

476 CIB World Building Congress 2007 Keywords: Collaboration, Strategic partnership, Purchasing Strategy, Kraljic, Purchasing Portfolio, Supplier Assessment 1. INTRODUCTION The building sector is a network of different companies and cooperation is a key element of construction. Changes in society and technology influence the construction market. Increasing international competition and changes in the sector are making it necessary for parties to work together. Strategic partnerships can improve companies competitive position. This article takes an in-depth look at the concept of cooperation in general and strategic partnerships more specifically. As cooperation originates with a purchasing decision, attention will also be devoted to the purchasing strategy that can be employed. 2. OBJECTIVE AND PROBLEM DEFINITION Based on the above, it is obvious that selecting the right subcontractors and suppliers is very important. But what are the deciding factors in that selection process, apart from the traditional factor of lowest price? When an accurate supplier database is available, a more targeted selection can be made based on assessments of subcontractors. The objective of this research is therefore to develop an assessment system to facilitate the selection of the best subcontractors from a supplier database to enable purchasing departments to develop strategic partnerships. This objective leads to the following problem definitions: 1. What selection aspects are used to assess subcontractors for strategic partnerships? 2. What performance indicators correspond to the selection aspects? 3. How can the selection aspects and performance indicators be made comparable? 4. How can the selection aspects and performance indicators be converted into an assessment system? 3. RESEARCH METHOD A literature study was conducted on the subject of strategic partnerships. A case study was done for the assessment system and the problem definitions based on the objective. The selection aspects and performance indicators must be identified based on the first two problem definitions. The goal of the first is to identify selection aspects.

CIB World Building Congress 2007 477 The goal of the second is to subdivide the selection aspects into comparable performance indicators. This was accomplished by means of interviews and a brainstorming session. The KJ method was used to identify performance indicators for the selection aspects. In order to convert the selection aspects and performance indicators into a measurable system each selection aspect and performance indicator must be weighted. The weight of each selection criterion is determined using weighting factors, which are assigned a value from 1 to 5. 4. LITERATURE STUDY 4.1 Cooperation Cooperation can be described as follows: Different parties joining forces to work on the same project with the desire to bring the project to a good conclusion. In the building sector, cooperation between parties is often related to specific projects. Types of collaboration such as traditional cooperation, the building team and the turnkey project are widely known. As soon as a building project is completed, the parties go their separate ways. As a result, knowledge and experience are lost. Therefore, cooperation that is not bound to a specific project is better. When parties work together for a longer period of time, they have a chance to get acquainted and strengthen their competitive position together. The strategic partnership is a form of cooperation that is not based on a specific project. In this type of partnership, a party works with companies in its own branch, but also with other businesses that can make an additional contribution to the building process. This is necessary to further reinforce the competitive position. 4.2 Strategic partnership Besides being a network of different companies, the building sector is also a chain of various processes. In order to control these processes within the various links in the chain they must be viewed from the perspective of Supply Chain Management. Supply chain management encompasses the process and techniques for steering, controlling and optimising the flow through all the process chains.[3] From this perspective, the next step is the World Class Supplier concept, which is logically followed by the step to Strategic Partnership. In this process, a supplier first becomes a preferred supplier, then a world-class supplier and finally a strategic partner. What is a strategic partnership? Partnership is a type of long-term collaboration in which the parties learn for and from each other and make improvements in a range of areas. Resources are shared to increase each party s

478 CIB World Building Congress 2007 opportunities. The objectives of the collaboration should be known to both parties so that they can pool their strengths. Several common elements are found in most collaborations of this nature. [2] A long-term relationship Mutual trust Limited number of suppliers The win-win principle Mutual trust is considered the most critical success factor for a partnership. Three kinds of trust can be distinguished: contractual trust: the expectation that the partner will comply with specific written or oral agreements competence trust: the expectation that the partner has sufficient technical and management competence goodwill trust: the mutual expectation that each party is willing to do more than has been formally agreed. In order to be successful a company needs partners. The creation of a winwin situation for all the parties involved is a very important driving force for partnership. Other advantages for the parties are: [5] the ability to deliver products faster improvements in design improvements in quality faster response to developments flexibility higher earnings A strategic partnership requires seven support pillars to sustain an effective customer-supplier network. [5] Superior quality Continuity Good communication Flexibility The will to improve continuously The habit of working together Trust The path to creating a partnership has four phases: [4] 1. Confrontation with the supplier 2. An arm s-length relationship in which an adversarial stance gradually evolves into a cautious experimental approximation of a working relationship 3. Coalition of mutual goals

