DESIGN AND APPLICATION OF AIR DECKS IN SURFACE BLASTING OPERATIONS 2 MODERN APPLICATIONS 2 PRODUCTION HOLES 2 DESIGN CRITERIA 3

Similar documents
202 The Chemical Crusher: Drilling and Blasting. Bill Hissem & Larry Mirabelli

2005 National Quarry Academy. Golden, Colorado October 31 to November 3, Blast Management

Blast Dynamics POWER DECK OPTIMIZATION POWER DECK COMPANY MAY, 2004 PREPARED BY: improving productivity wi th the use of efficient blast designs

A newly developed plaster stemming method for blasting

301 Part A The Chemical Crusher: Drilling and Blasting. Bill Hissem & Larry Mirabelli

Comparison of the Non-Ideal Shock Energies of Sensitised and Unsensitised Bulk ANFO-Emulsion Blends in Intermediate Blasthole Diameters

Blast optimisation at limestone quarry operations good fragmentation, less fines

Recent Innovations in Perimeter Blasting. Ontario Mining Health and Safety Conference Sudbury April 18, 2013

Monitoring and analysis of production waste blasts at the Cadia Hill Gold Mine

302 Blast and Drill A Single Value Chain Process. Bill Hissem & Larry Mirabelli

Mining Services Low Density WALA Deep hole blasting

Mining Services Low Density WALA Post blast fume resistant

BENEFITS RELATED TO THE APPLICATION OF MASS BLASTS IN OPEN CUT MINING

The Effects of Blasting on Crushing and Grinding Efficiency and Energy Consumption

Electronic vs Pyrotechnic Detonators. Presented by Philipa Lamb RedBull Powder Company Ltd

301 Part B The Chemical Crusher: Drilling and Blasting. Bill Hissem & Larry Mirabelli

New blasting methods to a efficiency in economics and environmental

Case Studies using the WipFrag Image Analysis System

Cut and fill productivity. Operating procedures. Introduction. 1. Approach of the model

301 Managing the Chemical Crusher. Bill Hissem & Larry Mirabelli

INVESTIGATION ON TECHNIQUES TO CONTROL STRUCTURAL DAMAGE DUE TO BLASTING ACTIVITIES

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price)

Chapter 19 BLAST DESIGN. Introduction

POUR n CRACK. A simple solution for non explosive demolition.

CAUTIOUS BLASTING IN CRITICAL AREAS AT RAMAGUNDAM SUPER THERMAL POWER STATION

Explosive Selection. Techniques to Select the Most Economic Solution. Drew Martin Principal Drill and Blast Engineer Blast It Global

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES

An investigation into the fragmentation of blasted rock at Gomes Sand

Frequently Asked Questions about Blasting at Richardson Ridge

Electronic detonators and the Gautrain rapid rail project

INTRODUCTION SUMMARY. misclassification, resulting in increased ore recovery.

Groundbreaking Performance Through Practical Innovation

Bengalla Mining Company Pty Limited. Post Blast Fume Generation Mitigation and Management Plan

Macraes Phase III Vibration and Air Blast Assessment Oceana Gold (New Zealand) Limited March 30 th 2010

CONSTRUCTION SPECIFICATION FOR GRADING

Equipment Specific Optimum Blast-Design Using Genetic Algorithm

Smarter, Cheaper, Ash Pond Dewatering

CIVILS QUARRING MINING high pressure rock/concrete breaking system

THE INTRODUCTION OF ELECTRONIC DETONATORS AT OPTIMUM COLLIERY JD BOTES MINE MANAGER - EXPOSURE OPTIMUM COLLIERY PRIVATE BAG X1201 PULLENSHOPE 1096

The Importance of Energy Containment to the Blast Outcome & Justification for use of

MUCKPILE SHAPING FOR DRAGLINES AND DOZERS AT SURFACE COAL MINES

Ring Blasting Mine to Mill Optimization

Monetary Savings Opportunities of Electronic Blast Initiation Systems

J.W. Hall RPS Aquaterra, Australia

Blasting in Hong Kong, A Review of Current Blasting Assessment Requirements

The entire document shall be read and understood before proceeding with a test. ISTA 3B Page 1 of 35

