ENERGIZING THE ECONOMY

Similar documents
SECTOR ASSESSMENT (SUMMARY): ENERGY. 1. Sector Performance, Problems and Opportunities

SECTOR OVERVIEW. Government of Indonesia, State Electricity Corporation (PLN). Electricity Power Supply Business Plan (RUPTL ). Jakarta.

SECTOR ASSESSMENT (SUMMARY): ENERGY

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5150 Project Name. Indonesia Power Transmission Development Project Region

SECTOR ASSESSMENT (SUMMARY): ENERGY

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Lahendong II Geothermal Power Project

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB5610 Indonesia Power Transmission Development Project

SCALING UP RENEWABLE ENERGY PROGRAME IN TANZANIA

SECTOR ASSESSMENT (SUMMARY): ENERGY 1

SCALING-UP RENEWABLE ENERGY PROGRAM (SREP) COUNTRY INVESTMENT PLAN KENYA

ECUADOR CASE STUDY ENERGY

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB4685 Project Name. Geothermal Clean Energy Investment Project Region

Renewables Rising: Renewable energy & energy efficiency in SEA

Solar PV in ASEAN Challenges and Opportunities. Peerapat Vithayasrichareon Centre for Energy and Environmental Markets (CEEM), UNSW Australia

SECTOR ASSESSMENT (SUMMARY): ENERGY

PAKISTAN Renewable Energy Distributed Generation NAMA

Reliable, affordable, and sustainable energy services for agriculture,

The World Bank s Energy Business East Asia and Pacific

International Atomic Energy Agency

Indonesia's Energy Transit: Struggle to Realize Renewable Potential

SUPPORT TO INDONESIA EXIMBANK Building Capacity for Energy Efficiency

IEA In-depth review of Greece

15 TH ANNUAL EAST AFRICAN POWER INDUSTRY CONVENTION

TRAN THI MAI PHUONG Ministry of Planning and Investment, Vietnam. Bali, Indonesia November 2012

Levelling the Playing Field for Nuclear Make or Break

Fiscal Support for the Efficient and Sustainable Management of Natural Resources in Indonesia: Renewable Energy and Forestry Resources

How Can Green Growth Help Indonesia Meet Its Energy Needs?

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1901 Project Name. ET- Electricity Access Expansion (FY06) Region

Opportunities and challenges of the Indonesian electrification drive. March 2015

Clean Energy Development in Sri Lanka

CHAPTER 2 ELECTRICITY CONDITION IN INDONESIA

Locally Appropriate Mitigation Action: Mine Reclamation for Rural Renewable Energy in East Kalimantan (LAMA-MORRE)

Good morning ladies and gentlemen and thank your for the introduction. Trends and Opportunities in the Indonesian Oil and Gas sector

U N I T E D N A T I O N S. Joint Statement

Profound changes underway in energy markets Signs of decoupling of energy-related CO 2 emissions and global economic growth Oil prices have fallen pre

Economic and Environmental Emissions Analysis in Indonesian Electricity Expansion Planning: Low-rank Coal and Geothermal Energy Utilization Scenarios

REToolKit Case Study

Energy in Kenya. Energy Scenarios Workshop July 24, 2013 Stanley Hotel

DESIGN DOCUMENT FOR THE PROGRAM ON SCALING-UP RENEWABLE ENERGY IN LOW INCOME COUNTRIES (SREP), A TARGETED PROGRAM UNDER THE STRATEGIC CLIMATE FUND

Indonesia s Energy Requirements Part One: Current Energy Dynamics

INDONESIA S NEW DEVELOPMENT IN POWER AND RENEWABLE ENERGY SECTORS by Hapsari Arumdati

PROJECT IDENTIFICATION FORM (PIF) PROJECT TYPE: Full-sized project THE GEF TRUST FUND

SECTOR ASSESSMENT (SUMMARY): ENERGY

Terms of reference INDIVIDUAL CONSULTANT PROCUREMENT NOTICE

Ensuring energy security in ASEAN countries: Current trends and major challenges

Policy Developments in Turkey Bioenergy Markets Turkey

SREP MALI - INVESTMENT PLAN Scaling Up Renewable Energy. Scaling Up Renewable Energy in Low Income Countries (SREP)

IFC s Approach to Climate Change in the Electricity Sector

Grid Resilience in Developing Countries

Development of Renewable Energy in the Insular context of Indonesia. Refi Kunaefi

THE IMPACT OF THE NEW LAW OF REPUBLIC OF INDONESIA NUMBER 20 OF 2002 TO THE ENERGY PLANNING IN INDONESIA

R.M. Soedjono Respati Indonesian PV Business Association and Indonesian Renewable Energy Society (APSURYA IRES/METI)/ )

Republic of Indonesia. Electrification Promotion by Small Scale Biomass Power Generation System in Non-electrified Regions.

