Implementation of AHP and TOPSIS Method to Determine the Priority of Improving the Management of Government s Assets

Similar documents
A Decision Support System for Performance Evaluation

Chapter 4 Fuzzy Analytic Hierarchy Process of Green Supply Chain Management in the Pharmaceutical Industry

The Multi criterion Decision-Making (MCDM) are gaining importance as potential tools

Multi-criteria decision making for supplier selection using AHP and TOPSIS method

Implementation of Analytic Network Process Method for Decision Support System on Library Services Quality Assurance Based on ISO 9001

A hybrid approach based on FAHP and FIS for performance evaluation of employee

MULTIPLE-OBJECTIVE DECISION MAKING TECHNIQUE Analytical Hierarchy Process

Supplier Selection Using Analytic Hierarchy Process: An Application From Turkey

Supplier Selection of Technical Goods Using AHP Methods

Employee Performance Appraisal to Determine Best Engineer Candidates with Analytical Hierarchy Process Approach

VENDOR RATING AND SELECTION IN MANUFACTURING INDUSTRY

Product quality evaluation system based on AHP fuzzy comprehensive evaluation

A Comparative Analysis for Multi Attribute Selection of Non-traditional Machining Processes Using Fuzzy AHP and Fuzzy TOPSIS

Keywords- AHP, Operating System, MCDM, Linux, Mac, Windows.

Application of AHP in Education Legislation Project. Ying-ying YAO and Yong-sheng GE *

SELECTION OF PLANT MAINTENANCE STRATEGY AND PERFORMANCE ENHANCEMENT OF A WIRE MANUFACTURING INDUSTRY USING AHP

Use of AHP Method in Efficiency Analysis of Existing Water Treatment Plants

Cloud adoption decision support for SMEs Using Analytical Hierarchy Process (AHP)

Fuzzy analytical hierarchy process for the selection of maintenance policies within petroleum industry

Evaluation of Personnel Selection Criteria Using Consistent Fuzzy Preference Relations

The Analytic Hierarchy Process Based Supplier Selection Approach for Collaborative Planning Forecasting and Replenishment Systems

CHAPTER 2 LITERATURE REVIEW AND THEORIES

ESTABLISHING RELATIVE WEIGHTS FOR CONTRACTOR PREQUALIFICATION CRITERIA IN A PRE-QUALIFICATION EVALUATION MODEL

Product Evaluation of Rijal Tashi Industry Pvt. Ltd. using Analytic Hierarchy Process

Evaluation of Software Testing Techniques Through Software Testability Index

USING AHP TO ANALYZE THE PRIORITY OF PERFORMANCE CRITERIA IN NATIONAL ENERGY PROJECTS

IOP Conference Series: Materials Science and Engineering PAPER OPEN ACCESS

Measuring Maturity Index of Risk Management for IT-Governance Using Fuzzy Ahp and Fuzzy Topsis

Presentation Program Outline

Multi Criteria Decision Analysis for Optimal Selection of Supplier Selection in Construction Industry A Case Study

The Development of Condition Assessment for Heritage Building

SUPPLY CHAIN MANAGEMENT OF DIESEL MUFFLER COMPANY: A CASE STUDY

EVALUATION OF USER PRIORITY IN SELECTION OF READY MIXED CONCRETE SUPPLIERS IN LOMBOK-INDONESIA USING AHP METHOD

Plant Location Selection in Natural Stone Industry

Introduction. Analytical Hierarchy Process. Why AHP? 10/31/2011. The AHP is based on three principles: Decomposition of the decision problem

Decision Support Systems for The Determination of Cattle with Superior Seeds using AHP and SAW Method

Using the Analytic Hierarchy Process in Long-Term Load Growth Forecast

TABLE OF CONTENTS CHAPTER NO. TITLE PAGE NO. LIST OF TABLES LIST OF FIGURES LIST OF SYMBOLS AND ABBREVIATIONS

Prioritizing the agility strategies using the Fuzzy Analytic Hierarchy Process (FAHP) (case study: Hospitals)

CHOOSING THE BEST OPTIMIZATION SOFTWARE WITH THE MULTI-CRITERIA DECISION-MAKING APPROACHES

2013, IJARCSSE All Rights Reserved Page 392

The Potential Utilization of the Analytical Hierarchy Process (AHP) for the Selection of a Tenure Track Faculty Position

