Comm/CP/NCE/Tariff/28362 Date: COMMERCIAL CIRCULAR No. 228

Similar documents
CE/Comm/CP/NCE/Tariff/6699 Date: COMMERCIAL CIRCULAR No. 260

COMMERCIAL CIRCULAR NO.: 194.

No. CEjPPjNCEj RE Tariff jCommentsj18224 Date:

Jammu and Kashmir State Electricity Regulatory Commission

450 Compendium of Regulations & Tariff Orders Issued by Regulatory Commissions for Renewable Energy Sources in India

CASE No. 328 of Coram. Anand B. Kulkarni, Chairperson I.M. Bohari, Member Mukesh Khullar, Member

Chhattisgarh State Electricity Regulatory Commission

Compendium of Regulations & Tariff Orders Issued by Regulatory Commissions for Renewable Energy Sources in India

Staff Paper Determination/Fixation of generic levellised generation tariff for various Renewable Energy Technologies / Projects for the year

CENTRAL ELECTRICITY REGULATORY COMMISSION

PROCEDURE FOR GRANT OF DISTRIBUTION OPEN ACCESS PERMISSION AS PER MERC (DISTRIBUTION OPEN ACCESS) REGULATIONS, 2014

(Draft Captive and Renewable Energy Generating Plants) Regulations

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION MUMBAI

PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO NO , SECTOR 34-A, CHANDIGARH

MADHU SHARMA University of Petroleum and Energy Studies, Dehradun, India

PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO No , SECTOR 34-A, CHANDIGARH

ORISSA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK BHAWAN UNIT-VIII, BHUBANESWAR ***** NOTIFICATION Dated the 30 th September, 2010

RE Tariff Setting Approach

PUBLISHED IN THE KOLKATA GAZETTE, EXTRA ORDINARY, PT.I DATED AUGUST 10, 2010 VIDE NO. WB (Part-I)/2010/SAR-460

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION

Compendium of Regulations & Tariff Orders Issued by Regulatory Commissions for Renewable Energy Sources in India

NEW POLICY FOR POWER GENERATION FROM NON-CONVENTIONAL SOURCES OF ENERGY -2008

M.P. Electricity Regulatory Commission

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION

Gujarat Electricity Regulatory Commission

PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO NO , SECTOR 34-A, CHANDIGARH

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION

Chapter 1. General. 1. Short title, commencement, extent of application and interpretation.

Case No. 107 of Shri Vijay L. Sonavane, Member Smt. Chandra Iyengar, Member. Maharashtra State Electricity Distribution Company Limited

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI. Petition No. SM/016/2014 (Suo Motu)

TAMIL NADU ELECTRICITY REGULATORY COMMISSION Comprehensive Tariff Order for Bagasse

PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO NO , SECTOR-34 A, CHANDIGARH

APSERC (Draft Terms and Conditions for Tariff Determination from Renewable Energy Sources) Regulations, 2018

Case No. 308 of Coram. Anand B. Kulkarni, Chairperson I.M. Bohari, Member Mukesh Khullar, Member

Comprehensive Tariff Order on WIND ENERGY

HARYANA GOVERNMENT HARYANA ELECTRICITY REGULATORY COMMISSION. Notification

Welcome to Presentation on Integration of RES to the WR grid. 02 nd Sept, 2015 Taj Lands End, Mumbai

November Explanatory memorandum for CERC Regulations for implementation of REC mechanism in India

Case No. 52 of Shri. V.P. Raja, Chairman Shri. Vijay L. Sonavane, Member CLARIFICATORY ORDER

TANGEDCO (ACCOUNTS BRANCH)

Renewable Energy Tariffs, RPO and REC Mechanism

PRAYAS Initiatives in Health, Energy, Learning and Parenthood

TAMIL NADU ELECTRICITY REGULATORY COMMISSION. Order No.4 of 2015 dated

Grid Connected SPV Rooftop Systems. Policy and Regulatory Framework in Various States. Policy/ Tariff * Validity upto

