Minnesota Healthcare Engineers Association, Fall Conference. Bob Dehler, P.E. Engineering Program Manager September 14, 2017

Similar documents
LIFE SAFETY 101. Architecture Interior Design Planning Sustainable Design

CODE ANALYSIS REPORT SECOND FLOOR

SUMMARY OF FIRE SPRINKLER REQUIREMENTS FOR ALTERATIONS TO EXISTING BUILDINGS 2015 I-Codes

Building Code 8 th Edition

&02.1. Level 3 Alterations. Level 3 Alterations shall comply with Sections & and &

Minnesota Health Care Engineers Association

PRESCRIPTIVE COMPLIANCE METHOD

Code Requirements for Existing Buildings. R. W. Sullivan, Inc. 529 Main St., Suite 203 Charlestown, MA (617)

CTC MEETING #25 CHILD WINDOW SAFETY REPORT

Analysis of Changes for the 5 th Edition (2014) of the Florida Codes

Code Requirements for Existing Buildings. R. W. Sullivan, Inc. 529 Main St., Suite 203 Charlestown, MA (617)

2012 IEBC Fundamentals 12/11/2017. Copyright 2012 International Code Council 1

2018 APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES)

UNIVERSITY OF ARIZONA CONSTRUCTION AND RENOVATION PERMITTING PROCEDURE ADOPTED: JULY 2011

Application for Certificate of Occupancy Procedure for Existing Commercial & Residential 4 (+) Family Buildings

BUILDING CONSTRUCTION

Project Address Applicant: (Please Print) Plan review Engineer: Phone: Date

Minimum Requirements for Residential Occupancy Codes and FAQs

JC Code & Construction Consultants, Inc. Advanced 2010 FBC Update Ch. 1 to 16

CHAPTER 34 EXISTING BUILDINGS

COMMERCIAL TENANT IMPROVEMENT PERMIT APPLICATION

City of Tacoma Planning and Development Services

2018 APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES)

Brad Keyes, CHSP LIFE SAFETY CODE. The New. How to Prepare in Advance

A minimum of 25% of any money spent upgrading areas of primary function shall be devoted to ADA upgrades. Existing non-compliant areas include:

COST ESTIMATE FORM FOR ESTIMATING THE PREVAILING COST OF RESIDENTIAL ADDITIONS AND REMODELING

COST ESTIMATE FORM FOR ESTIMATING THE PREVAILING COST OF RESIDENTIAL ADDITIONS AND REMODELING

INTERIOR FINISH, DECORATIVE MATERIALS AND FURNISHINGS

LEAD DESIGN PROFESSIONAL:

Name of Project: Address: Zip Code Owner/Authorized Agent: Phone # ( ) - Owned By: Select one Code Enforcement Jurisdiction: Select one

Name of Project: Address: Zip Code Owner/Authorized Agent: Phone # ( ) - Owned By: Select one Code Enforcement Jurisdiction: Select one

City of Rohnert Park When Permits are Required

9/19/2018. Session: 2018 IEBC Essentials - History

The Lexington Division of Fire and Emergency Services. Fire Chief Robert G. Hendricks

2012 International Building Code Errata (Portions of text and tables not shown are unaffected by the errata)

Fire Safety Design Report

Applying the Building Code During Design

Q. Do residential and historical buildings that are going to be protected with sprinklers need to conduct an LSE?

Uniform Construction Code

Company Overview. Significant Code Changes Massachusetts State Building Code 9 th Edition (2015 International Code)

ORDINANCE NO BE IT ORDAINED BY THE GOVERNING BODY OF THE CITY OF MANHATTAN, KANSAS: Section Adoption of the International Building Code.