The Use of AHP (Analytical Hierarchy Process) as Multi Criteria Decision Tool for the Selection of Best Water Supply Source for Benin City

Application of AHP for Lean Implementation Analysis in 6 MSMEs

An Integrated Multi-Attribute-Decision Making Approach for Selecting Structural System: A Case Study

RESEARCH ON DECISION MAKING REGARDING HIGH-BUSINESS-STRATEGY CAFÉ MENU SELECTION

An Approach of Contractor Selection By Analytical Heirarchy Process

A Fuzzy Analytic Hierarchy Process Approach for Optimal Selection of Manufacturing Layout

Determining and ranking essential criteria of Construction Project Selection in Telecommunication of North Khorasan-Iran

Customer Satisfaction Parameters for Fruits and Vegetables Retail- An AHP Approach

E-Commerce Logistics Mode Selection Based on Network Construction

Apply Fuzzy AHP to the Principal Selection Systems

The Analysis of Supplier Selection Method With Interdependent Criteria

Development of TOPSIS Techniques

The Contract Expert System: A Proposal for Long-Term Supplier Evaluation, Selection and Performance Monitoring

Submitted to the Grand Rapids Community College Provost and AGC Executive Committee.

PRIORITISATION OF ROAD CORRIDORS BY DEVELOPING COMPOSITE INDEX

Abstract. Keywords: Decision Support System, Simple Additive Weighting (SAW), Best Employee Selection.

Using Macbeth Method for Technology Selection in Production Environment

Knowledge-Based Systems

Mechanism Engineering College, Heping West Road NO.97th, Shijiazhuang , China

Application of Fuzzy AHP for Evaluation of Green Supply Chain Management Strategies

Selection of medical waste logistic firms by using AHP-TOPSIS methodology

Leader Culling Using AHP - PROMETHEE Methodology

International Journal of Advance Engineering and Research Development STUDY OF SOME PERFORMANCE MEASUREMENT INDICES OF SUPPLY CHAIN MANAGEMENT

International Research Journal of Engineering and Technology (IRJET) e-issn: Volume: 03 Issue: 11 Nov p-issn:

Comparative Study of AHP and ANP on Multi- Automotive Suppliers with Multi-Criteria

RELATIVE RELIABILITY RISK INDEX FOR GREEN SUPPLY CHAIN MANAGEMENT

DEVELOPMENT OF AHP BASED MODELS AND DSS FOR STRATEGIC PLANNING OF LOCAL SUSTAINABLE DEVELOPMENT

Supplier Selection in Construction Industry using AHP Integrated with TOPSIS Method: A Case study

Fuzzy Simple Additive Weighting Method in the Decision Making of Human Resource Recruitment

ANALYZING FACTORS INFLUENCING INDUSTRIAL COMPETITIVENESS OF THAI SILVER JEWELRY INDUSTRY USING ANALYTIC HIERARCHY PROCESS

Supplier Selection for Construction Projects Through TOPSIS and VIKOR Multi-Criteria Decision Making Methods

Facility Location Selection For Seasonal Product: A Case Study For New Business And A Comparative Study Of AHP And ANP

A MODIFIED AHP ALGORITHM FOR NETWORK SELECTION

Employing Multiple Criteria Decision Making to Evaluate HSE Performance of Contractors Case study : Lorestan Province Gas Company

Identification of Factors Affecting Production Costs and their Prioritization based on MCDM (case study: manufacturing Company)

ANALYSIS OF SUPPLY CHAIN MANAGEMENT IN INDONESIAN CREATIVE INDUSTRIES: AN AHP APPROACH

A RANKING AND PRIORITIZING METHOD FOR BRIDGE MANAGEMENT

main target of the AHP is to decide and help decision makers in making resolutions for the complex problems by

Ranking Landfill Sites in Najaf Governorate, Iraq Using AHP and Fuzzy TOPSIS Methods

The Application of the Analytic Hierarchy Process for Multicriterion Evaluation of the Enterprise s Investment Attractiveness

Analytical hierarchy process (AHP) approach to the selection of heritage building element

Decision-Support System for Assessment of Alternative Signal Controllers using Expert Knowledge Acquisition

