Watershed size and name: The drainage area is acres. The pond is located within the Ohio River watershed. (2016 Inflow Design Plan)

Similar documents
CCR Annual Inspection (b) for the Ash Pond at the A.B. Brown Generating Station. Revision 0

CCR Annual Inspection (b) for the Ash Pond at the A.B. Brown Generating Station. Revision 0

CCR Annual Inspection (b) for the Ash Pond at the A.B. Brown Generating Station. Revision 0

HISTORY OF CONSTRUCTION 40 CFR (c)(1)(i) (xii) PLANT HAMMOND ASH POND (AP 2) GEEORGIA POWER COMPANY

CCR Certification: Initial Written Post-Closure Plan (d) for the Ash Pond at the A.B. Brown Generating Station. Revision 0

McElroy s Run Impoundment Structural Stability Assessment Report

HISTORY OF CONSTRUCTION 40 CFR (c)(1)(i)-(xii) PLANT WANSLEY ASH POND (AP-1) GEORGIA POWER COMPANY. Carrollton, Georgia 30116

CCR Certification: Initial Structural Stability Assessment (d)

HISTORY OF CONSTRUCTION 40 CFR (c)(1)(i)-(xii) PLANT MCDONOUGH ASH POND 1 (AP-1) GEORGIA POWER COMPANY

CCR Certification: Initial Inflow Design Flood Control System Plan for the

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND B (AP-B ) GEORGIA POWER COMPANY

INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257

Report. Inflow Design Flood Control System Plan Belle River Power Plant East China, Michigan. DTE Energy Company One Energy Plaza, Detroit, MI

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY

VISUAL SITE INSPECTION REPORT 2018

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT BOWEN ASH POND 1 (AP-1) GEORGIA POWER COMPANY

HISTORY OF CONSTRUCTION 40 CFR (c)(1)(i)-(xii) PLANT MCDONOUGH ASH POND 2 (AP-2) GEORGIA POWER COMPANY

INITIAL INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT MCMANUS ASH POND A (AP-1) 40 CFR

CCR Annual Inspection (b) for the West Ash Pond at the F. B. Culley Generating Station. Revision 0

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY

INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GASTON GYPSUM POND ALABAMA POWER COMPANY

DTE Energy St. Clair Power Plant

Report. Inflow Design Flood Control System Plan St. Clair Power Plant St. Clair, Michigan. DTE Energy Company One Energy Plaza, Detroit, MI

AMERICAN ELECTRIC POWER (SWEPCO)

VISUAL SITE INSPECTION REPORT

2018 Annual Dam and Dike Inspection Report

McElroy s Run Impoundment Coal Combustion Residual Annual Report

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT DANIEL ASH POND B MISSISSIPPI POWER COMPANY

AMERICAN ELECTRIC POWER (SWEPCO)

2015 INSPECTION REPORT FLY ASH DAM and BOTTOM ASH POND COMPLEX JOHN AMOS PLANT ST. ALBANS, WEST VIRGINIA. June 2015

Jim Bridger Power Plant

CHOLLA POWER PLANT FLY ASH POND INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN CH_InflowFlood_002_

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT MCMANUS ASH POND A (AP-1) 40 CFR (c)(1)(i)-(xii)

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No

ALLIANT ENERGY WISCONSIN POWER AND LIGHT COLUMBIA ENERGY CENTER CCR SURFACE IMPOUNDMENT ANNUAL INSPECTION REPORT. January 15, 2016

2017 Annual Landfill Inspection Report

VIA . September 19, Mr. Jeffrey Maxted Alliant Energy Sr. Environmental Specialist 4902 North Biltmore Lane Madison, WI

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. Part PLANT MCINTOSH ASH POND 1 GEORGIA POWER COMPANY

CCR Certification: Initial Written Post-Closure Plan (d) for the East Ash Pond at the F.B. Culley Generating Station.

