ITER Organization. Françoise Flament. Head of Procurement Arrangements & Contracts Division. Journée ITER/CEA 01/12/2010. Page 1

Similar documents
ITER Organization. Procurement Process Industrial Strategy Business Opportunities

3ème RV Business du Nucléaire Civil en PACA. ITER Organization Future Call for Tenders

Engineering Support in the Areas of Vacuum, Cryogenics and Instrumentation for ITER Magnet Feeders and Vacuum System. Technical Specification

FUSION FOR ENERGY The European Joint Undertaking for ITER and the Development of Fusion Energy

Call for Expertise TECHNICAL SPECIFICATION. Expert Services Contract. Procurement Technical and Administration Support

ITER Status & Opportunities. Meeting with CONFINDUSTRIA Piemonte Torino, November 16 th 2015 Benjamin Perier

ITER Assembly Opportunities

ITER Vacuum Vessel Status and Procurement

Fusion for Energy The European Domestic Agency for ITER. F4E Contracts & Procurement Unit

DRAFT DOCUMENT SUBJECT TO MODIFICATIONS. Foreseen Procedure. Estimated spending

Summary Technical Specification. In-vessel Survey Development

Mario Cavinato On behalf of Antennas and Plasma Engineering group

TECHNICAL NOTE RELATED TO THE MARKET SURVEY OF THE PF COILS COLD TEST FACILITY SUPPLIER

Integrated System Level Simulation and Analysis of DEMO with Apros. Sami Kiviluoto

Technical Specifications (In-Cash Procurement)

Background information for Procurement Procedure F4E-OPE-301 (TB04)

ITER REMOTE HANDLING SYSTEM

Call for Nomination Documents IDM UID W37G6V. VERSION CREATED ON / VERSION / STATUS 20 Feb 2018 / 1.1 / Approved EXTERNAL REFERENCE / VERSION

Vacuum Vessel In-Service Inspection_Phase 2 (WP3+WP6): Summary of Technical Specifications

Fusion: the fundamental principle

PF Coils Time table of procurement

Buildings Construction Procurement Strategy

TOKAMAK ARCHITECTURE FOR PRACTICAL REMOTE MAINTENANCE

ITER: Another Way for the Nuclear Industry

Technical Specifications (In-Cash Procurement) Engineering support for the follow up of procurement for the magnet division activities

Safety Classification of Mechanical Components for Fusion Application

FUSION FOR ENERGY The European Joint Undertaking for ITER and the Development of Fusion Energy

Buildings Construction Procurement Strategy

RH Supervisory Control System - Technical Summary Technical Summary of the RH Supervisory Control System to be used for Call for Nominations

Status of ITER Buildings construction and next procurement steps

Technical Summary. Contract for Procurement of Piping and Fittings (IO/14/CFT/9560/ACS CP/1)

Design Analysis for the development of the design of the ITER Hot Cell Complex (HHC)

ITER R&D Needs, Challenges, and the Way Forward

ITER TOKAMAK VACUUM VESSEL THERMAL SHIELD ADDITIONAL NEUTRAL SHIELDING

EU Contribution to ITER Fuel Cycle

Hydrogen Fusion The frontier in abundant CO 2 -free energy generation

INFORMATION DAY. Fusion for Energy (F4E)

ITER AND INTERNATIONAL SCIENTIFIC COLLABORATION*

Buildings Construction Procurement Strategy

Technical Specification for Engineering Support on Instrumentation, TF Coils and Magnet Supports

Perspective from China on. Institute of Plasma Physics, CAS, China

Technical Specification - Hot Cell Complex - Mechanical Engineering

Status of Design and R&D Activities for ITER Thermal Shield

General Overview of JADA procurement activities

Scientific Status of ITER

Expert Engineer to provide coordination and support for mechanical design and structural analysis within the IC&LH Section. Technical Specification

Technical Summary for the Tokamak Assembly Works- A0

Summary Technical Specification Building 13 - Metrology Laboratory

5 th INTERNATIONAL CONFERENCE ON THE FRONTIERS OF PLASMA PHYSICS AND TECHNOLOGY April 21, 2011, Singapore

El Séptimo Programa Marco de I+D de la Unión Europea Cómo tener éxito en las convocatorias 2013

EU Contribution to ITER Remote Handling

Call for Nomination. Vacuum Vessel Assembly Welding

ITER Council Working Group on the Independent Review of the Updated Long-Term Schedule and Human Resources (ICRG) Report

The ITER Neutral Beam Test Facility. Design Overview. European Tasks ref. TW3-THHN-IITF1 ( ) TW4-THHN-IITF2 ( ) Jean-Jacques Cordier

