DAVID J. HOLLER DETAILED EXPERIENCE

Similar documents
NRC INSPECTION MANUAL

Accepting Supplier ISO 9000 Quality Programs

NQA-1 Graded Approach, 55-Gallon Drum Summary

REQUIREMENTS FOR SAFETY RELATED (ASME AND NON-ASME) ITEMS OR SERVICES

NRC INSPECTION MANUAL

Quality Management Manual Revision 19

NUPIC General Membership and Vendor Meetings June Greg Galletti Quality Electrical Vendor Branch Office of New Reactors U.S.

ASME NQA-1 Certification. Matthew Vazquez September 4, 2017

LONGENECKER and ASSOCIATES. Ronald E. Matthews

Page 1 / 11. Version 0 June 2014

Historical Perspectives on Nuclear Procurement in North America

NRC INSPECTION MANUAL INSPECTION PROCEDURE 35065

EPRI QUALITY PROGRAM MANUAL

Definitions contained in the above mentioned document and industry regulations are applicable herein.

CYNTHIA (CINDY) D. JOHNSON

Quality Assurance - Supplier Qualification

Conformity Assessment. Section III Nuclear Requirements Buenos Aires, Argentina May 2017

Łańcuch dostaw i procedury zapewnienia jakości w realizacji elektrowni jądrowej budowanej w oparciu o technologię amerykańską.

NR CHECKLIST Rev. 1. QAM IMP References NBIC Part 3, 1.8 Y N Y N a. Organization. Company Name/Certificate Number: Page 1 of 26

How to face higher quality expectations for the global nuclear supply chain

Nuclear Quality Standard Association

Did You Know? Brian L. Mervak South Carolina Electric & Gas

Challenge facing the Nuclear

NUCLEAR QUALITY ASSURANCE MANUAL

US REGULATORY OVERSIGHT OF COMMERCIAL-GRADE DEDICATION

Successful Nuclear Construction A Regulator s Perspective

OCRWM Title: Quality Assurance Requirements and Description DOE/RW-0333P, Revision 19 Page: 2 of 149

Commercial Grade Dedication

Sargent & Lundy LLC April 8, 2014

Supplier Evaluation Program Doosan QA Team / Jeong Sun Kim

CNSC Framework for the Regulation of Licensees Supply Chain

Association of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017

Greg Galletti & Richard McIntyre Quality Electrical Vendor Branch Quality Mechanical Vendor Branch Office of New Reactors U.S. NRC

SUPPLY AND INSTALLATION OF TURBINES AND GENERATORS CONTRACT SCHEDULE 8 QUALITY MANAGEMENT TABLE OF CONTENTS

ITER Quality Assurance

U. S. Department of Energy. Consolidated Audit Program Treatment, Storage and Disposal Facilities. Checklist 1 Quality Assurance Management Systems

CNSC Oversight of Counterfeit, Fraudulent and Suspect Items

I. Development, Submittal, and Acceptance of a Quality Management System

Nuclear Quality Standard Association General information about Quality Management System in the nuclear industry

MDEP TR-VICWG-03. Technical Report. Common QA/QM Criteria for Multinational Vendor Inspection

M9C 1A3 VELO (PH) (FX)

COMMERCIAL GRADE DEDICATION OF RELAP5-3D

ASME As a Help to Export! Our Topic today: Nuclear Quality Assurance ASME NQA 1

NUPIC DOCUMENT NO. 11

NRC Licensing Process for Review of SMRs

Power Reactor Decommissioning: U.S. Perspective on Regulatory Insights and Challenges

BHG Operational Awareness Program May 8, 1998 Performance Assessment Guide ENA 7.1 Revision 0 Engineering Program Page 1 of 10 ENGINEERING PROGRAM

STEP 3 MANAGEMENT OF SAFETY AND QUALITY ASSURANCE ASSESSMENT OF THE WESTINGHOUSE AP1000 DIVISION 6 ASSESSMENT REPORT NO.

Enabling the Nuclear Renaissance The Importance of Quality Assurance

CQR-1. CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES Revision Date: 6/8/2015

NRC Perspectives on Quality Assurance ASQ 35 th Annual Energy & Environmental Training and Education Conference Raleigh/Durham, North Carolina

Schedule D3. Data Item Descriptions. Quality Assurance

ACCREDITATION OF FITTING MANUFACTURERS

STAGING/STORAGE OF COMPONENTS CFR Part 50, Appendix B, Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants

SQAR-1. SUPPLIER QUALITY ASSURANCE REQUIREMENTS for DESIGN AND PROCUREMENT SERVICES Revision Date: 2/1/2018

Supplier Quality Requirements

2007 Summer Meeting AASHTO Highway Subcommittee on Construction Project Quality for Design- Build

FBP-QA-PDD-00001, Quality Assurance Program Description (QAPD) Requirements

TURBO MACH A DIVISION OF VT SAA

LICENSING TOPICAL REPORT ESBWR I&C SOFTWARE CONFIGURATION MANAGEMENT PLAN (DRAFT) GE Energy Nuclear

Extending the New Plant Design 3D Model Into an Operations and Maintenance Tool. Ken Barry Senior Project Manager

RESUME of SCOTT ATWATER

Project Procedures 1.0 PURPOSE 2.0 SCOPE 3.0 REFERENCES. No.: P /21/2012 PAGE 1 OF 13 BASIS OF OPERATION

CSA N Environmental qualification of equipment for nuclear power plants

SELLER QUALITY REQUIREMENTS QCS-001 PROCESSING SOURCES

Pressure Points. Governing Code Edition Section I Table of Contents

Management System Requirements

Schedule D3. Data Item Descriptions. Quality Assurance

Proposed - For Interim Use and Comment

SAN FRANCISCO PUBLIC UTILITIES COMMISSION INFRASTRUCTURE CONSTRUCTION MANAGEMENT PROCEDURES

Clauses applicable only when specified by Q-number on the purchase order.

Quality Assurance Policy and Procedures

ACCREDITATION OF MANUFACTURERS OF BOILERS & PRESURE VESSELS

Facilities Planning and Construction (FP&C)

New Plant Process and Players Overview. George Rombold. Scientech Nuclear Regulatory Services

NUCLEAR PROCUREMENT ISSUES COMMITTEE AUDIT CHECKLIST

Supplier Quality System Survey

To establish supplier quality requirements applicable to the type of product or service procured by Hudson MFG LLC.

Supplier Quality Requirements (ASQR)

BS2482 TIMBER BOARDS ASSESSMENT REPORT. Assessment Summary

ADEM LTF Contractor QAPP Review Checklist

Quality Manual. Specification No.: Q Revision 07 Page 1 of 14

Desk Audit of. Based on Federal Transit Administration (FTA) Quality Assurance and Quality Control Guidelines FTA-IT

SAN FRANCISCO PUBLIC UTILITIES COMMISSION INFRASTRUCTURE CONSTRUCTION MANAGEMENT PROCEDURES

Transbay Transit Center Program

Quality Assurance Manual Revision 8 3/16/18

DRAFT ITEM GP-100 ITEM GP-100 CONTRACTOR QUALITY CONTROL PROGRAM 1.1 GENERAL

Implementing Procedure. DEDICATION OF COMMERCIAL GRADE ITEMS Approved/Date President & COO /vji!"l~:l

Quality Assurance Requirements for Nuclear Facility Applications. March 2019 Draft Revisions

EN39 TUBE ASSESSMENT REPORT. Assessment Summary

GUIDE FOR ASME REVIEW TEAM LEADERS FOR REVIEW OF APPLICANTS FOR ASME CERTIFICATES OF AUTHORIZATION H (Cast Iron/Cast Aluminum)

Audit of Weighing Services. Audit and Evaluation Services Final Report Canadian Grain Commission

INS QA Programme Requirements

EPRI Update Procurement Engineering and Supply Chain

Job Family Matrix. Develop, forecast, and administer complex budgets Verify budget, identify, analyze and resolve discrepancies

Voluntary Industry Distributor Accreditation Program (AC 00-56)

NRC INSPECTION MANUAL

SUPPLIER QUALITY SYSTEM SURVEY

Public Housing Revitalization Specialist GS Career Path Guide

A Dupill Group Company

Transcription:

DAVID J. HOLLER EXPERIENCE SUMMARY QA Professional and Technical Specialist with 33 years of nuclear power-related experience. Experience and capabilities include quality program assessment, management and consulting in various environments, procurement engineering, procurement quality, procedures writing and nuclear quality program development, auditing, supplier QA/QC oversight, commercial grade dedication, quality engineering and control, mentoring of trainees, and corrective action. Knowledgeable in the implementation of pertinent regulations, codes, and standards including 10CFR50 Appendix B, NQA-1, ASME Section III NCA-3800 & 4000, and ISO 9001:2008. DETAILED EXPERIENCE Longenecker & Associates 2015-Current QA Specialist and Functional Leader NuScale Power 2014-Current Responsible for the coordination and execution of all activities related to supplier quality and oversight, including scheduling and management of audits, surveillances, source verifications, commercial grade surveys, supplier evaluations and selection, annual evaluations, and procurement document review. Since taking over functional leadership duties in June 2014, accomplishments include: All procedures, processes, checklists, and forms related to these work activities have either been developed or rewritten to meet industry best practices and the expectations of the regulator. The supplier evaluation process and computer-based Approved Suppliers List has been redesigned and improved to reflect accurate and easily accessible information. Guidelines for audit and technical specialists participation in the audit process have been established and auditor training has been enhanced. Initiated the procurement of EPRI Nuclear Procurement Training for both procurement and engineering groups. The supplier quality group has established consistent interface and consultation with project management and internal customers. QA Consultant/Technical Specialist 2010-Current Independent Contractor providing a variety of consulting and staff augmentation services for domestic and foreign companies. Examples of project and work assignments include: QA Manager for Hopper Engineering Associates, a NUPIC-approved engineering firm providing design analysis services to the commercial nuclear industry. (ongoing) QA consultant and procedures writer for Mitsubishi Electric Corporation located in Amagasaki, Japan to establish and improve their Appendix B and NQA-1 QA program, including the QA Manual and applicable implementing procedures. (ongoing) Consultant to Ceradyne, Inc. (nuclear borates manufacturer) providing NQA-1 training and 2514 Red Arrow Drive, Las Vegas, NV 89135 702-493-5363 info@longenecker-associates.com

indoctrination, a GAP analysis between their ISO 9001 QA program and the requirements of NQA-1 2008/a2009, and consulting and final review of new NQA-1 compliant procedures and processes. (ongoing) Certified Lead Auditor & Audit Team Leader Team Leader for both internal and supplier audits performed for companies in the U.S., Asia, and Europe (ongoing). Most recent audit was of Mitsubishi Electric Company, Amagasaki, Japan. Consultant to Generation mpower providing project management to develop and establish a NIRMA compliant electronic records management system. Provided consulting and procedures writing services to the plant engineering department in the development of owner acceptance procedures. (2013-14) Consultant to Electric Boat Power Division lending expertise to the development of their QA program and procedures for compliance with 10 CFR 50 Appendix B and NQA-1-1994. (2013) Consultant to a B4C manufacturer (for Westinghouse fuel) lending expertise and procedures writing services to establish a CG Dedication program and the measures to control purchased items and services in accordance with Criterion 7 of 10 CFR 50 Appendix B and Requirement 7 of NQA-1-1994. (2012-2013). Principal QA Engineer Invensys Operations Management 2010-2012 Supplier Project QA Manager based in Spain to support a multi-unit DCS Human Factor Engineering and Main Control Room panel project for Chinese nuclear power plant projects. Assigned duties include QA oversight of Spanish (NQA-1) and French (ISO-9001) suppliers and lower tier sub-suppliers providing HFE Services, Main Control Room interface software design, and MCR Panel manufacturing activities. Perform review of project quality planning documents, procedures, and supplier submittals of the same, including project quality program documents, inspection and test plans, commercial grade dedication plans, and reports. Witness and participate in Pre-FAT, FAT, and final inspection and documentation review activities. Responsible for mentoring and assisting supplier QA staff in their understanding of applicable regulations and standards pertinent to CG Dedication and project quality requirements based on NQA-1-1994. QA Program Manager Mitsubishi Nuclear Energy System 2008-2010 Manager of Quality Programs and Procedures section, responsible for establishing quality-related processes and procedures in support of new plant design, licensing, and procurement. Developed and maintained the MNES QAPD as well as processes and procedures for implementation of the program. Developed the corrective action program (CAP) including the administration and management of the program. Was a regular participant and company representative at NEI and NRC meetings regarding new plant design certification, e.g. the QAPD template, ITAAC, and CAP guidelines. Certified as a Lead Auditor: performed external and internal audits. Quality Control Engineer General Electric 2007-2008 Responsible for project QA oversight of domestic and foreign (Slovakia) manufacturing and GSI-191 testing contracts including QA review and approval of pertinent procurement, engineering & deviation documents, performance of source surveillance dimensional and AWS D1.1 weld inspections, 2

