Feasibility Studies on Climate Change Mitigation Projects for Clean Development Mechanisms and Joint Implementation in 2003

Similar documents
EU Energy Policy and Energy Security of Central Europe VIII. Panel III. Nuclear energy in the EU and Central Europe Sándor NAGY MVM Ltd

General overview for investors in Hungary s energy market

Approved consolidated baseline and monitoring methodology ACM0013

Introduction to the Hungarian energy market

Determination Report

MOL CEZ Joint Venture. Budapest, 20 Dec 2007

Power Market Outlook in Hungary 2016

Draft revision to the approved consolidated baseline methodology ACM0007

AES WWF Co-operation in Hungary. Vienna, November 13 14,2006

ELECTRICITY TRADE AGREEMENT. An Assessment of the Ontario-Quebec Electricity Trade Agreement

Flexibility in the Swiss Electricity Markets. Jan Abrell Energieforschungsgespräche Disentis 2019,

SOPRONKÖVESD WIND FARM

Aggregated Costs of the German Energiewende How to improve Cost Effectiveness

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-PDD) Version 02 - in effect as of: 1 July 2004) CONTENTS

Merit Order Effect of Wind Power Impact on EU 2020 Electricity Prices

(20-MW Geothermal Power Generation)

Optimizing the Generation Capacity Expansion. Cost in the German Electricity Market

Outcomes TYNDP Visions - Request for Stakeholder Input Period 3 December January 2013

Wind energy and Climate policy Fixing the Emission Trading System

100% Fossil Free Electricity. June 27, 2018

Economics of Distributed Resources

Renewable energy in Europe. E-turn 21 workshop Cologne, 10 May 2006

WIND POWER TARGETS FOR EUROPE: 75,000 MW by 2010

Potentials of load-shifting with renewable energy storage: an environmental and economic assessment for the UK

Long-term Market Analysis Nordics and Europe Executive summary

JOINT IMPLEMENTATION PROGRAMME OF ACTIVITIES DESIGN DOCUMENT FORM Version 01 - in effect as of: 01 November CONTENTS

EU 2020 Targets: Managing integration of wind in the Hungarian grid. Tari Gábor CEO. Wind Energy the Facts Tari G. 12 June 2009 Workshop,

Highlights and Key Results

Carbon abatement effects of electricity demand reductions

JOINT IMPLEMENTATION (JI) PROJECT DESIGN DOCUMENT FORM 1 CONTENTS. C. Duration of the project activity / Crediting period. Annexes

How can the next Chief Executive build on Government s Climate Action Plan and encourage renewable energy uptake?

ENERGY AND POWER SUMMARY (Avoidance, mitigation and enhancement considerations)

Pannonia Ring wind farm Joint Implementation Project. Baseline Study & Monitoring Plan DRAFT

How? Establish a global power sector carbon budget

LAW ON ENERGY EFFICIENCY

Draft revision to the approved baseline methodology AM0014. Natural gas-based package cogeneration

Renewable Energy Guidance

Shadow price of carbon in economic analysis. Guidance note

Carbon Pricing. Overview of the Brattle Report. Nicole Bouchez, PhD Principal Economist Environmental Advisory Council Meeting

The Commission's Energy Roadmap 2050

Summary The world's capacity of renewable energies including hydropower is expected to increase from 2,200 GW at the end of 2017 to over 2,600 GW at t

Dominion Cove Point Export Project Platts 16 th Annual Liquefied Natural Gas February 9, 2017

Methodology for calculating subsidies to renewables

WORKGROUP REPORT ON GREENHOUSE GAS REDUCTION IN ENERGY SECTOR

The Impacts of the Green Communities Act on the Massachusetts Economy:

Resource and Financial Impact of Clean Line P&E HVDC Delivered Wind Resources for TVA

POWER CHOICES Pathways to carbon-neutral electricity in Europe by 2050 Nicola Rega Advisor Environment and Sustainable Development Policy