SECTOR ASSESSMENT (SUMMARY): ENERGY (RENEWABLE ENERGY GENERATION SOLAR)

Energy Perspectives for Asia

Photovoltaics in Indonesia. Frank Südbeck (853303)

DECADES Tool to Make Comparative Assessment of Electricity Generation in Indonesia 1

ANNEX A THE IMPLEMENTATION ROADMAP TO DEVELOP SUCCESSFUL INFRASTRUCTURE PUBLIC-PRIVATE PARTNERSHIP (PPP) PROJECTS IN THE APEC REGION

The Role of Renewable Energy and Energy Efficiency in Addressing Climate Change in Indonesia. with

Jordan Assessment Report

WORLD BANK CARBON FINANCE UNIT 2014 ANNUAL MEETING CPF NEW CREDITING INSTRUMENTS: PILOT CONCEPTS CARBON PARTNERSHIP FACILITY 1

Principal Barriers/ Constraints to Successful Public-Private Partnerships

PAGE 38 THOMAS KUSTERER THE GERMAN ENERGY TRANSITION

SUMMARY SECTOR ASSESSMENT: ENERGY 1

ASSESSMENT OF THE ENERGY SECTOR

Overview of Indian Power Sector & Opportunities for for promoting Social Inclusion in Indian power sector

ADB Energy Sector Investments and Prospects for Smart-Grid. Mr. Woo Yul Lee ( 이우열 ) Energy Specialist Pacific Department Asian Development Bank

Indonesia energy efficiency report

University of Groningen. Sustainable energy for developing countries Urban, Frauke

Chapter 7. Indonesia Country Report. September 2016

Energy Efficiency & the Energy Future in ASEAN Amit Bando, Executive Director, IPEEC Bangkok, Thailand 5 June 2013

Making NAMAs work for Indonesian provinces

Energy Technology Perspectives 2014 Harnessing Electricity s Potential

Renewables for Africa and for the World

NEW AND RENEWABLE ENERGY POLICY

Global Gas and Steam Turbine Markets Conventional Thermal Power Expansion Driven by Emerging Markets and Rising Natural Gas Availability

AFFORDABLE AND CLEAN ENERGY

Regulation and Development of New and Renewable Energy in Indonesia

A Case Study of Wind Power

SOUTHEA ST ASIA ENERGY OUTLOOK EXECUTIVE SUMMARY. World Energy Outlook Special Report

CHAIRMAN S SUMMARY. Renewable Energy: a Route to Decarbonisation in Peril?

Submission by Prospect to the Department for Business Energy and Industrial Strategy

cpf think big The Carbon Partnership Facility a s F l a r i n g

TECHNICAL ASSISTANCE RELATED TO THE SUSTAINABLE AND INCLUSIVE ENERGY PROGRAM, SUBPROGRAM 2

CURRENT STATUS & DEVELOPMENT PLAN FOR GRID SMALL HYDRO POWER IN VIETNAM - BARRIERS & MEASURES TO OVERCOME BARRIERS IN THE FUTURE

Energy Policy in Lao PDR

Renewable Energy Market Transformation Initiative

National Energy Policy Workshop. Cross cutting Issues

ECONOMIC AND ENVIRONMENTAL EMISSION ANALYSIS IN INDONESIAN ELECTRICITY EXPANSION PLANNING: LOW-RANK COAL AND GEOTHERMAL ENERGY UTILIZATION SCENARIOS

CHINA 2050 HIGH RENEWABLE ENERGY PENETRATION SCENARIO AND ROADMAP STUDY. Energy Research Institute National Development and Reform Commission

Perspective on Accelerating RE to reach ASEAN s 23% aspirational target. Asia Clean Energy Forum 2017, ADB, Manila Deep-dive session - 6 June 2017

GEF Focal Area Climate Change (Operational Program No. 7)

