Application for resource consent Form B Damming and diversion of water

Similar documents
FORM B: DAMMING AND DIVERSION OF WATER

Form B Farm dairy wastewater discharge

FORM B: ONSITE DISCHARGE OF TREATED EFFLUENT

Form 1: Application for resource consent

FORM B: SWING MOORINGS

Part B Assessment of Environmental Effects. Earthworks (Minor Effects) Consent No.:... Earthworks (Minor Effects) AEE 6

Temporary Watercourse Crossing: Culverts

Filter Tube Barriers (Instream)

Temporary Watercourse Crossing: Fords

E2. Water quantity, allocation and use

No. 6 December, Wisconsin s Forestry Best Management Practices for Water Quality Forest Roads

Temporary Stream Crossing

Temporary Stream Crossing

FLOODPLAIN PERMIT APPLICATION SUBMITTAL REQUIREMENTS

E7. Taking, using, damming and diversion of water and drilling

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual

13 Land Use Activities and Indigenous Biological Diversity

APPLICATION FOR LANDUSE RESOURCE CONSENT

Modular Sediment Barriers (Instream)

Water Resources Management Plan

Created by Simpo PDF Creator Pro (unregistered version) Asst.Prof.Dr. Jaafar S. Maatooq

Summary of Relief Sought by Transpower New Zealand Limited

Massachusetts River and Stream Crossing Standards: Technical Guidelines

14 NATURAL HAZARDS Background Resource Management Issues

These potential changes and their implications are outlined in Annex 1.

ILLINOIS URBAN MANUAL PRACTICE STANDARD TEMPORARY STREAM CROSSING (no.) CODE 975. Source: Hey and Associates, Inc.

The Streamkeepers Handbook

Appendix 11. Erosion and Sediment Control Management Plan. Appendix 11

APPLICATION FOR CHANGE OR CANCELLATION OF RESOURCE CONSENT CONDTION

Flow Control No Channel Flow Dry Channels Erosion Control Low Channel Flows Shallow Water Sediment Control High Channel Flows [1] Deep Water [2]

D EROSION AND SEDIMENT CONTROL. Table of Contents

COTTON CREEK CULVERT REPLACMENT

Suggested Stormwater Management Practices For Individual House Lots

Bridge Planning Updates. Bridge Planning Practitioners Workshop April 2012

WI-ENV-PER-0013 GROUND DISTURBANCE PERMIT

DOORNVALLEI EXT 5 & 6

Data Collection Site Information

STATE OF MISSOURI CLEAN WATER ACT SECTION 401 WATER QUALITY CERTIFICATION 2012 GENERAL AND SPECIFIC CONDITIONS

CHAPTER 3 Environmental Guidelines for WATERCOURSE CROSSINGS GOVERNMENT OF NEWFOUNDLAND AND LABRADOR DEPARTMENT OF ENVIRONMENT AND LABOUR

Use of WARSSS in Stream Restoration and Watershed Planning. Michigan Aquatic Restoration Conference 2015

Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw

Beds of Water Bodies 14 September 2017

Flow Diversion Banks: General

PART 1 GENERAL REQUIREMENTS

The Construction General Permit and Erosion Prevention and Sedimentation Control

A. INSTRUCTIONS (Please print or type all answers)

Habitat Assessment. Summary. Background. Chicago River Field Trip Activity

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1]

Tips with Creation of your Erosion and Sediment Control Plan

Dry Swale Wet Swale Grass Channel Dry Well Permeable Pavement Bioretention DESIGN ELEMENTS

Appendix 16 - Erosion and sediment control guidelines for earthworks

Stormwater Management System Project Review

TIMBER PLANTATIONS (HARVEST GUARANTEE) REGULATION 1997 under the TIMBER PLANTATIONS (HARVEST GUARANTEE) ACT New South Wales

Chapter 2 Site Selection

PART C APPLICATION OF EROSION AND SEDIMENT CONTROL PRACTICES

Appendix 14-I Description of Stream Crossing for Electrical Interconnect

Town of Friday Harbor PO Box 219 / Friday Harbor / WA / (360) / fax (360) /

The Role of Pervious Paving in Meeting the Requirements of the Auckland Unitary Plan

Pahiatua Waste Water Treatment Plant Wetland Erosion and Sediment Control Plan (ESCP)

NS-5 CLEAR WATER DIVERSION. Objectives

Public Information Centre September 19 th, 2017

GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN WATERBODIES AND ON WATERBODY BANKS

Construction Site Inspections

Formal Annual Inspection It is recommended that you customize this form to fit your dam. Pre-Inspection Information

EROSION CONTROL GENERAL NOTES EC JAN 2017 C.B.