Smart grid concepts at TSO level

EPA's Clean Power Plan: Evaluating State Compliance Plan Options

Prepared for: The Ministry of Economy, Trade and Industry

Future of the Nuclear Power Generation in Hungary

1 Risks and Opportunities Objective: To identify strategic risks and opportunities and their implications.

Canadian Wind Energy Association Operations and Maintenance Summit

EDF EU Group entities are regulated under EU ETS and EDF operates on the carbon market (EUAs and CERs/ERUs) through EDF-T, its trading entity

Renewable energy: regulatory and market issues

Dr. Tamás János KATONA Scientific Advisor Paks Nuclear Power Plant Hungary

This analysis was prepared by Matt Gurnham under the direction of Peter Harrison and Jeffrey Novak.

About Energy UK. Introduction

Simulated Energy Scenarios of the Power Sector in Bangladesh

E.ON s UK Consolidated Segmental Report for the year ended 31 December 2013

Energy in Denmark a framework for renewable energy. Lars Georg Jensen Chief Adviser, Energy Systems, Danish Energy Agency Dublin, RE Summit 2016

China - Risks From Power Sector Reform

Consolidated Financial Results for the Second Quarter of Fiscal Year Ending December 31, 2017 (Japan GAAP)

DRAFT 8/11/08. I. Renewable Portfolio Standard. (a) The Commission shall establish minimum numerical portfolio standards for each investorowned

THE EEG SURCHARGE FOR 2014

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.:51272 Project Name

DIRECTING THE STRATEGIES OF THE ELECTRICITY PRODUCTION SECTOR IN ROMANIA BASED ON THE RESULTS OF THE INTEGRATED ANALYSIS - ECONOMIC AND ENVIRONMENTAL

CARBON MARKET CDM training program 24 th of June 2010 JICA expert team Shiro Chikamatsu

Cleantech Leaders Conference, NYC March 11, 2009

GENERATION EXPANSION PLAN FOR THE 2014 NATIONAL TRANSMISSION NETWORK DEVELOPMENT PLAN

CLEAN DEVELOPMENT MECHANISM PROPOSED NEW METHODOLOGY: MONITORING (CDM-NMM) Version 01 - in effect as of: 1 July 2004 CONTENTS

Cape Verde: Achieving Fossil Fuel Independence through Innovation

Senate Bill 350 Study

Alberta Capacity Market

AES EMEA Generation Business Review AES CORPORATION AES CORPORATION. John McLaren Vice President. City or location Month XX, 20XX

Benefits for partners outside the EU

Approved baseline methodology AM0019

Nuclear Power Economics and Markets

Peninsula Clean Energy could launch a CCE by Fall January October 2015 October 2015 February 2016 March 2016 October 2016

Development and evaluation of long-term scenarios for a balanced European climate and energy policy until 2030

New Mechanism Feasibility Study for Development of Best Grid Electricity Mix Focusing on Renewable Energy Sources In Sri Lanka

World Bank: Carbon Finance Activities

Impact of Regional Greenhouse Gas Initiative and Renewable Portfolio Standards on Power System Planning

Green Electricity in Austria - Summary 2010

INNER MONGOLIA HANGJIN YIHEWUSU WIND POWER PROJECT

Public Generating Pool hired E3 to create a scenario analysis tool, to assess how different policies impact cost, emissions, and reliability of the El

Japan s Energy Mix and Clean Coal Technology

Geothermal Hot Water Supply of Saburtalo District in Tbilisi, Georgia

Transitioning to Low Carbon

Small Scale Methodologies in Power Sector

Document of The World Bank

EMAN- Sustainable Supply Chains Finland The role of risk related to carbon finance in CDM projects

Harness the wind to tackle climate change. = less CO 2

Pass Through Costs for Business Electricity Customers from 1st October 2017

Basics of Carbon Finance. Klaus Oppermann, World Bank Carbon Finance Unit Tenth Annual Financial Agent Workshop Washington DC, June 28, 2006

