Director, U.P. New and Renewable Energy Development Agency, Vibhuti Khand, Gomtinagar, Lucknow

Similar documents
Uttar Pradesh Solar Energy Policy-2017

Solar Power Policy Uttar Pradesh 2013

(Draft Captive and Renewable Energy Generating Plants) Regulations

BEFORE THE GUJARAT ELECTRICITY REGULATORY COMMISSION GANDHINAGAR

Uttar Pradesh Electricity Regulatory Commission

Jammu and Kashmir State Electricity Regulatory Commission

UTTARAKHAND STATE GOVT. POLICY FOR HARNESSING RENEWABLE ENERGY SOURCES

MADHU SHARMA University of Petroleum and Energy Studies, Dehradun, India

Government of Gujarat Energy and Petrochemicals Department G.R. No.EDA B Sachivalaya, Gandhinagar. Dated the 25 July, 2013.

450 Compendium of Regulations & Tariff Orders Issued by Regulatory Commissions for Renewable Energy Sources in India

GOVERNMENT RAJASTHAN POLICY FOR PROMOTING GENERATION THROUGH NON-CONVENTIONAL ENERGY SOURCES Sl. No 1 Order Energy Deptt. letter no. F.

Overview of Indian Power Sector & Opportunities for for promoting Social Inclusion in Indian power sector

GOVERNMENT OF RAJASTHAN

Chhattisgarh State Electricity Regulatory Commission

ORISSA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK BHAWAN UNIT-VIII, BHUBANESWAR ***** NOTIFICATION Dated the 30 th September, 2010

Compendium of Regulations & Tariff Orders Issued by Regulatory Commissions for Renewable Energy Sources in India

SECTOR ASSESSMENT (SUMMARY): ENERGY (RENEWABLE ENERGY GENERATION SOLAR)

PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO NO , SECTOR-34 A, CHANDIGARH

Abhilakh Singh General Manager 12th April, 2016

November Explanatory memorandum for CERC Regulations for implementation of REC mechanism in India

Uttar Pradesh Electricity Regulatory Commission

Jawaharlal Nehru National Solar Mission

Haryana Solar Power Policy, 2016

Development and Financing of Renewable Energy Projects in India

Grid Connected SPV Rooftop Systems. Policy and Regulatory Framework in Various States. Policy/ Tariff * Validity upto

Presentation Title ( Arial, Font size 28 ) Urban Rooftop PV Projects

GOVERNMENT OF ANDHRA PRADESH ABSTRACT

Gandhi Nagar 5 MW Solar Distributed/ Rooftop PPP Project

Partnership to Advance Clean Energy - Deployment (PACE-D) TA Program

Net Metering Inter Connection agreement

318/331/2017-GCRT Government of India Ministry of New and Renewable Energy *** NOTICE

(On Stamp Paper of Rs.100/-) Net Metering Inter Connection agreement

No. UPERC/Secy/VCA/ Dated: Public Notice

RE Tariff Setting Approach

SMALL HYDRO PROGRAMME IN INDIA. Bhuwanesh Kumar Bhatt Ministry of New and Renewable Energy

Amar Variawa Director - Marketing & Public Affairs Vestas India and SE 16th June 2016

SuryaC n HYDERABAD WITH SPECIAL FOCUS ON ROOFTOP SOLAR, SOLAR PARKS, UTILITY SCALE PROJECTS & PV MANUFACTURING

Policy Resolution for Promotion of. Petroleum, Chemicals and Petrochemical Investment Regions (PCPIRs)

Significance of Grid Connected Rooftop Solar Photo Voltaic in Kolkata and other Urban Spaces of West Bengal

National Power Summit Hyderabad. 9 th February 2018

With the support of the PV Market Alliance. APVIA Q Market Report

Renewable Energy Sector Profile

IMPERATIVE FOR RENEWABLE ENERGY SOURCES AN INSIGHT INTO THE REGULATORY AND POLICY FRAMEWORK

Section 86(1)(e): Specify Renewable Purchase Obligation. (RPO), grid connectivity. Section 61(h): Tariff regulations to be guided by promotion

