Coal Combustion Facility Assessment Report. October 20, 2010

Similar documents
TVA Colbert Fossil Facility Ash Disposal Pond 4

Instrumentation Computer Based Training

Pond Closure - Case Study[TP1]

McElroy s Run Impoundment Structural Stability Assessment Report

Via October Mr. William Neal, P.E. Technological Specialist DTE Electric Company One Energy Plaza Detroit, MI 48226

AMERICAN ELECTRIC POWER (SWEPCO)

HISTORY OF CONSTRUCTION 40 CFR (c)(1)(i) (xii) PLANT HAMMOND ASH POND (AP 2) GEEORGIA POWER COMPANY

CCR Rule Annual Inspection Report 2

2018 Annual Dam and Dike Inspection Report

2016 Annual Dam and Dike Inspection Report

Coal Combustion Residuals Unit Structural Stability Assessment

Inspection Report. David Burton, Facility Manager (NRG Indian River Generating Station)

2017 Annual Landfill Inspection Report

Inspection Report. Re: Keystone Ash Disposal Site Annual CCR Unit Inspection Report No. 1

Green CCR Landfill. Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule CCR Landfill 2016 Annual Inspection Report

CCR Annual Inspection (b) for the Ash Pond at the A.B. Brown Generating Station. Revision 0

Green CCR Landfill. Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule CCR Landfill 2017 Annual Inspection Report

2015 INSPECTION REPORT FLY ASH DAM and BOTTOM ASH POND COMPLEX JOHN AMOS PLANT ST. ALBANS, WEST VIRGINIA. June 2015

CCR Rule Operating Criteria Closure Plan

2017 Annual Surface Impoundment Inspection

DTE Energy St. Clair Power Plant

AMERICAN ELECTRIC POWER (SWEPCO)

Tennessee Valley Authority welcomes you to the

CCR Annual Inspection (b) for the Ash Pond at the A.B. Brown Generating Station. Revision 0

2016 DAM AND DIKE INSPECTION REPORT CCR PONDS COMPLEX

2017 ANNUAL DAM AND DIKE INSPECTION REPORT

HISTORY OF CONSTRUCTION 40 CFR (c)(1)(i)-(xii) PLANT MCDONOUGH ASH POND 1 (AP-1) GEORGIA POWER COMPANY

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual

Table of Contents. Attachments Attachment A Photos Attachment B Site Map. Pages 3 of 9

DTE Energy Monroe Power Plant

HISTORY OF CONSTRUCTION 40 CFR (c)(1)(i)-(xii) PLANT WANSLEY ASH POND (AP-1) GEORGIA POWER COMPANY. Carrollton, Georgia 30116

APPENDIX III Hydrologic and Hydraulic Evaluations

McElroy s Run Impoundment Coal Combustion Residual Annual Report

CCR Annual Inspection (b) for the Ash Pond at the A.B. Brown Generating Station. Revision 0

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT BOWEN ASH POND 1 (AP-1) GEORGIA POWER COMPANY

Big Rivers Electric Corporation Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule CCR Landfill Annual Inspection Report

2016 ANNUAL DAM AND DIKE INSPECTION REPORT. Bottom Ash Ponds. Rockport Plant Spencer County, Indiana. December 6 th, 2016

Table of Contents. Attachments Attachment A Photos Attachment B Inspection Map. Pages 3 of 10

APPENDIX B PROJECT DESCRIPTION AND ALTERNATIVE ANALYSIS

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY

2017 Annual Dam and Dike Inspection Report

Application for a Dam Permit Ash Basin No. 1

VISUAL SITE INSPECTION REPORT

2017 ANNUAL DAM AND DIKE INSPECTION REPORT

VICINITY MAP AND SITE MAP. Page 1 of 9

Active Coal Combustion Residuals Landfill Annual Inspection Escalante Generating Station

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No

VISUAL SITE INSPECTION REPORT 2018

Ponds. Pond A water impoundment made by excavating a pit, or constructing a dam or an embankment.