Appendix 16 Erosion and sediment control guidelines for earthworks

Ponds. Pond A water impoundment made by excavating a pit, or constructing a dam or an embankment.

Last amended 3 May 2011 Earthworks Operative 27/07/2000

PART 5D - NATURAL HAZARDS

Application Form for the Transfer/Release of Grass Carp and/or Silver Carp

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014

1 General questions on zone and catchment management plans

R I Freshwater Wetlands Buffer Zones

City of Texarkana, Arkansas. Storm Water Pollution

Asst.Prof.Dr. Jaafar S. Maatooq. 1 st Semester HYDRAULIC STRUCTUER, KINDS & FUNCTIONS 1 of 26

Permit Application: Soil Erosion and Sediment Control Program

LOCATION AND DESIGN DIVISION

Thinking about developing or building on land with ponding or drainage issues?

CCSD#1 Stormwater Standards

14 NATURAL HAZARDS Background Resource Management Issues

14 NATURAL HAZARDS Background Resource Management Issues

Implementation Plan and FAQs for the Guide to Water Act Authorizations Required for Dugouts, Borrow Pits and other types of Pits/Excavations

Mike Jastremski, CFM Watershed Conservation Director

Prepared by Christchurch City Council, P.O. Box 73013, Christchurch. Submission by Avon-Ōtākaro Network, 9 Stable Way, Christchurch 8051

Oatka Creek Stream Stabilization and Habitat Restoration Project Narrative

COFFERDAM (no.) CODE 803

SH3 Awakino Tunnel Bypass. Assessment of Environmental Effects Stormwater

CLOCA Rural & Agricultural Guide to Permits

Surface Water Management Procedure Environment

GUIDE TO THE CODE OF PRACTICE FOR WATERCOURSE CROSSINGS, INCLUDING GUIDELINES FOR COMPLYING WITH THE CODE OF PRACTICE

PLEASE RETURN TO MELBOURNE WATER CORPORATION. Melbourne Water Corporation PO Box 4342 MELBOURNE VIC 3001

Honeysuckle Reservoir decommissioning

CITY OF SPRING HILL Water Quality Buffer Zone Policy (Adopted April 22, 2008)

Filter Socks Used for Sediment Management

TOWN OF SMYRNA Water Quality Buffer Zone Policy

iv) Alberta fish weirs

[] The Red Cedar River and its Streams (Fall 2001)

Code of Practice for Watercourse Crossing

10(a) Bridge and culvert design information

Contents. LM Land Management 1. Issues 1. Objectives 4. Policies 4. Methods of Implementation 5. Rules 8. Land Management 14 September 2017

Transcription:

Application for resource consent Form B Damming and diversion of water Notes Resource use activities must meet all the conditions of any relevant Permitted Activity Rules in the Waikato Regional Plan or a resource consent from the Waikato Regional Council is required. This form will help you apply for a resource consent. You must fully complete this activity form and supply all the required information. Provide as much detail as you can where the questions are relevant to your activity. We request that, where possible, you provide electronic copies of any supporting information (for example, on CD). Doing so may reduce administrative costs charged to you. Office use only File No: Client ID: Project: You must also supply completed Forms A and C. You must pay the required initial deposit when you submit this consent application. Failure to provide the required information and payment will delay the processing of your application. If you do not provide adequate information then we will not be able to process your application, and will return it to you. If you do not pay the required fees, we may stop processing your application until payment is received. If you need any further help, please phone our resource use staff on 0800 800 402. Location 1 2 What is the name of the waterbody to be dammed or diverted? (if the waterway is a drain or an unnamed stream, then what is the name of the stream, river, lake or wetland that it flows into) If known, please supply relevant map coordinates of the activity or activities, preferably as New Zealand Transverse Mercator 2000 (NZTM2000 references). These locations must also be clearly identified on the location map you have supplied with Form A 23 Types of resource consent sought The resource consents sought relate to the following activities (please tick) Please tick Dam Weir Streambed diversion Stopbank or other diversion Previous consent number #S2703-06/11 Waikato Regional Council, 401 Grey Street, Private Bag 3038, Waikato Mail Centre, Hamilton 3240. Phone our enquiries officer on 0800 800 402. www.waikatoregion.govt.nz