CHOOSING THE BEST TRAINING AIRCRAFT FOR A FLIGHT TRAINING ORGANIZATION BY MULTI CRITERIA DECISION MAKING METHODS

DEVELOPING A CONCEPTUAL MODEL FOR A SPICE EXPORT COMPANY TO SELECT A FREIGHT FORWARDER IN SRI LANKA

An Innovative B2C E-commerce Websites Selection using the ME-OWA and Fuzzy AHP

ScienceDirect. Analytic Hierarchy Process of Academic Scholars for Promoting Energy Saving and Carbon Reduction in Taiwan

ASSESSMENT OF EFFECTIVE FACTORS ON TIME, COST AND QUALITY OF MASS HOUSE BUILDING PROJECTS USING ANALYTIC HIERARCHY PROCESS- A CASE STUDY IN TEHRAN

COMPARATIVE STUDY OF INVENTORY CLASSIFICATION (CASE STUDY: AN AFTER-SALES SERVICES COMPANY RELATED TO HEPCO COMPANY)

Road Maintenance Priority Based On Multi-Criteria Approach (Case Study of Bali Province, Indonesia)

An Integrated Hybrid MCDM Approach for Vendor Selection Problem (Case Study: Iran Khodro)

DECISION SUPPORT SYSTEM DETERMINATION OF BUSINESS LOCATION (CAKE SHOP) USING AHP AND TOPSIS METHOD

DECISION SUPPORT FOR SOFTWARE PACKAGE SELECTION: A MULTICRITERIA METHODOLOGY

Application of AHP Model for Evaluation of Solid Waste Treatment Technology

Fuzzy AHP approach for the Selection of Groundwater Recharge Alternative: Sensitivity Analysis

Introduction. Key Words: Analytic Hierarchy Process (AHP), Fuzzy AHP, Criteria weightings, Decisionmaking

Identification of Target Issues in Turkey s ADR Integration

PERFORMANCE MEASUREMENT OF DISTRIBUTION CENTRE COMBINING DATA ENVELOPMENT ANALYSIS AND ANALYTIC HIERARCHY PROCESS

A Fuzzy MCDM for Evaluating Risk of Construction Projects

Transcription:

Implementation of AHP and TOPSIS Method to Determine the Priority of Improving the Management of Government s Assets Januar Febriansyah * Rahmat Gernowo Amie Kusumawardhani Master of Information Systems Science and Math Faculty Economic and Business Faculty Diponegoro University, Indonesia Diponegoro University, Indonesia Diponegoro University, Indonesia Abstract Many problems of asset management based on audit results is an indicator of weakness implementation of asset management which adversely affects of the Audit Board of the Republic of Indonesia. All evaluation of the implementation of asset management is the first step in improving the quality of asset management. This study aims to build decision support system to help problems solving prioritization improved management of government assets with AHP and TOPSIS methods. Integration of AHP and TOPSIS methods are used to perform weighting and ranking alternatives. Weights are obtained by comparison of the level of interest criteria carried out by experts ranked. While alternative methods produced are based on the calculation method in which the best alternative has the shortest distance from the positive ideal solution and the farthest from the negative ideal solution. Alternative asset management is a low priority in the increasing in asset management. The results of this analysis, a system is used for prioritization based on defined criteria. The test results shows that the system can provide an alternative sequence that has an accuracy rate of 83% and has an average value of 4.91 of an evaluation system 5-point scale with the aspect of effectiveness, efficiency and user satisfaction. Keywords AHP; TOPSIS; Priority; Evaluation; Asset Managements I. INTRODUCTION Making a decision can be carried out through Analytical Hierarchy Process (AHP) and Technique for Order of Preference by Similarity to Ideal Solution (TOPSIS) methods to rank alternative weighting and determination in helping decision-makers (Pires et al, 2011). AHP method is widely used in the evaluation themes (Dweiri et al, 2016).This method is excellent for modeling experts in decision supporting systems (Deng et al, 2014). This method was developed by Saaty in 1980, divides the complex system in meticulous system element hierarchy by making paired comparisons, making a comparison matrixes, then eigenvector of the matrixes is formed, resulting is weight. Finally, eigenvalues is used for assessing the strength ratio of the consistency of comparison (Bozbura et al., 2007). Starting to set goals, identifying key criteria, rank the main criteria based on experts. The second stage is to identify sub-criteria and subcriteria sort ranked by major criteria (Dweiri et al, 2016). TOPSIS method is often used for selection (Kelemenis and Askounis, 2010). TOPSIS method was developed by Hwang and Yoon in 1981. This method is excellent for assessing the number of alternatives for efficient computation (Kusumadewi et al, 2006). According to this technique, the best alternative has the shortest distance from the positive ideal solution and the farthest from the negative ideal solution (Dagdeviren et al, 2009). Inspection report of the State Audit Board (SAB) shows the number of asset management issues. Starting from the asset management issues, the need is for a thorough evaluation of asset management. Evaluation of assets management is a stage in the developing of assets management. The results of evaluation stage, then the determination of priorities. Determination of priority is done due to many units of work and shortage of human resources is in an effort to develop the quality of assets management. Determination of priority is done by implementing the method of AHP and TOPSIS. The results of the calculation method will be obtained rank order of business unit performance in managing assets. The priority of developing the assets management is focused on the unit that has a low value. 2014-17, IJIRAE- All Rights Reserved Page -46