CIB World Building Congress 2007 479 4. Full partnership High Integration Intensity of relationship Involvement Streamlining Rationalisation Recognition Low High Number of suppliers Low Figure 1 Growth steps towards cooperation Cooperation between the parties should be shaped gradually by proceeding through a series of steps. Step 1 Recognition of suppliers as sources of added value Step 2 Rationalisation of the supplier database Step 3 Streamlining and improving the relationship with best-in-class or world-class suppliers Step 4 Involving the supplier in the development process Step 5 Integration: the boundaries between the customer and supplier fade There are a number of basic conditions for good cooperation which must be met. These conditions are related to the following elements: Vision and strategy: expectations concerning the course the company is to take Commercial organisation: the organisation must be organised in such a way that it allows for cooperation People: cooperation is all about people working together Knowledge and information: exchanging information and knowledge Relations management: the relationship requires continuous attention. Cooperation always begins with a purchasing decision. 4.3 Purchasing strategy Report 106 by RRBouw[6] shows that a 5% reduction of integral costs has the same effect as a 30% rise in turnover. It is therefore peculiar that cost

480 CIB World Building Congress 2007 control in cooperation with suppliers is not the highest priority. A wellconsidered purchasing strategy is indispensable. The purchasing process can be broken down into six steps [1]: 1. Purchase order itemisation 2. Supplier selection 3. Purchasing contract 4. Ordering 5. Monitoring 6. Aftercare and assessment The purchasing department can be charged with making a strategic purchasing decision based on a good choice of suppliers. Supplier selection is Step 2 of the purchasing process. Step 6 involves aftercare and assessment. The aim of this step is to acquire accurate data for the supplier database so that the purchaser can choose the right supplier from the list. Kraljic s purchasing portfolio matrix is an effective way of categorising suppliers and can be used to determine a strategy. Cooperation between the general contractor and subcontractor Purchasing department Step 2 Supplier selection Evaluator Step 6 Aftercare and assessment Supplier database Figure 2: relationship, steps from the purchasing process, the suppliers database and cooperation between the parties. In this purchasing portfolio matrix, there are four conceivable supplier categories, power positions and related purchasing strategies for the four discrete segments. The purchasing portfolio matrix also offers the supplier leverage points for developing strategies. The supplier will always strive to maintain the best possible relationship with the customer. The nature of its relationship with the customer will lead to differences in the commercial approach.

CIB World Building Congress 2007 481 Partnership is appropriate when the supply risk is high and a building process is dominated by high financial impact. In addition, the customer and supplier have a balanced power relationship. high Impact on financial result low Leverage suppliers * Alternative suppliers available * Substitution possible * High competition * Standard products Routine suppliers * Extensive range * High product diversity * Laborious * Many suppliers with little power Strategic suppliers * Difficult to alternate between suppliers * Critical for the cost price and delivery * Market leaders * Specific know-how Bottleneck suppliers * Monopolistic market * High entry barriers * Technology leader * Few or no alternatives low Supply risk high Figure 3 purchasing portfolio matrix by Kraljic 5. RESULT OF THE CASE STUDY 5.1. Selection aspects The assessment criteria are divided into selection aspects and performance indicators. Selection aspects are general terms that designate an area to be evaluated. They are broken down into measurable components, i.e. performance indicators. The selection aspects were identified in a case study by means of brainstorming. During the brainstorming session, use was made of preexisting assessment lists of various offices and a list of indicators. The following selection aspects were identified for the execution: 1. Quality 2. Planning 3. Health, safety and environment (HSE) 4. Service and guarantee 5. Wages and Salaries Tax and Social Security Contributions (Liability of Subcontractors) Act (Wet keten aansprakelijkheid), referred to as the Subcontractor Liability Act below.

482 CIB World Building Congress 2007 5.2 Performance indicators Figure 4 lists the performance indicators for each selection aspect. In order to transform the selection aspects and performance indicators into a working system, each aspect and indicator must be weighted. 5.3 Comparing indicators During the case study the participants were asked to give points to the different selection aspects and performance indicators individually by filling out a questionnaire. They were instructed that the point depends on the interrelationship of the various selection aspects and performance indicators. This produced the following values: 0.3 for quality, 0.25 for planning, 0.19 for HSE, 0.13 for guarantee/service and 0.12 for the Subcontractor Liability Act. After the selection aspects and performance indicators were identified, questions were formulated based on the performance indicators and incorporated into a questionnaire. 5.4 Assessment system The assessment system is a set of three automated forms that generate a point by means of internal calculations. Execution form On this form each question is answered with a value between 1 and 4, where 1 means poor and 4 means good. The form is filled out by the site manager, alone or with the project leader. Space is provided for extra comments about the work carried out. Questions that are not applicable may be left blank. Weight factors form This form is used to enter the weight factors for the selection aspects and the performance indicators. In this form, the point given and the weight factors are combined to generate a final point. Here, too, questions that are not applicable may be left blank and will not be included in the calculation.