Coal Region in Transition Platform

Revision to the approved consolidated baseline methodology ACM0001. Consolidated baseline methodology for landfill gas project activities

Gangwon Wind Park Project

25th USAEE / IAEE North American Conference, Denver, CO, USA

Zero Net Carbon Portfolio Analysis

Transcription:

Feasibility Studies on Climate Change Mitigation Projects for Clean Development Mechanisms and Joint Implementation in 2003 Feasibility Study on Wind Power Generation including financial study (Hungary, Monsonmagyarvar) Summary Report March 2004 MIZUHO SECURITIES CO., LTD. 1

1. Key information with regard to the project (Status of procedure to JI by the Hungarian Government) A law (called JI law in abbreviation) including approval and procedure of JI project in Hungary is being prepared and to be performed in 2004. The Hungary Government has designated its own items stated in the project design documents, and they are to be described in the above JI law. The project plan requires that the following information should be described. General information / technical and financial information / survey of the baseline / survey of acceptance / monitoring plan / analysis of influence / social communication 2. Outline of the project The purpose of the project is to perform wind power generation project with 24MW capacity (scheduled to install 12 facilities of wind power generation with 2.0MW) in Mosonmagyarovar located in the Northwest area of Hungary, near the border of Austria and Slovakia. The main bodies of the project performance are Northwest Hungarian Electricity Delivery Company Ltd. (called EDASZ, hereinafter), which is a power distribution company to the above area and Eon, a German electric power company which is its parent company. 3. Simulations of wind conditions in the area where the project is performed and power generation there 3.1 Simulation of wind conditions In accordance with a numerical model and the wind data measured in Mosonszolnok, the wind conditions were forecast in Kimle where windmills will be installed. A simulation of wind conditions was conducted by using WAsP, a representative numerical model, developed by RISO research laboratory in Sweden. An availability factor was reviewed with the specification of E-66 (2MW) designed by ENERON, a German company. Note that there is no relation between the windmill selected for the simulation and a windmill to be actually selected. 3.2 Results Annual power generation [kwh/year] 3,457,807 Availability factor [ ] 87.4 Utilization factor [ ] 19.7 2

The data of wind conditions for simulation have been measured by anemometers, which can also measure the direction of wind, on nacelle. The data smaller than actual values are expected because the anemometers worked in the after current. For this reason, there is a possibility that the simulation results will bring the simulated power generation lower than the actual power generation. Measured wind direction can also be a little bit biased from the actual direction by rotation of the after current because the wind direction is in the after current of nacelle. 4. Baseline study and greenhouse gas reduction effect 4.1 Methodology of baseline applied to the project activity "CO2 emission quantity increased with power generation which will be increased in the grid" without the project becomes the baseline emission gas quantity, because the project is the wind power generation project connected to the national grid of Hungary. Hence, the project uses CO2 emission factor gained by multi-projects for the electric power sector in Hungary as a baseline. For estimation of the coming CO2 emission factor, the project also has used the power generation scenario for individual power station estimated in "Baseline scenario in Hungarian electric power sector" which the Hungarian power companies (MVM) developed. 4.1.1 Baseline scenario in the Hungarian electric power sector (1) Outline For the development of the baseline scenario, the project utilized "ENPEP / IMPACTS" model and "ENPEP / BALANCE" developed by Argonne national laboratory (Chicago, USA), used for making the Hungarian power source development program. (2) Premises of the scenario (assumption) Period: 2001-2012 - 2020 Electric demand: +1% to 2005, +2% later than 2005 Peak load: +0.9% to 2005, +1.8% later than 2005 Base year: 2000 (peak load 5750MW, power demand 38.5 TWh) Ratio of import / export of electric power: 3% Introduction of best available technology in renewal or new construction of power plants 3