KERALA SOLAR ENERGY POLICY 2013

HARTEK POWER PVT LTD SOLAR BUSINESS CATALOGUE (Formerly known as Amtek Energy & Power Pvt Ltd)

The Energy Solutions Company OPEN ACCESS

Net Metering inter connection agreement

CENTRAL ELECTRICITY REGULATORY COMMISSION. New Delhi In exercise of powers conferred under Section 178 of the Electricity Act,

New Business Opportunities. Repowering, Offshore, MW scale Wind-Solar hybrids and Small Wind Turbines

Renewable Policy Framework and Wind Energy Programme in India

PROCEDURE FOR GRANT OF DISTRIBUTION OPEN ACCESS PERMISSION AS PER MERC (DISTRIBUTION OPEN ACCESS) REGULATIONS, 2014

A Multi Stakeholder Perspective

(To be published in the Gazette of India, Part I, Section 1) RESOLUTION. Tariff based Competitive-bidding Guidelines for Transmission Service

Accelerating Adoption of Rooftop Solar PV in India Through Project Aggregation and Financing

Comm/CP/NCE/Tariff/28362 Date: COMMERCIAL CIRCULAR No. 228

Renewable Energy Market Potential and Policy Overview in India

G.O. Ms. No.48. i) Tariff determination ii) Allotment of Potential Sites iii) Wheeling Charges and allied issues

NEW POLICY FOR POWER GENERATION FROM NON-CONVENTIONAL SOURCES OF ENERGY -2008

Jawaharlal Nehru National Solar Mission Building Solar India Ministry of New and Renewable Energy Government of India

Bihar Electricity Regulatory Commission Vidyut Bhawan-II, J.L. Nehru Marg, Patna

No Change. No Change

ENERGY POLICY, U.P.has a current peak deficit of power to the extent of 3000 MW. This is because no new plant came up after 1994.

Session 2: Theme Presentation On Issues in Scaling-Up of RE Deployment

SECTOR OVERVIEW. be restructured with commercial banks. In turn, the utilities commit to implement annual tariff increases. 8

PUBLISHED IN THE KOLKATA GAZETTE, EXTRA ORDINARY, PT.I DATED AUGUST 10, 2010 VIDE NO. WB (Part-I)/2010/SAR-460

Independence Freedom Happiness No: 11 /2017/QD-TTg Ha Noi, 11 th April 2017 DECISION. On the

ORISSA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK BHAWAN UNIT-VIII, BHUBANESWAR *********

M.P. Electricity Regulatory Commission

Energy from Renewable Sources Act

The Energy Solutions Company OPEN ACCESS

Compendium of Regulations & Tariff Orders Issued by Regulatory Commissions for Renewable Energy Sources in India

Ref. No.: SRMU/NDP-I/VBMPS-II/ INVITATION FOR QUOTATION FOR SUPPLY OF GOODS UNDER SHOPPING PROCEDURES

Biomass Power Generation: Prospects and Issues

CE/Comm/CP/NCE/Tariff/6699 Date: COMMERCIAL CIRCULAR No. 260

KERALA SOLAR ENERGY POLICY 2013

Draft Rajasthan Solar Energy Policy, 2014

Uttar Pradesh Electricity Regulatory Commission. No. UPERC/Secy/Regulation/ Dated: 23 March, 2006

Published byauthority EXTRAORDINARY ISSUE TRIPURA ELECTRICITY REGULATORY COMMISSION NOTIFICATION OF

Draft JSERC (Rooftop Solar PV Grid Interactive Systems and Net/ Gross Metering) Regulations, 2015

Flexibility in Indian Power System

Replacing Diesel with Solar

Session IV: Access to Electricity Services in Rural Areas

Amendment to Wind Power Policy Wind Power Policy

Approach Paper on Methodology for computation of Cross-Subsidy Surcharge for Open Access transactions

PROJECT TECHNICAL DESCRIPTION

Rural Electrification Policy, 2006

MAXIMIZING. Making Use of Existing Roofs

Regulatory Framework for Storage Microgrids

COMMERCIAL CIRCULAR NO.: 194.

