Distribution Code Definitions

Similar documents
South African Distribution Code

Distribution System Operating Code

Distribution Information Exchange Code

GUIDELINES ON ELECTRICITY RESALE

A summary of the MYPD3 application and the proposed tariff restructuring plan

Price Application Policy ABN

RATE DS-4 LARGE GENERAL DELIVERY SERVICE

EMBEDDED GENERATION: THE CITY POWER EXPERIENCE

Customer Capital Contributions Policy

Independent Power Producers (IPPs)

CONTENTS 1. INTRODUCTION POLICY CONTENT...

TRANSMISSION COMPLIANCE MONITORING FRAMEWORK FOR THE SOUTH AFRICAN ELECTRICITY INDUSTRY

Pass Through Costs for Business Electricity Customers from 1st October 2017

Strategic Direction for Eskom s Retail Tariffs 2011 onwards

Distributed Generation (DG) Connection Standard

ROLE OF THE NATIONAL ENERGY REGULATOR (SOUTH AFRICA) Lambert du Plessis: Senior Regulatory Specialist

PacifiCorp Renewable Portfolio Standard Oregon Implementation Plan 2011 through 2015

Lesotho Electricity Authority. Rural Electricity Quality of Service and Supply Standards

The South African Grid Code

George Ferreira Ex-ED, Electricity and Energy Nelson Mandela Bay Municipality Port Elizabeth, South Africa

The South African Grid Code. Preamble

Alan Tait Managing Director Pragma Africa

Principles of cost recovery: electricity tariff design

Non Registered Embedded Generation Information Pack

Eastland Network Limited. Pricing Methodology Disclosure

METHODOLOGY STATEMENT DETAILING THE BASIS OF CHARGES FOR CONNECTION TO SP DISTRIBUTION LTD S ELECTRICITY DISTRIBUTION SYSTEM

Wellington Electricity Lines Limited

Energex. Tariff Structure Statement. 1 July 2017 to 30 June Energex s Tariff Structure Statement

KOSOVO ENERGY CORPORATION J.S.C. TARIFF APPLICATION FOR 2010

Pursuant to the Electricity Distribution Information Disclosure Determination 2012

Electricity Industry Act Electricity Distribution Licence Performance Reporting Handbook

Distribution Pricing Methodology Disclosure

CONSULTATION PAPER COST OF SUPPLY FRAMEWORK FOR LICENSED ELECTRICITY DISTRIBUTORSIN SOUTH AFRICA

Demand Response Availability Data Systems Definitions

Newmarket-Tay Power Distribution Ltd. NT POWER COS Conditions of Service. Issue Date: July, Next Review Date: February, 2015

Proposed rationalising of Eskom tariffs to Municipalities

GENERAL SERVICE GAS SCHEDULE C

Meter and billing auditing of commercial and industrial electricity customers in a Metro Municipal Electricity Utility

Executive Summary. Transition to Time of Use Pricing

ANNEXURE 4 DRAFT REVISED CONSUMPTIVE TARIFFS, RATES AND BASIC CHARGES FOR ELECTRICITY SERVICES, WATER SERVICES AND WASTE MANAGEMENT SERVICES

Title of presentation

GUIDANCE PAPER: CALCULATION METHODOLOGY FOR DISTRIBUTION LOSS FACTORS (DLFs) FOR THE VICTORIAN JURISDICTION

Pricing Methodology: 1 April 2017

MASSACHUSETTS ELECTRIC COMPANY NANTUCKET ELECTRIC COMPANY TARIFF FOR BASIC SERVICE

Tariffs January 1, 2017

Pricing and the tariff

DISCLOSURE OF DISTRIBUTION PRICING METHODOLOGY APPLICABLE FROM 1 APRIL 2017

Gas Transmission Charging Methodology Statement. Gas Year 2016/17

Eskom Revenue Application. Multi-Year Price Determination (MYPD 4) FY2019/ /22

Gas Transmission Charging Methodology Statement. Gas Year 2017/18

(2) isolated operation with standby service provided by the Company by means of a doublethrow

HOW TO READ YOUR ELECTRICITY BILL

NATIONAL ELECTRICITY RULES ELECTRICITY CONNECTION FOR RETAIL CUSTOMERS CHAPTER 5A. Page 615

Performance Reporting Criteria

Seminar on African Electrical Interconnection. Module 7 - Market Operational Structures

THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY TERMS AND CONDITIONS FOR ELECTRIC SUPPLIERS PAGE 1 OF 19

WIND TURBINES IN WEAK GRIDS CONSTRAINTS AND SOLUTIONS. J O G Tande and K Uhlen. SINTEF Energy Research, Norway SUMMARY

PERFORMANCE EVALUATION, MONITORING AND ASSESSMENT OF UTILITY COMPANIES, AND DEVELOPMENT OF KEY PERFORMANCE INDICATORS.