APPENDIX III Hydrologic and Hydraulic Evaluations

STRUCTURAL STABILITY ASSESSMENT

Pond Closure - Case Study[TP1]

VICINITY MAP AND SITE MAP. Page 1 of 9

2017 Annual Dam and Dike Inspection Report

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY

DTE Energy Monroe Power Plant

2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL PERMIT NO S3N-R2 AFIN:

2016 LANDFILL INSPECTION REPORT CARDINAL PLANT BRILLIANT, OHIO

RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART PLANT DANIEL NORTH ASH MANAGEMENT UNIT MISSISSIPPI POWER COMPANY

CLOSURE PLAN. CFR (b) Document No. GERS Stingy Run Flyash Pond. Gavin Plant Cheshire, Ohio. October, 2016

Table of Contents. Attachments Attachment A Photos Attachment B Inspection Map. Pages 3 of 10

STRUCTURAL STABILITY ASSESSMENT

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT YATES ASH POND B (AP-B) 40 CFR (c)(1)(i)-(xii) Newnan, GA 30263

2017 ANNUAL DAM AND DIKE INSPECTION REPORT

2016 ANNUAL DAM AND DIKE INSPECTION REPORT. Bottom Ash Ponds. Rockport Plant Spencer County, Indiana. December 6 th, 2016

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

Coal Combustion Residuals Inflow Design Flood Control System Plan

2017 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL PERMIT NO S3N-R2 AFIN:

CONSTRUCTION PLAN CHECKLIST

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT YATES ASH POND A (AP-A) 40 CFR (c)(1)(i)-(xii) Newnan, GA 30263

Coal Combustion Residuals Unit Structural Stability Assessment

2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY WHITE BLUFF PLANT CLASS 3N LANDFILL PERMIT NO S3N-R3 AFIN:

2016 ANNUAL INSPECTION REPORT W.H. Sammis Coal Plant South Pond Stratton, Ohio

CCR Certification: Amended Inflow Design Flood Control System Plan for the. East Ash Pond. at the. F.B. Culley Generating Station.

Suggested Stormwater Management Practices For Individual House Lots

CCR Rule Annual Inspection Report 2

ENVIRONMENTAL ENGINEERING LAND SURVEYING

CCR Certification: Initial Inflow Design Flood Control System Plan for the. East Ash Pond. at the. F.B. Culley Generating Station.

CCR Rule Operating Criteria Closure Plan

CCR Fugitive Dust Control Plan

ALLIANT ENERGY INTERSTATE POWER AND LIGHT OTTUMWA GENERATING STATION CCR SURFACE IMPOUNDMENT ANNUAL INSPECTION REPORT.

POST CLOSURE PLAN. CFR (d) Bottom Ash Pond Complex. Cardinal Plant. Brilliant, Ohio. September, 2016

2016 Annual Dam and Dike Inspection Report

Ponds. Pond A water impoundment made by excavating a pit, or constructing a dam or an embankment.

Via October Mr. William Neal, P.E. Technological Specialist DTE Electric Company One Energy Plaza Detroit, MI 48226

2016 DAM AND DIKE INSPECTION REPORT CCR PONDS COMPLEX

Storm Water Pollution Prevention Plan (SWP3) Checklist

ALLIANT ENERGY WISCONSIN POWER AND LIGHT NELSON DEWEY GENERATING STATION CCR SURFACE IMPOUNDMENT ANNUAL INSPECTION REPORT.

1. Introduction Site Information Site Characteristics Hydrogeologic Setting... 2

Annual Landfill Inspection 2015

HAZARD POTENTIAL CLASSIFICATION REPORT

Table of Contents. Attachments Attachment A Photos Attachment B Site Map. Pages 3 of 9

2015 LANDFILL INSPECTION REPORT CARDINAL PLANT BRILLIANT, OHIO

2015 ANNUAL ENGINEERING INSPECTION REPORT PLUM POINT ENERGY STATION CLASS 3N LANDFILL PERMIT NO S3N AFIN:

Annual Inspection Report Jeffrey Energy Center Flue Gas Desulfurization (FGD) Landfill

December 21, Mr. Jeff Pittman, PE Cooperative Energy P.O. Box Hattiesburg, MS 39402

Green CCR Landfill. Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule CCR Landfill 2016 Annual Inspection Report

CHOLLA POWER PLANT BOTTOM ASH POND INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN CH_Inflowflood_003_

Pleasants Power Station Landfill Coal Combustion Residual 2017 Annual Report

POST CLOSURE PLAN. CFR (d) Pond 1. Clinch Power Plant Russell County, West Virginia. November Prepared for: Appalachian Power Company

Jacobi, Toombs, and Lanz, Inc.