Abhilakh Singh General Manager 12th April, 2016

Discussion Paper. Development of Renewable Energy Framework for Maharashtra For New Control Period (FY to FY )

TAMIL NADU ELECTRICITY REGULATORY COMMISSION. Comprehensive Tariff Order for Biomass based Power Plants

Solar Power in India 2011

Case No. 111 of Shri V.P. Raja, Chairman Shri Vijay L. Sonavane, Member ORDER

GOVERNMENT RAJASTHAN POLICY FOR PROMOTING GENERATION THROUGH NON-CONVENTIONAL ENERGY SOURCES Sl. No 1 Order Energy Deptt. letter no. F.

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI

Uttar Pradesh Electricity Regulatory Commission

Case No. 46 of 2012, Case No. 49 of 2012 and Case No. 66 of 2012

Grid connected Renewable Generators and Net-metering Amendment Policy

BEFORE THE GUJARAT ELECTRICITY REGULATORY COMMISSION GANDHINAGAR

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION

Case No. 35 of Shri V.P. Raja, Chairman Shri Vijay L. Sonavane, Member Smt. Chandra Iyengar, Member

CE(Dist)/D-III/Req. of Land/ Date: Circular

Case No. 89 of Shri V.P. Raja, Chairman Shri Vijay L. Sonavane, Member

State wise analysis of RPO Regulation for Captive users

BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION

.(A Govt. of Maharashtra Undertaking) CIN : U40109MH2005SGC In the matter of refund of tariff difference amount with interest

Government of Gujarat Energy and Petrochemicals Department G.R. No.EDA B Sachivalaya, Gandhinagar. Dated the 25 July, 2013.

OVERVIEW OF THE ENERGY SECTOR IN ZAMBIA: CASE OF RENEWABLE ENERGY

OFFICE OF THE CHIEF ENGINEER (Commercial) COMMERCIAL CIRCULAR No. 74

SMALL HYDRO PROGRAMME IN INDIA. Bhuwanesh Kumar Bhatt Ministry of New and Renewable Energy

Clarifications in Methodology of Grid Connected Roof top solar projects in the state of Maharashtra.

Impact of Renewable Energy Certificate (REC) Mechanism in India

REPOWERING OF OLD WIND FARMS IN INDIA

Published byauthority EXTRAORDINARY ISSUE TRIPURA ELECTRICITY REGULATORY COMMISSION NOTIFICATION OF

Presentation Title ( Arial, Font size 28 ) Urban Rooftop PV Projects

BEFORE THE ORISSA ELECTRICITY REGULATORY COMMISSION BHUBANESWAR

Transmission Policy and Wind Energy

BEFORE THE GUJARAT ELECTRICITY REGULATORY COMMISSION GANDHINAGAR

Approach Paper on Methodology for computation of Cross-Subsidy Surcharge for Open Access transactions

BEFORE THE ORISSA ELECTRICITY REGULATORY COMMISSION BHUBANESWAR

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION

Electricity Consumer's - Rights Statement

SERVICE CLASSIFICATION NO. 14-RA STANDBY SERVICE

Market Mechanisms in India s Clean Energy Efforts

Evolution of RPO and REC Mechanisms : Indian Experience

Regional Consultation on Climate Services for the 3 rd Pole and other High Mountain Areas

Case No. 81 of Shri V.P. Raja, Chairman Shri Vijay L. Sonavane, Member

Development and Financing of Renewable Energy Projects in India

CASE Nos. 8/9/10/15/17/18/19/20/21 of In the matter of Purchase of power from Bagasse based Co-generation Projects, etc.