II. THEORETICAL FRAMEWORK A. FORMER STUDY Fuzzy AHP and Fuzzy TOPSIS approach can be used in determining the priority level of effectiveness 7M (Management, Manpower, Marketing, Method, Machine, Material, and Money) for enhanced system performance untuk peningkatan kinerja sistem produksi. By consideration of criteria weights generated by the AHP, Fuzzy TOPSIS method approach is applied to produce the performance score of each alternative (Rostamzadeh dan Sofian, 2011). Performance measurement of service quality that combines in performance measurement is done by proposing a combining method is the FAHP, TOPSIS, DEA, that are applied on the basis of the distribution of electricity to show the efficiency of electricity distribution (Celen dan Yalcin, 2012).SCOR method (Supply Chain Operations Reference) is used to do supplier performance evaluation. Supporting Fuzzy TOPSIS allows the use of linguistic assessment to evaluate supplier performance, the best rank and categorize supplier (Junior and Carpinetti, 2016). Integration of AHP and TOPSIS methods are used to derive the weights of criteria and ranking alternatives have been done by some previous researchers (Secme et al, 2009; Pires et al, 2011; Buyukozkan dan Cifci, 2012; Taylan et al, 2014). B. MANAGEMENT OF GOVERMENT S ASSETS Assets management is a management process from the planning stage until the elimination of the need, where the process is done in the monitoring of the asset over the life its use by an agency. Assets management policy of government is stipulated in Government Regulation No. 27, 2014 concerning Assets Management of State or Regional. Management of government assets include demand planning and budgeting, procurement, use, utilization, safety and maintenance, assessment, transfer, destruction, removal, administration, and guidance, supervision and control (Ministry of Justice and Human Rights, 2014) C. AHP METHOD AHP method allows users to provide value relative weights of a compound or alternative criteria compound against a criterion intuitively by performing pairwise comparisons. Then Saaty determines a consistent way to change the paired comparisons into a set of number that represents the relative priority of each criteria and alternative (Turban et al, 2007). There are several principals that must be understood in resolving problems using AHP (Saaty, 1990), is the preparation of hierarchical structure, assessment criteria through a paired comparison with Saaty s comparative scale (Table 1), prioritization and consistency test. INTEREST RATE TABLE I - SCALE OF PAIRWISE COMPARISONS EVIDENCE 1 ELEMENT 1 AND 2 ARE EQUALLY IMPORTANT 3 ELEMENT 1 IS MORE IMPORTANT ENOUGH THAN ELEMENT 2 5 ELEMENT 1 IS MORE IMPORTANT THAN ELEMENT 2 7 ELEMENT 1 IS VERY IMPORTANT THAN ELEMENT 2 9 ELEMENT 1 IS ABSOLUTELY MORE IMPORTANT THAN THE ELEMENT 2 2,4,6,8 THIS VALUE IS GIVEN WHEN THERE ARE TWO COMPONENT BETWEEN TWO OPTIONS Prioritization through the following stages: a. Summing the values of each column in the matrix of pair wise comparisons. b. Dividing the value of A ij in each column with the number in the column in question in order to get the matrix normalized. c. Summing the value in each row from matrix that normalized and dividing by summing element in each row. The result of dividing it shows the overall priority value to each element. Consistency test carried out through the following steps: a. Multiplying each value in the first column with the relative priority of the first element, the value in the second column with the relative priority of the second element and so on. b. Summing each row. c. The result of the line summing id divided by the relative priority element in question. d. Summing the result, then divided by number of existing elements, the results is called λmax e. Ccalculate Consistency Index (CI) 2014-17, IJIRAE- All Rights Reserved Page -47