State wise analysis of RPO Regulation for Captive users

BEFORE THE ORISSA ELECTRICITY REGULATORY COMMISSION BHUBANESWAR

Sub: Comments on Draft National Renewable Energy Act", 2015

APSERC (Draft Terms and Conditions for Tariff Determination from Renewable Energy Sources) Regulations, 2018

APPLICATION FOR GRANT OF LONG-TERM OPEN ACCESS (to be submitted by the customer to STU)

Energy scenario in Himachal Pradesh and make in India vision 2030

CASE No. 328 of Coram. Anand B. Kulkarni, Chairperson I.M. Bohari, Member Mukesh Khullar, Member

Electricity Tariff Reform in Uttar Pradesh, India. Challenges & Key Findings May 2018

Solar Power in India 2011

Transcription:

The previous Solar Power Policy-2013 and Solar Rooftop PV Plant Policy-2014 is hereby being presented as Draft U.P. Solar Power Policy-2017 Comments/Suggestions are invited till 15-07-2017 on draft Uttar Pradesh Solar Power Policy-2017 Comments/Suggestions may be sent through email at dirupneda@gmail.com / compneda@rediffmail.com or may be sent by post at Director, U.P. New and Renewable Energy Development Agency, Vibhuti Khand, Gomtinagar, Lucknow-226010 This is a draft of the proposed Solar Power Policy -2017 therefore information provided or provisions /incentives proposed are not final. Final Solar Power Policy-2017 will be promulgated after the approval of competent authority.

Uttar Pradesh Solar Power Policy 2017

Table of Contents 1. Preamble...2 2. Title...2 3. Objectives...2 4. Operative Period...3 5. Applicability of the Policy...3 6. Regulatory Framework...3 7. Policy Targets...3 8. Implementation Plan...3 8.1Utility Scale Grid Connected Solar Projects...4 8.2 Grid Connected Rooftop Solar Projects...5 8.3 Off Grid Applications... 7 9. Ease of Business- Enabling Provisions. 7 10. Government of India Incentives...8 11. Empowered Committee...8 12. Nodal Agency...8 13. R&D Activities.. 9 14. Skill Development and Capacity Building......9 15. Benefits under other Policies of Government of UP....9 16. Power to amend the policy.. 9 17. Mini Grid Policy Annexure...10

1. Preamble India, being a tropical country receives adequate solar radiation for 300 days. However, solar power has not been able to contribute to a significant share in the Indian energy mix. The grid-connected capacity of Solar PV in India stands at 12.5 GW (as of April, 2017) of the total 329 GW installed in the country. The market for solar power is, however, set to grow significantly due to improved economics of solar projects and rise in the prices of the fossil fuels. Another push to the sector includes Government of India s commitment to 40% of the country s power from renewable sources by 2030 including achievement of 100 GW from solar power by 2022, of which 40 GW is allocated specific to solar rooftop projects. Additionally, the amendment in the National Tariff Policy in 2016 also targets to achieve 8% contribution from solar energy in the total state mix (excluding hydro) by 2021. To achieve a sustainable development route that provides for advancement in economic as well as environmental objectives, the Government of Uttar Pradesh is determined and taking necessary steps to encourage the generation based on renewable energy sources. The State has potential of 23.8 GW of Solar Energy which the State intends to harness to support the energy requirements of the State as well as meet the MNRE targets of 10.7GW of solar power which includes 4300MW from solar rooftop by 2022. In order to address the energy demand and access issues, the state is also targeted to provide 24 hours electricity connections to rural and urban households by 2018-19. Attaining such an ambitious target will require a complete transformation of power sector scenario in Uttar Pradesh including tapping huge solar energy potential. Additionally, solar energy deployment in the state will also attract investments creating many jobs in the state. The solar industry provides both one-time jobs during precommissioning/ construction phase and regular operations and maintenance positions over the life of the project. Investments in the solar industry as well as domestic manufacturing of solar panels will help create direct and indirect employment opportunities in both skilled and unskilled sector. Thus, keeping in view vast potential of solar power in the state and to improve the power availability, the Government is keen in establishing solar energy based power plants in the state. To achieve this, objective, U.P. State Government hereby declares and adoptssolar Power Policy, 2017. 2. Title This policy shall be known as The Uttar Pradesh Solar Power Policy 2017. 3. Objectives This solar policy has the following specific objectives: To encourage participation of Private Sector and provide investment opportunities to set up solar power projects in the state To support in providing environment friendly and affordable Power for All. To promote Research &Development, innovations and skill development in the state To achieve its target of 8% Solar Renewable Purchase Obligation (Solar RPO) by 2022. 3