Production and Characteristics of Rock Dust Applied in Underground Mines. April 13, 2017

THE UNIVERSITY OF QUEENSLAND

Optimisation of Overburden Blasts at Glencore Ulan Surface Coal Operations

Blaster Trade Communication Study Guide Blasting Logs and Reports

BEST PRACTICES IN DRILL AND BLAST

Physical and Technical Evaluation of Possibility Using Low-density Explosives in Smooth-wall Blasting

On-Line Mine Improving mining economy through on-line mineral analysis

Timing Effects on Fragmentation by Blasting

POTENTIAL IMPACTS TO GROUNDWATER FLOW AND NYANZA SUPERFUND LINER AND CAP SYSTEM

CONSTRUCTION SPECIFICATION FOR GRADING

isure a Revolution in precision Tunneling project management software

2015 UTAH ASPHALT CONFERENCE AGGREGATE PRODUCTION 101. Kilgore Companies and Kimball Equipment

Quarry Management. Saleable Rock Products. Solid Rock. Shotrock. Stages of downsizing rock

Technical Guidance 9. Guidance on Preparing Nitrogen Management Plans for Mines using Ammonium Nitrate Fuel Oil Products for Blasting

CAT COMMAND FOR DRILLING

FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A

Loss Control TIPS Technical Information Paper Series

Chapter 6. Application of Explosives Technology to the Mining Industry - Case Studies

Hydraulic Excavators

320 Linking the FULL Value Chain Chemical Crushing and Mechanical Crushing. Scott Giltner & Charles Hillmann

Long-Hole Stope Evaluation. Operating procedures. Introduction. 1. Approach of the model. 2. Notification. 3. Worksheets

Explosives utilization at a Witwatersrand gold mine

TECHNICAL REPORT BLAST-INDUCED DAMAGE

A Framework for improving the ability to understand and predict the performance of heap leach piles

AN EXPERIMENTAL STUDY OF DEEP BOREHOLE PRE-CRACKING BLASTING FOR GAS PRE-DRAINAGE ON A MINE HEADING ROADWAY IN A LOW PERMEABILITY SEAM**

Electronic Delay Detonators

GROUND WATER RECHARGE

Utilizing Continuous Photo Analysis of Fragmentation as a Blast / Crush Improvement Tool. Ran Tamir, Lawrence J. Mirabelli, James P.

COMPARISON OF MICRO-INCH IN-PLANE AND OUT-OF-PLANE RESPONSE OF CRACKS TO BLAST VIBRATION AND WEATHER

MULTI-POINT BOREHOLE EXTENSOMETER (MPBX) INSTALLATION INSTRUCTIONS

ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0.

Investigative Projects in Engineering for Secondary School Students 2

Below-grade pours (such as foundations) can be done out of the chute of the concrete truck or conveyer, however using a pump is best.

water-powered drilling in mining

water-powered drilling in mining

STAR-CRACK TECHNICAL MANUAL. Instructions For Use Of STAR-CRACK Non-Explosive Quarrying & Demolition Agent. NO noise NO vibration NO flying rock

SECTION A1 EXCAVATION AND BACKFILL GENERAL

Special Provision 206S03 November OPSS 206, Construction Specification for Grading is deleted in its entirety and replaced with the following:

Crushing. Comminution

Economic evaluation of optimum bench height in quarries

Construction. Blasting Solutions for the Construction Market

MDAG.com Internet Case Study 29. Leaching of Nitrogen Species during Underground Mining

1 st Edition. Western Canada Chapter of the International Society of Explosives Engineers Best Practices Guide for Urban Blasting Operations

The Implications of Blast-Induced Movement to Grade Control

StormPod Arch Installation Guide

Optimizing Non-ideal Blasting for Ideal Grinding

Preliminary Design Report: Prices Subdivision Drainage Improvements & Wastewater Servicing

CLICK HERE TO KNOW MORE

GEOTHERMAL HEAT PUMPS CONFIGURATIONS/INSTALLATION

Detonators: Best-for-Project Practices in Drill and Blast By Michael Wiseman and Stephen Timbrell