CONSTRUCTION PLAN CHECKLIST

Jim Bridger Power Plant

HISTORY OF CONSTRUCTION 40 CFR (c)(1)(i)-(xii) PLANT MCDONOUGH ASH POND 2 (AP-2) GEORGIA POWER COMPANY

2016 LANDFILL INSPECTION REPORT CARDINAL PLANT BRILLIANT, OHIO

Regulation 18 August 2009 NO Operations and Maintenance LEVEE ENCROACHMENT STANDARDS AND PROCEDURES

Annual Inspection Report

INITIAL HAZARD POTENTIAL CLASSIFICATION ASSESSMENT REPORT

Annual Inspection Report Jeffrey Energy Center Flue Gas Desulfurization (FGD) Landfill

2016 Annual Dam and Dike Inspection Report

POST CLOSURE PLAN. CFR (d) Pond 1. Clinch Power Plant Russell County, West Virginia. November Prepared for: Appalachian Power Company

STRUCTURAL STABILITY ASSESSMENT. Bremo Power Station CCR Surface Impoundment: North Ash Pond STRUCTURAL STABILITY ASSESSMENT

Coal Combustion Residuals Inflow Design Flood Control System Plan

Geotechnical Considerations in Surface Impoundment Management and Closure

2015 LANDFILL INSPECTION REPORT CARDINAL PLANT BRILLIANT, OHIO

During Ash Impoundment Construction Activities

Watershed size and name: The drainage area is acres. The pond is located within the Ohio River watershed. (2016 Inflow Design Plan)

CCR Annual Inspection (b) for the West Ash Pond at the F. B. Culley Generating Station. Revision 0

CCR Annual Inspection (b) for the Ash Pond at the San Miguel Plant. Revision 0

ARKANSAS & LOUISIANA LEVEE AND DRAINAGE DISTRICTS MEETINGS

ALLIANT ENERGY WISCONSIN POWER AND LIGHT NELSON DEWEY GENERATING STATION CCR SURFACE IMPOUNDMENT ANNUAL INSPECTION REPORT.

Ashley Farless, PE, AICP NEPA Project Manager Tennessee Valley Authority 1101 Market Street, BR 4A Chattanooga, Tennessee

Disposal of CCRs in Landfills and Impoundments

2016 ANNUAL INSPECTION REPORT W.H. Sammis Coal Plant South Pond Stratton, Ohio

CLOSING UP SHOP AT THE WATTS BAR FOSSIL PLANT LESSONS IN COAL ASH POND CLOSURE 2015 WORLD OF COAL ASH CONFERENCE. Presenters: Jimmy Mullins (TVA)

David Miller, P.E.- Atlanta. The New Coal Ash Regulations Wednesday, May 6, 2015

VISUAL SITE INSPECTION REPORT 2017 HOOSIER ENERGY REC MEROM GENERATING STATION AREA 3 RESTRICTED WASTE LANDFILL MEROM, INDIANA

STRUCTURAL STABILITY ASSESSMENT

AMENDMENTS TO BAYFIELD COUNTY ZONING ORDINANCE. Lake Superior Shoreland Lot Development Requirements.

Unit(s): Units Issued for Information RSG/ JAL/ JCP/

INITIAL INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT MCMANUS ASH POND A (AP-1) 40 CFR

Annual Inspection Report North CCR Surface Impoundment. MidAmerican Energy Company, Walter Scott Energy Center

Pleasants Power Station Landfill Coal Combustion Residual 2017 Annual Report

Manure Storage for Environmental Management Systems

INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257

Supplemental Watershed Plan Agreement No. 10 for Neshaminy Creek Watershed Core Creek Dam (PA-620) Bucks County, Pennsylvania

ALLIANT ENERGY INTERSTATE POWER AND LIGHT OTTUMWA GENERATING STATION CCR SURFACE IMPOUNDMENT ANNUAL INSPECTION REPORT.