Steps To Avoid the Historic Boom/Bust Cycle in Power Sector

Overview on the Development of the Egyptian PPP Program

Dr. Joe Leitmann Lead Environment Specialist, EASER SDN FORUM: CEA and Climate Change, January 27, 2010

SOLAR PV PROMOTION PROGRAM IN INDONESIA

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA982. Project Name. Region. Country

SECTOR ASSESSMENT (SUMMARY): ENERGY. 1. Sector Performance, Problems and Opportunities

Challenges for Renewable Energy Finance

Expert Working Group Meeting on Universal Access to Energy Services, Renewable Energy, Energy Efficiency and Clean Use of Fossil Fuels 14 Dec 2017

Transcription:

Terwatt-hours Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized ENERGIZING THE ECONOMY Strategic Priorities for the POWER Sector in Indonesia Indonesia is likely to confront looming power shortages due to insufficient capacity expansion in the face of 7 to 9 percent yearly increase in demand. Indonesia Power Demand Projections Power demand growth has been on Indonesia electricity demand projections the rise recently responding to an 400 PLN 2006-2015 plan (Grow th: 8.5% /yr) economy that is growing at around 6 Beicip study 2002-2025 (Grow th: 6.2% /yr) 300 Nexant 2005-25 (10% /yr to 2010 then 6%) percent each year. After experiencing excess capacity 200 following the slowdown from the Asian Financial Crisis, Indonesia is 100 now beginning to experience low 0 reserves with some power shortages 1996 2000 2004 2008 2012 2016 2020 Annual GDP growth: PLN 7.3% for 2006-2015, Beicip study 5% for 2002-2025, Nexant study 6% for 2005-2025 across the country. While some Source: PLN, Nexant, Beicip Franlab generation capacity is being added, very few new projects have been started that could be commissioned beyond 2007. As a result, the reserve margins are expected to deteriorate until new capacity is added, risking the reliability of the power supply in the interim. There are indications that captive power producers facing rising fuel costs may want to revert to using power from state-owned utility, PLN, which will further increase demand. Consequently, economic growth in Indonesia, which is highly dependent on energy, could be jeopardized. Over 70 million people in Indonesia, mostly the poor, still do not have access to electricity. About 80 % of those without access to electricity live in rural areas and over half live outside of the dominant economic centers of Java and Bali. Given that 3 out of 4 Indonesian s poor reside in rural areas and outer islands, increasing electricity access in Indonesia is an important consideration for poverty alleviation and improving the quality of life of the poor. Internationally, Indonesia has fallen behind other countries in the region in terms of electrification. For example, Major Islands Electrification Rate by Major Island (2004) Population (million) Electrification Ratio (percent) Population w/o Access (million) Java 128.7 74% 33.6 Bali 3.4 86% 0.5 Sumatra 45.3 57% 19.4 Kalimantan 11.9 59% 4.9 Sulawesi 15.6 61% 6.1 Nusa Tenggara 8.2 33% 5.5 Maluku 2.1 54% 1.0 Papua 2.3 22% 1.8 TOTAL 217.7 (average) 67% 72.7 Source: The World Bank 69089 1

Vietnam, which had lower electrification coverage than Indonesia in 1994, has substantially greater access levels today. Strategic Priorities to Address Power Sector Issues Clear policies and predictability in the legal and regulatory framework are necessary to reduce the uncertainty that exists in the power sector. The 2002 Electricity Law provided a long-term vision for a financially and environmentally sustainable development of the power sector based on reliance on competition (where feasible and gradually to avoid disruption), modern regulation, regionalization and private sector involvement among others. The annulment of the Law created an important gap and unpredictability with regards to the way forward in the sector. The sector reverted to the previous electricity law of 1985, complemented by a set of more recent regulations to temporarily address its shortcomings due to legal changes introduced after 1985. It is essential that Indonesia develops a legal and regulatory framework with a clear long term vision and regain private investors confidence. There are a number of short-term policy measures that could bring sufficient clarity to promote investors interest regarding the immediate potential of investing in the sector. Putting in place a comprehensive framework for the power sector, on the other hand, will take time, and should be developed and implemented with a sound overall strategy and a long-term approach. Policy reforms that are essential to restore confidence in the sector, and will impact across all strategic priorities, are the following: - Provide a clear VISION and policy direction for the sector to guide investment decisions and attract private sector participation. Investors and lenders are looking for clarity and guidance from the Government as to the direction in which the sector is heading. Issuing a policy and roadmap for power sector development could partly address this problem in the short term. In the medium term, it will be essential to fill the legal void with a new electricity law and the corresponding implementation regulations that define the market design and structure for the power sector, the roadmap for implementation and required transitions, and clear roles of the central and sub-national governments, PLN, and the private sector. - Rationalize PRICING in the power and related sectors to eliminate numerous distortions that impede progress, while creating adequate mechanisms to protect the poor and to encourage efficient use of electricity. Average electricity prices that are below cost recovery levels undermine the financial prospects of the electricity industry and subsequently deter private investors. Furthermore, the national uniform 2