initiation/resolution of corrective action requests, and interface activities with supplier and customer quality personnel. Technical Specialist San Onofre Nuclear Generating Station 2003-2007 Certified Lead Auditor and NUPIC Audit Team Leader in the Supplier Oversight group. Responsible for performance and participation of domestic and foreign supplier audits and commercial grade surveys of QA programs meeting 10 CFR 50 Appendix B, ISO 9001:2000 and ISO 17025. Responsible for project QA oversight of GSI-191 related Reactor Containment Strainer replacement procurement, testing, and fabrication. Procurement Engineer responsible for specifying procurement technical and quality requirements applicable to plant materials, parts, and components, including related technical evaluations, parts safety classifications, and commercial grade dedication acceptance criteria. Provided technical input for supplier audits/surveys and resolution of material receipt deficiencies. Responsible for the completion of item equivalency evaluations and associated 10CFR50.59 screening. Provided Technical Specialist support for NUPIC Joint Utility audits and surveys. Investigated and resolved industry related Operating Experience issues pertinent to spare parts and components. Senior QA Assessor Kewaunee Nuclear Plant (NMC) 2002-2003 Certified Lead Auditor in the Supplier Assessment group, responsible for performance of supplier audits, commercial grade surveys, evaluations, and source verification activities. Lead Procurement Engineer Point Beach Nuclear Plant (NMC) 2000-2002 Lead Procurement Engineer responsible for technical oversight eight staff members in the Supply Chain organization. Coordinated the day by day activities applicable to procurement engineering, purchase document review, and QC inspection of incoming materials. Responsible for the definition and implementation of the overall supply chain technical approach relative to specifying, inspecting, testing, and accepting spare parts and materials for plant maintenance and construction activities. Prepared and/or reviewed all procedures related to procurement engineering and material receipt acceptance processes. Performed procurement engineering activities including parts classification, CG Dedication, item equivalencies, and resolution of receiving discrepancies and CAR s. Vendor Manual Engineer Litchfield Park, AZ (CVMS) 1998-2000 As part of a vendor manual subscription service to nuclear customers, reviewed revised vendor/oem technical information for client utilities, developed detailed comparison reports, and submitted to clients for their use at the power plant to meet commitments in response to NRC GL 83-28 & 90-03 requirements. Procurement Engineering Specialist Cooper Nuclear Station (NPPD) 1997-1998 3

Procurement Engineer with duties including the determination of spare part safety classification, commercial grade dedication requirements, and purchase document quality and technical requirements. Procurement Engineer ComEd/Zion Nuclear Station 1996-1997 Duties included the performance of technical evaluations for replacement parts, item equivalency evaluations, 10CFR50.59 screenings, resolution of receiving discrepancies, and shelf life evaluations. Quality Assurance Procurement Planner Salem/Hope Creek Nuclear Stations 1996 Duties included quality review of purchase documents, and the establishment of procurement quality requirements, acceptance criteria, and receipt inspection activities. Materials Technical Specialist River Bend Nuclear Plant 1995-1996 Duties included performing technical evaluation of replacement parts, establishing purchase document technical and quality requirements, receipt inspection acceptance criteria, and resolution of receiving discrepancies. Configuration Management Specialist Turkey Point Nuclear Plant Reconciliation project of hard copy Instrument Index with the Equipment Database. 1994 Bill of Material/Procurement Engineer Turkey Point Nuclear Plant 1992-1993 Duties included bill of material development for plant components, including identification of key spares, establishment of stock codes and stocking levels, safety classification, and acceptance criteria. Bill of Material/Procurement Engineer South Texas Project 1988-1991 Duties included bill of material development for mechanical plant components, including identification of key spares, establishment of stock codes and stocking levels, procurement classification, safety classification, and acceptance criteria. Also performed procurement engineering activities, including technical evaluation of replacement parts, establishing PO T s & Q s, item acceptance criteria, and resolution to receiving discrepancies. Procurement Engineer Perry Nuclear Plant 1987-1988 Duties included writing procurement mini-specs for future procurement of common replacement parts used in plant equipment, particularly NSSS system mechanical components. Procurement Engineer Arkansas Nuclear One Nuclear Plant 1987 Duties included the establishment of a commercial grade dedication process based on the draft EPRI NP- 5652. 4

Senior Maintenance Specialist Arkansas Nuclear One Nuclear Plant 1986-1987 Duties included establishing plant equipment in-storage maintenance program as part of an overall preventive maintenance improvement initiative. QA Technical Specialist Waterford 3 Nuclear Plant 1984-1985 Duties included receipt inspection of all incoming materials and components including compliance review of all supplier provided certifications and documentation. Performed procurement quality review of purchase requisitions. Plan and perform surveillances of plant material control activities. QA/QA Inspector Shearon Harris Nuclear Plant 1978-1982 Duties included receipt inspection of all incoming materials and components including compliance review of all supplier provided certifications and documentation. Certified welding inspector performing inspection of welds to AWS D1.1. Plan and perform surveillances of plant material control activities, including in-storage maintenance of major equipment types, identification and traceability of installed material, and long term storage techniques. EDUCATION/TRAINING Bachelor of Arts - Western Illinois University 2005 Lead Auditor Training 2003, 2006, 2013 Certified Technical Specialist Hartford Steam Boiler Global Services 2013 EPRI Nuclear Procurement Training and ASME Code Procurement Training Corrective Action/Problem Resolution Workshop Certification Program for Conducting Commercial Grade Surveys and Source Verification INPO accredited design engineering indoctrination and training @ Zion and SONGS 5