Soil Volume Change Meter (PVC)

Similar documents
product manual H-4156 Mechanical Loading Press for CBR

H-4137 Instruction Manual

LABORATORY COMPACTION CHARACTERISTICS AND MOISTURE-DENSITY RELATIONSHIP OF SUBGRADE, EMBANKMENT SOILS, AND BACKFILL MATERIAL

Tex-113-E, Laboratory Compaction Characteristics and Moisture- Density Relationship of Base Materials

APPENDIX J PROFICIENCY CHECKLISTS

Commonwealth of Pennsylvania PA Test Method No. 106 Department of Transportation October Pages LABORATORY TESTING SECTION. Method of Test for

Commonwealth of Pennsylvania PA Test Method No. 106 Department of Transportation Revised May Pages LABORATORY TESTING SECTION

SPEEDY MOISTURE TEST. Equipment Needed: Complete speedy kit, No. 4 sieve, speedy chart, and sample of soil.

GC-X360S-W GC-X360S-B

Circular Expansion Cement Curing Kit Instruction Manual

MAKING, CURING AND TESTING CEMENT TREATED AND UNBOUND BASES (Kansas Test Method KT-37)

Infinity - Century Combination Installation Instructions Gelcoat & Solid Surface Bathware

ROOF MOUNT KIT OWNERS MANUAL

ROOF MOUNT KIT OWNERS MANUAL

STP Mount Series. Installation Manual. STP-LSCR-MAN 2017 Edition v1.0. For models: STP-SCR/045 STP-SCR/060 STP-SCR/070 STP-LCR/090 STP-LCR/120

FITNESS PLAYGROUND ITEM NO: 8010

HD Firewall Mount 850 all, S/V , C ipd #

FREEZING AND THAWING TESTS OF COMPACTED SOIL-CEMENT MIXTURE

Operator s Manual for Morse Mobile-Karrier for 55-Gallon Plastic or Steel Drum

OHD L-54 STANDARD METHOD OF TEST FOR MAKING, CURING, AND TESTING CEMENT-TREATED BASE FIELD SAMPLES

Model m x 1.98 m NPRM with Roof Pads For 1.2 m Antenna Systems

Instruction Manual HK285. Note: The Owner/Operator must read carefully and understand all the information presented here before operation.

CONCRETE TECHNOLOGY LABORATORY

LABORATORY COMPACTION CHARACTERISTICS AND MOISTURE-DENSITY RELATIONSHIP OF BASE MATERIALS

ODYSSEY FLOOR MODEL. Owner s Manual. O-6400-F shown rev 118

Assembly Instruction wedi Fundo Floor element

4 ft. and 6 ft. Downstream Defender Handling and Installation Instructions

FIXED CEILING COLUMN. Installation Manual FIXED CEILING COLUMN

Welding & Fabrication Tools Mini VaR Tool Kit

Tex-121-E, Soil-Lime Testing

MODEL 185R Kontrol-Karrier Operator s Manual for Morse Kontrol-Karrier

INSTALLATION MANUAL RECTANGULAR COLUMN

V 2.0 ASSEMBLY GUIDE. TS Platform Scale Series 2

GROUND MOUNT INSTALLATION MANUAL

SECTION CHAIN LINK FENCES AND GATES (PARK)

4-PIECE SHOWER WITH E-Z Pin INSTALLATION

Multi-Piece Shower with Trench Drain

Multi-Piece Shower with Trench Drain

Standard Test Procedures Manual

Tex-614-J, Testing Epoxy Materials

EMBANKMENT AND BASE WAQTC FOP AASHTO T 99 / T 180 (18) IN-PLACE DENSITY

For more information, call PERGO

OWNER S MANUAL SERIES MDS-96-BK, SM, DR

INSTALLATION INSTRUCTIONS

OWNER S MANUAL SERIES MDS-96-BK, SM, DR

66-Bin Wire Shelf Storage Rack

Construction Standard No: 8.3.3

Limerock Bearing Ratio Technician Training Course

Perry Fiberglass Products, Inc. LEADERS IN FIBERGLASS REINFORCED PLASTIC DUCT PRODUCTS

3ft, 4 ft., 6 ft., and 8 ft. First Defense HC Handling and Installation Instructions

Operator s Manual for Morse Kontrol-Karrier with Spark Resistant Parts and Air Power Tilt

Instructions for the use of the Link 4 Pallet Rack Lifter (PRL) model 5000

Precision Roller Pinion System Models RPS16, RPS20, RPS25, RPS32, RPS40 LINEAR MOTION CONTROL PRODUCTS FORM NO. L A-1204.

