CYPRUS EXPERIENCE WITH URBAN WASTEWATER TREATMENT DIRECTIVE (91/271/EEC)

Similar documents
WORKSHOP ON THE QUALITY OF RECYCLED WATER AND ITS APPLICATION IN AGRICULTURE. Organised by: SEWERAGE BOARD OF LIMASSOL AMATHUS LIMASSOL 27 APRIL 2012

Urban Waste Water Treatment Directive Drinking Water Directive, their relation to the Water Framework Directive, in a context of scarcity

Reuse of Treated Effluent in Cyprus

Water Issues in Cyprus

Management of Water Resources in Cyprus

Reuse of Treated Effluent in Cyprus

Safety of Dams in Cyprus

Implementation of the UWWTD in Austria. Ernst Überreiter

The environmental objectives and Programme of Measures of the River Basin Management Plan. The case of Cyprus. Iacovos Papaiacovou

Desalination: The Cyprus Experience

Characteristics and performance of small and medium wastewater treatment plants in Greece

Cyprus Experience with Desalination and Non-Revenue Water Reduction

Wastewater Management in the Danube Region: Opportunities and Challenges of EU Accession Mr. Stjepan Gabric (World Bank)

CYPRUS NATIONAL REPORT

EF.DEL/39/07 21 May 2007

Water Pricing in Cyprus and the cost of water scarcity. Christos Zoumides & Theodoros Zachariadis

Indicator Fact Sheet (WEU16) Urban waste water treatment

Market summaries for technologies on reuse of water, resource recovery and resource efficiency

RURAL DEVELOPMENT PROGRAMME (RDP) OF THE REPUBLIC OF BULGARIA. Integration of Environmental and Climate Policy into the RDP

In the name of God. Country Level Presentation Iran Country Report. Rome, Italy, December 15 th, 2015

DISCUSSION PAPER INTEGRATED WATER RESOURCES MANAGEMENT IN ISRAEL

URUGUAY FACING CHALLENGES TO ACHIEVE UNIVERSAL COVERAGE OF SANITATION

WG Economics - 1st meeting (March 20 & 21, 2014) Assessment of Environmental and Resource Costs in Cyprus

Implementation of the Urban Wastewater Treatment Directive in France

SERVICE CONTRACT NOTICE. Supervising Engineer for Serbia Floods Rehabilitation Support - Emergency works project

The Reforms In The WSS Sector In Bulgaria. Eng. Ivan Ivanov President Bulgarian Water Association

Council Directive 91/271/EEC The National Programme for Municipal Waste Water Treatment

Perspectives on water reuse in Europe. Windhoek, October 2018

Cyprus Scientific and Technical Chamber ( ETEK)

National Water Policy for Palestine

COMMISSION OF THE EUROPEAN COMMUNITIES COMMISSION STAFF WORKING DOCUMENT. Annex to the

Serbia: Belgrade Water Project - Project Implementation Unit Support for Tranche 1

Agricultural Reuse of Water and Nutrients. from Wastewater Treatment in Turkey

REPUBLIC OF BULGARIA AUDIT OF EUROPEAN UNION FUNDS EXECUTIVE AGENCY

Drought conditions and management strategies in Iran

Water Account, Mauritius 2013

Sewage Management Changes in the Northeastern Poland After Accession to the European Union

Instruments of environmental policy

How is our District Plan shaping up? Matamata-Piako District Council Network Utilities 70 July 2015

Construction of first wastewater treatment plant in Kosovo: an EU pilot project

Reform of Public Procurement Strategy, Policy and Priorities. Professor C. H. Bovis

Implementation of Water Reuse in Cyprus

P.T. ODIRILE, DEPARTMENT OF CIVIL ENGINEERING FACULTY OF ENGINEERING & TECHNOLOGY UNIVERSITY OF BOTSWANA

Non-exclusive right to handle the marketing and distribution for sale of reference materials from the JRC world-wide

Synthesis centres on innovative wastewater treatment: feasibility studies in the Lower Danube

EIB FUNDING FOR FLOOD RISK MANAGEMENT

WATER SECTOR REFORMS IN ESTONIA*

Slovenia. Highlights in Climate change and energy

Sustainable Sanitation in Eastern Europe and Germany. WECF (Women in Europe for a Common Future)

SECTOR ASSESSMENT (SUMMARY): WATER AND OTHER URBAN INFRASTRUCTURE AND SERVICES 1

Cluj - Napoca, Romania March 26th 2014

SDG 6 (Water and Sanitation) in Republic of Korea

WATER MANAGEMENT IN TURKEY AND IN ISTANBUL

Impact of Water Management on Water Saving in Some Pre-accession Countries

Flood risk management and land use planning in changing climate conditions Mikko Huokuna Finnish Environment Institute, SYKE