D.G.S.W. Pitakumbura Manager (Groundwater Studies) Groundwater Section NWS&DB. Groundwater recharge or deep drainage or

* The use of these areas can vary from car park space, where little waterproofing is required through to store rooms or plant rooms where a high

This report presents the findings of the subsurface exploration concerning the design of the taxiway rehabilitation. Description

Three-dimensional computer simulation of soil nailing support in deep foundation pit

Transcription:

DESIGN AND APPLICATION OF AIR DECKS IN SURFACE BLASTING OPERATIONS 2 MODERN APPLICATIONS 2 PRODUCTION HOLES 2 DESIGN CRITERIA 3 PRESHEARING 4 DEWATERING LARGE BLOCKS OF GROUND 4 DESIGN CRITERIA 5 VIBRATION AND OVER-PRESSURE REDUCTION 5 TEST RESULTS 6 CONCLUSIONS 7 FIGURE 1 8 FIGURE 2 8 FIGURE 3 9 FIGURE 4 9 FIGURE 5 - VOD TRACE THROUGH INERT DECK 10 FIGURE 6 - VOD TRACE THROUGH AIR DECK 10 FIGURE 7 - EFFECT OF PRIMER LOCATION, DETONATING CORD LENGTH BETWEEN PRIMERS 11 FIGURE 9 12

FIGURE 10 12 FIGURE 11 13 FIGURE 12 13 ACKNOWLEDGEMENTS 18 DESIGN AND APPLICATION OF AIR DECKS IN SURFACE BLASTING OPERATIONS Airdecking was originally applied in the late 19th century as a means to distribute the explosives pressure more evenly throughout the rock mass being blasted. This was critical to reduce shattering in dimensional stone, yet was also recognized as a means to "stretch the powder" in conventional shooting. The technique was restricted primarily to small diameter holes using black blasting powder in dimensional stone work. Today, black powder shooting in dimensional stone quarries is the exception rather than the rule. MODERN APPLICATIONS Today air decking is being used succesfully around the world to allow reductions of from 10% to 30% in total explosives required for production blasting. With the increased pressure on operators in large volume operations to reduce blasting costs, potential savings of this magnitude cannot be ignored. Other common applications of airdecking are for wall control, rip-rap production, to reduce vibration/overpressure and to create a barrier to groundwater using pre-splitting techniques. In all these cases, air decking can result in substantial savings and improved efficiencies over conventional methods. PRODUCTION HOLES In designing the burden for production blast-holes, the engineer is restricted to how much ground the hole can pull at the toe. This is the most heavily constricted area of the hole and proper fragmentation and movement in this zone is critical. At the top (or "collar") of the hole, there is much less vertical constriction, so it follows that considerably less explosive energy is required to fragment and move the material at the top of the hole than at the bottom.

Common practice to compensate for this is to use a lower energy/density explosive in the upper region of the hole. Generally speaking, there is no lower density, lower cost explosive for the upper region than AN/FO, and this in fact is the one most commonly used. When blast engineers design the pattern to pull the toe with AN/FO as the total charge, things get a bit more complex. Operators can use bulked out AN/FO mixtures to achieve similar energy reduction in the collar zone, but the added time and effort often make this impractical. Air decking offers an economical and energy efficient alternative to this practice. The physical steps in creating an airdeck are simple : 1. Lower the design top of the explosive column 2. Set a barricade to the stemming material at some point above the original top of column location 3. Stem from this barricade to the top of the hole, as usual The explosive gases will be able to expand into the air deck created above the column and exert a reduced but prolonged stress in the collar zone of the hole. This can allow significant reductions in the total explosives loads in production holes without significant loss in either fragmentation or movement of the collar zone. DESIGN CRITERIA The most common design criteria used to estimate an air deck volume is a percentage of the total explosive column length. When working in a fairly tight range of diameters and hole lengths, this approach works quite well. This method has the added advantage of automatically giving the operator an accurate estimate of how much will be saved in explosives costs. The new stemming length is usually started at 75% of the original - but this is dependant on the degree of risk for stemming ejection or fly-rock. Gradual reductions in stemming length will determine the minimum allowable, and this can often be as little as half of the original stemming length provided good stemming material is used. Carefully controlled field tests are required for exceptional conditions (rock or explosives types, holes diameters or depths). It is recommended that these tests begin with the minimum amount

