NAVSEA STANDARD ITEM. 1.1 Title: Piping System Cleanliness Restoration (Non-Nuclear); accomplish

Similar documents
NAVSEA STANDARD ITEM. 1.1 Title: Piping System Cleanliness (Non-Nuclear); accomplish

NAVSEA STANDARD ITEM. 1.1 Title: Authorization, Control, Isolation, Blanking, Tagging, and Cleanliness; accomplish

NAVSEA STANDARD ITEM. 1.1 Title: Interference; remove and install LP , Submarine Safety (SUBSAFE) Requirements Manual

NAVSEA STANDARD ITEM

NAVSEA STANDARD ITEM

R & R IDENTIFICATION CO.

MILITARY STANDARD SCHEDULE OF PIPING, VALVES, FITTINGS, AND ASSOCIATED PIPING COMPONENTS FOR NAVAL SURFACE SHIPS

NAVSEA STANDARD ITEM. 2.2 S9AAO-AB-GOS-010, General Specifications for Overhaul of Surface Ships (GSO)

CHAPTER 51 MACHINIST'S MATE (MM) NAVPERS F CH-70

NAVSEA STANDARD ITEM. 1.1 Title: Globe, Globe Angle, and Globe Stop Check Valve; repair

STANDARD PHRASEOLOGY SECTION A

Standard Specifications for Ship Repair and Alteration Committee SSRAC

Bondstrand Marine Piping Systems

STANDARD PHRASEOLOGY SECTION B. 1. This section of standard phraseology is for general use in all disciplines.

QUALITY ASSURANCE MANUAL FOR APPLICATORS OF ELASTOMERIC SHEET LININGS

NAVSEA STANDARD ITEM. 2.1 T9074-AS-GIB-010/271, Requirements for Nondestructive Testing Methods

.1 marine diesel engine.1 approved in-service appropriate experience.2 marine steam turbine.2 approved training.3 marine gas turbine ship experience

NAVSEA STANDARD ITEM. 1.1 Title: Maintaining Protection and Cleanliness from Non-Radioactive Operations; accomplish

NAVSEA STANDARD ITEM. 2.1 S9086-RJ-STM-010/CH-504, Pressure, Temperature and Other Mechanical and Electromechanical Measuring Instruments

NAVSEA STANDARD ITEM. 1.1 Title: Maintaining Protection and Cleanliness from Non-Radioactive Operations; accomplish

TOPIC: KNOWLEDGE: K1.01 [2.5/2.5]

Stainless steel 444 HS tube. 6m lengths

MARCH 09, 2011 CIRCULAR NO. 11/11 TO MEMBERS OF THE ASSOCIATION. Dear Member:

NAVSEA STANDARD ITEM NUMERICAL INDEX

.1 All equipment, controls and accessories to be compatible with system design, and matched to the steam boiler(s) by the boiler Manufacturer.

FUNDAMENTALS OF PROCESS & MECHANICAL ENGINEERING

Proserv Flushing Unit - Offshore

C. heating turbine exhaust steam above its saturation temperature. D. cooling turbine exhaust steam below its saturation temperature.

Recommendations are based on validity of above assumptions.

PTAC PROCESS TECHNOLOGY II - SYSTEMS. Last Reviewed: Page 1 of 10

CITY OF HAMILTON Codified Ordinance CHAPTER 941

NAVSEA STANDARD ITEM. 2.1 S9086-RJ-STM-010/CH-504, Pressure, Temperature and Other Mechanical and Electromechanical Measuring Instruments

CRYOGENIC FLUIDS CHAPTER 55

Glassfiber Reinforced Epoxy Pipe Systems (GRE)

NAVAL SEA SYSTEMS COMMAND What s New in Nonskid?

BuildingName The Description of the Project P DOCUMENTS

Division II Contractors

ANSULITE ALCOHOL RESISTANT CONCENTRATE (ARC) 3% - 6% AFFF CONCENTRATE

CHAPTER 5 SEWAGE PUMPS AND LIFT STATIONS

Valve Nest Filter with Time Clock Control Installation and Operation Manual

How equipment reliability delivers low cost, energy efficient assets at plants around the world!