PF Coils 2-6 Manufacturing Scope of the different contracts

Technical Summary for TCC0 Global overview of the scope for TCC0 contract

R&D required to place a test module on FNF (how does it compare to ITER TBM?) R&D required for base blanket

Wendelstein 7-X A technology step towards DEMO

Annex II. Technical Specifications. Operational Systems Diagnostics Engineering Services. ITER_D_ SD8PNK v.1.3

FUSION FOR ENERGY The European Joint Undertaking for ITER and the Development of Fusion Energy

Buildings Construction Procurement Strategy

ITER Remote Maintenance

ITER ITA NEWSLETTER. No. 13, FEBRUARY 2004 INTERNATIONAL ATOMIC ENERGY AGENCY, VIENNA, AUSTRIA ISSN

Computational Fluid Dynamics Analysis for loads definition during accidental scenarios

FUSION FOR ENERGY The European Joint Undertaking for ITER and the Development of Fusion Energy

Technical Summary. 1. Purpose

Technical Summary. Purpose. ITER_D_RZ5S7J v2.1

The Status of the ITER Design. N. Holtkamp

Hot Cell Complex Building Engineering Contract (REVISED)

Key Features and Progress of the KSTAR Tokamak Engineering

The Tokamak Concept. Magnetic confinement. The Tokamak concept

Engineering services HCD-EC-UL

Europe s contribution to ITER Remote Handling

Workshop on Big Science, ITER and Fusion Energy

KSTAR Assembly and Vacuum Commissioning for the 1 st Plasma

Technical Specifications (In-Cash Procurement)

ITER The way to a benign and limitless new energy

ITER The way to a benign and limitless new energy

Specific technologies involved Near term opportunities for Industry Future opportunities for Industry (hints)

ITER ITA NEWSLETTER NO. 22, MAY 2005 INTERNATIONAL ATOMIC ENERGY AGENCY, VIENNA, AUSTRIA ISSN

STANDARD TENDER EVALUATION REPORT FORMAT FOR PROCUREMENT OF WORKS (MAJOR CONTRACTS)

DECISION OF THE GOVERNING BOARD ADOPTING THE FIRST AMENDED 2017 WORK PROGRAMME OF FUSION FOR ENERGY

Status Report and Documentation of DCLL Design

Competed ITER Task Agreements (ITAs, for information and expression of interest)

Doing business with CERN

R&D of the ITER Correction Coil magnet system in China

The Heat Rejection System of the ITER Reactor

EU considerations on Design and Qualification of Plasma Facing Components for ITER

Cable supply, Electrical and I&C Installation Works

Attachment 1. External Experts Areas of Expertise

Status of Design and Research & Development for ITER Sector Sub-assembly Tools

Tender Document for the Provision of services for the: Development and Testing of a Dynamic Positioning Prototype for Small Vessels

Fusion Transmutation Reactor -Feasible early use of fusion fast neutron

ABERYSTWYTH UNIVERSITY PROCUREMENT RECORDS RETENTION SCHEDULE

ITER Remote Handling: Overview and Technical Requirements

Recent Progress of JT-60SA Project H. Shirai 1, P. Barabaschi 2, Y. Kamada 3 and the JT-60SA

Concept Development of DEMO in Japan

DEMO Concept Development and Assessment of Relevant Technologies

Design Progress and Analysis for ITER Thermal Shield

Engineering Design Evolution of the JT-60SA Project

Transcription:

ITER Organization Françoise Flament Head of Procurement Arrangements & Contracts Division Page 1

1. Overview of the IO Procurement System 2. Business Opportunities 3. IO Procurement Processes and Procedures Practical Tips for Potential Suppliers Page 2

1. Overview of the IO Procurement System First TF conductor has been manufactured Page 3

1. Overview of the IO Procurement System PF COILS Facility is under Construction The ITER Project entered into the Construction Phase Page 4

1. Overview of the IO Procurement System ITER Project Organization Management Advisory Committee (MAC) ITER Council Scientific &Technical Advisory Committee (STAC) 7 Members: - China - Korea - Europe - India - Japan - Russian Fed. - United States ITER Organization In Cash Budget Procurement Arrangements In Kind Contribution Domestic Agencies In Kind Budget Suppliers Suppliers Page 5

1. Overview of the IO Procurement System Procurement Sharing (kiua) 400 300 200 100 0 EU CN IN JA KO RF US IO Machine core Internal auxiliaries External auxiliaries Heating, Diagnostics, Control Buildings A unique feature of ITER is that almost all of the machine will be constructed through in kind procurement from the Parties Page 6