TVA Colbert Fossil Facility Ash Disposal Pond 4

STRUCTURAL STABILITY ASSESSMENT. Bremo Power Station CCR Surface Impoundment: North Ash Pond STRUCTURAL STABILITY ASSESSMENT

D. B. Wilson Station CCR Landfill

MODEL Stormwater Local Design Manual. City of Centerville

Harrison Landfill Run-on and Run-off Control System Plan

Applying landforming to reclamation: A case study in Central Appalachia

Inflow Design Flood Control System Plan for Louisa Generating Station CCR Impoundment. MidAmerican Energy Company

Transcription:

A. B. Brown History of Construction 40 CFR 257.73 (c) (i.) (ii.) (iii.) Owner Name: Southern Indiana Gas and Electric Company dba Vectren Power Supply Owner Address: One Vectren Square, PO Box 209, Evansville, IN 47708 CCR Unit Name: A. B. Brown Ash Pond Identification Number: not applicable Location: West Franklin Quadrangle, Posey County, Indiana; Section 24, Township 7S, Range 12W Purpose of CCR Unit: The A. B. Brown Ash Pond receives the discharge from the Physical-Chemical Waste Water Treatment System which processes waters from landfill run-off and wash water used to spray off the filter cake belt filter and filter cake truck loading bays from both scrubbers; south side runoff pond water consisting of coal pile run-off, boiler water pretreatment system, reverse osmosis reject, water treatment filter & softener backwash, boiler blow down, precipitator & ash pit area floor drains, air heater wash, the hopper seal & ash hopper overflow, storm water, coal trestle dust suppression system, coal handling French drain, coal handling and sanitary waste from the coal handling area and SIMI building, and the East Ditch Drain; storm water; water from plant floor drains; bottom ash; and intermittently fly ash. The ash pond has a further purpose of serving as the source water for the cleaning of the filter cake belt filter and truck loading bays. These waters recirculate back to the ash pond after passing through the aforementioned physical-chemical treatment system. Additionally, the Hydroveyor system used to move dry fly ash to the load out facility at the river requires a vacuum which is created by the flow of water which is created by recirculating water in the ash pond. (iv.) (v.) (vi.) Watershed size and name: The drainage area is 242.4 acres. The pond is located within the Ohio River watershed. (2016 Inflow Design Plan) Foundation Properties: The foundation soils consist of interbedded stiff to very stiff clay and loose to medium dense silt soils (2016 Structural Stability Assessment). The dam was constructed across a western end of a natural valley. (see ABB Civil Plan_1974 in section vii) CCR Unit Construction: Construction drawings required the embankment be compacted to 95% of the Standard Proctor maximum dry density (ASTM D 698). Based on geotechnical field evaluations, the dam embankment consists of stiff to very stiff clayey soils that have consistency and strength indicative of well-compacted materials. The soil buttress that exists against the downstream slope of the dam was constructed in 8-inch loose lifts and was mechanically compacted to at least 95% Standard Proctor maximum dry density. (2016 Structural Stability Assessment) In 2003, an Emergency Spillway was added to the far southern end of the dam to supplement the original Principal Spillway. The emergency spillway was cut into native soils to an elevation of 447 ft and protected by riprap (see ABB A. B. Brown History of Construction Page 1 of 3