PJM Manual 27: Open Access Transmission Tariff Accounting Revision: 88 Effective Date: November 16, 2017

SERVICE CLASSIFICATION NO. 14-RA STANDBY SERVICE

Energex. Network Tariff Guide. 1 July 2018 to 30 June Energex s Network Tariff Guide

Solar PV User Guide for Generators

Revenue Enhancement Project Naledi Local Municipality. August 2016

Glossary of Terms Used in Reliability Standards. Preliminary Draft Version 0 Reliability Standards September 1, 2004

SUSTAINABLE GREEN ELECTRICITY FOR RURAL DEVELOPEMNT IN TANZANIA

ELECTRICITY SUPPLY - POWER QUALITY AND RELIABILITY Code of Practice

APPLICATION FOR A GENERATOR AND A SUPPLY CONNECTION AT THE SAME POINT OF SUPPLY TO THE ESKOM NETWORK. Revision September 13 July 2016

DISCUSSION PAPER ON THE DECOMMODIFICATION OF ELECTRICITY

Energy Storage Application definitions and how these relate to the South African EDI policy, legislation and regulation:

POWERNET LIMITED LINE PRICING METHODOLOGY

Uncontrolled Document when printed. Refer to internet for latest version. Disclaimer refer

Proposed Tariff Structure Statement

CEOP CONNECTION POLICY CONNECTION CHARGES. 1 July 2015

Wellington Electricity Lines Limited

AGREEMENT FOR CONNECTION TO [EASTERN /LONDON / SOUTH EASTERN] POWER NETWORKS PLC S DISTRIBUTION SYSTEM

ELECTRICITY SERVICES QUALITY STANDARDS DIRECTIVE No. 2/2005. DRAFT awaiting approval

Residential and Farm Customer Guide

EVOENERGY 2017/18 STATEMENT OF TARIFF CLASSES AND TARIFFS

)(ewura. Energy and Water Utilities Regulatory Authority. In the matter of Application by the TANZANIA ELECTRIC SUPPLY COMPANY LTD

Annual Pricing Proposal

Distribution Value Added

Walk through the Eligible Customer Regulation. Dr. Seun Amoda

Solar PV User Guide for Residential Consumers

Statement of Use of System Charging Methodology for. Western Power Distribution (South Wales) plc. (April 2008)

Distribution - Reset RIN, Basis of Preparation

PIPED-GAS REGULATION FEBRUARY 2017

TECHNICAL INDICATOR DESCRIPTIONS 2012/ /15

ALSTOM Transmission & Distribution, Protection & Contrôle

Preventing load shedding/black out in Distribution feeders by curtailing load/brown out.

Stakeholder Comments Template Review TAC Structure Stakeholder Working Groups

THE DISTRIBUTION SYSTEM SECURITY AND PLANNING STANDARDS. Asset Management & Regulation, ESB Networks

(4 November 2016 to date) ELECTRICITY REGULATION ACT 4 OF 2006


Pricing Methodology: 1 April 2014

8.1. GENERAL RULES OF CAPACITY BOOKING

NEPRA. (Supply of Electric Power) Regulations, 2015 (:)

POWERLINK COST ALLOCATION METHODOLOGY

Counties Power Limited

Impact of localised Energy Efficiency (EE) and Renewable Energy (RE) on City of Cape Town s finances over the next 10 years Report.

Solar Rooftop PV Municipal regulation, application, approval etc. processes. GIZ - All rights reserved

Transcription:

Distribution Code Definitions Version 5 Approved September 2007 Comments to this document can be forwarded to: RSA Grid Code Secretariat Attention: Mr. Bernard Magoro Eskom, Transmission System Operator P.O Box 103, Germiston 1400 Tell: +27 (0)11 871 2774 Fax: +27 (0)11 871 3238 Mobile: +27 (0)83 292 2876 Email: bernard.magoro@eskom.co.za