CI = (1) f. Determining a value Index Random Consistency (IR) corresponding to the size of each matrix shown in Table 2. TABLE II- INDEX RANDOM CONSISTENCY g. Calculate Consistency Ratio (CR) N 1 2 3 4 5 6 7 8 9 10 IR 0.00 0.00 0.58 0.90 1.12 1.24 1.32 1.41 1.45 1.49 CR = (2) h. Checking consistency, if the value CR <= 0,1so, it is consistent however if CR > 0,1it is not consistent. D. TOPSIS METHOD TOPSIS method is an approach to solve the problems of multicriteria. TOPSIS method is based on the concept that the best alternative is selected not only the shortest distance from the positive ideal solution but it also has the longest distance from the negative ideal solution (Kusumadewi, 2006). TOPSIS method has the following steps: a. Determining the decision of matrix b. Determining the normalized decision matrix (r) r = (3) c. Calculate a weighted normalized decision matrix (y) y = W r (4) d. Calculating ideal solution matrix of positive and negative ideal solution matrix (A) A ± = (y ±, y ±,..., y ± ); (5) e. Calculating the distance (D ) between the weighted value of each alternative to the positive ideal solution and the distance (D ) between the weighted value of each alternative against the negative ideal solution. D = y y (6) D = y y (7) f. Calculating the value of preferences (V) for each alternative V = (8) 2014-17, IJIRAE- All Rights Reserved Page -48

III. METHODOLOGY In to obtain optimal results, the implementation of research studies by following the procedure as shown in Figure 1. Fig. 1 Observation procedure The study begins with a literature study to get a comprehensive understanding of the implementation of AHP and TOPSIS by studying literature as international journals, national journals, books and scientific papers have been verified. In building a decision support system, the necessary variables for the system requirements such criteria, subcriteria and alternatives. The criteria is used by the Government Regulation No. 27, 2014 is shown in Table 3. As an alternative in this research is the implementation of asset management in six work units within the Ministry as samples, aimed in Table 4. TABLE III CRITERIA AND SUB CRITERIA TABLE IV ALTERNATIVE SAMPLE Code Criteria Code Sub Criteria No Alternative C1 Utilization SC11 Determination of the Status Usage (PSP) to the 1 BP manager of the goods SC12 PSP proposal to the goods 2 BHM SC13 PSP report 3 BU C2 Securing and SC21 Administration Security 4 BOK Maintenance SC22 Physical security 5 PK SC23 Legal safeguards 6 BK SC24 Maintenance C3 Eradication SC31 Goods damaged / missing SC32 The proposed eradication SC33 Eradication report C4 Administration SC41 Book keeping SC42 Inventory C5 Supervision and Control SC43 SC51 SC52 SC53 Reporting Supervising Publishing Supervision and control report 2014-17, IJIRAE- All Rights Reserved Page -49

