ST ANDARD SPECI FI CAT I ON FOR T ANK PADS

Similar documents
STANDARD SPECIFICATION FOR TANK PADS

CW 3170 EARTHWORK AND GRADING TABLE OF CONTENTS

CW 3615 RIPRAP TABLE OF CONTENTS

INDEX DESCRIPTION MATERIALS APPROVAL FOR BASE COURSE CONSTRUCTION MEASUREMENT PAYMENT 6

Section 25 Aggregate Subbase

Highway construction C 5

SCHEDULE A BILL OF QUANTITIES Part - I : Construction of Road

CITY OF LETHBRIDGE SECTION Construction Specifications SIDEWALK CONSTRUCTION PAGE 1 of 5

INDEX DESCRIPTION MATERIALS CONSTRUCTION MEASUREMENT PAYMENT 10

SECTION 28 AGGREGATE BASE COURSE (FAA P-208) [For base course under runway and taxiway surfaces, use Section 29, FAA Item P-209.]

ITEM 252 IN-PLACE FULL DEPTH COLD FLEXIBLE PAVEMENT RECYCLING

SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 2 BACKFILL. 2.1 General...2-1

CONSTRUCTION SPECIFICATION FOR CONCRETE UNIT PAVERS

CITY OF LETHBRIDGE SECTION INFRASTRUCTURE SERVICES Page 1 of 7 GRANULAR BASE PREP

Natural aggregates. Type 1

ITEM P-609 SEAL COATS AND BITUMINOUS SURFACE TREATMENTS

SECTION TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING

SECTION ASPHALT PAVEMENT

SECTION 3: SUB BASE AND BASE COURSES

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT).

Information Bulletin:

Allen & Sherriff Architects, Inc Yonge Street, S202, Richmond Hill, Ontario L4C 5K9 Tel: Fax: File Ref.

TechniSoil G5 Installation Specification

SECTION 1100 GRADING 1102 MATERIALS AND DEFINITIONS.

SECTION 14 EMBANKMENT

SECTION TRENCHING, BACKFILLING AND COMPACTION. B. Provide necessary sheeting, shoring and bracing.

SECTION EARTHWORK

TECHNICAL SPECIFICATION

SECTION RIPRAP, BOULDERS, AND BEDDING

SOR FOR PILE FOUNDATION WORKS FOR TANKAGE & ENGINEERING STORE

THE REGIONAL MUNICIPALITY OF PEEL BASIS OF PAYMENT FOR RESTORATION

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION

Stanford University Facilities Design Guidelines SECTION ASPHALT UNIT PAVING. A. ASTM C-33 Standard Specification for Concrete Aggregates.

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price)

Stanford University Facilities Design Guidelines SECTION SEAL COATS. C. Section : Traffic Striping and Pavement Markings

ITEM 432 RIPRAP. Dry Riprap is defined as Stone Riprap of the required type with voids filled only with spalls or small stones.

Safety Method Statement External Works

City of Estevan. Construction Specifications

Special Provision Item P-152 Excavation and Embankment

SECTION 10.0 PIPE TRENCHES Excavation and Preparation of Trench

SECTION ASPHALT PAVING

SECTION AGGREGATES

SECTION 303 CULVERTS

SECTION ASPHALT PAVING

378 - POND NATURAL RESOURCES CONSERVATION SERVICE CONSERVATION PRACTICE SPECIFICATION I. SCOPE

S C H E D U L E - "B"

SECTION BITUMINOUS CONCRETE PAVING

Item 247 Flexible Base

Item 247 Flexible Base

INDEX GENERAL EQUIPMENT CONSTRUCTION SUBGRADE PROTECTION MEASUREMENT PAYMENT 5

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT).

CONSTRUCTION SPECIFICATION FOR COLD MIXED, COLD LAID, OPEN AND DENSE GRADED BITUMINOUS MIX TABLE OF CONTENTS

Item P-219 Recycled Concrete Aggregate Base Course

SECTION ASPHALT PAVING

Student Services & Classroom Addition

CUT, RE SECTION VI. (Sub-section 290) Cut, Removal, and Replacement of Paved Surfaces. 1. Description Bituminous Pavements thru 290-2

Drainage, Road Drainage and Collection Pit A - EXCAVATION:

The Work under this Section consists of performing all operations necessary to complete construction of the leveling course on the prepared subbase.

TRENCH EXCAVATION AND BACKFILL

Draft Specifications and Design Guidelines for Use of Scrap Tires in Embankment Construction

SECTION ASPHALTIC CONCRETE PAVING

SECTION 500 STRUCTURES

SECTION 503 TEMPORARY PAVEMENT RESTORATION

Sl No. Rate. Hct By manual means In area of light jungle

Construction Specification for Concrete Unit Pavers

SECTION INTERLOCKING PRECAST CONCRETE UNIT PAVERS

CONSTRUCTION SPECIFICATION FOR SINGLE AND DOUBLE SURFACE TREATMENT

The developer/contractor shall be responsible for replacing all fences which must be disturbed for the installation of sanitary sewer or water lines.

