a. Are the foundry s employees trained and familiar with portions of the system applicable to their position?

Similar documents
Introduction: NAV 30 - FORGING PROCESS. State, Zip: Type of company ownership: Business ownership/relationship with other organizations:

FORM Rexnord Industries, LLC Aerospace Division. Subject: Supplier Quality Assurance Requirements

TURBO MACH A DIVISION OF VT SAA

NAV 06 MATERIAL CONTROL

Quality Assurance in the Amusement Industry CLARK WESTERFIELD

TITLE: Quality Assurance Sub-Contract Quality Clauses DATE: 12/4/2017 OWNER: Operations Manager

SELLER QUALITY REQUIREMENTS QCS-001 PROCESSING SOURCES

TASK REQUIREMENTS. Supplier Quality Requirements

These requirements apply to all suppliers:

Document Rev: 18 State: RELEASED see Smarteam for approval authorities TASK REQUIREMENTS. Supplier Quality Requirements

Helical Products Company

ASM AEROSPACE SPECIFICATION METALS, INC NW 34 th Place #B28 Terrace Pompano Beach, Florida Tel: Fax:

Quality Management System

PURCHASING QUALITY NOTES

PURCHASING QUALITY CLAUSES

Printed versions may not be the latest. Suppliers shall utilize the latest version which can be found on our website at

Purchase Order Quality Requirement Clauses

Supplier Quality Assurance Requirements Manual

1.0 Purpose. 2.0 General notes 3.0 QUALITY SYSTEM REQUIREMENTS. Approved by: G. Stugart Prepared by: Schelert

ACCREDITATION CRITERIA FOR INSPECTION PROGRAMS FOR MANUFACTURERS OF METAL BUILDING SYSTEMS AC472. September 2018 Effective January 1, 2019 PREFACE

Requirements for Suppliers

ACCREDITATION OF MANUFACTURERS OF BOILERS & PRESURE VESSELS

c) Have personnel been appointed to supervise the production operations across all shifts in order to ensure the product quality?

NR CHECKLIST Rev. 1. QAM IMP References NBIC Part 3, 1.8 Y N Y N a. Organization. Company Name/Certificate Number: Page 1 of 26

STANDARD QUALITY REQUIREMENTS FOR SUPPLIERS F05-QP008 Rev A Dated 08/12/2010

Purchase Order and Quality Clauses

Table of Contents Table of Contents... 2 Introduction to Manual... 3 Scope... 3

002 Supplier Quality System Compliance with Rocker Quality System for Suppliers is required for this Purchase Order.

Quality Code Matrix Appendix A for 8.4.3

QP Supplier Quality Requirements Manual. Purchasing. Dearborn Inc. Revision: E Page 1 of PURPOSE

Quality Flow-Down Requirements to Suppliers

SUPPLIER QUALITY SYSTEM SURVEY Please complete and return, within 10 days of receipt, to: GENERAL INFORMATION Attn: Manager of Quality

SQRs SUPPLIER QUALITY REQUIREMENTS

SQRs SUPPLIER QUALITY REQUIREMENTS

Desk Audit of. Based on Federal Transit Administration (FTA) Quality Assurance and Quality Control Guidelines FTA-IT

Document Type: Main Process: Revision Level: Page: POLICY QUALITY ASSURANCE 3 1 of 6 Process Owner Title:

Quality Procurement Requirements

SUPPLIER QUALITY SYSTEM SURVEY

Expediting. Research of suppliers. Vendor Assessment. Inspection Testing. Qualification of suppliers. Inspection Audit

PROCUREMENT QUALITY ASSURANCE SPECIFICATION 7 REV. H

Corrosion Resistant Bolting for Use in the Petroleum and Natural Gas Industries

Association of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017

Quality Flow-Down Requirements to Suppliers

The TOCA Ductile Iron Foundry in Dingzou

GKN Aerospace Advanced Composite Structure

PP Quality Assurance Procurement Clauses for Suppliers

PROCUREMENT QUALITY PROVISIONS Revision G January 9, 2017

PURCHASING QUALITY CLAUSES

An UNSAT here would require a STOP WORK and an investigation into what has been delivered to NNS will be required.

