GM Remarks 3/27/2017

Similar documents
General Manager Remarks

Bus Maintenance Strategy Update

Commuter Rail: Best Practices and Revenue Growth Proposal. March 6, 2017

Bus Maintenance. Strategy Update. July Draft for Discussion & Policy Purposes Only

General Manager Remarks

GM Remarks. Fiscal and Management Control Board. May 22, 2017

INSERT PICTURE OF FLEET VEHICLE MAINTENANCE PLAN

Commuter Rail Positive Train Control (PTC)

LIFT Program - Overview

Getting The MBTA Back On Track

Getting The MBTA Back On Track

MBTA Parking Updates FMCB Presentation May 16, 2016

2016 transit accessibility plan

Metro s Guide to Accessibility and Independence

Preventive Maintenance Policies and Plan for Vehicles and Facilities Northeastern Connecticut Transit District

Chapter 4. Recommendations

Public Transportation

MBTA: Moving Forward with Sustainability John Markowitz

State of Good Repair

South Bend Public Transportation Corporation. Transpo Access PASSENGER HANDBOOK S. Lafayette Blvd. South Bend, IN

Department of Transportation Maryland Transit Administration

LYNX Flexible Services

NEVADA DEPARTMENT OF TRANSPORTATION (NDOT) VEHICLE PREVENTIVE MAINTENANCE PLAN

Meeting Facilitator Gavels in Meeting and Presenter Comes to the Podium.

1/ The 2008 Wheel-Trans Operating Budget (summarized in Appendix A) as described in this report and the following accompanying reports:

Maintenance Plan Template Outsource

TTC AUDIT COMMITTEE REPORT NO.

PART 3 TRANSIT ASSET MANAGEMENT (TAM) REQUEST FOR PROPOSALS (RFP) SCOPE OF SERVICES

Service Development. Committee of the Whole April 3, 2019 Adam Harrington, Director of Service Development 1

2019 Transit Accessibility Plan DRAFT

Bus Service RFI Routes Overview on Process

The Guide to Riding the B-Line

The Corporation of the TOWN OF MILTON

HARTPlus Certification and Services. April 2, 2018 Regular Board of Directors meeting

CAPITAL AREA TRANSIT PLANNING SERVICE STANDARDS AND PROCESS

2018 transit accessibility plan DRAFT

Transportation OTHER FUNDS. Positions. Percent. Change

Keolis MBTA Commuter Rail Commuter Rail Rider Satisfaction Survey Spring Presented By: SocialSphere, Inc. June 2017

CAPITAL AREA TRANSIT PLANNING SERVICE STANDARDS AND PROCESS. Planning Department

Nifty-lift Rider s Guide

Capital Metropolitan Transportation Authority Response to the State-Mandated Performance Audit, January 12, 2017

Transit, Intercity Bus, Taxi 8-1

2004 FEASIBILITY STUDY UPDATE

Miami-Dade Transit. Alice N. Bravo, P.E. Director. Miami-Dade Transit 1

User Guide. handydart

MTA Metro-North Railroad. Operations Division. Annual Report on Fleet Maintenance 2011

OMNITRANS. Established in 1976 Serving the San Bernardino Valley. 16 Million Passengers Per Year Three Facilities Fleet. 15 Cities 480 Square Miles

Status of Recommendations: Miami-Dade County Public School District Chapter 12 Student Transportation

TTC AUDIT COMMITTEE REPORT NO.

Greenbush Project FAQ's Last Updated: July 26, 2004

Moving Transit Technology

Performance Monitoring and Measures

Strategic Transit Plan

Commuter Rail Schedules Initiative North Side

Service Routes and Community Transit Hubs: Right Sizing Transit NATIONAL CONFERENCE ON RURAL PUBLIC AND INTERCITY TRANSPORTATION OCTOBER 2-5, 2016

Airport Area Shuttles Analysis Prepared by the PART Planning Staff

Vehicle and pedestrian management audit form

There are three main operational challenges we need to address. We need to:

Service Business Plan

Office of Transit Asset Management Plan

APPENDIX A - TECHNICAL SPECIFICATIONS. JEA Fleet Services Light Duty Equipment Maintenance and Repair