Abnormal operating conditions Operation under abnormal conditions shall comprise all conditions deviating from normal operation. Administration charge Periodic charges to cover the cost of the administration of the account payable irrespective of whether or not electricity is consumed, for example meter reading and billing costs. Note: this may include meter capital costs Administrative losses Administrative losses shall include meter-reading errors and any unbilled energy resulting from billing system operational errors. Applicant Potential user intending to connect to the Distribution system. Connection agreement An agreement detailing the conditions under which the Distributor intends to connect the customer. This agreement specifies the conditions applicable to an end use customer or any other connection such as an embedded generator. This agreement is entered into after the offer to connect is accepted by the customer. Connection charge A charge recouped from the customer for the cost of providing new or additional capacity (irrespective of whether new investment is required or not). This is recovered in addition to the tariff charges as an up-front payment (connection fee) or as a monthly charge where the distributor finances the connection. Connection fee Minimum upfront contribution to the allocated connection costs (connection charge) payable by the customer Control and operating facility A Distributor s facility responsible for the operational control of electricity distribution network assets. Cost of supply Study Standard procedure for deriving and allocating costs for the design of tariffs. This does not include determining the connection charge. Cross-subsidy / Cross-subsidisation. Over-recovery of revenue from customers in some tariff classes whether intentional (e.g. electricity levies) in order to balance the under-recovery of revenue from customers in other tariff classes (i.e. electricity subsidies) as informed by the cost of supply study or unintentional by way of un-identified surcharges Customer / user A person or legal entity that has entered into an agreement with a Distributor for the provision of distribution services. An entity may be an Embedded Generator, another Distributor, an end-use customer (including generators), an international customer, a retailer or a reseller. Customer service charge A charge designed to recover the cost of providing services to customers. May include administrative charges depending on the tariff structure. Customer Connection information guide A document prepared and published by the Distributor which contains all information regarding an application to connect to the relevant Distributor network. Page 2 of 7

Customer interruption cost This is the cost (in R/kWh) to customers due to interruptions of supply. Dedicated Assets / Dedicated Network That portion of the network which is dedicated to a specific customer. Customer Dedicated Assets are assets created for the sole use of a customer to meet the customer s technical specifications, and are unlikely to be shared in the distributor s planning horizon by any other end-use customer. Demand Side Management (DSM) Technology or programme that encourages customers to modify patterns of electricity usage including timing and level of consumption. This includes conservation, interruptability and load shifting. Distribution charges The grouping of the use of the distribution system (DUoS charges) and the connection charge Distribution network The network owned and operated by a Distributor. Distribution system (DS) The network infrastructure operating at nominal voltages of 132kV or less Distribution system impact assessment studies Studies to model and assess the impact of connecting a customer load or an embedded generator on the Distribution System. Distribution Use of System (DUoS) charges Unbundled regulated tariffs charged by the Distributor to the distribution network services customers for making capacity available and for use of the distribution system. Distributor A licensee or its appointed representative that constructs, operates and maintains the distribution network, Domestic supply Supply taken by a customer occupying a residential dwelling Economic Cost Total cost of the electricity related investment to both the Distributor and the customer(s). Economic evaluation The project benefits and return, including both the Distributor s and the affected customer s costs related to electricity infrastructure. Embedded generator A legal entity that operates one or more unit(s) that is connected to the Distribution System. Alternatively a legal entity that desires to connect one or more unit(s) to the Distribution System. End-use customer Users of electricity connected to the Distribution System. Energy charges Charges designed to recover the costs of electrical energy. Excluded services Services requested by customers that are excluded from the regulated activities and funded directly by the customer requesting the service. Page 3 of 7

Financial evaluation The project benefits and return over the life cycle of the project Firm supply A Distribution supply that can withstand any single (n-1) contingency within the Distribution network, e.g. the customer supply shall not be dependent on any single component. Forced outages Occurs when a component is taken out of service immediately, either automatically or as soon as switching operations can be performed as a direct result of abnormal operating/emergency conditions or human error. Generator A legal entity that operates one or more units that supply power to the Transmission System High Voltage (HV) Nominal voltage levels equal or greater than 44 kv up to and including132 kv (Check IEC definition) Information Owner The party to whose system or installation the information pertains. International customers Customers who are situated outside the borders of the Republic of South Africa and supplied by the Distributor as defined in this Code. Interruption (of supply) An interruption, not requested by the customer, of the flow of power to a point of supply for a period exceeding 3 seconds. Least-economic cost The lowest value of the sum of the life cycle costs to both the Distributor and the customer related to various options for the supply of electricity. Least life cycle costs The lowest sum of all cost categories from installation to decommissioning when evaluating the different investment alternatives for the supply of electricity. Licensee A legal entity licensed by the NERSA in terms of the Electricity Regulation Act to provide the electricity distribution and / or trading services Losses Refers to energy for which the Distributor does not recover revenue. Losses include Technical losses, non-technical losses and administrative losses. Low Voltage (LV) Nominal voltage levels up to and including 1 kv. Metering Installations All meters, fittings, equipment, wiring and installations, used for measuring the flow of electricity. Metering service provider A legal entity contracted by the Distributor to provide metering services. Medium Voltage (MV) Nominal voltage levels greater than 1 kv and less than 44kV Page 4 of 7