Supplier Quality Requirements

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR QUALITY CONTROL PLAN FOR WELDING FOUNDATION PILING SPLICES

NQA-1 Graded Approach, 55-Gallon Drum Summary

The Following Clauses are applicable only as noted on the Purchase Order, either by Quality Clause Code or Itemized Quality Clauses:

PPI/TZ Standard Quality Requirements for Suppliers -SQRS-

QUALITY CONTROL INSTRUCTION

Special Purchase Order Clauses

Supplier Self Survey

Trident Precision Manufacturing

4. RELATED DOCUMENTS AND FORMS 4.1. AS ISO Cambridge Valley Machining, Inc. QMS procedures, including, but not limited to:

Purchase Order Quality Clauses

ACCREDITATION CRITERIA FOR INSPECTION PROGRAMS FOR MANUFACTURERS OF METAL BUILDING SYSTEMS AC472

SUPPLIER QUALITY REQUIREMENTS

Manufacturing Supplier Requirements Manual

INS QA Programme Requirements

QUALITY DEPT request to have FORM 1135 for REVIEW/APPROVAL Cycle everytime form will be updated/revised.

Orbital ATK Alliant Techsystems Defense Electronic Systems Special Mission Aircraft Fort Worth

YOUNG & FRANKLIN / TACTAIR FLUID CONTROLS QUALITY ASSURANCE SURVEY. Company Name: Address: City: State: Zip: Phone: Fax: Response Prepared By:

YOUNG & FRANKLIN / TACTAIR FLUID CONTROLS QUALITY ASSURANCE SURVEY. Company Name: Address: City: State: Zip: Phone: Fax: Response Prepared By:

c. Temperature monitoring - preheat, spraying temp, cooling, etc

Supplier Quality Requirements

Guide for the preparation of quality programs for licensing of companies performing BPE regulated work.

SECURE COMMUNICATION SYSTEMS INC. (Secure) QUALITY CLAUSES

COMPLETED QUALITY SYSTEMS QUESTIONNAIRE

ThinKom Purchase Order Quality Provisions Number: Q4000 Revision: D

CTM. SUBJECT: Quality Clauses (Q Clauses) WI The purpose of this work instruction is to control the content of the CTM Quality clauses.

EB 2678K Compliance Checklist

Web Address. Contact Personnel (Include the President, Sales Manager, AR, and Quality Interface at a minimum) Service Years.

PROCUREMENT QUALITY CLAUSES

AEROJET PURCHASE ORDER QUALITY CLAUSES (FULL TEXT) CONTENTS

SUPPLIER QUALITY SYSTEM SURVEY

MRO Facility Self Audit Questionnaire

APPENDIX A QUALITY ASSURANCE REQUIREMENTS FOR SUPPLIERS

Ahlers Aerospace Quality Procedures Manual

GENERIC QUALITY ASSURANCE REQUIREMENTS FOR: BUILT TO PRINT ITEMS, ITEMS TO STANDARD AND OFF THE SHELF ITEMS

Supplier Questionnaire and On-site Supplier Evaluation

D. All distributors shall be reviewed and approved as per company procedure.

I. Development, Submittal, and Acceptance of a Quality Management System

EB 2678 Compliance Checklist

Supplier Requirements Manual

Form Fit & Function Engineering, LLC 350 Seminole Drive Spartanburg, SC Supplementary Quality Assurance Clauses

SOLAR KEYMARK SPECIFIC SCHEME RULES ANNEX E: FACTORY PRODUCTION CONTROL INFORMATIVE BASED ON ISO 9001 STANDARD COVERING THE PRODUCTION LINE

OPW Engineered Systems

FIDELITY TECHNOLOGIES CORPORATION QUALITY CLAUSES

Purchase Order Quality Requirement Clauses

Satellite Aerospace, Inc. TERMS & CONDITIONS Page 1 of 6

Supplier Quality Manual

Supplier Quality Requirements Master List

Purchase Order Quality Clauses These quality clauses are in addition to the Standard Ameriflex Inc.Terms & Conditions

FLEXFAB SUPPLIER ASSESSMENT QUESTIONNAIRE COMPANY DATA

Role of NDE in Regulatory Oversight of Nuclear Power Plants

Transcription:

NAV 29 FOUNDRY OPERATIONS 1. Does the foundry have a documented quality system? a. Are the foundry s employees trained and familiar with portions of the system applicable to their position? b. What recognized quality management system does the foundry s quality system comply with? (ISO 9000, MIL-I, MIL-Q) c. Does the foundry conduct internal assessments or audits when required by contract or internal quality system? i. Does the foundry maintain records of internal review such as schedule, results, and corrective actions? 2. Has the foundry ever been subjected to a 3 rd party quality audit? If so, by whom? (Provide documentation of these audits.) 3. Does the foundry have a documented process for evaluation, review and selection of suppliers for their raw material? (i.e., ingot, alloying additions, purchased scrap)? a. Does this process include a review for past performance? b. Does this process include any onsite review or evaluation of technical capability? c. Provide listing of suppliers, noting the type/alloy of material provided? 1 of 9

4. Is there a documented procedure/process to determine the acceptability of raw materials? (i.e., ingot, alloying additions, purchased scrap)? a. Does this include reviewing material certifications and/or reperforming material verification testing to confirm material meets specification requirements? b. Does this process include reviewing the traceability of certified material to the paperwork? c. Does this procedure/process take into account differences in the source of the material such as, past supplier performance, receiving certified and traceable material with test reports, versus uncertified scrap? (i.e. changing sample sizes or performing additional testing on material before acceptance) 5. Does the foundry have a documented procedure for controlling, storing, and issuing raw materials and additives? a. Does this procedure require raw materials to be labeled/marked and stored in a manner to preclude mix-up with other similar materials? b. Does the foundry control back scrap (revert); re-melt or internal scrap material by alloy and/or heat number? c. Does the procedure cover the disposition of material that does not meet chemical and/or mechanical requirements? 6. Is there a procedure for developing, documenting and controlling the entire casting process, including all foundry engineering, such as gating, risering, pattern design and pour temperature, when a 1 st article test is required? 2 of 9

a. Does this procedure include a change control process that addresses analyzing any changes to the casting processes for their effect on the end product and whether or not validation and/or requalification of the 1 st article test is required? b. Once the 1 st article test is accepted by the customer, is the customer notified when there are modifications to the production of a casting that impacts the acceptability of the original 1 st article test? 7. Does the foundry have a specific melting and pouring procedure for each alloy group the foundry melts? a. Do these procedures define what is considered a single heat or lot? i. Do the heat/lot definitions comply with the applicable specifications for the alloy? b. Do these procedures call for the use of calibrated instrumentation to control the temperature of the melt? i. Are calibrated instruments being used where required by internal procedure or by the governing specifications? (see checklist #4 for additional guidance on auditing calibration systems) c. Do internal procedures require a chemical check analysis prior to releasing the melt for pouring? d. Do these procedures identify when and how many chemical and/or mechanical test coupons are poured? i. Do the procedures comply with the applicable specifications for the alloy? 3 of 9

ii. Are these test coupons marked to maintain traceability to the heat/lot and to the actual production material? e. Do the procedures identify the size and shape of the test coupons required? i. Does this meet the requirements of the applicable casting specifications, including some heat treatable castings which require the test coupons to represent the thickest portion of the production castings? f. Do the melt procedures specifically forbid adding material to the melt after the test coupons used to certify the final product have been poured? g. Do the melt procedures have limits on the maximum size or weight of a pour? i. Are these limits within the capability of the foundry s equipment? h. Do these procedures limit pour time and/or address additions of deoxidants and other additives to maintain chemistry where applicable? i. Do procedures require measurement or weighing of these additives before use? i. Do the procedures require heat lot traceable records that record the parameters used during the casting process, such as mold #, personnel performing pour, the constituents (additives, certified ingot, backscrap/revert) used in the pour including amounts, and the melt time and temperature? 4 of 9