Performance Report Facilities State of Good Repair

FCMAT REPORT TRANSPORTATION. Presentation

TRANSIT SERVICE GUIDELINES

CHAPTER 7. Illustrative Scenarios

TRANSPORTATION FACTS. OUR CUSTOMERS: Travel Patterns

4 PUBLIC TRANSIT 4.1 SYSTEM RIDERSHIP

A Win/Win Strategy: Fixing Transportation and Reducing Greenhouse Gas Emissions in Massachusetts

South Bend Public Transportation Corporation RFP No Addendum #1

In-Station Customer Experience Fiscal and Management Control Board March 20, 2017

Transportation OTHER FUNDS. Positions. Percent. Change

Certificate in School Bus and Passenger Transport Operations. Contents are subject to change. For the latest updates visit

The Operator holds a current European Community Licence with all vehicles listed on the Vehicle Identification Schedule.

RIDER S GUIDE & POLICIES

Smart Technical Services

Request for Proposal. Howell Public Schools Used School Buses

Budget Year 2019 updated 9/14/18

PROPOSAL EVALUATION WORKSHEET (CONSENSUS) EVALUATION FACTOR: MECHANICAL SERVICES PLAN (RATED)

Recommend to Board. Final Action

METRO MANAGEMENT RESPONSES TO FISCAL 2005 FISCAL 2008 STATE REQUIRED PERFORMANCE AUDIT OF THE METROPOLITAN TRANSIT AUTHORITY OF HARRIS COUNTY, TEXAS

ADVERTISING 2016 INFORMATION & RATES. Kim Britton, Marketing Director

SECTION 5310 FUNDING APPLICATION Enhanced Mobility of Seniors and Individuals with Disabilities

ASSOCIATION 0 OF AMERICAN RAILROADS

SAMPLE WORK PLAN. 2. Execute subcontractor agreements and gather forms and documentation required from each sub

View from Cabot Yard, South Boston. ACEC State Markets Conference April 2019

3 Documentation of Alternatives

Flagler County Public Transportation. User Guide

Staffing Request for Expo Line Phase 2 and Gold Line Foothill Phase 2A - Systems Integration

November FEDERAL TRANSIT ADMINISTRATION COMPLIANCE REVIEW MV TRANSPORTATION, INC. Program Evaluation and Audit

Advance Construction Authority. Massachusetts Bay Transportation Authority Boston, Massachusetts

Job Goal Transportation Director will schedule and maintain an efficient transportation system to meet the needs of students and staff.

Quarterly Capital Progress Update

Creative Bus Sales Inc. REPRESENTING Mobility Works

The RIDE Access Center (TRAC) Update June 26, 2017

Deputy General Manager for Planning and Development

11. Operating and Maintenance Costs

Diagnosys delivers integrated repair and management solutions to Porterbrook Leasing

Passenger transport. Operational review / Diversified logistics revenue-earning vehicles. Revenue increased by 7% employees

A step-by-step guide to writing your fleet policy

Deputy General Manager/ Chief Financial Officer

Transcription:

GM Remarks 3/27/2017

Agenda RIDE FY17 Budget Forecast Update Winthrop Bus Routes Commuter rail performance 2

The RIDE is expected to end FY17 $17M over budget FY17 BUDGET FY17 PROJ. ACTUAL Var. Pilot $2.3M $0.3M -$2.0M Call Center $5.5M $4.2M -$1.3M Traditional RIDE Service $84.2M $104.6M +$20.4M Total $92M $109M +$17M 3

Agenda RIDE FY17 Budget Forecast Update Winthrop Bus Routes Commuter rail performance 4

MBTA Bus Operations and Maintenance: Expansion Service Model MBTA contracting with private bus company to run Winthrop routes 712/713 Winthrop service has been contracted out by MBTA since 1991 Private contractor (Paul Revere) has traditionally run service using own fleet New model mirrors national best practices for contracted bus service MBTA will provide 6 New Flyer buses to private contractor to operate and maintain Service Level Agreements govern performance and maintenance Private company employees operate and maintain buses Contract runs for 4 years with up to 2 option years Fixed price contract caps costs at 2% annual growth over contract period Consistent with the L589 12/19 agreement, the MBTA can utilize this model for all expansion bus service in the future Contract terms provide cost stability MBTA to provide 6 New Flyer Xcelsior XDE40 FT buses Assets are owned by MBTA while operated and maintained by private company 5