Hunter Power Plant Coal Combustion Residuals Annual Inspection. Hunter CCR Landfill

Update on Kingston Ash Spill

2017 Annual Inspection Report

Successful Foundation Preparations in Karst Bedrock of the Masonry Section of Wolf Creek Dam

Coal Combustion Residual Management Services

Annual Inspection Report CCR Surface Impoundment. MidAmerican Energy Company, Louisa Generating Station

Visual Inspection Checklist

POST CLOSURE PLAN. CFR (d) GERS Fly Ash Pond. Big Sandy Plant Louisa, Kentucky. October, 2016

ALLIANT ENERGY WISCONSIN POWER AND LIGHT COLUMBIA ENERGY CENTER CCR SURFACE IMPOUNDMENT ANNUAL INSPECTION REPORT. January 15, 2016

Naughton Power Plant

Run-on and Run-off Control System Plan

2017 Annual Landfill Inspection

NRG BRANDYWINE ASH STORAGE SITE BRANDYWINE, MARYLAND 2015 ANNUAL CCR INSPECTION REPORT

Green Station CCR Surface Impoundment

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT MCMANUS ASH POND A (AP-1) 40 CFR (c)(1)(i)-(xii)

Transcription:

Coal Combustion Facility Assessment Report October 20, 2010

Introduction Stantec Consulting Services Inc. North American Consulting Firm 10,000 Engineers, Geologists, Architects, Scientists and Technicians 140 Geotechnical Engineers Clients include: USACE FEMA Power Generating Industry John S. Montgomery, PE Senior Principal Licensed Professional Engineer in Tennessee, Kentucky and Alabama Over 23 Years Experience Dam and CCP Disposal Design and Construction 1

Presentation Outline Program Overview Phase 1 Facility Review Phase 2 Engineering Assessment Phase 3 Remediation Design and Construction Phase 4 Programmatic Improvements 2

Presentation Outline Program Goals Assess Structural Conditions of Impoundments Implement Improvements Program Statistics FY10 Man-hours ~ 472,324 FY 09 Engineering g Man-hours ~ 168,074 Borings ~781 (47,000 ft of footage drilled) Instruments ~ 594 Rock Placed ~ 455,305 tons Sand ~ 26,277 tons Phases 1,2,3 and 4 in Parallel Construction of Improvements at Bull Run 3

Program Overview Phase 1 Facility Review COMPLETE Records Review/Staff Interviews Site Condition Review Recommendations for Future Analysis, Studies, and Program Improvements Final Report Issued June 24, 2009 Phase 2 Engineering Assessments COMPLETE Geotechnical Explorations Hydrologic and Hydraulic Analysis Dam Safety Hazard Classifications Spillway Inventories 4

Program Overview Phase 3 Remediation Design and Construction Structural Deficiencies Improve Freeboard (Storage) Risk Reduction Phase 4 Programmatic Improvements COMPLETE Dam Safety Inspection Training Programmatic Documents 5

Phase 2 Engineering Assessments General Findings Seepage Steep Slopes Slope Stability Occasional Surface Slumps Operational and Storm Freeboard (Storage) Poor Surface Drainage / Standing Water All Issues Are Being Addressed Geotechnical Drilling at Cumberland 6

Phase 2 Engineering Assessments Geotechnical Explorations Geotechnical Exploration Statistics 781 Borings 47,000 Linear Feet of Drilling FS=1.4 20,000 Samples Retrieved 17,000 Tests Performed Ash 594 Instruments Installed Slope Stability Findings All Facilities > 1.0 12 Met Criteria Aggressively Working to Improve Others Conditions Suggesting Imminent Failure not Observed FS Factor of Safety : Strength Driving Force Minimum Criteria: FS > 1.5 (Long Term, Static) Source US Army Corps of Engineers EM 1110-2-1902 7

Phase 2 Engineering Assessments Geotechnical Explorations Comparison to Kingston Root Cause Analysis Increased Loads Due to Higher Fill Fill Geometry and Setbacks Unusual Weak Silt/Ash Slime Foundation Hydraulically Placed Loose Wet Ash This Combination of Conditions Was Not Observed at Any Other Facility 8

Phase 2 Engineering Assessments Dam Safety Hazard Classification Low Hazard Potential No Probable Loss of Human Life Low Economic/Environmental Losses Losses Principally Limited to Owners Property. Significant Hazard Potential No Probable Loss of Human Life Can Cause: Economic Loss Environmental Damage Disruption of Lifeline Facilities Impacts to Other Concerns High Hazard Potential Probable Loss of Human Life Source: FEMA 333 Issued April 2004 9