EXPLANATORY NOTES FOR DRAFT GUIDELINES FOR OPERATION OF MERIT ORDER DESPATCH

Power Saver TM Program

ASSAM ELECTRICITY REGULATORY COMMISSION

THE JHARKHAND GAZETTE

SECTOR ASSESSMENT (SUMMARY): ENERGY (RENEWABLE ENERGY GENERATION SOLAR)

Renewable Energy Act of 2008

318/331/2017-GCRT Government of India Ministry of New and Renewable Energy *** NOTICE

(A Govt. of Maharashtra Undertaking) CIN : U40109MH2005SGC PHONE NO. : / Consumer Grievance Redressal Forum

Renewable & Alternative Energy Resources: What s the difference? 2

Bihar Electricity Regulatory Commission Vidyut Bhawan-II, J.L. Nehru Marg, Patna

(A Govt. of Maharashtra Undertaking) CIN : U40109MH2005SGC153645

Market Power And Generation from Renewables: The Case of Wind and Solar in India

COMPENDIUM REGULATIONS & TARIFF ORDERS ISSUED BY REGULATORY COMMISSIONS FOR RENEWABLE ENERGY SOURCES IN INDIA

[Note: Please attach copy of PAN Card.] [Note: Contact Person shall be a duly approved authorized signatory for the Organization.]

Director, U.P. New and Renewable Energy Development Agency, Vibhuti Khand, Gomtinagar, Lucknow

Transcription:

(A Govt. of Maharashtra Undertaking) CIN: U40109MH2005SGC153645 Maharashtra State Electricity Distribution Co. Ltd. Office of the Chief Engineer (Commercial) Prakashgad, 5th Floor, Station Road, Bandra (E), Mumbai -400 051. Tel.: (P) 26474753, (O) 26474211, Fax : (022) 26472366 Email: cecomm@mahadiscom.in, Website: www.mahadiscom.com Comm/CP/NCE/Tariff/28362 Date: 10-09-2014 COMMERCIAL CIRCULAR No. 228 Sub: Tariff of Non-conventional Energy (NCE)/ Renewable Energy (RE) Projects for FY. Ref: MERC RE Tariff order dated 7th July 2014 in Case No. 100 of 2014 The Maharashtra Electricity Regulatory Commission has notified the MERC (Terms and Conditions for determination of RE Tariff) Regulations, 2010 ( RE Tariff Regulations ) on 7 th June 2010. Accordingly, MERC issued generic RE tariff order for the first year of the control period (i.e FY 2010-11) on dated 14 th July 2010. The guidelines to implement the said order were issued vide Commercial Circular No. 122 dated 12.10.2010 which shall continue to remain applicable for RE Projects commissioned on or before March 31, 2011. Subsequently, the Hon ble Commission has issued generic RE tariff orders on 29 th April 2011 and 30 th March 2012 & 22 nd March 2013 for the renewable energy projects for the second, third & fourth year of the control period (i.e FY 2011-12, FY 2012-13 & FY 2013-14). The guidelines to implement the said orders were issued vide Commercial Circular No. 137 dated 16.06.2011, 164 dated 20.04.2012 & 196 dated 29.04.2013 respectively. Now, the Hon ble Commission has issued generic RE tariff order on 7 th July 2014 in Case No. 100 of 2014 for the renewable energy projects for the fifth year of the control period (i.e FY ). Accordingly, guidelines are issued for implementation of the said order as below: 1. Applicability of Tariff Order:- This Tariff is applicable for New RE Projects to be commissioned during FY (i.e. from April 1, 2014 to March 31, 2015). In case of Biomass power projects and Non fossil fuel based power projects commissioned on or prior to 31 March, 2014, the variable charge component of the tariff for FY shall be determined as outlined under the relevant provisions of this Order, whereas, fixed charge component of the tariff of such projects shall continue to be governed by the relevant Orders issued by the Commission. 1