CRIS Number: 2002/

Urban Wastewater and Sanitation Situation in Vientiane, Lao PDR

DEUS 21. Decentralized Urban Infrastructure System for water provision and sewerage. Dr.-Ing. Ursula Schließmann

EU funding in water sector Latvia results, lessons learned, future. B.Gulbe, CEO, Latvian water and wastewater works association

Bereich für Bild OVERVIEW WATER SECTOR GHANA

City of Redlands Wastewater Treatment Plant. Redlands, CA LOCATION: Carollo Engineers; CH2M HILL MBR MANUFACTURER: COMMENTS:

WORKS PROCUREMENT NOTICE

Patrons of Lake Khuvsgul Environment and Health Center

SUBSOL bringing coastal SUBsurface water SOLutions to the market

Greater Dublin Drainage Project

Water Industry Training in non-metropolitan NSW

SECTOR ASSESSMENT (SUMMARY): WATER AND OTHER URBAN INFRASTRUCTURE AND SERVICES

PUBLIC-PRIVATE PARTNERSHIP

ASSESSMENT AND DEVELOPMENT OF MUNICIPAL WATER AND WASTEWATER TARIFFS AND EFFLUENT CHARGES IN THE DANUBE RIVER BASIN.

Policies to Enhance Water Sector in Jordan

Implementation of the water Directives in Romania

Grant Agreement. Public procurement rules and Additional remuneration. DG Research and Innovation

Council of European Municipalities and Regions

Wasserverband Eifel-Rur (WVER) Water Management Board River Rur Catchment. Mekong River Commission 5 December 2012.

Ex-Ante Evaluation (for Japanese ODA Loan)

Case Study on the Right to Water and Sanitation in Romania

Waste Management Plans in Hungary and the Miskolc Regional Waste Management Project

On-site wastewater treatment systems and legal regulations in the European Union and Hungary

STANDARD SUMMARY PROJECT FICHE: PROJECT PL Project Title: Extension of Waste Water Treatment Plant (WWTP) of Wroclaw

T.C. MINISTRY OF ENVIRONMENT AND URBANIZATION Wastewater Management inturkey

WATER MANAGEMENT THE BASIS OF THE ROMANIAN SUSTAINABLE DEVELOPMENT - PRESENT STAGE AND PERSPECTIVES -

The ILF Group General Presentation. Best practice in public tendering, a view from the private sector. Thomas Fritz, 05 th November 2009

WORKS PROCUREMENT NOTICE

Japanese ODA Loan. Ex-Ante evaluation

Ex-ante Evaluation - 1 -

Alternative water supply options

PROJECT INFORMATION FORM - WATER Part A General Information

OVERVIEW ON ALBANIAN WATER SECTOR THROUGH ANALYSE OF W.R.A

URBAN SYSTEMS IN AREAS OF EXTREME ARIDITY. PROPOSALS FOR SUSTAINABLE WATER MANAGEMENT

Europe s water in figures

Financing possibilities in accordance with the WFD and cost recovery for water services in Hungary Judit Rákosi, ÖKO Inc. Budapest

Case Study Brasov, Romania

Climate Change Adaptation in Europe and Spain. Cities.

International Urban Sustainability Indicators Studies

National Water Demand Management Policy

Batumi Initiative on Green Economy (BIG-E) Actions by Lithuania

Proposal by Lithuania for deletion of the Hot Spot No. 41 Šiauliai WWTP

SECTOR ASSESSMENT (SUMMARY): WATER AND OTHER URBAN INFRASTRUCTURE AND SERVICES 1 Sector Road Map

SERVICE CONTRACT NOTICE Supervision of the Dutch Quarter Sewerage Project St. Maarten

Wastewater Reuse for Irrigation : an Acceptable Soil Conditioner?