TESTING SINGLE-COMPONENT POLYURETHANE WATERPROOFING

Model Defibrillator Platform OPERATIONS/MAINTENANCE MANUAL. IMPORTANT Keep manual on file at all times.

LAHAINA. Lahaina Showerspa Model #1030 Installation Instructions

Pittsburgh Corning ProVantage Glass Block Installation System Assembly Instructions

Pallet Jack 4,400 Lbs Capacity Model #31001

Radiant PV-RoofTopRac System Planning and Installation With Australia AS/NZS1170.2:2011 AMDT

BESTMOVE STANDING TRANSFER AID

6032 SH 3P Residential Shower Installation Instructions Gelcoat & Solid Surface Bathware

Installation Instructions for SuperFast Hurricane

Model: LoLander Series Truck Scale Model: LL FT Model: LL FT Installation, Set-Up and Operation Manual

LUXURY VINYL GENERAL INSTALLATION INSTRUCTIONS FOR LOCKING FLOORING

OPEN SET SYSTEM. Easy-to-install Waterproofi ng Shower System. Installation guide

Assembly Instruction. wedi Fundo Primo Shower System

BioPrism Solid Surface

117-Bin Wire Shelf Storage Rack

Preparation and Installation of the FA, FAV, and FAS Type Rupture Discs in Forward Acting Insert, Full Bolted, and Union Type Holders

2 HP SIMPLEX GRINDER PUMPS

Model No. BWTDWFK-TRIFLO.

KEEP FOR FUTURE REFERENCE FORKLIFT ADAPTER FOR MRTA6 AND MRTA8 LIFTERS READ ALL INSTRUCTIONS AND WARNINGS BEFORE USING THIS PRODUCT

U-LAP. UTR-30 & UTR-70 Recipro Air Lappers Repair Manual. BORIDE Engineered Abrasives 2615 Aero Park Dr. Traverse City, MI

Regent Bar Stool - White Model # REGBST-W

Perry Fiberglass Products, Inc. LEADERS IN FIBERGLASS REINFORCED PLASTIC PIPE PRODUCTS

MASS PER CUBIC FOOT (METER), YIELD, AND AIR CONTENT (GRAVIMETRIC) OF FRESHLY MIXED CONCRETE (Kansas Test Method KT-20)

HIGUERA HARDWOODS SOLID STRAND WOVEN FLOORING PRE-INSTALLATION JOBSITE REQUIREMENTS

ENGINEERED WATERPROOF FLOORING GENERAL INSTALLATION INSTRUCTIONS FOR VÄLINGE 2G LOCKING FLOORING

MODEL GEK E3 Guard Enclosure Kit. Operator s Manual for Morse Guard Enclosure Kit Model GEK E3 for Can Tumbler Model E3

MODEL GEK E1 Guard Enclosure Kit. Operator s Manual for Morse Guard Enclosure Kit Model GEK E1 for Can Tumbler Model E1

SECTION SLUICE GATES

MERCEDES SPRINTER PARTITION INSTALLATION INSTRUCTIONS

A Collaborative Program of Arbor Day Foundation and Dimensions Educational Research Foundation. Tube Drums #7000. Assembly Instructions

High Temperature Aging Cell Instruction Manual

Site Preparation... 2

Universal Tactical Light

Standard Practice for Molding Roller-Compacted Concrete in Cylinder Molds Using a Vibrating Hammer 1

1-300 SERIES Endover Rotator Operator s Manual for Morse End-Over-End Drum Rotators Series

Mounting Screw. Channel Filler. Light Angle Adjustable Screw. LED Board Vertical stud and blocking Locking Nose. Driver.