Nature of the proposal Include with this application form labelled photographs of the site in its present form which include: any existing structures at the site the view of the waterway downstream of the site the view of the waterway upstream of the site for existing dams: upstream batter, downstream batter and crest for diversions: the stream and its banks where it will be affected by the works. 4 Please describe the purpose of the dam, weir or diversion. 5 Please describe the general design of the structure or works required in the watercourse, the materials to be used, and the construction methods to be employed, what compaction will be undertaken, for example. If there are engineering plans of the proposed structure or plans of the works please enclose a copy with the application. Please include your own diagram on a separate page, if this will assist in describing the proposal, and attach it to this application form. 6 Have any alternatives been considered when planning the proposal? Yes, please explain No 7 Please describe the current nature of the waterway at the proposed site for the works. Water colour/clarity Flow Bed material (for example, rocky, silty) Bank material Vegetation Erosion Fish/invertebrate life Other 2

8 9 What is the catchment area upstream of the proposed location for the works? (If unknown then please ensure that the location of the dam is marked clearly on an enclosed plan or map.) ha/acres/km 2 (circle the units you use). Please describe the extent of tracking to be undertaken in relation to this proposal: (Note: if the tracking works are significant, or on steep or erosion prone land, then an additional application may be required for a landuse consent please contact staff of the resource use group to confirm your requirements.) 10 Please describe the extent of vegetation removal to be undertaken in relation to this proposal: (Note: if vegetation removal works are significant, or contain a significant area of indigenous vegetation, or will be on steep or erosion prone land, then an additional application may be required for a land use consent please contact staff of the resource use group to confirm your requirements.) Dams 11 Please fill in the dimensions shown on the diagrams in the lists below (if the dam design is different from that shown below please include a diagram showing all dimensions). Overflow pipe Water level 1 Downstream batter width m 2 Crest width m 3 Upstream batter width m 4 Downstream batter height m 5 Over flow pipe height m 6 Upstream batter height m 7 Dam base width m 8 Depth dam is to be keyed into the ground m 3

11 9 Overflow pipe Water level 10 9 Length of the pond behind the dam m 10 Average depth of the pond m 11 Diameter of overflow pipe m Other dimensions not shown on the diagrams 12 Crest length m 13 Spillway width m 14 Spillway depth m 15 Spillway inlet height m 16 Spillway gradient (slope) m 17 Spillway surface material (for example, rocks, grass) 18 Average width of the pond behind the dam m 19 Volume of water retained by the dam m 3 If dam height is greater than 3 m or retains more than 20,000m 3 then a building consent may also be required. Please contact the Waikato Regional Council s staff if this is the case. 12 What is the source of water for the dam? ground water (that is, spring) surface water (that is, stream OR captured rainwater runoff) 13 If surface water: is the dam or is the waterway or in stream (the full flow of a stream passes into the dam and over the dam spillway) off stream (part of a stream is diverted into the dam and may be returned back to the stream after the spillway OR surface rainwater runoff is captured in the dam then discharged) perennial (flows all year round) ephemeral (flows only intermittently or when there is rain). 14 How will fish get past the dam? Please describe (for example, fish pass, diversion, climbing surface). 15 What material(s) is the dam made of (or to be made of)? 16 What is the design life of the dam? years. 17 Is the dam: existing to be built 4

Stopbanks 18 What material(s) is the stopbank made of (or to be made of)? 19 What is the design life of the stopbank? years. During what size storm is the stopbank designed to overtop? (for example, a 1 in 50 year storm) 20 21 What is the proposed length of the stopbank? m. Draw a cross section diagram of the stopbank and show all dimensions including: Height Distance from stream banks Stream bank levels Batter slope Width Annual flood water level Stream bed level 22 Is the stopbank: existing to be built 5

Maintenance and mitigation of dams and stopbanks Form B Damming and diversion of water A Existing dams and stopbanks 23 24 When was the dam/stopbank constructed? Describe the maintenance programme for the dam/stopbank: (Note: the following aspects of a dam should be checked at least annually: green cover, erosion, any stock or vehicle damage, whether crest levels have consolidated, seepage any seepage problems should be further investigated by an engineer.) 25 How will stock be prevented from access to the structure and its banks, batters and/or spillway? Please describe: 26 For dams only describe what plants exist, or are proposed, to provide shading over the water in the pond behind the dam? B New dams and stopbanks 27 28 29 When is construction of the dam/stopbank proposed to start? How long is it expected to take to complete the dam/stopbank? What instream excavations are required for the dam/stopbank? 30 Describe the proposed maintenance programme for the dam/stopbank: (Note: the following aspects of a dam should be checked at least annually: green cover, erosion, any stock or vehicle damage, whether crest levels have consolidated, seepage any seepage problems should be further investigated by an engineer.) 6