Lower Dam Emergency Spillway_2003 in section vii). The pond was created by damming a natural valley and the base of the pond is native soils. The ABB Pre Plant 1957 Topo listed below shows original natural contours. (vii.) Construction Drawings: Drawings of the original dam construction and modifications are listed below. ABB Site 1974 Civil Plan ABB 1974 Lower Dam Engineering Plan ABB Lower Dam Profile and Storage Curve ABB Lower Dam Principal Spillway ABB Lower Dam Construction Drawing ABB 2003 Emergency Spillway ABB Lower Dam 2016 Post Buttress Plan and Cross Section ABB Pre Plant 1957 Topo (viii.) (ix.) (x.) Instrumentation: No instrumentation is present. Area Capacity Curve: The original storage capacity curve is listed on the ABB Lower Dam Profile and Storage Curve drawing identified above. Spillway Description: The principal spillway is a 36 reinforced concrete pipe with an invert elevation of 444 ft. Peak flow rate during a 1000 year, 24-hour storm event is 38.8 cfs. Calculations to determine the flowrate can be found in the 2016 Inflow Design Flood Control System Plan posted on the A. B Brown CCR webpage. The construction is further described on the ABB Lower Dam Principal Spillway drawing listed above. The emergency spillway is a 30 wide trapezoidal channel cut into native soils and lined with rip rap for erosion protection. Based on calculations from the 2016 Inflow Design Flood Control System Plan posted on the A. B Brown CCR webpage, the design storm event will not reach the elevation of the emergency spillway and therefore the peak flow rate is 0 cfs. The construction is further described on the ABB Lower Dam Emergency Spillway_2003 drawing listed above. (xi.) (xii.) Surveillance, Maintenance and Repair: The dam is inspected weekly as required by the CCR regulation 40 CFR 257.83(a)(i). Deficiencies are either identified as requiring additional observation or entered into a Work Order request to trigger repairs. Water surface elevation is remotely monitored through a level indicator which is set to alarm in the Control Room if the water level is within 0.5 ft of the Principal Spillway elevation. The system also alarms if the water level drops below 440.5 ft. The plant routinely monitors weather forecasts to prepare the pond for predicted high precipitation events. Video cameras or other surveillance technologies are not present. Record of Structural Instability: Extensive information on the stability of the dam and foundation can be found in the 2016 Structural Stability Assessment and 2016 Safety Factor Assessment documents posted on the A. B. Brown CCR webpage. In 2016, a 190,000 cy yd stabilizing buttress was constructed against the downstream slope of the dam to address potential seismic consideration. The buttress crest is up to 200 ft wide and varies in elevation from 432 ft A. B. Brown History of Construction Page 2 of 3

to 444 ft. The buttress was installed to insure Safety Factor criteria were met and was not in response to a suspected instability. NOTE: Information in the History of Construction is based on information that was reasonably and readily available. The CCR rule does not require owners of existing surface impoundments to generate new information or provide anecdotal or speculative information regarding the design or construction history. (Final Rule Preamble, Fed Reg 80, page 21380) A. B. Brown History of Construction Page 3 of 3

A B C D E F 1 0 75 150 Feet 1 1300 E. 9TH STREET SUITE 500 CLEVELAND, OH 216-622-2300 (PHONE) 380 380 390 P.O.BOX 209 EVANSVILLE, IN 47702 1-800-227-1376 400 2 2 400 390 COAL STOCKPILE (GRADES VARY DEPENDING ON PLANT OPERATIONS) A.B. BROWN GENERATING STATION POSEY COUNTY, IN 410 LOWER DAM STABILIZING BUTTRESS 390 400 420 410 3 430 420 6" PERFORATED HDPE SEEPAGE COLLECTION SUBDRAIN 3 440 STORM MANHOLE 410 400 PRINCIPAL SPILLWAY, NPDES OUTFALL 004 390 400 410 420 430 432 6" HDPE SOLID LATERAL 410 420 430 440 ISSUED FOR BIDDING - 3/28/16 VKG - DATE BY 4 450 440 430 420 6" HDPE SOLID LATERAL 420 430 432 410 420 430 432 432 6" PERFORATED HDPE SEEPAGE COLLECTION SUBDRAIN 36" RCP 12" HDPE ASH POND DISCHARGE LINE 434 436 438 440 442 444 444 442 P4 P5 4 ISSUED FOR CONSTRUCTION REVISIONS 5/12/16 VKG DATE BY NO. DESCRIPTION DATE 0 ISSUED FOR CONSTRUCTION 5/12/16 1 REVISION 1 7/11/16 2 AS-BUILT DRAWINGS 10/11/16 EMERGENCY SPILLWAY SOIL BUTTRESS AECOM PROJECT NO: 60442676 430 432 P3 RECIRCULATION PIPING BASELINE WORK POINT COORDINATES NUMBER NORTHING EASTING STATION DRAWN BY: DESIGNED BY: CHECKED BY: DATE CREATED: PLOT DATE: ACI ACI VKG 10/05/2016 10/05/2016 SCALE: AS SHOWN PUMPHOUSE ACAD VER: SHEET TITLE AUTOCAD CIVIL 3D 2014 5 P1 P2 5 BUTTRESS PLAN A B C D E F RECORD DRAWING C-200 SHEET 07 OF 25