4. Operative Period This policy shall come into operation from date of issuance and shall remain in operation for a period of five (5) years or till the Government notifies the new policy whichever is earlier. The Solar Power Projects (SPPs) that are taken up during the operative period shall continue to be eligible for the incentives declared under this policy. 5. Applicability of the Policy The solar policy shall be applicable for the following solar projects set up within the state: 1) Utility Scale Solar Power Projects (SPPs) Utility scale grid-connected solar power projects based on both Photo Voltaic (PV) as well as Solar Thermal technologies pertaining to: Projects set up for sale of power to UP Electricity Distribution licensees Projects set up for sale of power to third parties within the State or outside the State Projects set up for captive generation/ group captive generation (including those funded and owned by developers) with intention to sale part generation to Electricity Distribution Company or Third party. 2) Solar Rooftop Projects State shall encourage the development of solar rooftop projects to meet the MNRE target of 4300MW for the State of UP by 2022. 3) Off-Grid Applications: Solar Street Lights Solar powered agricultural pump sets Any other off grid solar product. 6. Regulatory Framework The Electricity Act 2003, as amended from time to time, mandates the State Electricity Regulatory Commission, to set tariffs for renewable energy as well as to issue regulations pertaining to renewable power purchase obligation (RPO), and set charges for wheeling, transmission and distribution of electricity. 7. Policy Targets The Government of Uttar Pradesh in its endeavor to achieve minimum 8% solar energy out of the total projected consumption (as defined in the Tariff Policy), proposes to meet the target of 10700MW solar power for UP including 4300 MW from rooftop solar projects by FY 22. 8. Implementation Plan The State shall encourage implementation of the Solar Power under below mentioned segments: 4

8.1 Utility scale grid-connected Solar Projects 8.1.1Category-1: Solar Park State Government will promote the development of integrated solar parks for utilizing waste lands in the State for generation of power. Through development of solar parks, private participation will be encouraged by providing plug and play options for developers. Size of Solar Parks set up will be minimum 100 MW capacity at contiguous location,subject to minimum capacity condition of Solar Park laid down by Ministry of New and Renewable Energy (MNRE), Government of India for providing Central FinancialAssistance (CFA) for development of Solar Park. The solar parks can be set up under: A. Public Sector Solar Parks The State shall support the development of solar parks under any of the following modes: 1. Solar Parks developed and managed by Central/ State Government Public Sector Undertaking (PSU) or a Special Purpose Vehicle (SPV) of the State Government 2. Solar Parks developed and managed by a Joint Venture Company (Lucknow Solar Power Development Corporation Limited) comprising of UPNEDA (50% equity) and Solar Energy Corporation of India (SECI) (50% equity) 3. Solar Parks developed and managed bysolar Energy Corporation of India (SECI) on behalf of State Government on mutually agreed terms. Government of U.P will provide the following Incentives: i. Land on lease or Right to use basis for development of Solar Park. ii. iii. iv. Connectivity of Solar Park to the nearest transmission Substation. Support for strengthening of Grid network The State through UPPCL/Distribution licensee to offer purchase of 100 % power generated from solar park out of which atleast 50% of the power will have to be sold to UPPCL/Distribution Licensee. Location of the Solar Park shall be finalized in consultation with State Transmission utility to optimize the cost of transmission.allocation of the Solar Power Projects inside the Solar Park will be done through bidding as per guidelines of Ministry of New and Renewable Energy (MNRE), Government of India B i ii Private Sector Solar Parks The state shall promote the solar parks developed by private companies. Government of U.P will provide the following Incentives: Support for strengthening of Grid network The State through UPPCL/Distribution licensee to offer purchase of 100 % power generated from solar park out of which atleast 50% of the power will have to be sold to UPPCL/Distribution Licensee 5