Scope of Work and Service Information SCOPE OF WORK: Contractor will provide full operation and maintenance of MBTA-owned vehicles for Routes 712/713 For the first time, MBTA will provide six (6) new 40FT hybrid diesel/electric buses to contractor Same New Flyer buses recently put into operation out of MBTA s Cabot garage Contract Length: FY2018-FY2021 (4 years) with two (2) one-year option years SERVICE INFO: Number of Buses: 6 Annual Revenue Hours: 18,115 Annual Revenue Hour per Bus: 3,019 Ridership (FY2016): 735,390 passengers 6

Service Level Agreements and Maintenance Requirements SERVICE LEVEL AGREEMENTS: Penalties will be assessed for missed trips, defined as the vehicle never arriving or arriving more than 30 minutes after the scheduled pick-up time Amount of penalty will be equal to twice the contractor s per trip rate (daily rate divided by # of trips that day, times 2) Contractor responsible for providing weekly list of missed trips MAINTENANCE REQUIREMENTS: Facility: contractor responsible for providing maintenance facility within 10 miles of the route Experience: lead mechanic applicants hired will have a minimum of 5 years maintaining heavy duty buses (a master technician with ASE certification is required); supporting mechanics will have at least 1 year of experience Other Requirements: adhere to MBTA-authorized PM schedules, adhere to all OEM standards, and allow for bi-annual audits by MBTA staff Source: MBTA RFP No. 140-16 7

Maintenance Requirements: Stringent Requirements Governing Facilities, Employees and Maintenance Practices FACILITY SAMPLE REQUIREMENTS Maintenance facility must be within 10 miles of routes Contractor required to maintain and garage buses at this facility MBTA reserves right to inspect buses at this facility at any time EXPERIENCE AND TRAINING Lead mechanic(s) must have minimum 5 years experience maintaining heavy duty buses A master technician with ASE certification is required Supporting mechanics must have at least 1 year experience Trainer staff required to attend MBTA training modules on BAE hybrid propulsion, Cummins engines, Multiplex, etc. Failure to comply with standards will result in hefty fines and sanctions Daily circle checks MBTA-authorized preventative maintenance (PM) schedules Adherence to all OEM requirements Electronic record-keeping in MIS system Monthly technical and engineering inspections Bi-annual maintenance audits by MBTA staff No body damage greater than 1 in length or that inhibits safe vehicle operation Passenger area free from excessively worn floor or broken seats Functioning heating and A/C Annual emission/opacity inspections Wheelchair ramp maintenance and performance Minimum 2 weeks parts inventory Source: MBTA RFP No. 140-16 8

Maintenance Requirements: Private Operator Must Adhere To All Specified OEM Standards For New Buses Preventative Maintenance Front Axle & Suspension Rear Axle & Suspension Steering System Engine System Hybrid Drive System Cooling System Fuel System Air System Electric System HVAC System Structures & Chassis Interior Panels & Applied Parts Exterior Panels & Applied Parts Windows Access Doors & Panels Entrance & Exit Doors Seating & Stanchions Destination Signs Driver s Controls Wheelchair Ramps Source: MBTA RFP No. 140-16 9

Maintenance Requirements: Private Operator To Use Daily/Weekly/Monthly Checklists Specified By OEM DAILY CHECKLIST MONTHLY CHECKLIST WEEKLY CHECKLIST 10

Maintenance Requirements: Private Operator Must Use MBTA-Authorized Inspection Forms DAILY CIRCLE CHECK FORM MBTA PM INSPECTION FORM Operators must perform routine safety check before bringing bus into service Private contractor s staff must perform MBTAspecified preventative maintenance 11

Best Value Bid Was Paul Revere at $106 Per Revenue Hour ATU (L589) IAM (L264) TEAMSTERS (L25) ATU (L1512, L1363) Note: MBTA FY16 costs include present value of fully funded pension and retiree health costs, include Everett Bus Shop, and exclude Non- Revenue Shops; MBTA internal costs only includes a portion of total bus G&A expense and reflect pure cost only (no profit margin) Source: MBTA Internal Data 12