31 How will stock be prevented from access to the structure and its banks, batters and/or spillway? Please describe: 32 For dams only describe what plants will be provided for shading over the water in the pond behind the dam? (If planting already exists please describe.) Weirs 33 How will fish get past the weir? Please describe: 34 Please fill in the dimensions shown on the diagram in the lists below: (if the weir design is different from that shown below please include a diagram showing all dimensions.) Water level 1 Height of the weir m 2 Length of the water level increase behind the weir m 3 Average depth of the water level increase m Other dimensions not shown on the diagram 4 Natural width of the stream at the weir m 5 Natural average depth of the stream m 6 Design life of the weir yrs 7 Material(s) to be used for the weir 8 Volume of water retained by the weir m 37 Will the stream need to be temporarily diverted during construction and placement of the weir? Please describe: 7

Streambed diversion 38 39 40 41 42 What is the proposed commencement date of the diversion? How long will the diversion works take to complete? What is the length of the existing stream to be diverted? What is the length of the new stream path to be constructed? m. Describe the material that is proposed for the bed and banks of the diverted length of the waterway. 43 Draw a plan diagram in the box below of the location of the stream including the existing stream in relation to the proposed diversion, showing location of any meanders and planting proposed (alternatively enclose with the application an appropriately marked plan with these details). Please indicate all dimensions on the diagram. 8

62 44 Show a cross section of the existing stream bed and banks including the bank slopes and depth, width between stream banks, for example. Show a cross section of the existing stream bed and banks including the bank slopes and depth, width between stream banks, for example. Indicate all dimensions on the diagrams and show the relative heights of the existing stream bed and proposed stream bed 45 46 47 What is the flood flow volume of the stream at the point of the proposed diversion (if known)? m 3 /s From your observation of the site will the proposed stream diversion channel hold winter flows of the stream? Yes No 48 Please describe how the works will be carried out and the order that they will take place: (for example, will the diversion be constructed by firstly digging the new stream channel, and then diverting the stream flow through this channel when completed?) 49 During the construction of the diversion how will scouring of the bed and bank material be prevented? Please describe Please describe the provisions to be made to prevent stock access to the stream (for example, fencing): 9

Assessment of environmental effects and mitigation measures Form B Damming and diversion of water 50 Water quality Construction of structures in, over, or near a waterway, or diversion of a waterway, have the potential to affect water quality. Contamination can come in the form of sediment runoff, stream bed disturbance, building debris, machinery fuels and other objects or chemicals entering the waterway. This can affect the waterway in a number of ways including the uses that the water is suitable for, fish migration and other aquatic life and their habitats. What are the actual and potential effects of your proposed activity in terms of water quality and how do you propose to avoid or minimise these effects? Exposure of bare soil from vegetation clearance and excavation works associated with construction/diversion may result in runoff of sediment to the waterway when it rains. What works or methods are proposed to minimise and control sediment runoff? Dams can have adverse effects on the flow of a waterway under low flow conditions due to evaporation unless the dam is off stream or a residual flow is maintained. Slowing of water flows and increasing the area of water by dams can have the effect of raising the temperature of the water unless trees and other vegetation are provided to shade the water. For dam proposals only what are the actual and potential effects of your proposed activity in terms of low flows and how do you propose to avoid or minimise these effects? 10

51 69 Machinery Machinery in or on the banks of a waterway have the potential to affect the waterway in many ways. Contamination can arise from sediment, fuel and other chemicals entering the waterway. Banks can be eroded by heavy machinery and wildlife habitat can be destroyed by its operation. (Note: if the works are significant in terms of the machinery required then a management plan for the use of machinery during the works may be required as part of the consent.) Describe the extent to which machinery is required to undertake your activity and whether machinery is to enter the waterway. How do you propose to minimise the effects of machinery near or in the waterway? 52 Fish Placement of structures in a waterway have the potential to affect the passage of fish past a structure due to alterations in water flow and physical barriers to fish passage both up and down stream. For dam and weir proposals only what are the actual and potential effects of your proposed activity in terms of fish passage and how do you propose to avoid or minimise these effects? Fish and their habitats can be affected by diversions. It is important that a diverted section of a stream has meanders (corners and curves), pools and riffles and that the gradient of the stream bed is not changed as increased flows can change the ecology of a stream. New stream banks require planting to provide shade, habitat areas and organic material as the primary source of energy for aquatic communities (and to provide bank stabilisation). For diversion proposals only what are the actual and potential effects of your proposed activity in terms of fish habitat and how do you propose to avoid or minimise these effects? 11

