Delta Zeta Sorority House Renovation Scope of Work

Similar documents
Delta Gamma Sorority Renovation Budget Scope 3/7/2018

Proposal. Lexington, MA. Price Work Description

Davis Frame Co., Inc. Construction Budget Considerations

Estimate Form for Bathroom Design and Installation

Smokey Ridge, Christiansburg, Virginia

RB Homes, Inc. 152 Witherspoon St. Princeton, NJ P: (609) / F: (609)

RB Homes, Inc. 152 Witherspoon St. Princeton, NJ P: (609) / F: (609)

Work Write Up / Specification of Repairs HUD DIVISION 1. MASONRY HUD DIVISION 2. SIDING. Toll Free

HC Homes at Tehaleh. Framing

Budget Estimate Basic Tenant Improvement

REHABILITATION STANDARDS CHECKLIST

RB Homes, Inc. 152 Witherspoon St. Princeton, NJ P: (609) / F: (609)

Cheshire, CT. By: A.M. Napolitano, LLC. Project Manager: Carolyne Sakonchick Ext. 323

RB Homes, Inc. 152 Witherspoon St. Princeton, NJ P: (609) / F: (609)

HC Homes at Tehaleh Standard Features

RB Homes, Inc. 152 Witherspoon St. Princeton, NJ P: (609) / F: (609)

Newberry. Foundation Framing

PHASE I ACADEMIC BUILDING CORE RENOVATIONS RCNJ Project No C

Appalachian Log Structures Construction Cost Estimating Guide

Handyman & Maintenance Cost Estimator

Waikoloa Homesites. Kohala Coast, HI. Outline Specifications. Prepared By: 16 December 15

Interior Remodeling Proposal

Columbia County Health Care Center Added Amenities

Included Features for The Meadows at Slate Run Single Family Homes - Bridgewater, Chelsey, Ashland

Bath Project General Services GC/PS Worksheet

QUINN COMMONS. Quinn Ln. SOLD

Monteleone Homes, Inc Canfield Norridge, Illinois Lot #1 Lot Size: 72 x 100 feet

Atlantic Builders Saratoga Woods Included Features Classic Series Single Family Homes Included Features - Bridgewater II, Griffin, Ashland, Chelsey

Feasibility Report. Property Inspection Engineers, Inc. (248) Property Address. 405 Fairgrove Royal Oak, MI.

Project #1139 Budget #82. $ Budgeted $ Billed to Date $ Paid to Date $ Due 210, , , ,158.50

SPEC SHEET Truman Model 8013 Key West Conch Drive

Date: Kitchen Project General Services GC/PS Worksheet

A. F. Sterling Custom Homes Division

Pembridge The Country Club Collection TOWNHOMES AT CRYSTAL SPRINGS

THE RESTORE LOUISIANA REIMBURSEMENT ESTIMATE

PLANNING FOUNDATION FRAMING

pershing+ desperes uichomes.com 6005 and 6007 Pershing Avenue pershing+desperes call or

Whitley Shower Locker Toilet Facilities

YOU LL LOVE LIFE IN A NEW PENTREX HOME! Lillian Ave. ~ Des Peres 63131

EXHIBIT B. Narrative Scope of Proposed Renovation, dated April 30, 2015

Renovation Estimate $ 95, Page 1 of 6. Preliminary Cost. General Fees SUB TOTAL $ - Powered by HomeWorx Unlimited, LLC.

MODULAR BUILDING SPECIFICATIONS

Carter's Oshkosh (SIS) # The Center at Pearland Parkway - Pearland, TX Scope Of Work / Bid Qualifications

$308,900. Caleb Crescent Collection The Algonquin Model 1113 Sq. Ft. Elevation A. Updated: September 28, Elevation B

1634 W CATALPA 5 BED 3.1 BATH ANDERSONVILLE

STANDARD CONSTRUCTION PACKAGE Addendum A REV SITE & EXCAVATION Layout of the foundation and septic system as approved by local and state author

Features & Amenities

TRIPLEX BUILDING 3 TOWNHOUSE UNITS

ADDENDUM NO 1 Issued November 21, 2017

Timberglen Recreation Center Summary

EXHIBIT B New Jersey City Homes 308 S. New Jersey Ave., Unit B, Tampa 33609

HOMES FOR SALE. Under Construction. Quality Stick Built Starting at $278,000. Watford City North Dakota WATFORDCITYREALESTATE.

Mountainview Estates.