5/15/2013. Approved Course Title 2010 Existing Building Code Chapters Florida Building Code, Existing Building. Chapters

2021 ICC Group A National Model Codes: Online Voting Guide

A UCC Building permit is not required for the exceptions listed below for COMMERCIAL application: (403.42): Building construction for the following:

INTERIOR FINISH, DECORATIVE MATERIALS AND FURNISHINGS

Module 8: Ontario Building Code Fire and Spatial Separations

City of Des Moines. Permit and Development Center 602 Robert D Ray Drive Des Moines, IA Phone: Fax:

HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS

(Statute, Rule, FBC, Industry) FBC 406.3, see also FBC No provisions in FBC or FS

5/9/ Florida Building Code, Existing Building. Chapters Approved Course Title 2010 Existing Building Code Chapters

INTERIOR FINISH, DECORATIVE MATERIALS AND FURNISHINGS

General Building Information

Centennial Hills Skilled Nursing Facility Fire Protection Report July 13, 2016 Revised September 15, 2016 JBA Project No

INTERNATIONAL CODE INTERPRETATIONS

Chapter 4-16 SPECIAL DESIGN STANDARDS FOR TYPE V CONSTRUCTION

INTERNATIONAL EXISTING BUILDING CODE

First Revision No NFPA [ Section No ]

Alterations, disproportionality, and the 20% rule

Washoe County PLAN SUBMITTAL

Fire Inspection and Code Enforcement, 7 th Edition. Chapter 6 Building Construction: Components Inspector II

City of Montevallo Commercial Construction Permitting. August 2016 Revised 8/12/16

EGRESS AZMIR SULTANA NICOLAS MIMU SAKUMA EDWIN VEGA CHAMORRO

IBC MEANS OF EGRESS. Code Change No: E5-07/08. Original Proposal

635 BUREAU OF BUILDING CODES AND STANDARDS MAINE UNIFORM BUILDING AND ENERGY CODE - COMMERCIAL BUILDING CODE OF MAINE

F , , , , , (New)

First Revision No NFPA [ Section No ]

UCC Permit Application Procedures

Current as of

IEBC: How to Address Challenging Code Issues; and, Let s Find Answers

Educational Occupancies such as schools, and day care centers (more than 12 children).

COMMERCIAL PLAN SUBMITTAL GUIDELINES JAN 2018

SIDEWALK & RAILING REPLACEMENT BOARD OF ED BUILDING

PROPOSED SAN FRANCISCO GREEN BUILDING CODE AMENDMENTS 2016 Edition

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE Information and Required Forms for Structures in Flood Zones AE & VE

FS , 712, 713, 714

Building Codes and Ordinances ARC 227

INTERIOR FINISH, DECORATIVE MATERIALS AND FURNISHINGS

WON-DOOR CORPORATION Won-Door FireGuard Applications

2018 IBC Update. Based on the 2018 International Building Code, (IBC ) Goal. Objectives. Content

Building Department Informational Handout. Residential Window Replacement Requirements

City of South Pasadena COMMUNITY IMPROVEMENT

6.14, 6.15, 6.16, 6.17, 6.18, 6.19, 6.20, 6.20A, 6.21, 6.22, 6.22A, 6.23, 6.24, 6.25, 6.26, 6.27, 6.28, 6.28A,

0B MAGNOLIA HALL. Scale: 1:110. Date: Feb Time: 7:40 pm. User: brady. 10 ft

How to Prepare Your LSE Report

Basement Renovation Guide For Residential Dwellings

HERMIT S REST GRAND CANYON NATIONAL PARK BUILDING CODE REVIEW

COLUMBIA COUNTY LAND DEVELOPMENT SERVICES COURTHOUSE ST. HELENS, OREGON PHONE (503) CODE SUMMARY REQUIREMENTS

Plan Check No. A. ELEVATORS

Path of Travel Upgrade Requirements

CLT The new use of timber in Australia Prepared for AIRAH Victoria Division Meeting, February 2014

Knowledge Objectives (3 of 3)

9/20/2016 4:01 PM. Second Revision No NFPA [ New Section after ] Submitter Information Verification. Committee Statement