Nexia 2-pk Gas Lift Barstool Stock # NEX2PGLBST-BE Black # NEX2PGLBST-RE Red

MODEL Operator s Manual for Morse MORSpeed TM Fork Mount Drum Handler Model Fork Mount Drum Handler

Operation and Maintenance Manual. Joyce/Dayton Metric Screw Jacks

Installation Manual. Foundations. Version 2

MODEL 285A-HD Heavy-Duty Forklift-Karrier Operator s Manual for Morse Heavy-Duty Forklift-Karrier Model 285A-HD

DEEP SOAK PRODUCT REQUIREMENTS. A. Product Requirements. B. Product Inspection. C. Clearance Requirements T01-A

KEEP FOR FUTURE REFERENCE MRT FORKLIFT ADAPTER READ ALL INSTRUCTIONS AND WARNINGS BEFORE USING THIS PRODUCT

King Portable Brinell Hardness Tester

Agilent G2615A Bar Code Reader

CA11 11 Column. Operator s Manual. To Purchase This Item, Visit BMI Gaming LIMITED WARRANTY

INSTALLATION INSTRUCTIONS MODEL THE CONTRACTOR SUMP BUDDY

Transcription:

05.11 product manual HM-2415 Soil Volume Change Meter (PVC)

General Information The HM-2415 Soil Volume Change Meter is used to evaluate potentially dangerous swelling or shrinking conditions existing in some clay soils used in residential and commercial developments. Severe damage to building foundations, walls, and floors can result when alteration of moisture in these soils causes volume change. This device yields PVC values which refer to the maximum possible volume change that a soil could undergo when subjected to changing moisture conditions. Easily operated, the HM-2415 includes: H-4454.010, 1,000 lb. (4.5 kn) capacity proving ring, mold assembly, loading cap, porous stones, loading pistons, 2-3/4" (70 mm) dia. specimen ring (HM-1220.70), and conversion charts. Related User Documentation Refer to The Character and Identification of Expansive Soils, a guide (FHA-701) published by the Federal Housing Administration, Washington, D.C., USA for a more complete explanation of the relationship between environment, moisture conditions, and expansive soils. Instructions in the use of the Soil PVC Meter are also contained in FHA Guide 595. Preparation of Sample A. Remove approximately one pint of soil from the soil layer in which the foundation will be placed. B. Air dry sample by breaking the soil into small lumps and leaving it in the sun for a few hours. C. For testing soil samples in moist or wet condition. See FHA guide 701. Use of Compaction Hammer A. Place the compaction hammer on the soil in the ring with the hammer sleeve vertical and the rubber handle at the top. Make sure that the sleeve of the hammer rests inside the rings so that the hammer does not damage them in falling. B. With one hand hold the sleeve in position. C. With the other hand grasp the rubber handle and pull it all the way up until it is stopped by the top of the sleeve; then drop the hammer by releasing the handle. This constitutes one blow, with the bottom of the hammer hitting the soil surface. D. Repeat pulling the handle to the top limit and dropping the hammer as often as prescribed for the particular test.

Compaction of Sample A. Disassemble the Soil Volume Change Meter. 1. Remove crosshead (#11 Figure 1) and proving ring (#2) by loosening hex nuts (#21) at top of each rod. The rods may remain screwed into the base (#1 0) but place the crosshead and proving ring where it will not be jarred during compaction. 2. Unscrew and put aside the lucite container (#18). Leave O ring (#22} in place. 3. Remove compaction ring (#15) and spacer ring (#16) by unscrewing the 3 bolts (#23) holding them to the base (#1 0). 4. Wipe equipment with clean cloth. B. Assemble meter for compaction. 1. Fit compaction ring (#15--the thicker ring) on base (#1 0) and align bolt holes with those in base. 2. Place spacer ring {#16) on compaction ring so the radial grooves are at top and align bolt holes with those in base. 3. Insert the 3 bolts (#23} through both the rings and the base and tighten firmly to base. C. Place soil sample in ring assembly in 3 layers of equal amounts, compacting each layer separately by use of the hammer. 1. Place 3 heaping teaspoonsful of sample in ring assembly and smooth lightly with hammer to firm up the surface before applying the blows. (This reduces the amount of soil "jumping" out of the mold during compaction.) 2. Place apparatus on a solid level floor. 3. Position sleeve of hammer 1/8" (3 mm) from soil and hold firmly against the inside of the spacer ring (#16). Be sure hammer sleeve rests inside rings so that hammer does not damage them in falling. Hold sleeve and hammer perpendicular and in line with supporting rods (#12). 4. Raise hammer to top of sleeve and let it fall free (not striking sides of sleeve). Space blows evenly over surface of sample by shifting hammer after each blow. 5. Repeat the process described in steps 1-4 for each layer, compacting the first two layers with 7 blows each. After compacting both the first and second layers, scratch the top surface of the layer with a knife to assure proper bond with the next layer.