8.1.2 Category-2: Large scale stand-alone solar projects with sale of power to Distribution Licensee The nodal agency for such projects shall be UPNEDA. The minimum project size shall be 5MW at a single location and shall be awarded through competitive bidding process as per Ministry of New and Renewable Energy (MNRE), Government of India guidelines. Incentives: State Government will bearone-third of the cost of construction of transmission line,for maximum transmission line length of 15 km for thesolar projects in the Bundelkhand and Purvanchal region of the State. Remaining cost for construction of transmission line, bay and substation will be borne by the Project Developer. Incentive will be available only in case of construction of Transmission line by State Transmission Utility (STU)/Distribution licensee. Other charges will be applicable as per the UP Electricity Regulatory Commission (UPERC) regulations, as amended from time to time. 8.1.3Facilities for third Party sale (i) Intrastate sale of solar power to any third party shall be exempted from any wheeling charges/transmission charges. (ii) Interstate sale of solar power shall be exempted from any cross subsidy surcharge and wheeling charges/transmission charges applicable inside the state. (iii) Metering for sale of power shall be done at STU/Distribution licensee substation end 8.2 Grid-Connected Solar Rooftop Projects The State shall encourage implementation of the grid connected rooftop solar photovoltaic power plants on public buildings, domestic, commercial and industrial establishments through following arrangements as per Rooftop Solar PV Grid Interactive systems Gross/Net Metering Regulations,2015 (RSPV Regulations,2015) issued by UPERC and amended from time to time: 8.2.1 Implementation Arrangement: a) Net Metering:The policy shall be applicable to Renewable Energy (RE) Beneficiary, who installs RE Systems under Net Metering Arrangement as per UPERC RSPV Regulation, 2015.Generally, such RE Systems shall be located in the premises of RE Beneficiary. In case of multi storied buildings, residential colonies, commercial buildings, etc,renewable Energy(RE) System could be located at common facility area; the same could supply to the bulk power connection or connection for common facilities therein, and, in other cases, without hindering or encroaching upon the lawful rights of the other occupants. b) Gross Metering: In this arrangement energy in a system is measured under which entire energy generated from a rooftop Solar PV system installed at eligible consumer premises is delivered to the distribution system of the licensee. 8.2.2Implementation Plan: 8.2.2.1Government/Public Institutions i. The Government of Uttar Pradesh shall promote deployment of rooftop solar photovoltaic plants for captive/self-consumption on the offices of the government organizations/state government owned or aided institutions under Net metering mechanism. Installation of these Rooftop solar photovoltaic plants through third party (Renewable Energy Supply Company -RESCO) will be 6