ICC CODE CORNER 2012 IFC Code & Commentary

CHAPTER 6 TYPES OF CONSTRUCTION

INTERIOR FINISHES CHAPTER 8

2015 IBC Exit Systems

HCD DSA OSHPD 1 2 1/AC AC SS SS/CC CALIFORNIA BUILDING CODE 301

Commercial Remodel Permit

APPLICATION NUMBER:, TAX MAP KEY: STREET ADDRESS:, PRPOJECT: APPLICANT:, PHONE NO: MAILING ADDRESS:, FAX NO:

EXHIBIT A PERMIT FEE SCHEDULE EFFECTIVE DATE: July 1, 2003

Transcription:

Minnesota Healthcare Engineers Association, Fall Conference Bob Dehler, P.E. Engineering Program Manager September 14, 2017

Categories of Rehabilitation Work in Healthcare Facilities Bob Dehler, P.E. robert.dehler@state.mn.us 651-201-3710

Building Rehabilitation Requirements, 2000 edition Chapter 4 Meet requirements for new construction (as nearly as practicable) Chapters 18/19 Major renovation, performed planned work per new requirements and sprinkler entire compartment Minor renovation, perform planned work per new requirements

Building Rehabilitation Requirements, 2012 edition Chapter 4 Meet chapter 43 Chapters 18/19 (18.1.1.4.3.4) Major renovation (>4,500sqft or >50% smoke compartment), perform work per chapter 43 and sprinkler smoke compartment Minor renovation if not sprinklered, perform work per chapter 43 and meet the non-sprinklered provisions of 18.4.3

Purpose and Scope Chapter 43 is full of information and can be a little confusing. For the most part, this chapter will not change the way MDH enforces the LSC or when we perform plan reviews/inspections. The basic intent of this chapter is to permit construction that maintains or improves safety in existing buildings without requiring full compliance with new construction requirements in all instances

Basic Concepts Chapter 43 is only for existing buildings Building cannot be less conforming to the code (reduce the existing level of safety) Existing features can be repaired or renovated to existing requirements New features must be constructed to new requirements

Categories of Rehabilitation Work Repair Renovation Modification Reconstruction Change of use Change of occupancy classification Addition

Categories of Rehabilitation Work As you move down the list of categories of work the code requirements increase More than one rehabilitation work category is permitted to be part of a singe construction project To make plan review and inspection as smooth as possible, use the categories of rehabilitation work listed in Chapter 43

Repair The patching, restoration, or painting of materials, elements, equipment, or fixtures for the purpose of maintaining such material, elements, equipment, or fixtures in good or sound condition

Repair The work shall be done using like materials The work shall not make the building less conforming with the other sections of the code The new work can comply with the requirements for existing buildings Possible to reduce to new but never less than existing

Renovation The replacement in kind, refinishing, replacement, strengthening, or upgrading of building elements, materials equipment or fixtures that does not result in a reconfiguration of the building spaces

Renovation The work shall be done using like materials The work shall not make the building less conforming with the other sections of the code The new work can comply with the requirements for existing buildings Interior finish materials must meet the requirements for new construction The reconfiguration or extension of any system, or the installation of any additional equipment, shall comply with the requirements of modification comply with new construction

Modification The reconfiguration of any space; the addition, relocation, or elimination of any door or window; the addition or elimination of load-bearing elements; the reconfiguration or extension of any system; or the installation of any additional equipment

Modification Newly constructed elements, components, and systems shall comply with new construction A modification in an entire building or occupancy shall be considered a reconstruction A modification that is exclusively electrical, plumbing, mechanical, fire protection system, or structural shall not be considered a reconstruction Where the total area of the rehabilitation work areas exceeds 50% of the area of the building (or entire occupancy), the work shall be considered a reconstruction

Reconstruction The reconfiguration of a space that affects an exit or a corridor shared by more than one occupant space; or the reconfiguration of a space such that the rehabilitation work is not permitted to be occupied because existing means of egress and fire protection systems, or their equivalent, are not in place or continuously maintained