The questionnaire is required as a reference for assessing the performance of asset management. In measuring the implementation of asset management designed two kinds of questionnaires. The first questionnaire contains a list of questions to perform pair wise comparisons among criteria / sub-criteria, using a scale of Saaty pair wise comparisons. Whereas the second questionnaire lists the execution votes on an alternative asset management, consisting of five criteria are divided into sixteen assessment questions, each question is based on the four elements of evaluation ratings. Answer a second questionnaire on sixteen assessment questions using a five-point Likert scale as shown in Table 5 (Widoyoko, 2015). While the element of judgment record answers using a model essay. TABLE V - LIKERT CONVERSION SCALE Linguistic Value Abbreviation Score Very Good VG 5 Good G 4 Good Enough GE 3 Bad B 2 Absolutely Bad AB 1 In this stage of data collection is done by netting a questionnaire distributed to respondents and respondents' expert evaluators performance. Respondents experts judge the importance of criteria / sub-criteria to perform pairwise comparisons among criteria / sub-criteria. Respondents performance evaluator assesses the performance of the asset management work unit. In assessing the performance of asset management, assessment data collection is done in three ways: interviews, observation and document collection (Patton, 2009). Data analysis are performed using the integration of AHP and TOPSIS. The shape of the system implementation is the creation of applications with the integration of AHP and TOPSIS. These applications will be built using the PHP programming language and MySQL database. IV. RESULT AND DISCUSSION A. Result In the resulting system is starting by entering user data, the data work units, the data criteria and sub-criteria, the data elements of assessment, determine the level of importance of criteria and sub-criteria based on expert opinion. Based on the data, and then do the calculation method of AHP to obtain the weight of each criteria and sub-criteria that have been through the test of consistency with the acquisition of the consistency ratio is less than equal to 0.1. From the weight obtained by the multiplication operation performed between the weights of criteria and sub-criteria weights resulting global weight. The value of the interest rate criteria and sub-criteria is obtained based on expert opinion and arranged in a matrix of pairwise comparison criteria (Table 6) and sub-criteria (Table 7). TABLE VI - PAIRWISE COMPARISON MATRIX CRITERIA Criteria C1 C2 C3 C4 C5 C1 1 3 2 0,5 6 C2 0,333 1 0,5 0,333 3 C3 0,5 2 1 0,333 4 C4 2 3 3 1 7 C5 0,167 0,333 0,25 0,143 1 TABLEVII - PAIRWISE COMPARISON MATRIX SUB CRITERIA Sub Criteria SC11 SC12 SC13 SC21 SC22 SC23 SC24 SC31 SC32 SC33 SC41 SC42 SC43 SC51 SC52 SC53 SC11 1 3 2 SC12 0,333 1 0,333 SC13 0,5 3 1 SC21 1 0,5 0,333 2 SC22 2 1 0,5 4 SC23 3 2 1 4 SC24 0,5 0,25 0,25 1 SC31 1 6 2 SC32 0,167 1 0,25 SC33 0,5 4 1 SC41 1 3 0,5 SC42 0,333 1 0,25 SC43 2 4 1 SC51 1 2 0,5 SC52 0,5 1 0,333 SC53 2 3 1 2014-17, IJIRAE- All Rights Reserved Page -50

From the pairwise comparison, and then determine the weight criteria (Figure 2), sub-criteria (Figure 3) and weighting of global significance (Figure 4) as well as to test the consistency. C4 0.406 41% C5 0.045 5% λmak s=5,0 88 CI=0, 022 IR=1, C3 0.164 16% Fig.2 Weight criteria C1 0.274 27% C2 0.11 11% SC43 0.226 23% SC51 0.013 1% SC43 0.557 11% SC42 0.123 2.5% SC41 0.32 6% SC33 0.324 6.5% Fig.3 Weight sub criteria SC52 0.007 1% SC52 0.164 3% SC51 0.297 6% SC53 0.024 SC53 0.539 11% SC11 0.144 14% SC32 0.089 λmaks=3,0 18 CI=0,009 IR=0,58 CR=0,016 SC12 0.039 4% SC13 0.091 9% SC11 0.525 10% λmaks=3,0 09 CI=0,005 IR=0,58 CR=0,008 SC31 0.587 1 λmaks=3,0 09 CI=0,005 IR=0,58 CR=0,008 SC12 0.142 3% SC13 0.334 λmaks=3,07% 54 CI=0,027 IR=0,58 CR=0,046 SC23 0.46 9% SC24 0.089 SC21 0.157 3% λmaks=4,0 SC22 46 0.294 CI=0,015 IR=0,9 6% CR=0,017 SC42 0.05 5% SC41 0.13 13% SC33 0.053 5% SC32 0.015 Fig. 4 Weight global significance Next, rating process is performed with TOPSIS method.the rating process is begun data values based on the alternative performance assessments conducted by evaluators such as Table 8. TABLEVIII - SCORING ALTERNATIVE PERFORMANCE Alternative Sub Criteria SC11 SC12 SC13 SC21 SC22 SC23 SC24 SC31 SC32 SC33 SC41 SC42 SC43 SC51 SC52 SC53 BP G G G VG VG G VG CG VG VG G G VG VG VG AB BHM G GE G VG VG G VG G VG VG VG VG VG VG VG AB BU AB AB G VG GE B VG VG VG VG VG B VG VG VG VG BOK G GE G GE VG G VG G VG VG VG VG VG VG VG AB PK G GE VG G VG G VG G VG VG G VG VG VG VG AB BK GE G G G VG VG VG G VG VG G VG VG VG VG VG From these alternative performance value data and then do the conversion so as to form such a decision matrix Table 9. TABLEIX - DECISION MATRIX Alternative Sub Criteria SC11 SC12 SC13 SC21 SC22 SC23 SC24 SC31 SC32 SC33 SC41 SC42 SC43 SC51 SC52 SC53 BP 4 4 4 5 5 4 5 3 5 5 4 4 5 5 5 1 BHM 4 3 4 5 5 4 5 4 5 5 5 5 5 5 5 1 BU 1 1 4 5 3 2 5 5 5 5 5 2 5 5 5 5 2014-17, IJIRAE- All Rights Reserved Page -51 SC31 0.097 10% SC24 0.01 1% SC21 0.017 SC22 0.032 3% SC23 0.051 5%