Brown University Updated March 11, 2013 Facilities Design & Construction Standards

CONTENTS CO-GENERATING WATER-DESALINATING FACILITY POWERED BY SVBR-75/100 NUCLEAR REACTOR DESIGN ORGANIZATIONS INVOLVED IN THE PROJECT

TOGA PRESENTATION REVIEW OF CASE STUDIES. Paul Boman,

Energy Efficient. & Cost Saving. Continuous Boiler Blowdown Package Heat Recovery Systems. 20 Models from 1,200 pph to 50,000 pph Capacity

CRYOGENIC FLUIDS CHAPTER 32

CARRIAGE OF INTEGRAL REFRIGERATED CONTAINERS ON BOARD SHIPS

CRYOGENIC FLUIDS CHAPTER 32

THE REPUBLIC OF LIBERIA LIBERIA MARITIME AUTHORITY

REBUILDING VESSELS LESS THAN 90 METERS (295 FEET) IN LENGTH AND BARGES OF ANY LENGTH

NAVSEA Documents. Topics. Scope. Learning Outcome. Relevant Documents. NAVSEA Basic Paint Inspector Training: NAVSEA Documents

Conceptual Facility Plans and Details. Appendix B

AP1000 European 21. Construction Verification Process Design Control Document

R.K.Yadav/Automobile Engg Dept/New Polytechnic Kolhapur. Page 1

NUCLEAR TRAINING CENTRE COURSE 134 FOR ONTARIO HYDRO USE ONLY

SPECIFICATION FOR 20,000 GALLON LIQUID NITROGEN STORAGE TANK D-ZERO PROJECT FERMILAB G. T. MULHOLLAND G. STEPANEK

Filtration Solutions. In Naval Applications. Clean Fluids. Keep Running.

R.K.Yadav/Automobile Engg Dept/New Polytechnic Kolhapur. Page 1

8 th Annual Systems Engineering Conference Sponsored by the National Defense Industrial Association San Diego CA October 2005 SEC-8

Generic New Construction Cost Estimating Libraries

Cooling tower efficiency U2 Eco-efficiency resources for the food processing industry

Energy Transfer in a Hydraulic System. Lecture (1) Hydraulic and Pneumatic Circuits 4th year Mech. power Engineering Dept.

Information on Status of Nuclear Power Plants in Fukushima

HEAVY INDUSTRY PLANT WASTEWATER TREATMENT, RECOVERY AND RECYCLE USING THREE MEMBRANE CONFIGURATIONS IN COMBINATION WITH AEROBIC TREATMENT A CASE STUDY

CONDENSATE-FEEDWATER-BOILER SYSTEM ON-LINE ANALYZERS. On-Line Analyzer Sample Point Alarm Points Comments

Replacement Works for the Steam Generator and the Reactor Pressure Vessel Upper Head

Read Only Copy Not For Distribution. Chapter 17. Private Potable Water Supply Systems 17.1 GENERAL REGULATIONS 17.2 QUANTITY OF WATER REQUIRED

Information on Status of Nuclear Power Plants in Fukushima

Standard Operating (Installation) Procedures (SOP) For Manual Refractory Shotcreting Applications

AIR OPERATED GAS BOOSTERS

Nuclear Services. Put Our Expertise To Work As Your Single Source For Industrial Cleaning And System Maintenance Solutions.

F u e l T a n k M a i n t e n a n c e & N e w I n s p e c t i o n R e q u i r e m e n t s

Information on Status of Nuclear Power Plants in Fukushima

Cyclone Technology protects analyzer systems for unrivalled reliability and tops productivity

INDUSTRIAL FILTRATION EQUIPMENT LWS Filter Series

NAVSEA STANDARD ITEM. 1.1 Title: Asbestos-Containing Material (ACM); control

RIGHT ON COURSE EXPERTISE ON BOARD MARITIME OPERATIONS

Application Guide for Internal Flow Efficiency Coating

NAVSEA STANDARD ITEM. 1.1 Title: Asbestos-Containing Material (ACM); control

Chapter 5 Water, Plumbing, and Waste

SMART Standard Design Approval inspection result July. 4 th

CHILLED WATER DISTRIBUTION SYSTEM

PROVINCIAL MILK PLANT STANDARDS

NAVSEA STANDARD ITEM. 2.1 S9086-RJ-STM-010/CH-504, Pressure, Temperature and Other Mechanical and Electromechanical Measuring Instruments

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY GROUND STORAGE. Section GROUND STORAGE TANK (GST) MODIFICATIONS, CLEANING AND DISINFECTION

Lecture (6) on. Schematic of a Thermal Power Plant. By Dr. Emad M. Saad. Mechanical Engineering Dept. Faculty of Engineering.