Reconstruction In a building with rehabilitation work areas involving over 50% of the aggregate building area, automatic sprinkler system shall be provided on the highest floor containing rehabilitation work and on all floors below Any story with rehabilitation work over 50% of a story, an automatic sprinkler system shall be provided throughout the story

Reconstruction In a building with rehabilitation work areas involving over 50% of the aggregate building area, the means of egress in the rehabilitation work area and the means of egress serving the work area shall be provided with illumination (7.8), emergency lighting (7.9), and marking of means of egress (7.10) in accordance with the requirements of new construction Any story with rehabilitation work over 50% of a story, the means of egress throughout the floor shall be provided with illumination, emergency lighting, and marking of means of egress in accordance with the requirements of new construction

Reconstruction

Reconstruction

Overview Repairs Fixing things (patching, painting, restoration) Renovations Replacing of building element or equipment Modification Installing a new element or system or reconfiguring space Reconstruction Modifications that affect egress or over 50% of building area

Change of Use A change in the purpose or level of activity within a structure that involves a change in application of the requirements of the Code

Change of Use A change of use that does not change the occupancy classification shall comply with the requirements in accordance with the applicable new occupancy chapter Meet requirements applicable to the work category (if any) If the change of use creates a hazardous area you have two options: Change of use complies with the new occupancy chapter Existing healthcare facilities fully protected by an automatic sprinkler system, the space does not exceed 250sqft, used for storage of combustible supplies, smoke partition walls and self closing door; requirements for new construction shall not apply

Change of Use Any repair, renovation, modification, or reconstruction work undertaken in connection with a change of use shall comply with the requirements of the particular work type

Change of Occupancy The change in the occupancy classification of a structure or portion of a structure

Change of Occupancy When a change of occupancy occurs within the same or lesser hazard classification category, the new occupancy can meet the existing requirements. All automatic sprinkler and detection, alarm, and communication systems and requirements for hazardous areas must meet new construction requirements

Change of Occupancy When a change of occupancy occurs within a higher hazard classification category, the new occupancy must meet the new construction requirements. All automatic sprinkler and detection, alarm, and communication systems and requirements for hazardous areas must meet new construction requirements

Change of Occupancy Table 43.7.3 Hazard Categories and Classifications Hazard Category Occupancy Classification 1 (highest hazard) Industrial or storage occupancies with high hazard contents 2 Health care, detention and correctional, residential board and care 3 Assembly, educational, day care, ambulatory health care, residential, mercantile, business, general and special-purpose industrial, ordinary hazard storage 4 (lowest hazard) Industrial or storage occupancies with low hazard contents

Addition An increase in the building area, aggregate floor area, building height, or number of stories of a structure

Addition An addition affects the structure by creating an increase in at least one of the four categories that follow: Building area Aggregate floor area Height Number of stories

Addition The addition shall comply with new construction requirements The existing building shall comply with existing construction requirements Sprinkler new and existing areas where sprinklers are required for new construction unless the new and existing areas are separated

Multiple Work Categories More than one work category on a project is permitted Where the areas are separate, each category is applied independently If you have modification and reconstruction in the same area then reconstruction rules apply

Multiple Work Categories

Examples with Typical Work Categories Replacement of a swatch of corridor carpeting Repair Replacement of carpeting Renovation Replacement of a few ceiling tiles Repair Replacement of entire ceiling - Renovation

Examples with Typical Work Categories Patching a hole in a wall Repair Removal and replacement of wall Renovation Removal, replacement and relocation of a wall Modification Replacement of faulty door closer Repair Replacement of a door - Renovation

Examples with Typical Work Categories A patient sleeping room is rehabilitated to be used as equipment storage Change of use, can meet existing requirements if fully sprinklered building A patient sleeping room is rehabilitated to be used as soiled linen storage Change of use, must meet new requirements according to table 18.3.1

Categories of Rehabilitation Work in Healthcare Facilities Thank You! Bob Dehler, P.E. Engineering Program Manager