A B C D E F 1 1 1300 E. 9TH STREET SUITE 500 CLEVELAND, OH 216-622-2300 (PHONE) EXISTING GRADE P.O.BOX 209 EVANSVILLE, IN 47702 1-800-227-1376 STA. 0+00 STA. 0+50 STA. 1+00 STA. 1+50 2 2 A.B. BROWN GENERATING STATION POSEY COUNTY, IN LOWER DAM STABILIZING BUTTRESS STA. 2+00 STA. 3+00 STA. 3+50 STA. 4+00 3 3 ISSUED FOR BIDDING - 3/28/16 VKG - DATE BY ISSUED FOR CONSTRUCTION 5/12/16 VKG DATE BY STREAM RELOCATION STREAM RELOCATION STREAM RELOCATION STREAM RELOCATION REVISIONS 4 STA. 4+50 STA. 5+00 STA. 5+50 STA. 6+00 4 NO. DESCRIPTION DATE 0 ISSUED FOR CONSTRUCTION 5/12/16 1 REVISION 1 7/11/16 2 AS-BUILT DRAWINGS 10/11/16 AECOM PROJECT NO: DRAWN BY: 60442676 ACI DESIGNED BY: ACI CHECKED BY: VKG DATE CREATED: 10/06/2016 PLOT DATE: 10/06/2016 SCALE: AS SHOWN ACAD VER: AUTOCAD CIVIL 3D 2014 SHEET TITLE 5 STA. 6+50 STA. 7+00 STA. 7+50 STA. 8+00 RECORD DRAWING 5 CROSS SECTIONS - SOIL BUTTRESS C-201 A B C D E F SHEET 08 OF 25

A B C D E F 1 1 1300 E. 9TH STREET SUITE 500 CLEVELAND, OH 216-622-2300 (PHONE) P.O.BOX 209 EVANSVILLE, IN 47702 1-800-227-1376 STA. 8+50 STA. 9+00 STA. 9+50 STA. 10+00 2 BUTTRESS CREST 442 BUTTRESS CREST 442 2 A.B. BROWN GENERATING STATION POSEY COUNTY, IN LOWER DAM STABILIZING BUTTRESS STA. 10+50 STA. 11+00 STA. 11+50 STA. 12+00 3 3 BUTTRESS CREST 442 BUTTRESS CREST 442 BUTTRESS CREST 442 BUTTRESS CREST 442 ISSUED FOR BIDDING - 3/28/16 VKG - DATE BY ISSUED FOR CONSTRUCTION 5/12/16 VKG DATE BY REVISIONS 4 STA. 12+50 STA. 13+00 STA. 13+50 STA. 14+00 4 NO. DESCRIPTION DATE 0 ISSUED FOR CONSTRUCTION 5/12/16 1 REVISION 1 7/11/16 2 AS-BUILT DRAWINGS 10/11/16 AECOM PROJECT NO: DRAWN BY: DESIGNED BY: CHECKED BY: DATE CREATED: PLOT DATE: SCALE: ACAD VER: SHEET TITLE 60442676 ACI ACI VKG 10/06/2016 10/06/2016 AS SHOWN AUTOCAD CIVIL 3D 2014 5 STA. 14+55 RECORD DRAWING 5 CROSS SECTIONS - SOIL BUTTRESS II C-202 A B C D E F SHEET 09 OF 25