National Transmission Company (NTC) The South African legal entity licensed to execute the national transmission responsibility. It consists of a System Operator and a National Transmission Network Service Provider. National Energy Regulator of South Africa (NERSA) A legal entity established in terms of the National Energy Regulator Act (Act 40 of 2004) to regulate the electricity supply industry in South Africa Network Electrical infrastructure over which electrical energy is transported from source to point of consumption. Network charges Charges designed to recover costs (including capital, operations, maintenance and refurbishment) associated with the provision of network capacity required by and reserved for the customer which may or may not be unbundled. Network service customers Customers receiving only a network service from a Distributor Non-technical losses Losses due to theft of electrical energy and errors due to inaccuracy of meters and administrative losses. Normal operating conditions An operating condition where the system frequency, voltage and equipment loading are within their statutory, contractual and/or design limits and no network component on the relevant part of the Distribution System is out of service due to a forced outage. Offer to connect A quotation issued by the Distributor to the applicant indicating the technical and commercial conditions upon which a connection agreement can be entered into. Participant A legal entity registered with or licensed by the NERSA in terms of the Electricity Regulation Act. Participants of the Distribution Code are defined as the following entities: Embedded generators Generators Traders / retailers Resellers Distributors Transmission network service providers The System Operator End use customers Planned outages An outage of equipment that is requested, negotiated, scheduled and confirmed prior to the maintenance or repairs taking place. Point of common coupling (PCC) The electrical node where more than one customer is connected. Point of connection / connection point The electrical node on a distribution system where a customer s assets are physically connected to the Distributor s assets. Point of supply Physical point on the electrical network where electricity is supplied to a customer. Page 5 of 7

Power factor Ratio of the RMS value of the active power (kw) to the apparent power (kva), measured over the same integrating period Power Station Supply A supply of power to the plant of a generator or embedded generator, that is separate and independent of the network into which it normally supplies the power that it generates. This supply could be from the Distribution System or the TS. Premium supply / premium connection Where the customer s requirements exceed the specifications of a standard supply. Quality of supply Technical parameters that describe the electricity supplied to customers according to NRS048 standard and any other NERSA prescribed requirements. Reliability A measurement of the continuity of supply. Service provider An entity providing a contracted or licensed service Standard connection charge The connection charge associated with the costs of providing a standard supply (see also monthly repayment of required capital contribution where the utility provides a customer with financing, for a standard supply). Standard connection / standard supply A standard connection is defined as the lowest life-cycle costs design that meets the specifications in terms of Quality of Supply and technical performance standards System Operator (SO) The legal entity licensed to be responsible for short-term reliability of the IPS, which is in charge of controlling and operating the TS and dispatching generation (balancing the supply and demand) in real time. Tariff A combination of monthly charges. each at a particular rate, that are usually escalated annually and are applied to recover the costs of measured quantities such as consumption and capacity and the costs of unmeasured quantities such as customer service and administration. Tariff structure The makeup of the tariff that contains all the components of price and the relationship to consumption and demand Technical Losses Losses intrinsic in transporting electrical energy (that is, heating and no-load losses etc.) Trader A legal entity licensed or registered to engage in the buying and selling of electricity as a commercial activity. Transmission Network Service Provider A legal entity that is licensed to own and maintain a network on the Transmission System (TS) Unit A turbine alternator and all the related equipment, including the step-up transformer, operated together to produce electricity. Page 6 of 7

User See customer SPECIFICATIONS NRS047: Electricity supply quality of service NRS048: Quality of supply NRS057: Code of practice for electricity metering NRS058: Cost of supply NRS069: Code of practice for the recovery of capital costs for distribution network assets NRS071: Automated meter reading for large power users NRS076: Guide for safety in AC substation grounding NRS082: Asset Maintenance NERSA Power Quality directive ABBREVIATIONS DS: Distribution System NRS: National Rationalised Specifications LV: Low Voltage MV: Medium Voltage HV: High Voltage NERSA: National Energy Regulator of South Africa NTC: National Transmission Company TNSP: Transmission Network Service Provider TS: Transmission System SO: System Operator SANS: South African National Standards Page 7 of 7