Bulletin /08 - US Environmental Protection Agency (EPA) Vessel General Permit (VGP) requirements - USA

ELEC / ELEX COMMITTEE Fiber Optic Component; remove, relocate, repair, and install Electronic Equipment; repair Rotating

Assessment Schedule - TS.5

Magnetically Coupled Submerged Cryogenic Pumps and Expanders for Ammonia Applications

WELDING AND ALLIED PROCESSES

Application Guide for Internal Flow Efficiency Coating Jotapipe FC 400

The following words and terms, when used in this article, shall have the following definitions, unless the context clearly indicates otherwise:

Enclosure (3) to NVIC 15-14

An Introduction to Plumbing and Gas Systems for Medical Facilities

HVAC WATER TREATMENT 1.01 RELATED CORNELL DESIGN AND CONSTRUCTION STANDARDS. D. Section Plumbing (Potable) Water Treatment

Riviera Beach DIVISION 2. CROSS CONNECTION CONTROL

Compressed Air Filters 1/4 and 1/2 Line Size Filters

Transcription:

NAVSEA STANDARD ITEM ITEM NO: 009-107 DATE: 18 NOV 2016 CATEGORY: II 1. SCOPE: 1.1 Title: Piping System Cleanliness Restoration (Non-Nuclear); accomplish 2. REFERENCES: 2.1 Standard Items 2.2 S9AAO-AB-GOS-010, General Specifications for Overhaul of Surface Ships (GSO) 2.3 0902-018-2010, General Specifications for Deep Diving SSBN/SSN Submarines 2.4 S9086-RK-STM-010/CH-505, Shipboard Piping Systems 2.5 MIL-STD-1330, Precision Cleaning and Testing of Shipboard Oxygen, Helium, Helium-Oxygen, Nitrogen Systems, and Hydrogen Systems 2.6 MIL-STD-419, Cleaning, Protecting, and Testing Piping, Tubing, and Fittings for Hydraulic Power Transmission Equipment 2.7 MIL-STD-1622, Standard Practice for Cleaning of Shipboard Compressed Air Systems 2.8 S9086-RW-STM-010/CH-516, Refrigeration Systems 3. REQUIREMENTS: 3.1 Accomplish the general cleaning requirements of 2.2 through 2.4 for new, modified, or repaired non-nuclear piping systems and components of nuclear and non-nuclear powered naval vessels. Accomplish the system cleaning requirements of 2.5 through 2.8. 3.1.1 Clean to the following acceptance standard: 3.1.1.1 Cleanliness Level II: Surface shall be visually free of grease, oil, flux, scale, dirt, loose particles and any other contamination foreign to the base metal. Tap water residues on all metals and light superficial rust on carbon steel surfaces, caused by short time exposure to the atmosphere, are permitted. Light dust on cleaned surfaces is not objectionable, provided that the quantity and size of the particle does not adversely affect system operations. 1 of 5 ITEM NO: 009-107

3.1.1.2 Cleanliness Level III: Surface shall be reasonably free of contamination and any remaining residue on the surface does not interfere with system operations or damage system components. 3.2 Accomplishment of a Process Control Procedure (PCP) for the cleaning, flushing, and acceptance criteria of compressed air systems shall be in accordance with NAVSEA Standard Items (See Note 4.3) and Section 551 of 2.2 and 2.7. 3.2.1 Verify cleanliness in accordance with acceptance standards. 3.3 Accomplishment of a Process Control Procedure (PCP) for the cleaning, flushing, and acceptance criteria of oxygen, nitrogen, and helium systems shall be in accordance with NAVSEA Standard Items (See Note 4.3) and Section 552 of 2.2 and 2.5. 3.3.1 Verify cleanliness in accordance with acceptance standards. 3.4 Accomplishment of a Process Control Procedure (PCP) for the cleaning, flushing, and acceptance criteria of hydraulic systems shall be in accordance with NAVSEA Standard Items (See Note 4.3) and Section 556 of 2.2 and 2.6. 3.4.1 Verify cleanliness in accordance with acceptance standards. 3.5 Accomplishment of a Process Control Procedure (PCP) for the cleaning, flushing, and acceptance criteria of fuel oil systems shall be in accordance with NAVSEA Standard Items (See Note 4.3) and Section 541 of 2.2. 3.5.1 Verify cleanliness in accordance with acceptance standards. 3.6 Accomplishment of a Process Control Procedure (PCP) for the cleaning, flushing, and acceptance criteria of steam systems shall be in accordance with NAVSEA Standard Items (See Note 4.3) and Section 253 of 2.2. 3.6.1 Verify cleanliness in accordance with acceptance standards. 3.7 Accomplishment of a Process Control Procedure (PCP) for the cleaning, flushing, and acceptance criteria of condensate systems shall be in accordance with NAVSEA Standard Items (See Note 4.3) and Section 255 of 2.2. 3.7.1 Verify cleanliness in accordance with acceptance standards. 2 of 5 ITEM NO: 009-107