of stemming and explosives removed, with gradual increases in each until the maximums that can be removed are determined. PRESHEARING Preshearing (or Pre-splitting ) is generally an expensive process, both from a drilling and from a blasting perspective. Drill factors can be as low as 15% of normal production which in turn means that the drilling cost per ton is increased over six-fold. In addition, there is a low yield of rock per man-hour loading when compared to normal production holes. In the loading process, high cost, specialty explosives are often used, or labour intensive preparations of string charges are involved. Air decking with bulk explosives offers two methods of reducing the impact of lower drill factors and high explosives costs. 1. Air deck pre-shearing is conducive to large diameter holes - normal production diameters can be used, usually at much wider spacings than small diameter holes. This, in effect, reduces the impact of lower drill factors on drilling and loading costs. 2. Bulk explosives are considerably less expensive to purchase and load than specialty or hand-prepared string charges. DEWATERING LARGE BLOCKS OF GROUND This technique involves the pre-shearing of target blocks well in advance of production drilling. Pre-shear charges are generally slightly heavier than normal to ensure wide, full-depth cracks. Ground water drains into these cracks and is able to escape at floor level into the previous excavation, resulting in a dry, isolated block of material. For operations already committed to pre-shearing for wall control, the only added cost is a slight increase in required explosives. For those operations not using wall control, this technique offers an added argument for wall control implementation. When combined, the benefits of wall control and dewatering can help maintain more uniform fragmentation, controlled blast displacement, more stable high walls and reduce wet hole explosives costs.

DESIGN CRITERIA Since more in-depth design criteria is presented in the attached material, a very basic method of arriving at approximate values is presented here, based on the production pattern. 1. Spacing equals from 1/2 to 1/3 of normal spacing 2. Burden equals from 1/3 to 1/4 of the normal burden 3. Charge equals from 0.5 to 1.0 kg per square meter of final wall VIBRATION AND OVER-PRESSURE REDUCTION When vibration problems are the result of charge per delay, the simple expedient of introducing air decks in the production holes can help. The resultant reductions in vibration levels are primarily due to the simple reduction of charge in each hole. There is some evidence to support the claim that the air deck also acts as an "accumulator", trapping previously wasted energy in the collar zone and converting it into useful work. This may further reduce vibration levels in the near field. Over-pressure due to stemming ejection can also be reduced through the use of air decks. In addition to effectively lowering the top of the explosive column, air decks can act as stemming enhancers. Coal operators have been able to solve stemming ejection problems by simply inflating an air bag directly on top of the explosive column before stemming the hole. A second major cause of overpressure is the transmission of the explosive shock wave from the rock surface into the atmosphere. Efficient pattern design and implementation, coupled with proper delay sequencing, can go a long way to reducing the magnitude of the shock wave introduced into the atmosphere, but can't eliminate it. Air decking, by the simple expedient of reducing the total explosive amount, can reduce it even further. Two surfaces must be considered - the vertical surface at the front of the shot (normally called the free face) and the horizontal surface on the top. Shock waves from the vertical face are least affected by air-decking, since the air deck itself comprises a relatively small portion of the vertical section of the blast. The shock wave off the horizontal face is most affected by air decking, where the deck (1) reduces the total explosive amount, and (2) increases the distance the shock wave must travel through the rock before it reaches the surface.