Phase 2 Engineering Assessments Dam Safety Hazard Classification - Initial TVA Fossil Plants Allen Bull Run Colbert Cumberland Gallatin John Sevier Johnsonville Kingston Paradise Shawnee Widows Creek Facility Ash Disposal Ash Pond Gypsum Dry Stack Bottom Ash Ash Pond Gypsum Ash Disposal Dry Stack Bottom Ash Ash Disposal Dike C Ash Pond Scrubber Complex Dry Stack Ash Pond Ash Pond Gypsum Initial Hazard Classification N/A N/A N/A Hazard Classification High Significant Low 10 Colbert Bottom Ash Pond Dike Lowering to Remove High Hazard

Phase 2 Engineering Assessments Dam Safety Hazard Classification Current TVA Fossil Plants Allen Bull Run Colbert Cumberland Gallatin John Sevier Johnsonville Kingston Paradise Shawnee Widows Creek Facility Ash Disposal Ash Pond Gypsum Dry Stack Bottom Ash Ash Pond Gypsum Ash Disposal Dry Stack Bottom Ash Ash Disposal Dike C Ash Pond Scrubber Complex Dry Stack Ash Pond Ash Pond Gypsum Hazard Classification High Significant Low Current Hazard Classification N/A N/A N/A 11

Phase 2 Engineering Assessments Spillway Inventory Spillway Pipe That Discharges Permitted Flows From an Impoundment Tall Unsupported Risers Outlet Pipes Spillway Replacement Johnsonville Colbert Shawnee Widows Creek Cumberland Outlet Pipe Dam Riser Shawnee Spillway Replacement Typical Spillway 12

Status 76 Capital Projects Currently in Planning, Design, Construction or Completed Phase TVA Fossil Plant Planning Design Implementation/ Complete Allen - 1 1 Bull Run 5 2 4 Colbert 2 1 4 Cumberland 3 2 1 Gallatin 1-1 John Sevier 2-1 Johnsonville 3-6 Kingston 2 1 1 Paradise 4 1 5 Shawnee - - 2 Widows Creek 5 1 3 System Wide - - 11 13

Status East Ash Pond Allen East Stilling Pond Main Ash Pond Area 2 Bull Run Bottom Ash Disposal Area 1 Gypsum Disposal Area 2A Disposal Area 5 Colbert Ash Pond 4 Dry Ash Stack Cumberland Ash Pond Gypsum Storage Area Fly Ash Pond E Gallatin Bottom Ash Pond A Stilling Pond B, C and D Dry Fly Ash Stack John Sevier Bottom Ash Disposal Area 2 Ash Disposal Area J (Closed) Johnsonville Ash Disposal Area 2 Kingston Paradise Shawnee Widows Creek Dike C Scrubber Sludge Complex Peabody Ash Pond Dry Stack AhP Ash Pond Ash Pond Complex Gypsum Stack Complex Calendar Year 2009 2010 2011 Global Stability As Found Current July 2011 15or 1.5 Greater 12 15 24 1.3 to 1.5 5 6 0 Less than 1.3 7 3 0 Oct 2010 14

Johnsonville Ash Pond ACTION: Spillway Closure ACTION: Spillway Replacement Kentucky Lake ACTION: Lower Pool 2.6 Feet ACTION: Spillway Closure ACTION: Rock Buttress / Seepage Blanket ACTION: Rock and Clay Buttress / Seepage Blanket Improvement Actions

Johnsonville Ash Pond South Spillway Inlets - Before South Spillway Inlets - After 16

Johnsonville Ash Pond South Spillway Outlets - Before South Spillway Outlets - After 17

Johnsonville Ash Pond North East Dike - Before North East Dike - After 18

Johnsonville Ash Pond North East Dike - Before North East Dike - After 19

Paradise Scrubber Sludge Complex ACTION: Drainage Improvements ACTION: Trees Removed and Vegetation Cut to Facilitate Frequent Slope Inspections. ACTION: Relocate Operating Pool Spring, 2011 Scrubber Sludge Complex East Pond ACTION: Fill and Regrade Pond ACTION: Rock Buttress /Slope Armoring / Seepage Blanket Spillways West Pond Stilling Pond ACTION: Grout Abandoned Pipes Improvement Actions

Paradise Scrubber Sludge Complex East Pond South Slope Buttress - Before East Pond South Slope Buttress - After 21