3.8 Accomplishment of a Process Control Procedure (PCP) for the cleaning, flushing, and acceptance criteria of lube oil systems shall be in accordance with NAVSEA Standard Items (See Note 4.3) and Section 262 of 2.2. 3.8.1 Verify cleanliness in accordance with acceptance standards. 3.9 Accomplishment of a Process Control Procedure (PCP) for the cleaning, flushing, and acceptance criteria of fresh and potable water systems shall be in accordance with NAVSEA Standard Items (See Note 4.3) and Section 532 of 2.2. 3.9.1 Verify cleanliness in accordance with acceptance standards. 3.10 Accomplishment of a Process Control Procedure (PCP) for each cleaning operation of refrigerant systems shall be in accordance with NAVSEA Standard Items (See Note 4.3) and 2.8. 3.10.1 Verify cleanliness in accordance with acceptance standards. 3.11 Accomplishment of a Process Control Procedure (PCP) for the cleaning, flushing, and acceptance criteria of HP/LP steam drains shall be in accordance with NAVSEA Standard Items (See Note 4.3) and Section 534 of 2.2. 4. NOTES: 3.11.1 Verify cleanliness in accordance with acceptance standards. 4.1 This Standard Item does not apply to systems of nuclear-powered ships covered by NAVSEAINST 9210.36, Steam Plant Cleanliness Control, or nuclear piping systems on nuclear-powered ships. 4.2 See Attachment A for Level II and Level III piping systems. 4.3 If a Process Control Procedure (PCP) of 3.3 through 3.12 is required; the use of Category II Standard Item 009-09 Process Control Procedure (PCP); provide and accomplish of 2.1 will be specified in the Work Item. 3 of 5 ITEM NO: 009-107

CLEANLINESS LEVEL II PIPING SYSTEMS: DIVERS AIR (NOTE 1) ATTACHMENT A CLEANLINESS LEVEL II AND III ELECTRONICS DISTILLED WATER COOLING (NOTE 1) HIGH PRESSURE AIR (NOTE 1) HYDRAULIC PIPING SYSTEMS (NOTE 1) LUBRICATING OIL SYSTEMS (NOTE 1) MISSILE HEATING AND COOLING REFRIGERANT SYSTEM (FREON AND LITHIUM BROMIDE) (NOTE 1) OXYGEN SYSTEM (NOTE 1) AIR CONDITIONING CHILLED WATER SYSTEM AUXILIARY STEAM SYSTEM CONDENSATE SYSTEM (NOTE 1) DIESEL FRESHWATER COOLING AIR FOR DIESEL CONTROL, VITAL AIR, ELECTRONICS SYSTEMS, ABC SYSTEMS AND PNEUMATIC CONTROL (NOTE 1) EXHAUST PIPING (STEAM) FEEDWATER SYSTEM (NOTE 1) POTABLE WATER SYSTEM (NOTE 1) FUEL SERVICE SYSTEM (NOTE 1) DISTILLATE PIPING SYSTEMS FUEL TRANSFER SYSTEM (NOTE 1) GASOLINE SYSTEM HIGH AND LOW PRESSURE DRAIN SYSTEM (NOTE 1) MAIN STEAM SYSTEM (NOTE 1) MEDIUM PRESSURE AIR (ABOVE 250 PSI AND BELOW 1500 PSIG) (NOTE 1) NITROGEN PIPING SYSTEM (NOTE 1) JP-5 PIPING SYSTEM OTHER SYSTEMS AS SPECIFIED BY THE SUPERVISOR NOTE 1: SEE INDIVIDUAL GSO SECTIONS FOR ADDITIONAL SPECIAL CLEANING REQUIREMENTS CLEANLINESS LEVEL III PIPING SYSTEMS: AIR ESCAPE (TANK VENT) AIR CONDITIONING SEAWATER COOLING SYSTEM AFFF CONCENTRATE AND AFFF/SW SYSTEMS 4 of 5 ITEM NO: 009-107

AUXILIARY SEAWATER SYSTEM CO2 SYSTEM DIESEL EXHAUST SYSTEM DIESEL SEAWATER COOLING SYSTEM DISTILLING PLANT, BRINE OVERBOARD DISCHARGE SYSTEM DISTILLING PLANT, SEAWATER FEED SYSTEM ESCAPE PIPING (STEAM) FIREMAIN SYSTEM HALON MAIN SEAWATER COOLING SYSTEM PLUMBING SYSTEM SANITARY AND FLUSHING PIPING SYSTEM SHIP SERVICE LOW PRESSURE AIR SYSTEM (NON-VITAL) OTHER SYSTEMS AS SPECIFIED BY THE SUPERVISOR 5 of 5 ITEM NO: 009-107