ITEM 404LVT (Low Volume Traffic) ASPHALT CONCRETE Revised June 5, 2015

CONSTRUCTION SPECIFICATION FOR CONCRETE SIDEWALK AND CONCRETE RAISED MEDIAN INDEX TS SCOPE...3 TS DEFINITIONS...3

City of Brandon Division 2 Standard Construction Specifications Section January 2007(Revision 1) Page 1 of 8 ROADWAY EXCAVATION AND GRADING

GRAVITY RETAINING WALL TECHNICAL MANUAL

Construction Specification 62 Grouted Rock Riprap

Handling and Installation Instructions

Excavation for Natural Gas Mains and Services

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7)

SECTION ASPHALT PAVING

CONSTRUCTION SPECIFICATION FOR BORROW

DIVISION 2100 SITEWORK

ITEM 247 FLEXIBLE BASE

7. Refer to Paragraph 3.08 for unit price adjustments.

SECTION FLEXIBLE PAVING

BASE CONSTRUCTION MATERIALS A Aggregate

Partial Depth Reclamation with Expanded Asphalt Mix [PDR-EAM] Method Specification 2018

CONSTRUCTION SPECIFICATION FOR COLD MIXED, COLD LAID, OPEN AND DENSE GRADED BITUMINOUS MIX

Stanford University Facilities Design Guidelines SECTION STONE FINES PAVING. American Society for Testing and Materials.

SPECIFICATION FOR REINFORCED SOIL WALL

Partial Depth Reclamation with Emulsified Asphalt Stabilization [PDR-Emulsion] Method Specification 2018

DIVISION 2 - EARTHWORKS

STANDARD SPECIFICATIONS JANUARY 2015 S-4 GRANULAR BASE and AGGREGATES TABLE OF CONTENTS

CONSTRUCTION SPECIFICATION FOR CONCRETE CROSSWALK INDEX TS SCOPE...3

Section Fill Placement Tender No. [ ] Page 1

MSCAA /04 ITEM P-219 RECYCLED CONCRETE CRUSHED AGGREGATE BASE COURSE DESCRIPTION MATERIALS

Schedule for construction of ROB Approaches no. 48, 54,55 of PKG-III (MGR) including temporary road diversion along ROB approach No 55.

Procedure and Specification for the Construction of Vehicle Access Crossings over Footways and Verges April 2016

KU Design Guidelines APPENDIX II PERMEABLE BITUMINOUS PAVEMENT

SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 17 ASPHALT CONCRETE PAVEMENT General Materials

County of Park PARK COUNTY WYOMING PRIVATE SOURCE GRAVEL POWELL AREA PRODUCE TO STOCKPILE REQUEST FOR QUOTE

This specification refers to the latest (current) edition of the following: For the purposes of this specification the following definitions apply:

Transcription:

ST ANDAR D SPECIFICAT ION 0 26.10.2005 I SSUED T ENDER HS HS RPB No. Date Revision By Chkd Appd C1088-ECS-SP-211 Page 1 of 6 0

CONT ENT S 1. SCOPE 2. R EFER ENCE STANDARDS 3. SUB-GR ADE PREPARATION 4. T ANK PAD CONSTRUCTION 5. CR USHED ROCK RING 6. ANT I -CORR OSI VE LAYER 7. PR EMI X CAR PET TANK PADS C1088-ECS-SP-211 Page 2 of 6 0

1.0 SCOPE T he specification describes the technical requirements for the material and construction of tanks pads of sand fill or murrum fill construction. For Cathodic Protection of the storage tank, the contractor shall execute the same in conformity with standard specification for cathodic protection system for tank bottom plate. Cathodic protection shall be by others to stipulation of HPCL. 2.0 R EFER ENCE STANDARDS I S 383 I S 1498 Aggregates-Coarse and fine, from natural sources for concrete. Part I V Grain size analysis. Part VII Determination of water content dry density relation using light compaction. Part VIII Determination of water content dry density relation using heavy compaction. Part XI V Method of test for soil : Determination of density index (relative density) of cohesionless soils. Classification and identifications of soils for general engineering purposes. 3.0 SUB GRADE PREPARATION T he surface of natural soil exposed at the bottom of excavated pit shall be thoroughly compacted by rolling or other means as directed by engineer-in-charge to obtain 90% of max. Laboratory dry density for the soil as per IS 2720 Part-VII. 4.0 T ANK PAD CONSTRUCTION T he tank pad shall be either of sand fill or murrum fill construction as specified in construction drawings. 4.1 Sand Fill Sand for filling shall be clean and well graded conforming to I S:383 with grading zone II or III. I t shall not contain any vegetable and organic mater ials. Sand shall be obtained from a source approved by Engineer-in-charge. Sand used for filling shall be laid in 150 mm layer and compacted in successive layer to a relative density of 85% as per IS:2720 Part-XI V. C1088-ECS-SP-211 Page 3 of 6 0