6. Compact the last layer with a blows. After compaction, the last layer should extend approximately 1/4" (6.35 mm) into the spacer ring (#16). If it is significantly below this point, remove entire sample and recompact. D. Put assembly on table and remove the 3 bolts {#23). Rotate spacer ring (#16}, to break bond between ring and soil, and remove carefully from sample. Rotate compaction ring (#15), to break bond between base and soil, and remove ring with sample from assembly. E. Trim top of the sample in the compaction ring (#15) with a knife. 1. Hold knife against the compaction ring (#15) at all times during trimming to avoid dislodging sample. 2. Trim in a sawing motion, taking off only a small amount of soil at a time. Rotate the ring as you trim. Work from the edge toward the center. 3. When sample is almost level, do final leveling by drawing a metal straight edge over sample. 4. The final surface of the soil sample should be firm and smooth. Fill any voids by pressing additional soil into them with the knife or spoon. 5. Clean soil from base and from all holes in rings and base. With a toothpick or paperclip, remove soil in the groove of the spacer ring (#16) and from the holes in the spacer ring and the compaction ring {#15). Test Procedure The swell index test is essentially a measurement of the pressure exerted by a sample of compacted soil when it swells against a restraining force after being wetted. A. Place spacer ring (#16 Figure 1) on base (#10) with radial grooves on top. Align bolt holes with those on base. 8. Place thoroughly dry porous stone (#14) in spacer ring (#16). C. Pick up compaction ring (#15) containing sample, trimmed side up. Carefully turn upside down the compaction ring containing sample and place flush against porous stone in spacer ring (#16). D. Align bolt holes in the two rings. Move compaction ring (#15) with as little disturbance of sample as possible. Boll rings tightly to base. E. Place a dry porous stone (#14) on top of sample inside compaction ring (#15).

F. Replace lucite container (#18) onto base, screwing it tightly to ensure water seal. G. Place loading disc (#17) on porous stone (#14) with the center indentation at the top. H. Place crosshead (#11) with proving ring (#2) on the supporting rods (#12). (Be sure that the adjustable rod which extends down from the proving ring dial does not strike the cover.) Add washers and nuts, then tighten firmly. I. Set proving ring (#2) dial to zero by moving the band around the dial face. Tighten the dial with the screw next to the top or the band. Push up on proving ring dial to see that it appears to work properly. J. By loosening nut (#14), turn adjustable rod exactly into the center of the indentation on top of the loading disc (#17}. Be sure that the loading disc is centered exactly over the stone. Firmly tighten lock nut (#14) on adjustable rod. Be sure adjustable rod does not stick in loading disc. K. Again loosen nut {#14) to turn adjustable rod until dial reads one division past zero. Tighten lock nut (#14) firmly until adjustable rod has no play. L. Record the time and the proving ring reading. M. Add water to sample by squeezing from squirt bottle into the holes located at the top of compaction ring (#15) until water level in lucite container (#18) has covered the spacer ring (#16) and tops of the bolts. (This procedure is used to reduce the amount of air entrapped in the ring assembly and thus ensures that the sample has uniform access to water over its entire top and bottom surfaces.) N. Allow soil to expand until completely stabilized or for a maximum of 2 hours, then read proving ring dial. Interpretation of Dial Reading A. To obtain the approximate PVC category and plasticity index, take the reading from the proving ring dial directly to the table in Figure 5. Established on the basis of the swelling and shrinking behavior of the soil, the following categories of PVC have been established: PVC Rating Category Less than 2 Noncritical 2 to 4 Marginal 4 to 6 Critical Greater than 6 Very Critical