electricity tariff structure in a country with significantly varying costs across the regions severely hamper PLN s ability to expand access unless compensated with a clear subsidy strategy and the corresponding funding mechanisms. The subsidies on petroleum products that persisted for years hampered the development of alternate competing energy resources for power generation. Data also show that many of these policies adversely impacted the poor in many instances. Therefore, it is vital that Indonesia embark on energy pricing reforms that will be driven by economic fundamentals with corresponding subsidy mechanisms to protect the poor and support rural development. Aggressive ENERGY SAVINGS measures are cost-effective shortterm options that will reduce capacity expansion needs. Indonesia s rapidly rising energy demand can be better managed to reduce the need for capacity expansion. Demand-Side Management (DSM), which is an often forgotten option, has the potential to at least reduce 2,500 MW of capacity requirements, which will be tantamount to expanding generation capacity. International experience suggests that DSM measures are successful when complemented with incentive in price-based regulation of consumption. In order to rapidly assess the benefits and potential of DSM programs, PLN will need to identify priority sectors and incorporate them to the power sector master plan. To successfully implement such programs, PLN will also need to commit financially to the operation and adequately staff the effort. Restoring INVESTOR CONFIDENCE and developing bankable projects will facilitate the financing to support momentous investment needs. PLN estimates that about $40 billion in generation, transmission, and distribution investment is needed in order to keep pace with power demand growth and to maintain system reliability. Potential for Energy Savings from Ongoing DSM Programs On-going Programs Efficient lighting (CFL, FTL) Street lighting Partnership for industrial and building energy conservation Energy labeling for appliances Total Reduction of Capacity Requirements Source: Econoler International Potential Savings 730 MW 160 MW 760 MW 910 MW 2,560 MW PLN Investment Estimates (2006-15) Generation $ 27 billion Transmission $5 billion Distribution $8 billion TOTAL $40 billion - Improve PLN s operations and financial position because the PUBLIC SECTOR will maintain its key role in advancing the sector in the near future: PLN s financial deterioration in the immediate aftermath of the Asian Financial Crisis was largely reversed through government 3

1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 US$ billions assisted measures. These actions include the restructuring of PLN debt, renegotiation of obligations to private power producers, and periodic tariff increases. With increase in fuel prices and tariff adjustments being suspended in 2003, PLN s future financial prospects became uncertain once again. The removal of petroleum subsidies to PLN at a time when international prices are at historical highs have significantly increased PLN costs, since over 25 percent of their generation is oil fired, and damaged its financial situation. Due to their financial weakness, PLN is facing difficulties to raise the necessary funding to implement their expansion plans. Therefore, it is essential that PLN optimally allocate their limited funds towards investments that can either be undertaken only by the public sector or projects that may leverage greater participation by other investors. In order to do so, priority needs to be given to developing and implementing a robust least-cost expansion plan that incorporates energy efficiency measures, closely coordinated with natural gas developments, and secure the necessary funding. - A strategy to attract PRIVATE INVESTMENTS to augment PLN s ability to expand capacity and services needs to be combined with bankable projects and mitigation of risks perceived by private investors and lenders. The present expansion plans calls for over 50% of the generation requirements to be secured through private power producers that would sell 25 20 15 10 Private Investment in Power Sector Investment in power projects with private participation (WB PPI database) Indonesia total power investment need (PLN 2006-2015 plan) electricity to PLN. Adequate Source: World Bank project preparation and documentation is required prior to engaging private investors. PLN s lack of credit worthiness has led to little private investments in the sector. While there has been a global slow-down in private investments in the power sector, in the last years there has also been a growing interest in IPP projects in the region when accompanied with an adequate framework and risk allocation. Given the investment climate in Indonesia, the scale of the program may have been too optimistic in the first instance. Nevertheless, private engagement remains a necessary and viable option for PLN to expand generation capacity. To progressively build investor confidence, PLN should develop first a few model transactions with a risk management strategy and guarantees framework to mitigate risks perceived by private investors. The success of these transactions, measured in attracting expert private investors and achieving reasonable 5 0 Indonesia power investment need Global power investment Indonesia power investment 4