BOK 4 3 4 3 5 4 5 4 5 5 5 5 5 5 5 1 PK 4 3 5 4 5 4 5 4 5 5 4 5 5 5 5 1 BK 3 4 4 4 5 5 5 4 5 5 4 5 5 5 5 5 Then determine the normalized decision matrix. Weighted decision matrix is produced from the matrix multiplication operation between the global weights obtained from AHP with normalized decision matrix. Next, continued with the process of calculating the distance between the weighted values of each alternative against the ideal solution and negative ideal solution. Further calculates the reference value of each alternative such as a Table 10. TABLE X - PREFERENCE SCORE Alternative D D Preference Score BP 0,0286 0,0545 0,6559 BHM 0,0200 0,0564 0,7383 BU 0,0573 0,0265 0,3160 BOK 0,0203 0,0563 0,7355 PK 0,0215 0,0559 0,7224 BK 0,0244 0,0456 0,6516 After it is obtained, it is done with a preference value in doing the rating alternatives like Figure 5. The work unit with low ratings are a priority in the effort to improve assets management. skor 0.8 0.7 0.6 0.5 0.4 0.3 0.2 0.1 0 0.7383 0.7355 0.7224 0.6559 0.6516 0.3160 BHM BOK PK BP BK BU Fig. 5 Alternative ranking B. Discussion In the process of the AHP, produce weight criteria and sub-criteria weights. Multiplication between both produce global significance, which the administration has the greatest weight criteria, sub-criteria as well as the reporting has a weight of sub-criteria. It was consistent, that the administration of the assets is the criterion that describes all the activities in which the asset management operations of reporting asset is an instrument to find out that the implementation of asset management implemented properly and accountably. TOPSIS for further process in which is a ranking of alternatives. Consecutive work unit with the highest to lowest preference value is BHM with the value 0.7383, BOK with a value of 0.7355, 0.7224 PK values, BP with a value of 0.6559, 0.6516 and BK with BU value with value of 0.3160. Priority is based on the increase in the asset management work unit with a low rating. By the obtaining rank orders of alternatives and determined priority criteria, then the work unit that the first priority in improving the management of their assets, that BU, BK are the second priority, third priority is BP, and so on. Priority setting is meant that efforts to improve asset management has become more focused on solving problems at an asset management work unit. Based on the comparison of alternative rankings is generated by coordinator asset management with system works, there are different alternatives rank with the accuracy of 83%. It shows that the system has been built in accordance with the stages of the process AHP and TOPSIS. Rating system is generated alternatives can be stated to be better than the results is given by the coordinator of an asset manager, for the application of AHP and TOPSIS into account the weight of each criteria / sub-criteria and able to provide an alternative to the calculation of the distance ranked alternatives with positive and negative ideal solution. While the method of assessment coordinator asset management, all the criteria / sub-criteria are considered to have the same importance weight.based on the results of the evaluation system, that the system has good ratings from users of the system with an overall average score of 4.91 on a scale of 5 on aspects of effectiveness, efficiency and satisfaction to the users of the system. Decision support system is built a web-based system. By the web- 2014-17, IJIRAE- All Rights Reserved Page -52