2. Tariff for Renewable Energy Projects:- I. WIND: Wind Zone-wise Tariff for New RE Projects for FY. Particular Tariff Period Tariff for FY Benefit of Tax and Additional (if availed) Net Tariff upon adjusting for Tax and Additional benefit (if availed) Years Rs/kwh Rs/kwh Rs/kwh Wind Zone-1 13 5.70 0.36 5.33 Wind Zone-2 13 5.01 0.32 4.69 Wind Zone-3 13 4.18 0.27 3.91 Wind Zone-4 13 3.92 0.25 3.67 Note: The above Tariff shall be valid for Projects Commissioned in FY and for a Tariff Period of 13 years from the Commercial Operation Date (COD). II. BIOMASS POWER PORJECTS: Tariff Period (Years) Fixed Charge Variable Charge for FY Tariff for FY 2014-15 Benefit of Net Tariff (upon adjusting for benefit) For Projects commissioned in FY : 13 2.27 4.36 6.63 0.22 6.41 For Projects commissioned during FY 2013-14: 13 2.17* 4.36 6.53 0.21 6.32 For Projects commissioned prior to FY 2013-14: 13 1.70** 4.73 6.43 The Tariff Rate comprises two parts viz. (i) fixed charge component and (ii) variable charge component and shall be applicable for Rankine cycle based biomass power project for sale of power to Distribution Licensee within Maharashtra during FY. *Considering levellised fixed charge as approved in MERC Case 6 of 2013 ** Fixed charge component is linked to year of operation & shall be governed as per the terms and conditions outlined under biomass tariff order dated 8 August, 2005 in Case No 37 of 2003 and Case no. 83 of 2008. The per unit fixed charge component is as under: 2

Year of operation Fixed Charge 1 st 2 nd 3 rd 4 th 5 th 6 th 7 th 8 th 9 th 10 th 11 th 12 th 13 th 1.70 1.67 1.63 1.59 1.54 1.49 1.43 1.37 1.32 1.25 1.18 1.11 1.02 The fixed charge component is linked to year of operation, commencing from date of commissioning of plant and the variable charge component is linked to the financial year. III. NON FOSSIL FUEL BASED CO-GENERATION PROJECT (BAGASSE): tariff for Non fossil bagasse based cogeneration power projects: Date of Commission of the Cogeneration Project Fixed Charge Variable Charge for FY Tariff for FY Benefit of Net Tariff (upon adjusting for benefit) During FY 2.46 3.81 6.27 0.28 5.99 During FY 2013-14 2.38* 3.81 6.19 0.27 5.92 Prior to FY 2013-14 2.26** 3.81 6.07 *As per order dated 22.03.2013 in Case No. 6 of 2013 ** As per order dated 11.01.2010 in Case No. 123 of 2008 The Tariff Rate comprises of two parts, viz., (i) fixed charge component, and (ii) variable charge component and shall be applicable for sale of power by non-fossil fuel based co-generation project to Distribution Licensees within Maharashtra during FY. IV. TARIFF FOR NON-QUALIFYING NON-FOSSIL FUEL-BASED CO-GENERATION PLANTS: The Tariff Rate for existing non-qualifying non-fossil fuel based co-generation projects for FY is Rs 2.33 per kwh. USE OF FOSSIL FUEL (For Biomass based IPP projects and Cogeneration Projects) : The use of fossil fuels is limited to 15% of the total fuel consumption on annual basis or as amended by MNRE from time to time. The project developer using fossil fuel more than 15%, shall be ineligible for preferential tariff from the date of default and for duration of the default during financial year when such default occurs. During the 3