encouraged wherein the consumer shall enter into a power purchase agreement with the Third Party and enter into Net-Metering agreement with the Distribution licensee. ii. The State shall endeavor to participate and avail benefits under the MNRE s scheme on Grid Connected Rooftop and Small Power Plants Programme. Further, the State shall take active part in the Ministry of New and Renewable Energy (MNRE) scheme on implementation of rooftop solar power plants on the roofs of the State Government department and State Public Sector Units namely Achievement-Linked Incentive for Government Sector or any other incentive available under any Government scheme from time to time. iii. All the public institutions such as government owned or aided hospitals, research institutions, educational institutions, hostels & training institutions, libraries, establishments of Indian railways, in the State, such as ticket reservation centre, Railway stations, research and development organization, rest houses, inspection houses etc, shall endeavor to install grid connected rooftop solar photovoltaic power plant and generates &consume some percentage of their annual electricityconsumption from such plant. iv. Nodal Agency, UPNEDA willpay an active role in collection of demand for installation of Grid connected Solar Rooftop Power PlantsfromGovernment departments.upneda will finalize model contract conditions and carry out competitive bidding for discovery of tariff and selection of Renewable Energy Service Companies (RESCO s) for implementation of Grid connected Solar Rooftop projects on Government buildings. v. Funds from the Government of Uttar Pradesh may be made available for providing payment security in case any State Government, Semi Government, Government aided organizations,government owned corporations and statutory bodies etcdecides to implement Solar Rooftop project through third Party (RESCO) mode. However depending on the response generated some budgetary support may also be provided by Government of U.P. for installation of Rooftop Solar Power Plants in State Government, Semi Government, Government aided organizations and corporations. 8.2.2.2Residential &Private Institutions The Government of Uttar Pradesh shall encourage the Residential, Commercial and Industrial units to implement Grid connected rooftop solar power plant, of suitable capacity, on the roof of their premises/area following the regulations as notified by Uttar Pradesh Electricity Regulatory Commission from time to time. 8.2.3 Incentives for implementation of Grid-connected solar rooftop projects The following incentives shall be available to the Grid connected Rooftop Solar PV Plants implemented by the eligible entities, as applicable, during the Operative Period of the policy, i. To promote large scale installation of Grid connected Rooftop systems under Net-Metering arrangement in private residential sectors, State Government will provide subsidy of Rs 10000/KW to a maximum limit of subsidy Rs 20000 per consumer on first come first basis for the first 100 MW applications submitted online to UPNEDA. Subsidy will be disbursed to beneficiary after successful installation and commissioning of Rooftop solar systems with net metering and submission of all documents to the State Nodal agency (UPNEDA). In case the project installation is delayed for more than 6 months, the subsidy shall be withdrawn by UPNEDA. This subsidy will be in addition to any Central Financial Assistance available from Ministry of New and Renewable Energy, Government of India which would be dispersed by State Nodal Agency. 7

ii. The height of the module structure carrying rooftop solar panels, in addition to the building height, shall not be counted towards total height of the building as permitted by building bye laws. Further in case a solar rooftop project is implemented, no further building permission will be required from the local development authorities/local bodies on this account. iii. In compliance to the Rule 47A of Indian Electricity Rules, 1956 the installation and testing of rooftop solar power plant up to 10 kw, will be exempted from the inspection by the Electrical Inspector of the State of Uttar Pradesh. The appropriate Distribution Licensee shall undertake the inspection of the rooftop solar power plant up to 10 kw before commissioning. 8.2.4 Metering Arrangement, Evacuation Voltage & Interconnection with the distribution system Metering arrangement,evacuation voltage of electricity generated from Solar Power Plants and interconnection of the Rooftop Solar Power Plant with the network of the distribution licensee will be as per UPERC RSPV Regulations 2015 and as amended from time to time. 8.3 Other Off-Grid Applications Off Grid applications like Solar Street Lights and Solar Water Pumps for irrigation purpose are being deployed presently in the State on large scale with State subsidy.government of UP will encourage off grid applications in rural areas of the State.State Government will review from time to time and provide support as appropriate.government of U.P. has declared Minigrid Policy U.P. -2016 which is annexed with this policy which may be reviewed by State Government as required from time to time. 9. Ease of Business-Enabling Provisions The State, in order to encourage solar based generation, has prepared the following measures for improving the ease of doing business. However the project developer has to ensure that the generation is within the time limit stipulated in the PPA or within a maximum period of 2 years from the date of application whichever is earlier, failing which the provisions under this policy automatically stands cancelled. The following provisions are for Solar Power Projects (SPP) and solar parks, wherever applicable: i) Single Window Clearance System The nodal agency will undertake single window clearance for all Solar Power Producers. ii) Energy Banking Banking of 100% energy in every financial year shall be permitted, subject to verification by the officials of the concerned State Distribution Company as per banking provisions of UPERC CRE Regulations 2014 and as amended from time to time. iii) Electricity Duty Electricity duty for ten years shall be exempted for sale to Distribution licensee, captive consumption and third party sale in respect of all solar projects set up within the state. 8