Transcription:

WATER DEVELOPMENT DEPARTMENT 1047 NICOSIA REPUBLIC OF CYPRUS MINISTRY OF AGRICULTURE, RURAL DEVELOPMENT AND ENVIRONMENT Water Security in Bulgaria 18 19 September 2017 Sofia Bulgaria CYPRUS EXPERIENCE WITH URBAN WASTEWATER TREATMENT DIRECTIVE (91/271/EEC) NICOS NEOCLEOUS CHIEF WATER OFFICER WATER DEVELOPMENT DEPARTMENT 1

SHORT DESCRIPTION ABOUT CYPRUS Area: 9250 Km 2 Population: 850,000 (under Government control) Year of Turkish invasion and percentage of the occupied area:1974, 39% Year joined the EU: 2004 Year joined the Eurozone:2008 Year of the Financial crisis:2013 GDP (per capita): 2016 20.984 Type of Climate: Semi arid climate Numerous small catchments No perennial flow Limited water resources Unevenly distributed rainfall Temporally and geographically Frequent and prolonged droughts Annual Rainfall Distribution (mm) 2

UWWT Directive 91/271/EEC The Directive was transferred to the Cyprus Law under the Water Pollution Control Laws via Regulations 772/2003 as well as Ministerial Decrees and The Sewerage Systems Laws (1/1971) Competent Authorities & Responsibilities Department of Environment Implementation of UWWTD and Participation with WDD to the European Committee. Designation of Sensitive Areas in cooperation with WDD, DFMR, GSD and DA. Reporting to E. C. according to Article 15 and 16 of the UWWTD. Effluent Quality Monitoring Programme in cooperation with the S.G. Laboratory and WDD. Preparation of Discharge Permits for the operation of UWWTPs and the effluent discharges. Water Development Department Preparation of the National Implementation Program. Reporting to E. C. according to Article 17 of the UWWTD. Preparation of design, tenders and contracts for the construction and the maintenance of all rural, sewerage collection systems and WWTPs on behalf of the Rural Sewerage Boards. Management /reuse of Municipal UWWTP effluent. Sewerage Boards Councils Installation of sewerage networks and UWWT plants in urban centers and peri-urban communities. Ministerial Council Implementation of the relevant projects.

RESPONSIBILITY FOR THE CONSTRUCTION OF THE WORKS (Sewerage Network and Wastewater Treatment Plants) Urban Settlements and peri-urban communities: Urban Sewerage Boards(Public Utility Organisations): Responsible for the construction and operation of the systems. Rural Communities (above 2000 p.e.): Water Development Department: Responsible for the construction phase. Rural Communities Sewerage Boards: Responsible for the operation and maintenance of the systems with the technical assistance from the Water Development Department 4

GOVERNMENTAL SUBSIDIES (from the governmental budget) Rural Communities: 80% of the capital cost (sewerage network, wastewater treatment plant, treated effluent storage lagoon and central irrigation network) 100% of the capital cost of the wastewater treatment plant or the required extension of any existing plant for the peri-urban communities joined the Urban Sewerage Boards. The contribution of each rural community decreases by 50% in case the project is co financed by the Cohesion Fund. 0% for the operation and maintenance Urban Sewerage Boards: 100% of the capital cost and the related cost of the operation and maintenance of the tertiary treatment plant. 5

FINANCING Construction of the works for the Rural Communities: a. National Fund b. Co financed by the cohesion fund of the EU and Cyprus Government c. Loan from EIB up to 50% of the required expenses d. Contribution of the Community Operation and Maintenance of the works (non governmental contribution): The Sewerage Board of the rural communities through taxation of the citizens. Two types of taxes: Sewerage fee: paid once a year based on the value of the house Sewerage system use: paid every two months based on the drinking water consumption Each fee has to be approved by the parliament. Construction of the works and Operation and Maintenance by the Urban Sewerage Boards Loans by the Urban Sewerage Boards from EIB, CEB and other banks The Sewerage Board through taxation of the citizens. Two types of taxes: Sewerage fee: paid once a year based on the value of the house Sewerage system use: paid every two months based on the drinking water consumption Each fee has to be approved by the parliament. 6

CONDITIONS OF CONTRACTS FOR THE RURAL COMMUNITIES. WASTEWATER TREATMENT PLANTS and pumping/lifting stations of the network (Turn-key Project) : FIDIC Contract - Gold Design Build Operate: Two phases Contracts Phase 1: Design - Build Commissioning Testing- One year operation as defects Liability period. Financing: Co financed by the cohesion fund of the EU and the Government of Cyprus. Contracting Authority: Water Development Department Requirements: Only the quality of the treated effluent. Treatment Method: the tenderer to select proven method. Phase 2: Operate for 19 years ( all the costs i.e. chemicals/electricity are borne by the Contractor. The contractor could also use renewable energy resources at his own cost) Contracting Authority: Sewerage Board of the Rural Communities. Water Development Department is acting as technical advisor. Award Criterion: Exclusively the lowest price (phase 1 and phase 2), provided that the tenderer fulfills the economical and technical qualifications. SEWERAGE NETWORK: Design: Prepared by WDD by subcontracting to Design Consultants. Contract Conditions: for the construction of Civil Engineering Public Works, based on FIDIC. Contract with approximate quantities. After taking over of the network the maintenance is by the Sewerage Board through subcontractors. 7