Table 4.1-1 Tendency of power source plan and power capacities Power Electric power capacity MW) Power station Fuel Efficien cy Plan for power source 2000 2008 2009 2010 2011 2012 Paks nuclear 1,752 1,800 1,800 1,800 1,800 1,800 Paks nuclear 31%abolition by 2001 1,752 - - - - - Paks, hosszabb. nuclear 31%renewal of facility in 01-02 - 1,800 1,800 1,800 1,800 1,800 Dunamenti oil, gas 1,872 1,452 1,452 1,452 1,452 1,452 Dunamenti F oil 29%abolition by 02 420 - - - - - Dunamenti F gas 36% 1,230 1,230 1,230 1,230 1,230 1,230 Dunamenti G2 gas 48% 222 222 222 222 222 222 Tisza II. oil, gas 833 884 884 884 884 884 Tisza II. oil 36%abolition by 01 612 - - - - - Tisza II. R gas 51%increase of facility in 01-02 221 884 884 884 884 884 Mátra lignite 748 576 576 576 576 576 Mátra lignite 29%abolition by 03 172 - - - - - Mátra R lignite 31% 576 576 576 576 576 576 Tiszapalkonya coal 23%abolition by 00 48 - - - - - Oroszlány coal abolition by 03 211 - - - - - Oroszlány coal 27% 49 - - - - - Oroszlány coal 27% 162 - - - - - Bánhida coal 30%abolition by 00 87 - - - - - Pécs coal 111 25 25 25 - - Pécs coal 26%abolition by 01 86 - - - - - Pécs coal 26% 25 25 25 25 - - Borsod coal 22%abolition by 01 78 - - - - - Ajka coal 23%abolition by 00 25 - - - - - Inota coal abolition by 02 24 - - - - - Inota coal 16% 14 - - - - - Inota coal 16% 10 - - - - - Inota-GT gt-oil 28%abolition by 02 170 - - - - - Csepel gas 45%new installation of facility in 01-378 378 378 378 378 Litér, Sajószöged gt-oil 32%abolition by 04 170 - - - - - Ujpest II. gas 57%new installation of facility in 01-100 100 100 100 100 Debrecen gas 55%new installation of facility in 03-92 92 92 92 92 Csúcs, gáz gas 36%new installation of facility in 11 - - - - 160 160 Kispest II. gas 74%new installation of facility in 05-116 116 116 116 116 4

Tisza, Fonix gas 37%new installation of facility in 05-188 188 188 188 188 Új, kapcs., fluid coal 43%new installation of facility in 12 - - - - - 130 Total 11,680 10,348 10,348 10,348 10,458 10,588 (Source: MVM) 4.1.2 Identification of Marginal Plant and calculation method of CO2 emission factor As to the power plants to generate the increase of electricity in the grid in case that this project does not exist ("Marginal Plant") and the calculation method of CO2 emission factor, we consider as follows. Exclude the power plant Paks from "Marginal Plant" because it is a "must run" plant which supports the base power. Assume that in Hungary co-generation power plants with the thermal efficiency of 65% or more (75% or more in case of natural gas) are no "Marginal Plant" because electric power delivery company (MVM) or power supplies company has an obligation of buying electricity. In Hungary, free retailing of electricity by the third party access started on January 2003 and expansion of free retailing to demanders other than family that will start on July 2004 was decided. In addition to it, 100% free retailing including family demand is expected in 2007 based on EU requirement. Because electricity price is decided by the market mechanism in such free market of electricity, power plants with higher electricity prices do not always become "Marginal". Accordingly, as we cannot decide "Marginal Plant" in advance, we assume the average CO2 emission unit from selected power plants as the baseline. That is, we focus only on the fossil power plants in the above power plants and as the baseline use the average CO2 emission unit from total fossil power plants except the co-generation plants with 65% or more of thermal efficiency (75% or more in case of natural gas). But the plant efficiency of the above mentioned power plants are assumed conservative, and the co-generation plants (65% or more thermal efficiency, 75% or more in case of natural gas) whose power is purchased with obligation do not exist. So, we finally use the average CO2 emission unit from total fossil power plants as the baseline. Ministry of Economy of Hungary does not necessarily agree to the exclusion of co-generation plants from the baseline. If co-generation plants to be considered exist, we need to negotiate with Hungary Government. 5