prices, will depend strongly on following international good practices and taking advantage of lessons learned, developing bankable documentation with the assistance of specialist advisors, and tendered in a fair and transparent manner in order to obtain best possible prices and conditions 5

Optimize FUEL MIX to improve efficiency and protect the environment. Indonesia has an abundance of many types of energy resources that can be utilized for power generation, yet the fuel mix is dominated by fossil fuels. Among fossil fuels, PLN is heavily dependent on diesel which has significantly increased its cost and impacted their finances. Government subsidies for petroleum products have stymied investment in alternative energy. There is a need to develop a plan and actions to support the development of renewable resources such as geothermal and biomass for power. - Develop reliable supplies of NATURAL GAS: One of PLN s strategic thrusts in the generation expansion plan was to switch from the use of diesel to greater utilization of natural gas. They have struggled, however, to secure gas supplies to fully implement this part of Potential for Diesel to Gas Conversion their plan. Making the situation worse is that PLN has already built a number of power plants (CCGT) to be powered by gas, yet they are 100% 80% 60% 40% 20% 0% Indonesia 2004 Indonesia 2015 (PLN) Fuel Mix in Select Countries Power Generation Fuel Mix (PLN Plan 2006-2015, IEA 2005) China India Brazil US&Canada OECD Europe expensively being Source: PLN operated at present using diesel. In 2005, these power plants produced nearly 20% of PLN s generation, and based on current prices, the cost differential of the lack of gas supplies could be as high as $1.5 billion. Obtaining adequate gas supplies will have multiple benefits of improving PLN s finances, reducing the government subsidy (PSO) for electricity, and more efficiently allocating the countries resources. Therefore, securing gas supplies for the CCGT power plants is a quick win priority that should be resolved as soon as possible. The World Source: International Energy Agency, PLN Note: Data for Indonesia is 2004 data. Data for other countries are 2002 data. Gas-fired plants utilizing diesel instead in Java Bali Grati Block 1&2 (CCGT) Tambak Lorok (CCGT) 6 Units Sunyaragi Gas Turbine Gresik Block 1&2 (CCGT) Muara Tawar Block 1&2 (CCGT) Total % of Java Bali total in 2005 Capacity 2005 (MW) 764 616 60 1,052 920 3,412 13.5% Other Renewa bles Hydro Nuclear Gas Oil Coal Generation 2005 (GWh) 2,067 3,879 196 5,676 5,552 17,370 18% 6

- SUSTAINABLE DEVELOPMENT of fossil-based fuels: In the generation expansion plan, PLN s other strategic option for diversifying their fuel mix is to utilize greater amounts of coal-fired generation. Coal fired power generation for based load could be justified provided that the environmental impacts of such expansions are thoroughly assessed and mitigation measures are implemented in accordance with environmental laws and regulations. Clean coal technologies should be progressively promoted whenever they are feasible and economically justified. This is particularly Green House Gas (GHG) Emissions 1971 (Mt CO2) 2003 (Mt CO2) Change since 1990 The World 13,958 23,579 18% Developing Countries 1,995 8,226 56% OECD Countries 9,378 12,446 13% China 809 3,307 45% India 199 1,016 71% Indonesia 25 303 119% Source: International Energy Agency important since Indonesia has one of the fastest rising CO2 emission rates in the world while increasing use of coal for power generation also leads to localized pollution such as acid rain. - Promote the development of RENEWABLE ENERGY: Indonesia is rich in renewable energy resources, and could benefit from increasing the share of renewable generation. It has 30% of the world potential geothermal resources, which could be a viable complement to coal-fired baseload generation. Geothermal generation can be developed at a scale that would be economically feasible, especially if coal prices keep rising. Biomass and hydro resources are abundantly available in most of the outer islands, and can be attractive options for switching away from the largely diesel-based generation in many of these locations. In order to exploit these resources, however, there is a need to develop a strategy and action plan to address technical, policy, and commercial barriers that presently hinder progress. No. Major Islands Primary Energy Reserves and Production in Indonesia Coal Natural Oil Geothermal Hydro Biomass Gas MTOE MTOE MTOE MWe MW MW 1 Java 6 165 67 3086 54 13,622 2 Bali - - - 226 20 347 3 Sumatra 13,558 425 1,551 5,433 5,489 6,433 4 Kalimantan 5,885 1,180 200-6,047 6,231 5 Sulawesi 20 24-721 4,479 5,337 6 Nusa Tenggara - - - 645 292 1,174 7 Maluku - - 1 142 217 1,093 8 Papua 64 24 2-24,974 6,814 TOTAL 19,533 1,817 1,822 10,027 * 41,436 41,651 * total geothermal potential that is presently ready for commercial extraction. There is an estimated additional potential of 17 GW that could be exploited with more development. Source: Ministry of Energy and Mineral Resources, Indonesia 7