10 Government of India incentives Various concessions allowed by Ministry of New and Renewable Energy (MNRE) for solar projects including central excise duty & customs duty exemptions shall be allowed to the project developer. 11. Empowered Committee To resolve key bottlenecks in implementation of this policy and resolve any other Inter departmental issues that may arise from time to time, an Empowered committee will be constituted under the chairmanship of the Chief Secretary of the State. The committee will have the following members:- Chief Secretary - Chairman Infrastructure & Industrial Development Commissioner -Member Additional Chief Secretary/ Principal Secretary Energy -Member Secretary /Principal Secretary, Additional Sources of Energy -Member Secretary /Principal Secretary, Finance -Member Secretary /Principal Secretary, Planning -Member Secretary /Principal Secretary, Revenue -Member Secretary /Principal Secretary, Housing - Member Managing Director, UPPCL -Member Managing Director, UPPTCL -Member Managing Director, Concerned DISCOM -Member Director, UPNEDA -Member Secretary 12 Nodal Agency Uttar Pradesh New and Renewable Energy Development Agency (UPNEDA) will be the nodal agency for facilitating solar policy as envisaged by the relevant authorities. 12.1 Role of Nodal Agency The Nodal Agency will facilitate and assist the project developers and undertake the activities to achieve the objectives of the policy. 12.2 Bidding of Projects The Nodal agency will be responsible for carrying out all the tasks related to bidding process for Solar Power Projects in the state. 12.2.1.For utility scale Solar projects Government of U.P. shall provide funds for activities like hiring of consultants for Bid process management, Outsourcing of single window system and other incentives to be made available directly under this policy or on any other activity or works which are required for implementation of Solar Policy in the State. 12.2.2 For projects being set up under other departmental budgets, concerned departments will bear the cost related to feasibility report preparation and bid process management. Nodal Agency may charge a nominal facilitation charge for providing this service. 12.3 Facilitation for Government Land/Space Facilitate allotment of suitable land/space in control of State Government or its agencies. 9

12.4 Coordination with other Departments. For arranging right of way, if any, water supply and connecting infrastructure like roads etcnodal agency will coordinate with other Government departments for expediting the setting up of Solar Projects. 12.5 Training Develop appropriate skilled manpower by tying up with training and educational institutions. 12.6 Formulating of Subsidy Scheme available to installation of RooftopSolar Power Plants in Residential Sector Nodal Agency shall formulate scheme to provide for State subsidy as mentioned in Para 8.2.3(i) 13 R&D Activities To promote awareness amongst researchers and to assist private sector in solving key issues related to reliability, adaptability of technology for Indian conditions with special reference to Uttar Pradesh,The State Government shall set up Solar Research &Development, testing and standardization facility in two institutes/universities in UP. 14 Skill Development and Capacity Building It has been realized that a large number of solar energy professionals will be required not only in UP, but in the entire country to achieve ambitious target of 100 GW of solar capacity. The government of UP, through UPNEDA shall design training programs in association with National Institute of Solar Energy (NISE) to train electricians, mechanical & civil experts on solar. Various skill development programs will be designed by UPNEDA and NISE and subsequently training will be imparted across the state. Skills will be developed across segments including installation, operation and maintenance of solar projects, testing of solar products, solar resource assessment, refurbishment, etc. UPNEDA will provide certifications under these development programs. 15Benefits under other Policies of Government of U.P. i. Incentives available for Solar Power Projects shallbe available as in Infrastructure Investment and Industrial Policyof the State as prevalent from time to time. Fiscal incentives available as per Infrastructure Investment and Industrial Policy of State from time to time will be payable from the budgetary provisions made in that policy. ii. Government of UP has delegated powers to Commissioners for early disposal of permission to be provided under land ceiling Act. iii. Solar PV projects shall be exempted from obtaining Environmental clearance 16Power to amend & interpret the policy Government of UP will have power to amend/ review/relax/interpret any of the provisions under this policy as and when required. 10

11 Wastelands/barren lands in State

Mini Grid Policy Annexure-1 12