period of default the tariff applicable shall be lower by Rs 0.50/kWh below the applicable preferential tariff determined. V. SMALL HYDRO: tariff for new small hydro, mini & micro hydro projects in FY : Particulars Tariff Period Tariff for FY Benefit of Net Tariff (upon adjusting for benefit) Years Mini and Micro Hydro Projects Other Small Hydro Projects 500 KW & below 35 6.06 0.63 5.44 Above 500 KW & upto & including 1 MW Above 1 MW & upto and including 5MW 35 5.56 0.63 4.94 35 5.06 0.63 4.44 Above 5 MW to 25MW 13 4.33 0.57 3.76 The above Tariff shall be applicable for Projects commissioned in FY and shall be valid for the entire tariff period as specified above. VI. SOLAR: tariff for Solar Photovoltaic (PV), Solar Rooftop PV And other Small Solar Projects in FY, wherein PPA are signed after 31 March, 2014 and projects are Commissioned during FY : Particular Tariff Period Tariff (FY ) Benefit of (if Availed) Net Tariff(upon adjusting for accelerated (if availed) years Solar PV Projects 25 7.95 1.16 6.79 Solar rooftop PV and other small solar power Projects 25 8.45 1.16 7.29 The Tariff for Solar PV projects and Solar Rooftop PV and other small solar Projects as stated above shall be applicable for Projects wherein PPA are signed after 31 March, 2014 and projects are commissioned during FY, and the same shall be valid for a tariff period of 25 years from the Commercial Operation Date (COD). 4

tariff for Solar Photovoltaic (PV), Solar Rooftop PV And other Small Solar Projects in FY, wherein PPA are signed on or before 31 March, 2014 and projects are Commissioned during FY : Particular Tariff Period Tariff (FY ) Benefit of (if Availed) Net Tariff(upon adjusting for accelerated (if availed) years Solar PV Projects 25 8.98 1.29 7.69 Solar rooftop PV and other small solar power Projects 25 9.48 1.29 8.19 The Tariff for Solar PV projects, Solar Rooftop PV and other small solar Projects to be commissioned during FY, wherein PPA are signed on or before 31 March, 2014, shall be as stipulated in the Commission s Generic RE Tariff Order (Case No. 6 of 2013) for RE technologies for fourth year of control period, issued on 22 th March, 2013. General Conditions for all New RE Projects: Payment Mechanism:- Payment shall be made within 60 days from the date of receipt of Bill/ Invoice in Circle office. Late payment surcharge at the rate of 1.25% per month shall be applicable for the payment beyond a period of 60 days from the date of billing. For existing RE projects commissioned on or before 31 st March 2010, the payment mechanism shall be as per the EPA. Other Terms and Conditions: (i) The Tariff determined for a particular year shall continue to be applicable for the entire duration of the Tariff period i.e. Agreement Period. (ii) The Tariff payable to all the RE generators shall be the Net Tariff (upon adjusting for accelerated depreciation benefit). However, if benefit of accelerated depreciation is not availed by the project developer, the Total tariff shall be made applicable. In such case, the project developer at the time of execution of EPA shall submit an Undertaking that he is not going to avail the said benefit and after the end of financial year shall submit the duly certified certificate from the Chartered Accountant / Copy of Income tax returns confirming that, the benefit of accelerated depreciation is not availed. (iii) Applicability of Reactive Power Penalty : Till the finalization of suitable action plan with regard to the reactive power penalty the reactive power compensation as stipulated in following paragraphs (in line with the MERC Order dated 5

29.04.2011) and as may be revised from time to time shall be applicable in the following manner for all the RE Projects (Existing and New): a. - In case of Wind Energy Projects: Reactive energy charge at the rate of Rs 0.10jRkVAh shall apply for reactive energy consumption upto 10% of the active energy delivered to the grid by the Generators. The reactive energy consumption in excess of 10% of active energy delivered to the grid shall be payable at the rate of Rs 0.25jRkVAh. Reactive energy charges shall be recovered from the bill of the developer for energy sold to the Utility; in case of self-usej third party, these charges shall be added to the monthly electricity bill of the developerj generator. b. In case of biomass power projects, non-fossil fuel based co-generation projects and Small Hydro projects, the Project will supply reactive power (RkVAh) equivalent to at least 36% of the active power (kwh) supplied to the grid on a monthly basis. In case of failure to do so, the STUjLicensee shall charge the shortfall at the rate of Rs 0.25jRkVAh, or such other rate as may be stipulated by the Commission from time to time. All the field officers are requested to take necessary action accordingly. ~.:.V"\'" Chief Engineer (Commercial) Copy: As per mailing list. 6