1. Overview of the IO Procurement System ITER Project Procurement Sharing China: magnet conductor, correction coils, feeders and supports, blankets, remote handling transfer casks, gas injection system, electrical switchgear, some diagnostics. India: vessel ferromagnetic inserts, cryostat, cryolines and cryodistribution, heat rejection system, ion cyclotron and startup electron cyclotron heating power supplies, diagnostic neutral beam, some diagnostics. Japan: half the TF coils, most of the TF coil structure, part of the TF and all the CS conductors, part of the first wall, divertor outer target, blanket remote handling equipment, atmosphere detritiation, equatorial electron cyclotron launchers and power supplies, neutral beam components, some diagnostics. Korea: some conductor strand, part of the vessel and vessel ports, blankets, assembly tooling, thermal shield, tritium storage, part of the power supplies, some diagnostics. Page 7

1. Overview of the IO Procurement System ITER Project Procurement Sharing Russian Federation: PF coils 1 and 6 and some PF and TF coil conductor, some vacuum vessel ports, blankets and connectors, divertor dome and testing, electrical switchgear, some klystron tubes, some plasma diagnostics. USA: wind CS coils, some TF conductor, some blankets, port limiters, part of the cooling system, part of the vacuum pumping and fuelling system, tokamak exhaust processing, part of the steady power supplies, RF transmission lines, some plasma diagnostics. Europe: the remainder, including sharing in most of the above procurements, plus the buildings. IO-funded items: magnet feeder sensors, diagnostic first wall, assembly operations and tooling, hot cell maintenance equipment, on-site assembly of the tritium, vacuum, heating, cooling and cryoplant systems, control and data acquisition, some plasma diagnostics. Page 8

1. Overview of the IO Procurement System Different Steps of Procurement Arrangements (PA) Concept Design & Engineering studies Concept Control Documents/Specifications Concept Design Review Step 1 Signature of PA (Hand Over) Preliminary Design & Engineering studies Step 2 Functional Specifications PA Detailed Design Preliminary Control Documents/Specifications Preliminary Design Review Signature of PA (Hand Over) Final Design & Engineering studies Final Control Documents/Specifications PA Documents (Main, Annex A & Annex B) Final Design Review Step 3 PA Build to Print PA Signature of PA (Hand Over) Manufacturing Drawings Manufacturing / Readiness Review Time Page 9

1. Overview of the IO Procurement System PA Breakdown per DA in kiua (ITER Unit of Account) and percentage of signed PAs 57% signed JA 530 71% signed KO 240 RF 263 39% signed 60% signed US 257 CN 256 39% signed IN 260 CN EU 48% signed EU 1139 68% signed IN JA KO RF US Page 10

1. Overview of the IO Procurement System Procurement Arrangement Status The IO and DAs have signed 46 PAs, totaling 1767kIUA, representing approximately 60% of the total procurement value for the construction of ITER and 35% of the total number of PAs; PAs are prioritized according to the Integrated Project Schedule (IPS); approximately 20 more PAs are scheduled to be signed by spring 2011; Page 11

1. Overview of the IO Procurement System 1. Overview of the IO Procurement System 2. Business Opportunities 3. IO Procurement Processes and Procedures/ Practical Tips for Potential Suppliers Page 12

IO Procurement: Implementation of the Baseline Short and Medium Term Objectives The IO management s main objective is to keep the schedule and conduct a project-wide campaign on cost containment and cost savings; The priority for the IO is to finalize the design to support the Procurement Arrangements signed with the Domestic Agencies in order for them to place the contracts for the in Kind contribution launch contracts in the Members' countries, The IO s DG identified the top priorities for the design: magnet coil feeder; cryostat; vacuum vessel; central solenoid conductor, TF coil and PF coils. Page 13

IO Procurement: the Sub-systems under IO s responsibilty CODAC : Control and Data Acquisition and Communication, Magnets Feeders Sensors, Hot cells maintenance Equipment, Part of the Cooling Water System : engineering and on-site assembly, Part of the Thermal Shield, Part of the Vacuum Pumping & Fuelling, Part of the Tritium Plant, Part of the Cryo Plant, Part of the Heating and Current Drive, About 900M Budget Including the R&D Diagnostics of the First Wall. Assembly Operations and Tooling, Page 14

Ongoing Significant Call for Tenders Global Transport for all ITER components (joint tender with all DAs) Contract signature in February 2011 Engineering Support for Machine Assembly and Installation Contract signature February 2011 Vacuum Vessel Assembly Welding Tender to be launched in December 2010 Cable management Tender to be launched in January 2011 Financial Administrative Support `Tender to be launched in January 2011 Cryogenic Plant (for the liquid Helium plant) Tender to be launched in April 2011 Page 15