based system, then the system users such as administrators, evaluators and leaders can use online system to remember the location of the work force are in almost all provinces in Indonesia. Thus, as the leader s decision makers can make decisions quickly and accurately. V. CONCLUSIONS This study successfully is established SPK prioritization increasing in assets management with AHP and TOPSIS, webbased so that decisions can be quickly and accurately and generate alternative rank order, with an accuracy of 83%. REFERENCES [1] Bozbura, F.T., Berkeze, A., dankahraman, C., Prioritization of human capital measurement indicators using fuzzy AHP,Expert Systems With Applications,vol.32,pp. 1100-1112, 2007. [2] Buyukozkan, G., Cifci, G., A combined fuzzy AHP and fuzzy TOPSIS based strategic analysis of electronic service quality in healthcare industry, Resources, Conservation and Recycling,Expert Systems With Applications,vol.39,pp. 2341-2354, 2012. [3] Celen, A., Yalcin, N., Performance assessment of Turkish electricity distribution utilities: An application of combined FAHP/TOPSIS/DEA methodology to incorporate quality of service,utilities Policy.vol.23,pp. 59-71, 2012. [4] Dagdeviren, M., Yavuz, S., dankilinc, N., Weapon selection using the AHP and TOPSIS methods under fuzzy environment,expert Systems With Applications,vol.36,pp. 8143-8151,2009. [5] Deng, X., Hu, Y., Deng, Y., danmahadevan, S., Supplier selection using AHP methodology extended by D numbers,expert Systems With Applications,vol.41,pp. 156-167,2014. [6] Dweiri, F., Kumar, S., Khan, S.A., dan Jain, V., Designing an integrated AHP based decision support system for supplier selection in automotive industry,expert Systems With Applications,vol.62,pp. 273-283,2016. [7] Junior, F.R.L., C [8] arpinetti, L.C.R., Combining SCOR Model and Fuzzy TOPSIS for Supplier Evaluation and Management,Intern. Journal of Production Economics,2016. [9] Ministry of Justice and Human Rights, Government Regulation No. 27, 2014 concerning Assets Management of State or Regional, 2014. [10] Kelemenis, A., Askounis, D., A new TOPSIS-based multi-criteria approach to personnel selection, Expert Systems With Applications,vol.37, pp.4999-5008, 2010. [11] Kusumadewi, S., Fuzzy Multi Attribute Decision Making Fuzzy MADM, Yogyakarta, Indonesia:GrahaIlmu,2006. [12] Patton, M. Q., MetodeEvaluasiKualitatif, Yogyakarta,Indonesia :PustakaPelajar, 2009. [13] Pires, A., Chang, N.B., danmartinho, G., An AHP-based fuzzy interval TOPSIS assessment for sustainable expansion of the solid waste management system in Setúbal Peninsula,Portugal, Resources, Conservation and Recycling, vol.56, pp. 7-21,2011. [14] Rostamzadeh, R., Sofian, S., Prioritizing effective 7Ms to improve production systems performance using fuzzy AHP and fuzzy TOPSIS (case study),expert Systems With Applications,vol.38, pp. 5166-5177,2011. [15] Saaty, T.L., How to make a decision : The Analytic Hierarchy Process. European Journal of Operational,vol.48,pp. 9-26,1990. [16] Secme, N.Y., Bayrakdaroglu, A., dankahraman, C., Fuzzy performance evaluation in Turkish Banking Sector using Analytic Hierarchy Process and TOPSIS,Expert Systems With Applications,vol.36, pp. 11699-11709,2009. [17] Taylan, O., Bafail, A.O., Abdulaal, R.M.S., dankabli, M.R., Construction Projects selection and risk assessment by fuzzy AHP and fuzzy TOPSIS methodologies,applied Soft Computing,2014. [18] Turban, E., Aronson, J.E., dan Liang, J.P., Decision Support System and Intelligent System, New Delhi, India :Asoke K. Ghosh,2007. [19] Widoyoko, E. P., TeknikPenyusunanInstrumenPenelitian, Yogyakarta,Indonesia :PustakaPelajar, 2015. 2014-17, IJIRAE- All Rights Reserved Page -53