4.2 Justification of selection of the method and reason for applying it to the project The MARRAKESH ACCORDS defines the criteria for baseline setting to co-operation business as follows. On a project-specific basis and/or using a multi-project emission factor; In a transparent manner with regard to the choice of approaches, assumptions, methodologies, parameters, data sources and key factor; Taking into account relevant national and/or sectoral policies and circumstances, such as sectoral reform initiative, local fuel availability, power sector expansion plans, and the economic situation in the project sector; In such a way that ERUs cannot be earned for decreases in activity levels outside the project activity or due to force majeure; Taking account of uncertainties and using conservative assumptions We consider that our baseline setting to the project satisfies the above criteria for the next reasons; Using CO2 emission factors for multi-projects applied to Hungarian electrical sector. Using the algorithm based on the open "ENPEP / IMPACTS" model and ENPEP / BALANCE", and showing premises (assumptions) and data clearly. Containing in scenario liberalized market of electricity in Hungary, enforcement of environmental regulation such as SO2 emission regulation, abolition / renewal / new construction program considering aged facilities and economical situation. Setting low electricity import ratio (3%) as a conservative estimation in the model calculation and setting conservative plant efficiency, which is largely dependent on plant availability. (Note: By considering the lower electricity import ratio, CO2 emission unit becomes smaller, because earlier introduction of the newest plants is expected in Hungary. 4.3 Description of application method to the project activity The emission of greenhouse gas from the project does not exist because the project is a wind power generation project, and the baseline emission quantity corresponds to the reduced quantity of emission gas, which produces greenhouse effect, in the project. The baseline emission quantity is defined as "CO2 emission gas quantity accompanied with power increase in grid" in case of no existence of the project as mentioned above, and we calculate CO2 emission unit for the baseline according to the baseline methodology above. Then we can get annual reduction quantity, which produces greenhouse effect, by multiplying the unit by the annual power production expected in the project. 6

4.4 Description with regard to the reduction of artificial GHG emission gas quantity, compared with the case that the project does not exist. Because the project is for the system connected to the Hungarian national grid, the generating power by the project is an alternative of the power from other power stations, which are connected to the grid. Because the project is for the wind power generation the emission gas is zero for the greenhouse effect. The power stations in the Hungarian national grid consist mainly of fossil fuel plants with natural gas, coal and oil, and the emission gas for the greenhouse effect is reduced from those plants. 4.5 Additionality The wind power generation project is widely applied and the presently planned 2MW facility is in the phase of actual use. When such a wind power generation project is operated in the region where regulations (for land use, for environmental restriction, etc) and the impact to the environment are resolved, higher or lower competitiveness in the local electrical market will be only a barrier for the project. When we consider additionality of the JI project, we can think the project has the additionality required for JI project if it has no competitive power in the regional electrical market. In Hungary, there exists higher price purchasing system for the power generated by renewable energy and we make use of it for the project. Therefore we cannot prove the additionality in case of the power generating cost comparison. For this reason, we decided to evaluate the additionality by the evaluation of IRR and capital investment recovery year. The followings are the IRR which credit is not considered for and the evaluation result of the capital investment recovery year. IRR: 10.32% Capital investment recovery year: 9.78 yr We discussed the IRR and the capital investment recovery mentioned above with EDASZ, a main body for the business and their evaluation was "Longer period than 9 years for the capital investment recovery is not sufficient for the 20 year project. From this viewpoint, we consider that this project has additionality. 4.6 Description of how to set the project boundary with regard to the baseline method As mentioned above, the baseline methodology for the project adopts a static baseline and the average CO2 emission unit from plants other than "must run" power plants in the Hungarian national grid. Accordingly, as the project boundary related to the baseline methodology, we consider other activities except the project activity as follows. Apply CO2 emission unit as the baseline and consider the grid within the project boundary because selling power to the grid determines the absolute 7