Increase ACCESS to electricity for inclusive development The Government of Indonesia has set a target of electrifying 90 percent of the population by 2020 recognizing the low levels of access to electricity in the country. Approximately 1.3 million new connections are needed each year if Indonesia is to achieve this target. Despite this ambitious Achieving the 2020 Access Target Year 2004 2012 2020 Population (mil) 218 245 276 Pop. w/o Access (mil) 73 48 28 Households w/o Access (mil) 15 10 6 # new connections (mil) 10 10 % of population w/ access 67% 80% 90% Source: World Bank target, there is no comprehensive plan for achieving this goal, as the pace of electrification by PLN has substantially slowed during recent years. With PLN s present rate of rural electrification, it is unlikely that the Government will be able to meet its target. Despite PLN s slow-down in expansion, they still connect nearly one million customers per year. Most of this expansion has been concentrated in Java and Bali where, before they faced unsubsidized fuels prices, PLN was able to recover their costs. If PLN is to refocus on expanding connections throughout the country, it is essential that Indonesia reform its electricity pricing in combination with improved cost-efficiency and well targeted subsidies to assist the poor when necessary. There is also increasing evidence that sub-national solutions are increasingly becoming a way forward for increasing access in the absence of significant sector reforms at the central level. Many of these schemes are designed to augment PLN expansion efforts mostly through cost sharing mechanisms or implementing options for cost recovery. These decentralized solutions could be a viable complement to PLN if they were to be replicated in a systematic way at a greater scale where access to electricity is desired. To move forward, it would be important that such alternate solutions are mainstreamed in the electricity laws and policies. In addition, sub-national entities will require technical assistance to build their capacity to undertake such activities, and access to subsidies and financing sources. 8

Recommended ACTIONS for a successful way forward In order to avoid a looming power crisis, PLN and the Government will need take speedy actions that will lead to quick wins and strengthen the predictability and reliability of the power sector. Other longer term actions are also needed to ensure the long-term sustainability of the sector and the investment for security of supply. Short-Term actions for quick wins Develop Demand-Side Management Plan: As one of limited short term options available to address the present capacity shortfall, PLN should make DSM an immediate institutional priority and undertake a program based on a master plan incorporating these measures. A successful DSM program will require PLN to commit adequate staff and resources, and will require sufficient funding for this purpose. Secure Gas Supplies for Power Plants: The Government should assist PLN in securing gas supplies for the CCGT power plants in Java-Bali that are presently utilizing diesel. This will immediately help shore-up PLN s finances and reduce the Government s fiscal burden by reducing its power subsidy. Revise Existing Least-Cost Expansion Plan: The present PLN expansion plan has already stalled in implementation. A revision that brings greater realism is required. A revised plan should rethink previous strategic options, prioritize generation expansion options based on levels of project preparation, incorporate DSM measures and include a corresponding financing plan. Conduct Model IPP Transactions: Revive the IPP Program, which remains vital in funding the required level of investments, by developing a few wellprepared model projects that can attract private sector interest based on adequate risk sharing arrangements which may include select government guarantees. These projects should also be tendered for private participation in a fair and transparent manner with bankable conditions so that the best possible prices are obtained and financial closure can be achieved. Implement Policy for Attracting Generators that Utilize Renewable Energy: Review, enhance and implement the present policy on Medium Scale Renewable Energy for Electricity to catalyze investment and more power generated through renewables being sold to the PLN grid. Monitor progress to make any necessary adjustments to the policy. Issue IRRs for Implementing the Geothermal Law and Revise Blueprint: The implementing rules and regulations should be quickly issued so that the Geothermal Law can begin to be implemented. The Geothermal Blueprint also should be updated to be more realistic in terms of implementation. 9