CIB World Building Congress 2007 483 Result 1. Quality 7,3 1.1. How would you rate the quality of the preliminary consultation? 1.2 How would you rate the quality of the drawings? 1.3 How would you rate the contracted party s accessibility? 1.4 Does the contracted party fulfil its commitments? 1.5 How would you rate the competence of the contracted party (informed/instructed)? 1.6 Does the contracted party comply with the work instructions? 1.7 Is the contracted party flexible when changes and adjustments are made? 1.8 Are defects/failures handled within the specified term? 1.9 How does the contracted party handle additions to or omissions from the order? 2. Planning 7,7 2.1 Does the contracted party have a permanent contact (at the building site)? 2.2. Is the contracted party flexible with when the pace is changed? 2.3. Did the contracted party deliver or perform according to our timetable? 2.4 Did the contracted party deliver or perform in compliance with the documentation? 3. HSE 6,8 3.1 Did the contracted party provide a HSE plan? 3.2 Is the HSE plan adequate? 3.3 Did the contracted party provide the desired structural surveys? 3.4 Does the contracted party use approved equipment and materials? 3.5 Does the contracted party clean up while working on site? 3.6 6 Did the contracted party separate waste properly? 3.7 Did the contracted party provide and use personal protective equipment? 4. Warranty / Service 6,8 Guarantee/Service 4.1 Does the contracted party issue performance bonds on time? (quality of the 4.1 bonds is not at issue here) 4.2 Does the contracted party issue revised data on time? (quality of the data is not at issue here) 4.3 How would you rate the aftercare provided by the contracted party? 5. Subcontractor Liability Act 7,7 5.1 Did the subcontractor farm out the work to third parties? 5.2 Does the number of man hours specified correspond with the contract? 5.3 What kind of identification does the contracted party require? Total points 7,3 figure 4 Result form Result form In this form a rating is given for each selection aspect. The ratings for the selection aspects are then taken together with the relevant weight factor to calculate a total below. Once the assessment system is in place, the data obtained must be stored effectively. By setting up an automated database all the data can be processed easily and made accessible. The assessment form is filled in online by the evaluator and the site manager, alone or with the project leader. Once that is done and the form has been sent, it is processed automatically in the supplier database in order to generate a point. 6. CONCLUSIONS AND RECOMMENDATIONS This assessment system is intended as the basis of an efficient flow of data for the supplier system from which purchasers can select suppliers and subcontractors. The supplier database is not only a kind of directory for the company. It is also an active resource that facilitates strategic choices when the company decides on potential strategic partnerships with suppliers and subcontractors. Because the building market is changing, improving cooperation will have to become a priority if companies are to remain competitive and

484 CIB World Building Congress 2007 continue offering high quality. Kraljic s purchasing portfolio matrix shows that the two upper segments are of particular importance when it comes to a company s financial risk, so it is in these two segments that companies will need to look at how they can improve cooperation. The assessment system offers organisations several benefits. Speed: the assessments can be filled in online and processed immediately. Retrieving assessments takes just seconds. Cost savings: the administrative burden is reduced as there are no paper forms to file. Costs can also be reduced during the execution phase by working with the best scoring supplier. Other benefits of an improved assessment system are: Subcontractors have an incentive to perform better. Assessments can no longer be contentious. Subcontractors are ruled out due to a single poor assessment. In a follow-up to this study, research can be done to identify possibilities and restrictions in the law that affect strategic partnerships. In addition, the possibilities for establishing a standard contract form with general agreements could be explored. It is also possible to study how the assessment system can best be implemented within an organisation. Only time will tell how well the system works and an assessment study will need to be carried out after implementation. This paper shows an example of the benefits of the combination of the purchasing theory with the original project management theory. 7. REFERENCES Arjan J. van Weele: Inkoop in strategic perspectief: analyse, planning en praktijk. Fourth edition, Deventer: Kluwer, 2001. http://www.ovia.nl/dossiers/inkoopsamenwerking/samenwerkeninuitbestedi ngrelaties.pdf. M. Saunders. Strategic purchasing and supply chain management. Second edition, London: Pitman, 1997. Keki R. Bhote. Strategic supply management: a blueprint for revitalizing the manufacturer-supplier partnership. New York: AMACOM, 1989. Patricia E Moody: Breakthrough partnering: creating a collective enterprise advantage. Essex Junction: Wight, 1993. Strategic inkoop door bouwondernemers: RRBouwrapport 106. Baarn, 2001.