4.2 Murrum Fill I t shall consist of coarse and granular murrum containing not more than 20% cohesive fines such as clay (grain size less than 0.074 mm). T he murrum shall be of 20 mm and down size grading and shall be taken from approved quarries. Murrum shall be spread in layers not exceeding 15 cm in loose thickness over the area. Each layer shall be uniform in density, quality of materials and moisture content before compaction. The moisture content shall be within (2% ) two percent of optimum moisture content (OMC) on dry side of OMC as per IS:2720. Compaction of each layer shall be done by Mechanical means as per directions of Engineer-in-charge. Only inacces s ible reaches shall be worked manually. Each layer should be uniformly compacted to obtain 95% of standard proctor or 90% of Modified proctor maximum laboratory dry density of the material as per IS:2720 part-vii or VIII as the case may be as specified in the drgs. If the material fails to achieve the required density, the layer should be reworked with necessary alteration in the composition so that required compaction is obtained. 4.3 Further layer shall be placed only after the layer already laid has been compacted to the required density. 4.4 T he finished surface must be dressed to required grade and slope. Excess material must be removed from compaction site. 4.5 Payment Payment for sand/murrum filling shall be made on the basis of volume of fill, after placement and compaction. T he rate quoted should include cost of material royalties, transportation, handling compacting, watering, testing at various stages, dressing removal of surplus material and other work incidental to this. 5.0 CR USHED ROCK RING 5.1 A crushed rock ring shall be provided below the tank shell as per details given in construction drawings. T he stone aggregates for the ring wall shall be 40 mm and down grade size and shall be of hard black trap, granite or such other approved materials. Sand used shall be medium to course grade as per IS:383 and shall be clean and free from organic/clay materials. 5.2 Laying T he stone aggregates shall be laid in two layers and each layer shall be compacted to obtain a hard core ring wall to the satisfaction of engineer-incharge. T he surface shall be checked from time to time during spreading and compaction to ensure a finished surface true to levels and grade as per drawings. Use of fine aggregates such as sand or finer stone aggregates may C1088-ECS-SP-211 Page 4 of 6 0

be required to fill voids and pockets to obtain a uniform compacted hard core. Over the fine compacted layer of stone aggregate sand shall be evenly and compacted by tamping/rolling. 5.3 Payment T he rate shall include the supply of all materials, tools, labour including cutting a trench, supporting the sand suitably during such a cutting, placing the hard core and compacting the same to the satisfaction of Engineer-in-charge. The payment shall be made on the cubic metr e basis with the finished cross section of the hard core. 6.0 ANT I CORROSIVE LAYER 6.1 Anti corrosive layer shall consist of screened coarse sand mixed with 80/100 bitumen or equivalent 8 to 10% by volume. 6.2 Bitumen shall be heated to a temperature 175 Deg.C to 190 Deg.C with 3% kerosene if required and sand shall be thoroughly mixed with it in a mixing drum to give uniform mixture and shall be laid over the compacted surface of pad in line, grade and levels as shown on the drawings, and as directed by the engineerin-charge. Bitumen shall not be heated beyond the temperature limits given above. 6.3 T he layer shall be tamped to form hard mass of uniform compacted thickness as per schedule of items and drawings. 6.4 Payment T he payment shall be made on square metre basis of the area of the layer laid on top of the T ank pads. T he quoted rate shall include cost of materials, transportation, mixing, laying, tamping, finishing etc. all complete. 7. PR EMI X CAR PET TANK PADS Materials Sand Sand shall be clean, dry, coarse hard angular free from coatings of clay, dust and mix of vegetable and organic matters and shall conform to I S:383 Grade III. Stone Chippings Stone chippings shall be of hard black trap or granite or approved locally available stone and shall confirm to I S:383. The grading shall be normally 12 mm down size and 6 mm down size in the ratio of 3:2 respectively. C1088-ECS-SP-211 Page 5 of 6 0

Bitumen Bitumen required for the work shall be 80/100 grade or its equivalent quality. 7.2 Laying 7.2.1 T he crushed rock ring where provided and areas on which the premix is to be laid shall be thoroughly cleaned of all dust and loose materials. On the clean surface, a tack coat at the rate of 1.0 kg/m2 of hot bitumen shall be uniformly applied by sprayers. The applied binder shall be evenly brushed. 7.2.2 T he binder bitumen 80/100 shall be heated to the temperature of about 190 Deg. C with 3% kerosene, if required and mixed with stone chippings of size as given in 7.1.2 at the rate of 400 kg. With 6 m2 of stone chips for 100 M2 surface. The total mixed quantity as mentioned above is the quantity required for the total 50 mm thick layer for 100 sq. M area. Mixing shall continue until the aggregate is well coated. 7.2.3 T he premix carpet shall be laid in two layers of 3 cm and 2 cm respectively. After compacting and laying the first layer of 3 cm, a tack coat of hot bitumen at the rate of 1 kg/m2 shall be uniformly applied to the surface by means of sprayer and the second layer of 2 cm. thick shall be laid tamped and compacted to the satisfaction of the Engineer-incharge. 7.3 Sand shall be spread on the final surface at the rate of 0.5 M3/100 M2. 7.4 Payment Payment shall be made on square metre basis of the completed surface. The rate shall include cost of all materials and labour involved in all operations described above to complete the work in all respects. C1088-ECS-SP-211 Page 6 of 6 0