B. To obtain a more exact PVC category and plasticity index, refer to the tables prepared for your specifically calibrated unit. These tables (in pounds, kilograms, and newtons) are separately supplied with this manual. 1. To calculate the equivalent swell index value in pounds per square foot, take the reading from the proving ring dial and subtract the one division that registered on the dial prior to swell. 2. Use this number on the proving ring calibration table to find the load in pounds. 3. Calculate the equivalent swell index value in pounds per square foot by dividing the toad (in pounds) by the area of the specimen (.04164 SQ. ft.}. Example: Proving ring dial indicator reading less.0001" (1 div.) = 58 Corresponding load from proving ring calibration table = 200 lb. (This reading is for a fictitious proving ring.} Swell index value in lb./sq. ft. = 200. 04164 = 4803 lb./sq. ft. 4. Use the swell index values calculated as above in pounds/square foot on the graphs in Figure 3, figure 4, and Figure 5 for determining the PVC category and plasticity of the soil. Specifications Mold Assembly: Proving Ring: Includes porous stones and loading cap 1,000 lb. (4.5 kn) capacity; dial indicator Other Components: Loading pistons; compaction hammer Specimen Ring: Sample Size: Water Required: Charts: Dimensions: Weight: 2-3/4" (70 mm) diam. 10 teaspoons 5 oz. Convert readings to lbs./sq. ft. and then to PVC (Potential Volume Change) rating 7-1/4" diam. base x 15-1/2" h. (184 x 394 mm) Net 25 lbs. (11.3 kg)

Parts List Item Description Requred 1 Frame Pot. Vol. Change Meter 1 2 1 000 lb. Single Proving Ring 1 3 Standard Compaction Hammer (Not Shown) 4 Corundum Porous Stone 2 5 Proving Ring Adapter 1 6 ~-20 x 1 3/4 Soc.Hd.Cap Screw 1 7 Cleaning Rod 1 10 Base 1 11 Crosshead 1 12 Supporting rod 2 13 Adjusting Screw 1 14 Lock Nut 1 15 Compaction Ring 1 16 Spacer Ring 1 17 Loading Disc 1 18 Lucite Container 1 19 Washer 2 21 Hex Nut 5/8-11 Th'd - St'l 2 22 "O"Ring 4~1.0. X 4 3/4 0.0. X 1/8 1 23 5/16-18 x 2 Hex Hd. Scr. 3 1

Proving Ring Reading Figure 5 - Conversion Table TABLE FOR CONVERTING PROVING RING READINGS TO PVC CATEGORY AND APPROXIMATE PLASTICITY INDEX Swell Index (#/SF) PVC Category Plasticity Index (%) 5 775 0.8 8.5 6 925 1.0 9.5 7 1075 1.2 10.7 8 1250 1.4 11.7 9 1375 1.4 12.7 10 1550 1.8 13.8 10.8 1675 2.0 14.6 11 1700 2.0 14.8 12 1875 2.2 15.8 13 2025 2.4 17.0 14 2175 2.65 18.0 15 2350 2.85 19.0 16 2500 3.05 20.0 17 2675 3.3 21.5 18 2800 3.45 22.5 19 2975 3.7 23.8 20 3150 3.9 25.0 20.3 3200 4.0 25.5 21 3300 4.1 26.0 22 3450 4.3 27.5 23 3600 4.5 28.5 24 3775 4.75 29.8 25 3925 4.95 30.8 26 4075 5.15 31.8 27 4225 5.4 33.0 28 4375 5.55 34.0 29 4525 5.75 35.3 30 4700 5.95 37.0 30.2 4725 6.00 37.1 31 4850 6.2 38.0 32 4975 6.35 39.0 33 5125 6.5 40.4 34 5275 6.7 41.7 35 5425 6.9 43.4 36 5575 7.1 44.2 37 5725 7.25 45.5 38 5850 7.4 46.6 39 6000 7.5 48.0 40 6150 7.65 49.5 40.5 6225 7.7 50.0 Prepared by the Architectural Section, Federal Housing Administration Insuring Office, San Antonio, Texas

Warranty Humboldt Mfg. Co. warrants its products to be free from defects in material or workmanship. The exclusive remedy for this warranty is Humboldt Mfg. Co., factory replacement of any part or parts of such product, for the warranty of this product please refer to Humboldt Mfg. Co. catalog on Terms and Conditions of Sale. The purchaser is responsible for the transportation charges. Humboldt Mfg. Co. shall not be responsible under this warranty if the goods have been improperly maintained, installed, operated or the goods have been altered or modified so as to adversely affect the operation, use performance or durability or so as to change their intended use. The Humboldt Mfg. Co. liability under the warranty contained in this clause is limited to the repair or replacement of defective goods and making good, defective workmanship. Humboldt Mfg. Co. 875 Tollgate Road Elgin, Illinois 60123 U.S.A. U.S.A. Toll Free: 1.800.544.7220 Voice: 1.708.456.6300 Fax: 1.708.456.0137 Email: hmc@humboldtmfg.com Testing Equipment for Construction Materials HUMBOLDT www.humboldtmfg.com