53 Erosion Placement of structures in the bed or banks of a waterway can cause or increase erosion due to changes in water flow velocities and water flow paths and through the removal of vegetation associated with the works. What are the actual and potential effects of your proposed activity in terms of erosion and how do you propose to avoid or minimise these effects? 54 Neighbours and other people Other people may be affected by activities in a waterway such as dams and diversions. Effects can be changes in water flow velocities, restricted water flow causing upstream ponding or flooding, changes in water quality and effects on cultural, heritage and archaeological values. People may be particularly affected if they take water downstream or use the water recreationally. See the consultation section of this application form all affected or potentially affected parties must be consulted regarding your proposal. What are the actual and potential effects of your proposed activity in terms of effects on other people or groups and how do you propose to avoid or minimise these effects? 55 Other effects Are there any other actual or potential effects of your proposed activity and how do you propose to avoid or minimise these effects (for example, visual effects, other physical effects)? 12

Consultation Identify and consult with any parties that may be potentially affected by or interested in your activity This generally involves your immediate neighbours. It may also include local authorities, iwi and interest groups such as local recreational and care groups. If you are in doubt about who you should be talking to, then call the Waikato Regional Council s staff. Make sure you provide everyone with sufficient information that they can fully understand what it is you want to do and how they may be affected by it. This could include a copy of this application form once it is completed and and/or any plans or maps. Make sure you make yourself available to explain the application, answer any questions and discuss options for resolving any concerns. 56 Identify the parties that may be potentially affected by or interested in your activity and consent application Party details/relationship (such as neighbour, local iwi, interest group) Contact person Postal address Phone number/s Home: Business: Mobile: Fax: Party details/relationship (such as neighbour, local iwi, interest group) Contact person Postal address Phone number/s Home: Business: Mobile: Fax: Party details/relationship (such as neighbour, local iwi, interest group) Contact person Postal address Phone number/s Home: Business: Mobile: Fax: 13

Other affected or interested parties 56 Provide details of your consultation Provide details about the consultation you have undertaken, or explain why consultation was not considered necessary. If possible you should provide written comment or approval from those you have identified. A consultation form is provided at the end of this form that will help you with this. Photocopy off a separate form for each party identified. Otherwise, make sure you let us know: who you consulted with how we can contact these people their relationship to you (for example, neighbour, local iwi, interest group) any concerns they may have about your activity, and how you intend to avoid or mitigate (lessen) these effects. Final checklist Have you? (please tick) Filled in all parts of this form (Form B) that are relevant to your activity, provided all the information required, and completed and attached any other related activity forms. Completed and attached Forms A and C. Applied for any district council consents that are also required for your proposal. Consulted with all interested and affected parties, and included their comments and/or written approval (if possible). Included or paid the required deposit fee for this application. 14

Consultation form Form B Damming and diversion of water Photocopy this form for each person or group to be consulted Applicant: Description of proposal: Person/group consulted in regard to this proposal Name of contact person: Contact phone number: Name of group (if appropriate): Postal address: Street address: Email address: Fax: Consulted party s views on the proposal (to be completed by person/group consulted) If you would like the Waikato Regional Council to know your views on the applicant s proposal, and/or if you consider you may be adversely affected, please indicate your views below (attach additional pages if necessary). Consider the following: how do you consider you will be affected? How would you like the applicant s proposal to be modified to take account of your views? What other comments do you have on the proposal that you would like the Waikato Regional Council to consider in making a decision on these resource consent applications? Applicant s response to views of consulted parties (to be completed by applicant) Please indicate how your proposal can be modified to take account of the views of the party you have consulted with (or why the proposal may not be able to be modified to take account of those views). Consulted party s response to the proposal (to be completed by person/group consulted). (Please tick one only) I/we give my/our approval for the proposal I/we do not give my/our approval for the proposal I/we are not affected by this proposal Signed: Date: Waikato Regional Council, 401 Grey Street, Private Bag 3038, Waikato Mail Centre, Hamilton 3240. Phone our enquiries officer on 0800 800 402. www.waikatoregion.govt.nz 15