Market Pricing: Lifecycle maintenance Costs New Flyer Xcelsior Diesel-Electric 40 Ft. Transit Bus INTERNALLY PROVISIONED PRIVATE CONTRACTORS Note: MBTA FY16 costs include present value of fully funded pension and retiree health costs, include Everett Bus Shop, and exclude Non- Revenue Shops and fuel; MBTA internal costs only includes a portion of total bus G&A expense and reflect pure cost only (no profit margin) Source: MBTA Internal Data 13

Market Pricing: Lifecycle Maintenance Costs New Flyer Xcelsior Diesel-Electric 40 Ft. Transit Bus MBTA P. Revere Wages, fringe, taxes $74.4M $229K Materials, services, supplies Retiree health & pension $34.5M $104K $23.2M Revenue Hours 2.34M 18.1K Does not include all overhead expenses likely distributed over other Paul Revere contracts Note: MBTA FY16 costs include present value of fully funded pension and retiree health costs, include Everett Bus Shop, and exclude Non- Revenue Shops and fuel; MBTA internal costs only includes a portion of total bus G&A expense and reflect pure cost only (no profit margin) Source: MBTA Internal Data 14

Contracted operations-maintenance model: Budget Certainty and Fixed Pricing Benefits of Contracted Service: Bus service costs will grow at 2% annually (vs. historical 4-5% MBTA bus cost growth) CAGR 2% Provides budget certainty and predictability Not to exceed provision means contractor bears financial risk Aligns costs with MBTA s own long-term cost targets (below 2% annual growth) and closer to historical revenue growth Source: MBTA Internal Data 15

Agenda RIDE FY17 Budget Forecast Update Winthrop Bus Routes Commuter rail performance 16

Commuter Rail On-Time Performance Summary By Line & Equipment Availability Commuter Rail Weekly Operational Report 100% 90% 80% 2/27/2017 2/28/2017 3/1/2017 3/2/2017 3/3/2017 3/4/2017 3/5/2017 3/6/2017 3/7/2017 3/8/2017 3/9/2017 3/10/2017 3/11/2017 3/12/2017 3/13/2017 3/14/2017 3/15/2017 3/16/2017 3/17/2017 3/18/2017 3/19/2017 3/20/2017 3/21/2017 3/22/2017 3/23/2017 3/24/2017 3/25/2017 3/26/2017 Last 7 Days Service Delivery Cancellations/Trips 23/2971 Service Delivery 99.23% Actual OTP 70% 60% 50% 40% 30% 20% 10% 0% Providence Worcester Franklin Lowell Fitchburg Haverhill Newburyport Needham Stoughton Kingston/Plymouth Rockport Greenbush Fairmount Middleboro <85% <90% >=90% Actual OTP under 10 min Actual OTP Target Rolling 7 Days Actual OTP By Line Rolling 7 Days Actual OTP By Line Rolling 7 Days Actual OTP By Line 73 71 69 67 65 63 61 Locomotive Availability 378 374 370 366 362 358 354 350 346 342 338 334 330 Coach Availability 17 2/27/2017 2/28/2017 3/1/2017 3/2/2017 3/3/2017 3/6/2017 3/7/2017 3/8/2017 3/9/2017 3/10/2017 3/13/2017 3/14/2017 3/15/2017 3/16/2017 3/17/2017 3/20/2017 3/21/2017 3/22/2017 3/23/2017 3/24/2017 2/27/2017 2/28/2017 3/1/2017 3/2/2017 3/3/2017 3/6/2017 3/7/2017 3/8/2017 3/9/2017 3/10/2017 3/13/2017 3/14/2017 3/15/2017 3/16/2017 3/17/2017 3/20/2017 3/21/2017 3/22/2017 3/23/2017 3/24/2017

Commuter Rail Locomotive availability Turbocharger failures on MPIs, legacy locomotive main engine failures and PTC program putting pressure on availability 1st UTEX locomotive progressing well, expected in revenue service ahead of schedule (mid April), 2 nd & 3 rd locomotives on plan

Commuter Rail Coach availability Sudden decline in coach availability due to large number of coaches with damaged wheelsets coinciding with reduced wheel true facilities (capital replacement of wheel true machine at BET) Arranging wheel trueing with Amtrak and increased production on remaining machine at Readville to return to strong position rapidly

Commuter Rail OTP