A third mechanism in over-pressure reduction could be the "accumulator" effect noted previously. TEST RESULTS Over a two year period, demonstrations and tests with air decks were carried out in a wide variety of mines, and one quarry, in Peru and Venezuela. These included two iron mines, one limestone quarry, one coal mine, two gold mines, one poly-metallic mine and two copper mines. The objectives of these tests were to : 1) improve fragmentation in the top zones of the blasts, 2) demonstrate how to implement air decks as standard practice in production blasts, 3) develope an air deck loading procedure that was at least as efficient as, and preferably faster and simpler than, the normal loading procedure 3) demonstrate sufficient explosives savings to offset the cost of the air decking device 4) demonstrate the design and implementation of air decks for wall control In all tests involving top air decks, surface fragmentation with properly designed and implemented air decks was equal to or better than that achieved with normal practice. In the one test with a mid-column airdeck, fragmentation was judged equal to normal, but this was a subjective assesment on the part of the shovel operator. Only minor adaptations were required to the bulk explosives trucks on the tests, consisting of attaching the inflation hose kit to the air tank on the truck brake system. Training was rapid and intuitive, rarely requiring more than fifteen minutes, and the additional step of lowering and inflating the air decking device was acceptable to the loading crews. During the demonstrations, the time to place the air decking device was between five and twenty five seconds per hole - this included lowering the device into the hole, inflating it and retrieving the inflation hose. The main variables in total time were the size of the bore hole (which defined the size of inflatable device to use) and the length and diameter of the inflation hose. For example, the longest time in any of the tests (25 seconds) was reduced to 10 seconds by simply removing six meters of un-necessary hose and several connectors. Stemming time was reduced by from 25% to 50%, considerably more than the extra time taken to place the air decking device. In addition, there was a substantial reduction in the amount of stemming material required. This was a major issue in one mine that used crushed stone as stemming material.

The initial air deck designs in all the mines visited were based on removing just enough explosives to offset the purchase price of the air decking device. In all cases, the operators insisted on removing at least double, and in two cases three times, this amount. There was no discernable differance in the blast results between the minimums and maximums of these values. Air decking for wall control was demonstrated at only one mine, and no clear conclusion could be drawn on the results of this demonstration. The wall that was blasted was not scheduled to be dug out for two weeks, by which time the tests would have been concluded and the participants returned to the United States. The drill/blast foreman at the mine affirmed that the results from all test configurations were "acceptable" during a follow-up call one month later, but it was not possible to enter the mine at that time to confirm this. CONCLUSIONS The most important thing for an operator to keep in mind is that these techniques do work and are being used as standard operating procedure in a wide variety of applications. As in any technique, there will naturally be situations where air decking will not be feasible - either due to economics, convenience or geology. In summary, the potential benefits of air decking include : 1. improved fragmentation in the collar zone of the blast 2. a faster loading cycle 3. reduced crushed rock requirements for stemming material 4. reduced vibration and overpressure levels 5. improved costs and production in wall control drilling and blasting 6. a savings in overall explosives costs

From Numerical modelling of the effects of air decking/decoupling in production and controlled blasting, L. Liu and P. D. Katsabanis, Fragblast 5, Montreal, Canada Figure 1 Figure 2

From Numerical modelling of the effects of air decking/decoupling in production and controlled blasting, L. Liu and P. D. Katsabanis, Fragblast 5, Montreal, Canada Figure 3 Figure 4

From The application of mid-column airdecks in full scale production blasts, T. Davids and B.J. J. Botha, Fifth High Tech Seminar State of the Art Blasting Technology Instrumentation and Explosives Applications, Blasting Analysis International Figure 5 - VOD trace through inert deck Figure 6 - VOD trace through air deck

From The application of mid-column airdecks in full scale production blasts, T. Davids and B.J. J. Botha, Fifth High Tech Seminar State of the Art Blasting Technology Instrumentation and Explosives Applications, Blasting Analysis International Figure 7 - effect of primer location, detonating cord length between primers Figure 8 - effect of VOD on acceptable time variance over a 5 meter mid-column air deck

From A study of free toe-space explosives loading and its application in open pit blasts, G. J. Zhang, Fragblast 5, Montreal, Canada Figure 9 Figure 10

From A study of free toe-space explosives loading and its application in open pit blasts, G. J. Zhang, Fragblast 5, Montreal, Canada Figure 11 Figure 12