value of the baseline emission gas quantity. Do not contain the GHG emission quantity related to the manufacture, transportation and construction of wind power generation facility in the project boundary because it is much smaller than the GHG reduced by the project performance. Do not contain the import / export of power from / to other domestic plants or plants in other countries in the project boundary because the baseline methodology applies a static method. Do not consider the status of power consumption in the project boundary because it gives no impact to the baseline emission. 4.7 Leakage (Change of the emission gas quantity produced in the outside of the business area) There is no change of emission gas quantity (leakage) produced outside the area where the project is performed. 4.8 The reduction of the greenhouse effect gas emission The wind power generation does not produce the gas for the greenhouse effect and leakage. So, in the project the baseline emission gas quantity corresponds to the reduced quantity of the gas for the greenhouse effect. The calculation of the baseline emission gas is shown below. 4.8.1 Calculation of the average CO2 emission unit for all fossil power plants (1) Calculation method of fuel consumption of each power plant CO2 emission quantity (TJ) = generating power (GWh) plant efficiency (%) 3.6 10 6 (in case that several fuels exist, sum of each fuel) (2) Calculation method of CO2 emissions quantity for each plants and each fuel CO2 emission quantity = fuel consumption C emission factor 44/12 (in case that several fuels exist, sum of each fuel) (3) Calculation method of CO2 emission unit for the baseline Divide total CO2 emission quantity from each plant in each year by total generating power CEFx = CEx(i) Opx(i) Here, CEFx : Average CO2 emission unit from power plants included in the baseline in year X CEx(i) : CO2 emission quantity from power plants (i) included in the baseline in year X Opx(i): Generating power from power plants (i) included in the baseline in year X 8

(4) Calculation results The results of CO2 emission unit calculated by the above method are shown as follows. CO2 CO2 emission exhaust unit CO2/MW Average CO2 CO2 emission exhaust unit unit from from all all fossil fossil plants plants Fig 4.8-1 Baseline of the project 4.8.2 Calculation of the baseline emission gas quantity (1) Calculation method of the baseline emission gas quantity Annual CO2 baseline emission quantity can be calculated by "CO2 emission unit" shown in Fig. 4.8-1, times annual selling generating power produced in the project as follows. Baseline emission quantity = OpPx CEFx Here, OpPx : Annual generating power with the project in the year X (2) Calculation results Annual CO2 reduction quantity calculated by the above method, are shown below. Table 4.8-1 Annual CO2 reduction quantities CO2 emission unit (t-co2/mwh) Annual generating power (kwh) Annual CO2 reduction quantity (t-co2) 2008 0.73 3,457,807 30,473 2009 0.73 3,457,807 30,280 2010 0.72 3,457,807 30,010 2011 0.70 3,457,807 29,173 2012 0.71 3,457,807 29,603 9

5. Monitoring plan 5.1 Monitoring method applied to the project We monitor only the data related to the baseline emission gas quantity because greenhouse gas is not emitted from the project. Because the baseline methodology in the project makes use of the static method and CO2 emission factor is decided in advance, we monitor only the selling generating power in the project necessary for the calculation of the baseline emission gas quantity. 5.2 Justification of selection of the method and reason for applying it to the project The above methodology can be applied to the project due to the following reasons. (1) There is no greenhouse gas emission from the project because the wind power generation does not require fossil fuels. (2) The project is connected to the Hungarian national grid. (3) The project stands on the baseline with total fossil power average in the Hungarian national grid, and the baseline is static. Hence, the parameter, which decides the emission gas quantity, is the selling power from the project only. 5.3 Data acquired for monitoring the emission quantity released from the project activity, and their saving method There is no greenhouse gas in the project. 5.4 Identification, acquisition and saving method of the related data necessary for baseline setting. ID Data type Data Data Will data be How is data For how long is Comment number variable unit collected on archived? data archived to this item? (If no, explain). (electronic/pape r) be kept? D-1 Selling generating power MWh Yes Electronic At least 1 year after ERU issued 5.5 Procedures for QC and QA in monitoring Data Uncertainty level of Are QA/QC Outline explanation why QA/QC procedures are or are not data (High/Medium procedures planned being planned. /Low) for these data? D5-1 Low Yes Monitoring of selling generation power and maintenance of instruments are performed from the standpoint of the project management, but not from the operation of JI project. 10