Develop A Strategy for Unlocking Brownfield Geothermal Sites: Current brownfield geothermal sites can be quickly expanded if existing barriers could be addressed to compel current licensees to make further investments. Actions to ensure the long-term viability of the sector Issue Revised Electricity Law and Corresponding Regulations: Provide a legal and regulatory framework for the power sector that will clearly define the future market design and sector structure identifying the roles of various stakeholders. It is important that the implementing rules and regulations quickly follow the law so as to provide clarity to all stakeholders and potential investors. Develop a Rationalized Pricing and Subsidy Policy: Adopt economic pricing principles and de-politicize tariff setting in the power sector. Also develop a well-targeted subsidy policy with the necessary funding mechanisms/ allocations in order to protect the poor. Fully Implement the Geothermal Law: A number of measures will need to follow the promulgation of the Geothermal IRRs so that the Government is well prepared and positioned to attract investments. This would include addressing long-terms barriers that would provide appropriate incentives for investors, build capacity through technology transfer, institutional arrangements for tendering sites for development, and risk mitigation measures for upstream exploration. Develop Long-Term Renewable Energy Policy: The Government should develop a robust policy that will increase the utilization of renewable energy for power generation that could include pricing, fiscal and other incentives to encourage greater investments. Develop and Implement Policy Framework for Regional Electrification and Rural Access: Assist regional electrification initiatives through a robust policy that will provide a conducive legal framework, and mechanisms to obtain technical assistance, well targeted subsidy funds to protect the poor, and access to affordable financing. 10

Increase supply, improve reliability, and expand access to electricity in order to support economic growth in an environmentally responsible and socially conscientious manner SUMMARY MATRIX OF PROPOSED REFORMS FOR THE POWER SECTOR IN INDONESIA IMPACT GOAL STRATEGY RECOMMENDED ACTIONS Provide a vision for sector Provide a clear and effective legal and regulatory outlining a clear direction in direction for the sector Immediate Actions for Quick Results (6 months) reforms Implement a rationalized pricing and subsidy policy Develop and implement aggressive plan for demand-side Enhance the effectiveness of energy utilization by improving the efficiency of use Secure financing needed to undertake the substantial investments needed in the energy sector Optimize fuel mix for greater energy security, diversity, reliability, and to protect the environment Provide affordable electricity to the poor and increase access to achieve the government target Mainstream energy efficiency measures in overall sector policies including pricing Implement demand-side management (DSM) measures to improve energy efficiency Improve PLN s operations and financial position Attract private investments to augment PLN s own capacity expansion Decrease the over-reliance on expensive petroleum products for energy needs Develop reliable natural gas supplies for energy needs Increase utilization of alternate renewable energy sources Implement reforms that will provide incentive for PLN to expand connections Improve investment climate for sub-national electrification initiatives that aim to augment PLN expansion Incorporate sub-national governments and other community stakeholders in providing electricity in outer islands management Secure gas supplies for the CCGT power plants that are utilizing diesel Revise existing least-cost expansion plan to bring more realism, develop a corresponding financing plan, and undertake the necessary project preparation activities Transact a few well-prepared models projects with select government guarantees if necessary, for private participation Enhance and implement policy on generators that utilize renewable energy Issue the implementation rules and regulations for the Geothermal Law and revise Geothermal Blueprint Develop strategy for unlocking investments into the expansion of existing brownfield geothermal sites Reforming the Sector over the Medium to Long Term (over 1 year) Issue revised electricity law and corresponding regulations that clearly define future market structure for the sector identifying the roles of various stakeholders Develop a rationalized pricing policy with well targeted subsidies to protect the poor Fully implement Geothermal Law to mobilize investments in line with Blueprint target Develop a renewable energy policy that will include pricing, 11

Develop innovative financing mechanisms and rationalized subsidy policies that will enable access to many who are unable to afford services. fiscal and other incentives to encourage greater investments Develop and Implement policy framework for regional electrification and rural access 12