CUSTOMER INFORMATION AND ESTIMATE SHEET (per shot) CUSTOMER DATE ROCK TYPE Hole diameter 311 mm METRIC Hole depth 18 meters Standard stemming 7 meters Burden 7 meters Spacing 8 meters Subgrade 1.5 meters Explosive density 0.8 gm/cc Explosive cost $0.33 per kilogram, in the hole Price of bag $6.50 kg/m. rise 60.77 $/m. rise $19.75 Proposed air deck 3.11 10.00 x borehole diameter Proposed stemming 5.25 0.75 x standard stemming Potential savings $20.36 per hole Holes per shot 80 Potential savings $1,628.88 per shot

CUSTOMER INFORMATION AND ESTIMATE SHEET (annual) CUSTOMER DATE ROCK TYPE Annual production, BCM 10,000,000 OPEN TWO FACES Percentage of production 75 Theoretical drill factor, BCM/m. 56.00 Actual drill factor 51.33 Total holes 8117 Sub-total 1, savings $165,268.18 OPEN ONE FACE Percentage of production 20 Number of lines per shot 11 Actual drill factor 46.67 Total holes 2381 Sub-total 2, savings $48,478.67 TIGHT Percentage of production 5 Number of rows per shot 15 Number of lines per shot 3 Actual drill factor 31.94 Total holes 870 Sub-total 3, savings $17,707.31 TOTAL ANNUAL SAVINGS $231,454.15

SPREADSHEET FOR PRE-SHEAR DESIGN/COMPARISON CLIENT DATE ROCK METRIC SYSTEM Hole diameter 100 mm Recommended range Hole depth 10 meters from to Collar 1.05 meters 0.90 1.20 Spacing 1.35 meters 1.20 1.50 Burden 1.65 meters 1.50 1.80 Sub-grade 0 meters Sp. Gravity of explosive 1.25 gm/cc Price of explosive $2.00 /kg Price of drilling $5.00 /m Recommended range Price of air bag $0.00 from to Charge per hole 10 kgs 7 14 Holes loaded per man-hour 4 $/hour for labour $50.00 $/initiator $4.00 $/primer $4.00 Holes per blast 400 Charge per square meter of final wall 0.74 kg $90.50 per hole Unit costs $6.70 per square meter of final wall $4.06 per cubic meter Total cost $36,200.00

SPREADSHEET FOR PRE-SHEAR DESIGN/COMPARISON CLIENT DATE ROCK METRIC SYSTEM Hole diameter 200 mm Recommended range Hole depth 10 meters from to Collar 2 meters 1.80 2.40 Spacing 2.7 meters 2.40 3.00 Burden 3.3 meters 3.00 3.60 Sub-grade 0 meters Sp. Gravity of explosive 0.8 gm/cc Price of explosive $0.35 /kg Price of drilling $10.00 /m Recommended range Price of air bag $4.50 from to Charge per hole 25 kgs 14 27 Holes loaded per man-hour 12 $/hour for labour $50.00 $/initiator $4.00 $/primer $4.00 Holes per blast 200 Charge per square meter of final wall 0.93 kg $120.92 per hole Unit costs $4.48 per square meter of final wall $1.36 per cubic meter Total cost $24,183.33

Acknowledgements Chiappetta, R. Frank, Mammele, M. E., Analystical high speed photography to evaluate air decks, stemming retention and gross motion studies, First High Tech Seminar State of the Art Blasting Technology Instrumentation and Explosives Applications, Orlando, Florida, 1989 Davids, T. and Botha, B.J. J., The application of mid-column airdecks in full scale production blasts, Fifth High Tech Seminar State of the Art Blasting Technology Instrumentation and Explosives Applications, New Orleans, Louisiana, 1994 Lanz, G. P., Stemming ejection analysis for the apllication of air-decking and the borehole plug, masters thesis, Queen s University, Kingston, Ontario, 1997 Liu, L. and Katsabanis, P. D., Numerical modelling of the effects of air decking/decoupling in production and controlled blasting, Fragblast 5, Montreal, Canada, 1996 Moxon, N. T., Mead, D., Danell, R. E., Richardson, S. B., The use of airdecks in production blasting, Proceedings of the Nineteenth Annual Conference on Explosives and Blasting Technique, International Society of Explosives Engineers, San Diego, California, 1993 Zhang, G. J., A study of free toe-space explosives loading and its application in open pit blasts, Fragblast 5, Montreal, Canada, 1996