Magnolia Cottages by the Sea Final Phase

The Compass ( 270 Lisgar Street, Brighton ) Features General Site Work 1. Construction Drawings 2. Building, Plumbing Electrical and Entrance Permits

Exterior Features. Interior Features

TEXAS DEPARTMENT OF HOUSING AND COMMUNITY AFFAIRS OFFICE OF COLONIA INITIATIVES TEXAS BOOTSTRAP LOAN PROGRAM. Form 15 Work Write-Up

Minneapolis Community and Technical College T-Building Floor 2 Student Affairs Cost Estimating Form Templates - Exhibit C

Burlington Model at Country Hills Estates

C ID-2.00 ISSUE DATE: SCALE: 1/2" = 1'-0" BUILT IN BENCH "NOOK" SEATING WITH STORAGE BELOW. SEE ELEVATIONS FOR DETAILS.

K and V HOMES. Client Questionnaire. Location. (Skip to page 3) Tree Removal Required. Yes No. Entrance

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

C ID-2.00 E ID-2.1 ISSUE DATE: 12/30/2016 SCALE: 1/2" = 1'-0" BUILT IN BENCH "NOOK" SEATING WITH STORAGE BELOW. SEE ELEVATIONS FOR DETAILS.

New Ringgold Middle School. Project Slideshow August 26, 2017

Features & Amenities. EXTERIOR FINISHES COMMUNITY FEATURES

The Woods at Spring Ridge from the mid $500 s Frederick, Maryland

Welcome to Smithfield Crossing Condominiums

108 North Grant Street Westmont, IL

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

FoundationsRealty.com Hickory Hills The. Condominiums

The Poplar. Hickory Hills. Condominiums. FoundationsRealty.com

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

By YR Communities.

Capital 21 Realty, LLC

G703 Continuation Sheet Minimum Schedule of Values Please use the breakdown listed below when submitting your billing for the project

11/1/2016. Smoke detectors will be furnished by MHA and installed by contractor.

ADDENDUM A 6 OLIVIA WAY, GROTON, MA CONSTRUCTION SPECIFICATIONS

J e w e l S e r i e s. Marquis Elevation A. Elevation B

Mountain West SERIES

HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS

Décor Design Construction llc

Hawthorn Plan - Aspen Hills

BuildingAdvisor.com Estimating Checklist

CVR TOWN HOMES NEW CASTLE, COLORADO MOUNTAIN RUSTIC (OPTION #1 FINISH PACKAGE)

Homes at Pine Ridge - NEW CONSTRUCTION SPECS

Town of Falmouth FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage COSTS FOR SUBSTANTIAL IMPROVEMENTS / REPAIR OF SUBSTANTIAL DAMAGE:

--*6 S CONSTRUCTION GROUP, INC SW 87 Avenue Miami, FL Phone:

What this Family Room Specification Package can be used for:

DURKEE FARM. Welcome to Durkee Farm Estates in Littleton, MA. Dennis M. Page & Company

11 HOLLIS STREET CONDOMINIUMS WELLESLEY, MA TOWNHOME FEATURES

Remodeling: Return On Investment

Manorwood. Coastal Home Collection

Cheshire, CT. by Sunrise Land Associates, LLC. Eight gracious homes set on 16 wooded acres, architecturally designed to become classics.

OFFICE Space STANDARD SPECS Page 1

FOUR CORNERS CUSTOM BUILDERS, LLC

Townes at Shady Grove Metro from the low $600s Rockville, Maryland

TABLE OF CONTENTS Public Safety Building

Signature Series STANDARD HOME FEATURES

Z & C Construction, Inc. Subdivision:

Transcription:

PROJECT: Delta Zeta Renovation Alpha Sigma Chapter 749 West Jefferson St. Tallahassee, FL 32304 Delta Zeta Sorority House Renovation Scope of Work This renovation scope is based on plans drawn by 4m Design Group, PA: Construction Documents/Permit Drawings dated 4/21/2017 ASI No. 1 dated 5/1/2017 and supplemental drawings A5.1 and A5.4 received 5/3/2017 A1.1, Proposed First Floor Plan, Phase 1 dated 5/4/2017 for the renovation of the first floor of the Delta Zeta sorority house at Florida State University. These renovations to the existing space include renovation of the Foyer, creating an accessible restroom, House Director s Bedroom and Bathroom, roughing-in for a future Accessible Bathroom/Bedroom, Exercise Room, 24/7 Sister s Kitchen, and Dining/Multipurpose Room. Parlor and Janitor s Closet will be moved to Phase 2. Phase 1 work includes limited wall, ceiling, and flooring demolition, installation of new walls, doors and roll-up shutters, flooring, electrical, plumbing and HVAC work as well as new painting. Kitchen equipment and appliances and cabinets/counters have also been included. Wood wall trim and ceiling work (except House Director Suite) have been removed along with the Projection Screen and Trophy Cases. The following summarizes the Accessibility Improvements included in the project: Accessible route from the front door to the public way, including one new Handicap Accessible Parking Space Enlarge door openings and corridors to ensure first floor accessibility Upgrade all interior hardware to lever hardware One new ADA restroom Rough-in for Accessible Bedroom and Bathroom Budget for remaining build-out of Accessible Bedroom and Bathroom See Page 7 for these costs broken out from total cost The work includes the following: 1

Sitework Demolition to place new sidewalk and accessible route Grading for new sidewalk and parking space Asphalt and Concrete Striping Detectable warning and Handicap Parking signage Demolition Remove all equipment designated for reuse and store in a POD container set on-site Includes labor to remove and relocate furnishings left in the house at the time of mobilization and place these items back at the end of the project Personal belongings to be removed by Delta Zeta prior to mobilization Interior Demolition includes: Selected walls Selected doors and jambs Trim including chair rail, base, etc. Counters and cabinets Wall finishes and drywall in restrooms Kitchen ceiling grid and tile Flooring Existing ceramic and quarry Tile to remain new flooring to be installed over Electrical, mechanical and plumbing, per Plans and revised scope Metals Stainless steel work in the Kitchen to modify equipment for new layout (allowance of $2,000 until configuration is finalized) Carpentry & Millwork Interior wood blocking for new cabinetry, 24/7 Kitchen barn door track, and toilet accessories Rough carpentry including subfloor manipulation in Beverage Area and Front Corridor and furnishing/installing LVL beam and blocking between Multipurpose Room and Dining Room for Dining Room pocket door detail Finish Carpentry and Millwork as follows (revised): o Entry foyer replace (6) missing balusters o 24/7 Sister s Kitchen and Beverage Area includes stained or painted base cabinets and wall cabinets with quartz countertops o House Director s Bathroom includes one painted or stained base cabinet vanity and quartz top o Accessible Restroom includes ADA apron front with quartz countertop o Includes new shoe mould at existing wood wall base at new flooring locations o All other remaining wood wall trim, including wainscot, crown moulding, wood base, door casings, etc. has been moved to Phase 2 2

Doors, Frames, Hardware Furnish and install doors and hardware as follows: o Wood doors and frames as shown o Swinging Kitchen Door o French Pocket Doors at Dining Room, Johnson Bi-Pass Pocket Kit with 12-lite wood doors (in lieu of Marvin Clad Doors) o Pocket doors at 24/7 Sister s Kitchen o Two redi-frames with glass sidelights o Finish hardware on new doors o Panic device on Vestibule Door o Includes option to replace all other existing First Floor locksets to new lever-style bronze locksets to match new Metal Framing, Drywall and Ceilings Wall repair at all wall demo areas per Demolition Floor Plan as well as new electrical/fire alarm conduit patches New framed walls with rockwool insulation and drywall New 2-hour firewall framing and drywall FRP on west wall of Main Kitchen at revised Kitchen layout Framing at double pocket door at Dining (9-1/4 wall) Drywall ceiling in 24/7 Sister s Kitchen New acoustical ceiling grid and vinyl-coated tile in Main Kitchen Scrape popcorn ceilings in House Director s Suite to avoid furniture relocation in Phase 2 Wall between Exercise Room and new Accessible Bedroom Soffits, coffers, Janitor Closet, work in Parlor, and all other popcorn ceilings to be addressed in Phase 2 Flooring New Flooring, per A2.0 Proposed Floor Finishes Plan and ASI No. 1 Painting Prep, prime, and paint: All new and existing walls in affected rooms Existing wood base and chair rail All new and existing wood doors and frames (does not include roll-up shutters) New drywall ceiling in 24/7 Sister s Kitchen Paint ceilings in House Director Suite New stair balusters in Foyer No ceilings except those mentioned above No painting in Parlor, Main Kitchen, basement, upstairs, or existing areas that do not get new flooring 3