6. Plan of fund in case of the project execution 6.1 Plan of fund in case of the project execution (How to procure fund demanded and national fund) There is a high possibility that EDASZ / Eon supply the fund. However, details of the execution scheme are under review by Eon / EDASZ, and the role of Japan side is also under negotiation with EDASZ. EDASZ seems to consider that the fund is procured with no problem because Eon, a German company, is the parent company. Table 6.1-1 Fund demanded for the project Item 1,000Yen 1,000HUF Wind power generator and attached 3,300,000 6,600,000 equipment Transforming, Connecting, Managing 450,000 900,000 and others Total 3,750,000 7,500,000 6.2 Information with regard to national fund source The budget for financial assistance applied to this area is 1.2 billion HUF under the assistance system called KIOP (Grant) and the upper limit is 0.3 billion HUF per one business. The amount of money supplied per one business is small and the total budget is 0.3 billion HUF times 4 items. The possibility to be applied is lower and the effect will be restricted. 7. Comparison of revenues 7.1 Premises In Hungary, the associated organizations accord with the obligation to buy the power generated by renewable energy, with higher price. Table 7.1-1 Purchasing prices of power produced by renewable energies ( by Ministry of Economy and HEO ) 2003 2004 High time 24.0 HUF/kWh 25.3 HUF/kWh Low time 15.0 HUF/kWh 15.8 HUF/kWh Weighted average of the prices above per time of one week is 18.34 HUF / kwh and the future prices are assumed to raise per consumer index, based on the 18.34 HUF / kwh. 11

7.2 Results of trial calculation Table 7.2-1 IRR (Credit acquisition period --- 5 years, unit: %) CO2 credit price (US $/t-co2) No credit 10$ 15$ 10.32 10.65 10.81 Table 7.2-2 IRR (Credit acquisition period --- 18 years, unit: %) CO2 credit price (US $/t-co2) No credit 10$ 15$ 10.32 10.96 11.28 Table 7.2-3 Capital investment recovery year (Credit acquisition period --- 5 years, unit: year) CO2 credit price (US $/t-co2) No credit 10$ 15$ 9.78 9.50 9.35 Table 7.2-4 Capital investment recovery years (Credit acquisition period --- 18 years, unit: year) CO2 credit price (US $/t-co2) No credit 10$ 15$ 9.78 9.36 9.16 8. Review of the fund introduction from Japan and business scheme 8.1 Review of the project from fund introduction standpoint (1) According to the current fund plan, it is more possible that Hungary side supplies the fund. When some company that will acquire credit is interested in the investment, the Hungary side will review the package of both credit and investment. (2) In the project, considering the present fund plan, it is more likely that the Hungary side will select deferred payment than in-advance payment, if the credit is purchased. The reason is that credit trade with good prices in the deferred payment is preferred to cash acceptance needs in the in-advance payment. 8.2 Review of scheme for the fund introduction from Japan (1) Japanese companies will individually make credit purchase agreement with the project side. But, when companies, which want the credit increase to 5 to 10, the workload of the project side may increase for negotiations of the contract, dealing conditions, etc. 12

(2) SPE is settled and the SPE makes the contract of credit purchasing with the project side. The SPE sells the credit to Japanese companies. The SPE will perform the credit purchasing not only with this project but also with other projects. (3) The following cases can be considered with the investment to the business although the realization is less possible in the project. the dividend is paid by the credit itself to investment, SPC possesses the facilities and leases them to local companies which conduct power generation business. However, various matters should be solved prior to the realization. investment plan to several JI projects besides this project. The credit is independently purchased in accordance with another purchasing plan, and money return is expected. 13