Paradise Scrubber Sludge Complex East Pond East Slope Armoring - Before East Pond East Slope Armoring - After 22

Bull Run Ash Pond and Gypsum Stack ACTION: Ditch Grading ACTION: East, West and North Slope Grading East and West Dredge Cells Bottom Ash Disposal Area 1 Gypsum Disposal Area 2A ACTION: French Drain ACTION: Lower Pool in Ash pond to Elev. 801 ACTION: West and South Slope Grading Fly Ash Pond Area 2 ACTION: Slope Armoring ACTION: Rock Buttress / Armoring Stilling Pond Area 2 Improvement Actions

Bull Run Gypsum Stack Gypsum Stack Buttress - After Gypsum Stack Buttress - Before 24

Bull Run Gypsum Stack Gypsum Stack Buttress After Pool Lowering Ash Pond Pool Before Pool Lowering 25

Bull Run Gypsum Stack Slope and Drainage Improvements Slope and Drainage Improvements 26

Widows Creek Gypsum Stack and Ash Pond ACTION: Rock Toe Buttress Around Perimeter of Main Ash Pond ACTION: Surface Water Drainage System with Seepage Control around Gypsum ACTION: Main Ash Pond Dredging and Spillway Replacements with Lowered Normal Pool Red Water Pond Main Ash Pond A ACTION: Grouted Abandoned Spillway Pipes ACTION: Constructed Buttress on West Slope of Gypsum Stack ACTION: Seepage Control Bottom Ash Stack Gypsum Stack Abandoned Ash Disposal Area Stilling Ponds Old Scrubber Sludge Pond Dredge Cell Gypsum Stack Stilling Pond ACTION: Dredge Cell Closure Construction with Crowned Cap Pump Pond Tennessee River Improvement Actions ACTION: Seepage control along North/South Perimeter of Dredge Cell

Widows Creek Gypsum Stack Gypsum Stack West Slope Buttress - Before Gypsum Stack West Slope Buttress - After

Widows Creek Gypsum Stack Gypsum Stack Seepage Drain and Armoring Gypsum Stack Seepage Drain and Armoring 29

Cumberland Ash Pond and Gypsum Stack ACTION: Lower Ash Pond Pool Cumberland River Ash Pond ACTION: Spillway Modifications ACTION: Permanent Pool Eliminated from Gypsum Stack, March 2009 Dry Ash Stack ACTION: Regrade Slopes and Perimeter Ditch, Buttressing Gypsum Disposal Area ACTION: Rock Toe Buttress Improvement Actions

John Sevier Ash Complex ACTION: Construct Toe Drain at Lower Perimeter Road ACTION: Grout Abandoned Spillway Pipes ACTION: Regrade / Flatten Slope ACTION: Regrade Slope between Upper and Lower Perimeter Roads Dry Ash Stack ACTION: Placement of Riprap Shoreline Protection for Scour Mitigation Sediment Pond East Ash Disposal Area J Sediment Pond West ACTION: Armor Interior Slopes to Eliminate Wave Erosion and Animal Burrows ACTION: Reshaped Slope near Spillway Outlets Stilling Pond Area 2 Bottom Ash Disposal Area 2 Improvement Actions

Phase 4 Programmatic Improvements Dam Safety Inspection Training Training Sessions at Each Fossil Plant Two Sessions in Chattanooga Over 300 Staff Received Training Training Elements Included: Roles and Responsibilities Failure Modes Case Histories Specific Plant CCP Features Design Philosophy Inspection Program Dam Safety Training Coal Combustion Product Management Unit Impoundments Tennessee Valley Authority Prepared for Gallatin Fossil Plant (GAF) Personnel Inspection Program August 26, 2009 32

Phase 4 Programmatic Improvements Programmatic Documents Volume 1 Program Management and Responsibilities Volume 2 Facilities Design and Construction Requirements Volume 3 Operation, Maintenance, and Inspection 33

Coal Combustion Facility Assessment Report Thank You

Status Material Totals For FY10 (excluding KIF) Man-hours ~ 472,324 Rock Placed ~ 455,305 tons Sand ~ 26,277 tons Instrumentation at Gallatin Paradise Scrubber Complex Armoring 35