Forthcoming Significant Call for Tenders Renewal of the contracts for the Engineering support for the finalization of the design Call for Nomination to be launched in December 2010 Design and Engineering for the Tritium Plant Call for Nomination to be launched in February 2011 Engineering support for electrical power distribution and installations Call for nomination to be launched in January 2011 Facility Management (joint tender with EU-DA) Call for Nomination to be launched in March 2011 Access Control for the sites Call for nomination to be launched in April 2011, Page 16

1. Overview of the ITER Organization and Procurement System 2. Business Opportunities 3. IO Procurement Processes and Procedures/ Practical Tips for Potential Suppliers Page 17

Different Types of Solicitation Average thresholds for the different types of solicitation: Up to 100k : Request for Quotation (duration: 3-4 weeks) Above 100k : Call for tenders (duration: 5-6 months) Specific tenders: Competitive Dialogue FIDIC Contracts Award Criteria Best value for money (most of the awards). Lowest-priced technically compliant offer, IO Evaluation Committee established to assess the offers and recommend the award. Page 18

Steps of IO Call for Tenders (1/5) First Step: Call for Nomination (One month) IO formally invites the Domestic Agencies to nominate several potential suppliers. Second Step: Pre-qualification (One Month) Ensure that offers are sought only from suppliers who have the requested resources and experience to perform the technical requirement and perform the work at the highest satisfactorily. Pre-qualification Questionnaire includes a summary of the technical requirements and the financial statements List of Companies Qualified to participate to the tender Page 19

Steps of IO Call for Tenders (2/5) Third step: Call for Tender (Duration: 6 weeks to 3 months) IO Instructions to Tenderers (ITTs): Procurement schedule, Submission procedure, Commercial requirements, Price breakdown requirements. Award criteria to be used for assessing the tenders. Technical specifications, Draft contract (Special and General conditions), Page 20

Steps of IO Call for Tenders (3/5) Submission and Receipt of Tenders: A two-envelope procedure is used where the technical and financial tenders are submitted in separate sealed envelopes, The Tenderers are responsible that their tenders arrive at ITER site or other location mentioned in the ITTs on time (local time at ITER site). Late Tenders are not considered, It is important that the Tenderers strictly follow the provisions given in the Instructions to Tenderers. Page 21

Steps of IO Call for Tenders (4/5) Clarifications: In principle, tenders have all the information in the tender package and they are evaluated based on the information they submitted. However, Tenderers may request from the IO clarifications through written correspondence before the submission of the offers. The questions/answers are anonymously distributed as a single response to all Tenderers. Page 22

Steps of IO Call for Tenders (5/5) Technical evaluation: Determine whether each tender meets all technical requirements and specifications: based on individual grids signed by each voting member and a strengths and weaknesses table signed by each voting member. The Evaluation Committee may require a presentation from the companies/consortia to clarify the technical aspects of the tender. Financial evaluation If a minimum threshold for technical compliance is set in the Instructions to Tenderers, only the tenders meeting this requirement can proceed to the financial evaluation, Financial proposals are analysed according to the award criteria given in the Instructions to Tenderers. Technical and financial scorings are combined in order to select the offer representing the best value for the IO. Page 23

Rules for Consortia Clarification concerning Consortia: The IO encourages the companies to create consortia, Once the prequalification is completed for a consortium in a whole the composition of the consortium cannot be modified during the tender process. The members of a consortium have a joint liability towards the IO for the tender and the performance of the contract, The Consortium Leader is the signatory Party of the contract and represents the other members. Page 24

Solicitation Types in Figures In 2010 (as of 22 November 2010) : 93% contracts are signed through a competitive process, 2% are placed with the Domestic Agencies (Task Agreements), 2% are single source, 3% are Agreements (CERN, CEA) RFQ 3% RT 3% SGS 3% TA 2% AGT 2% CFT : Call for Tender RT: Restricted Tender RFQ : Request for Quotation SGS : Single Source TA : Task Agreement AGT: Agreement CFT 87% Page 25

IO Global Marketplace In 2010 (as of the end of November): 630 contracts signed with suppliers from all Members Countries, 190M total contracts value. Evolution of the total value of the contracts signed since 2008 250 200 150 5.4 4.7 4.7 2.8 100 50 0 M 7.1 7.3 50.4 190 159.8 Contracts POs TAs 2008 2009 2010 (as of 11/2010) Page 26

Practical Tips for Potential Suppliers Registration on line on IO web site: Identification of the suppliers per business activities, ~ 400 suppliers registered since September 2009, No prequalification at this stage, www.iter.org Procurement / General information / On-Line Registration Point of contact: iopcd@iter.org Maintain normal marketing activities and regularly scan procurement information available on the IO and DAs websites. Page 27

Thank You Page 28