CONDITIONS OF CONTRACTS FOR THE URBAN SEWERAGE BOARDS. WASTEWATER TREATMENT PLANTS and pumping/lifting stations of the network : FIDIC Contract - Design Build Operate: Two phases Contracts Phase 1: Design - Build Commissioning Testing- One year operation as defects Liability period. Contracting Authority: Urban Sewerage Board Requirements: Only the quality of the treated effluent. Treatment Method: the tenderer to select proven method. Phase 2: Operate for 9 years ( all the costs i.e. chemicals/electricity are borne by the Contractor. The contractor could also use renewable energy resources at his own cost) Contracting Authority: Urban Sewerage Board. In some cases the Urban Sewerage Board operates the plant with its employees. Financing: The Urban Sewerage Board through taxation of the citizens. Two types of taxes: Sewerage fee: paid once a year based on the value of the house Sewerage system use: paid every two months based on the drinking water consumption Each fee has to be approved by the parliament. Award Criterion: Exclusively the lowest price (phase 1 and phase 2), provided that the tenderer fulfills the economical and technical qualifications specified in the tender documents. SEWERAGE NETWORK: Design: Prepared by the Sewerage Board by subcontracting to Design Consultants. Contract Conditions: for the construction of Civil Engineering Public Works, based on FIDIC. Contract with approximate quantities. After taking over of the network the maintenance is by the Sewerage Board through subcontractors. 8

STATUS OF COMPLIANCE Accession Treaty Commitments Transitional period negotiated in the accession treaty of Cyprus implementation of the UWWTD, Articles 3, 4 and 5(2) was 31.12.2012. for the full Current Situation: National Implementation Program of 2014 (with reference year 2014 and compliance date 31/12/2027) o 7 Urban agglomerations 736.000 p.e. o 50 Rural agglomerations 259.000 p.e. Construction of Collecting Systems and UWWTPs (as at 31/12/2016) o Construction of Collecting Systems Urban : 6 completed, 1 in process Rural : 29 completed, 18 haven t started yet, 3 IAS o Construction of UWWTPs Urban : 8 completed, 1 in process, 1 haven t started yet Rural : 1 completed, 1 in process, 4 haven t started yet % compliance According to the national report for the 9 th reporting (reference year 2014) of the Urban Waste Water Treatment Directive prepared by the EC: the compliance rate with Article 3 of the Directive is 65% related to the total generated load of the agglomerations the compliance rate with Article 4 of the Directive is 85.6% related to the load entering to collecting systems and treatment plants the compliance rate with Article 5 of the Directive is 85.3% related to the load entering to collecting systems and treatment plants discharging into Sensitive Areas

SUPPLY OF TREATED EFFLUENT The policy of the Government is that the treated effluent produced by the Urban Sewerage Boards will be reused by the Government through the Water Development Department who is responsible for the reuse of treated effluent from the urban wastewater treatment plants. The cost for the construction and the operation and maintenance of the tertiary treatment plant carried out by the Urban Sewerage Boards is undertaken by the Government. 10

REUSE OF TREATED EFFLUENT IN CYPRUS IN CYPRUS THE TREATED EFFLUENT FROM THE URBAN WASTEWATER TREATMENT PLANTS IS REUSED FOR THE FOLLOWING PURPOSES : 1. IRRIGATION 2. ENRICHMENT OF UNDERGROUND WATER 3. DRY BED OF RIVERS FOR INFILTRATION THE IRRIGATION IS DONE UNDER THE CODE OF GOOD AGRICULTURAL PRACTICE. Million Cubic Meter rs OTHER WAYS OF DISPOSAL DISCHARGE INTO THE SEA DUE TO SEASONAL DEMAND OF WATER FOR IRRIGATION AND LIMITED STORAGE CAPACITY, CERTAIN AMOUNTS OF TREATED EFFLUENT ARE DISCHARGED TO THE SEA AND POLEMIDIA DAM (NON POTABLE), DURING WINTER MONTHS. 11

WATER DEVELOPMENT DEPARTMENT 1047 NICOSIA REPUBLIC OF CYPRUS MINISTRY OF AGRICULTURE, RURAL DEVELOPMENT AND ENVIRONMENT THANK YOU LIMASSOL (MONI) WWTP NICOS NEOCLEOUS CHIEF WATER OFFICER WATER DEVELOPMENT DEPARTMENT nneocleous@wdd.moa.gov.cy 12