8. Are heat/lot traceability markings cast into final product or marked immediately after cooling and removal from the molds? Or is a process in place to assure traceability is maintained until markings are applied? 9. Is foundry equipment that may come in contact with molten product, such as ladles, crucibles, stirrers, skimmers and thermal blankets, controlled for use in a single alloy or family of alloys where cross contamination is not a concern? 10. Where foundry equipment is used on multiple alloy types are precautions such as wash heats or other cleaning processes used to prevent or limit cross contamination of different alloys? 11. Does the foundry have any process to limit surface contamination of the final product from shot blasting or other final cleaning process? 12. Is the remaining metal after each pour (gates, risers and other scrap) labeled, sorted and stored in accordance with the foundries material control process? 13. Are the chemistry and mechanical properties of each heat/pour of metal verified after melting and/or casting even where pre-certified ingot is used? 14. Does the foundry use a documented procedure for performing and evaluating NDT on the final product? (see checklist #3 for additional guidance on auditing NDT) a. Where required by contract has the foundry or their sub contractor received approval from an authorized activity for their NDT procedures? 15. NDT Performed in house a. Mark NDT performed MT PT VT RT UT 5 of 9

b. Is NDT used as certification of the final product being performed by a NDT examiner certified in the applicable discipline? c. Are records kept that detail the size and location of any rejectable defects noted during the inspections? 16. Subcontracted NDT a. Mark NDT subcontracted and list subcontractors used. MT PT VT RT UT b. Is any oversight or evaluation performed on subcontractors performing NDT? c. Does the foundry receive reports detailing the size and location of any rejectable defects noted during the inspections? 17. Does the foundry have a process for reviewing repetitive casting defects in order make improvements to their casting process and foundry engineering which will improve the acceptability of the final product? 18. Does the foundry use documented qualified procedures for performing welding repair on their castings? (See Checklist #22 for additional guidance on auditing welding) a. Are the welders trained and qualified to the welding procedures they are asked to perform? b. Does the foundry maintain records showing the training and qualification of the welders? c. Where required by contract has the foundry or their subcontractor received approval from an authorized activity for their welding procedures? 6 of 9

19. Are records maintained when welding repairs are performed? a. Do these records contain the information required by the applicable welding or casting specification (e.g. MIL-STD-278 or MIL- STD-1688) such as location of the repair, welder performing the repair, welding procedure used, welding consumables used, and results of follow-up NDT? 20. Are MILSPEC welding consumables used when required by the welding procedure, contract or governing specification? 21. Are the welding consumables used to perform weld repairs certified to the applicable MILSPEC, AWS, or other commercial specification? 22. Does the foundry subcontract the testing of any of its material, such as chemical, mechanical or weldability testing? a. Does the foundry use a documented procedure to select/evaluate subcontracted test lab(s) performing mechanical and chemistry testing? b. Are test labs required to be certified through a 3 rd party such as A2LA or NADCAP? c. Is a list of qualified testing labs, along with their capabilities, maintained? d. Does the foundry perform any oversight or confirmation testing to provide assurance that the testing lab is performing properly? 23. Is a documented procedure used for preparing the test coupons and accomplishing the chemical analysis? 7 of 9

a. Is this procedure available at the working level? b. Is there a documented training plan, including training records, for this procedure? c. List type, brand, and model of equipment used to perform chemical analysis. i. Is the equipment used for the chemical analysis calibrated in accordance with the applicable specification (ANSI Z-540.1) or manufacturer s recommendations? d. Are the standards used to calibrate the test equipment traceable to a NIST standard or other recognized organization? i. Are the standards used representative of the full range of alloys produced by the facility? e. Is the testing equipment capable of reporting full quantitative values, including trace elements, for the alloys produced by the foundry? f. Does the procedure define rounding and use of significant digits when reporting the results of the chemical analysis? 24. Is a documented procedure used for preparing the test coupons and accomplishing the mechanical property testing? a. Is this procedure available at the working level? 8 of 9

b. Is there a documented training plan, including training records, for this procedure? c. List type, brand, and model of equipment used to perform mechanical testing. i. Is the equipment used for mechanical testing calibrated in accordance with the applicable specification (ANSI Z-540.1) or manufacturer s recommendations? d. Are the standards used to calibrate the test equipment traceable to a NIST standard or other recognized organization? i. Are the standards used representative of the full range of alloys produced by the facility? e. Does the procedure define rounding and use of significant digits when reporting the results of the chemical analysis? 25. Is a documented procedure used for preparing and testing the weldability test coupons? a. Is this procedure available at the working level? b. Is there a documented training plan, including training records, for this procedure? Additional concerns/comments: 9 of 9