Specialties Restroom accessories, as follows: (2) 36 Grab Bars (2) 42 Grab Bars (2) Kohler Archer Toilet Tissue Dispensers (2) 4 x 8 mirrors Frameless shower door with 3/8 frosted glass at House Director s Bathroom Equipment and Furnishings Furnish and install Roll-up Shutters in Kitchen as follows: Item D per Equipment Legend on A1.0 fire-rated non-motorized stainless steel counter shutter with shelf and face-mounted frame in lieu of integral frame (due to schedule/constructability constraints), electrical motor option not available for rated shutters Item E per Equipment Legend on A1.0 non-rated push-up stainless steel counter shutter with shelf and face-mounted frame in lieu of integral frame (due to schedule/constructability constraints) and electrical motor option Furnish and Install/Connect Kitchen Equipment and Appliances as follows: Bagel/Sandwich Toaster, APW Wyott AT Express Conveyor Toaster w/ 1.5 Opening Double Door Refrigerator, True T-35G-LD 40, 2-Glass Door Reach-In Refrigerator w/led lighting 115V Stainless Steel w/removable casters Dish/tray and silverware cart,cambro TDCR12191 Granite Grey Try & Dish cart with Cutlery Rack and Protective Cover Electric 5 bin Hot Food Service Table, ServIt EST-5WE Five Pan Open Well Electric Steam Table with Undershelf - 208/240 V, 3750 W (no privacy screen available/included) GE Single Door Stainless Steel Bottom-Freezer Refrigerator (GDE25ESKSS) Whirlpool Stackable Ventless Electric Washer-Dryer Combo (WED7990FW, WFW7590FW, and W10869845) Heating and Cooling System Modify grilles and ductwork to accommodate the renovation Relocate the dishwasher hood and re-route duct Install (1) 2-port ductless split with (2) indoor units with associated refrigerant and condensate drain piping Route exhaust duct below house per plans Core-drill for new exhaust cap and refrigerant pipe openings Change filters in units prior to project completion Provide filter media as necessary in returns to protect during construction Mechanical permits and inspections Fire Protection 4

Rework or add 14 fire sprinkler heads and associated piping to accommodate new build out, sprinkler heads to be replaced with new Head Location drawing and associated permit All work will be performed in accordance with NFPA 13 Permit Fee and Shop Drawing Plumbing Plumbing work associated with House Director s Bathroom, Accessible Bathroom and Kitchen per plans, including: o One toilet, one fiberglass shower stall, one lavatory, and one rough-in for stackable washer/dryer in House Director s Bathroom o One toilet and one lavatory for Accessible Bathroom o Kitchen work includes dishwasher installation, installation of 3-compartment sink/faucet, installation of one water cooler, furnish/install new kitchen sink and faucet, two hub drains for ice machine and hot food table, check valves for relocated beverage machines, and two icemaker boxes Water cooler, 3-compartment sink, and ice machine shown to be existing/relocated Includes safe-off of existing Kitchen equipment to be relocated o Janitor Closet moved to Phase 2 o Rough-in for new Accessible Bedroom/Bathroom to be completed in Phase 2 o Plumbing fixtures per plans/asi o Includes permit and bacteria test Electrical and Fire Alarm Demo/Safe off as required Lighting and lighting controls in the following only: o Accessible Bathroom o House Director s Bathroom o Main Kitchen o 24/7 Sister s Kitchen o (2) owner-selected replacement ceiling fans in House Director s Suite Alternate lighting package included, subject to Owner/A/E approval Power to new Mechanical equipment, including weather proof GFI and connection to 1 outdoor mini -split condensing unit. Power to washer/dryer Power to new and relocated kitchen equipment Modifications to existing fire alarm as shown o o o No relocation of Fire Alarm Control Panel and no new Fire Alarm Remote Annunciator New Horn/Strobes and Strobe per Plans Additional Fire Alarm work to bring First Floor into code compliance as recommended by Fire Alarm vendor since it will be required by City of Tallahassee/Tallahassee Fire 5

Department to be completed in this Phase/Project, including (9) new pull stations and (6) horn strobes Electrical and Fire Alarm permits Total Scope of Work $531,686 The following ADA improvements are part of the Work: ADA parking and accessible route to public right of way $63,522 Enlarge door openings and corridors for first floor accessibility $3,553 Upgrade all interior hardware to lever hardware $3,375 One new ADA restroom $15,073 Rough-in for Phase 2 Accessible Bedroom and Bathroom $4,162 Budget for remaining build-out of Accessible Bedroom and Bathroom $40,000 Total Improvements $129,685 6