PETRONET LNG LIMITED, INDIA Current Activities : Agenda No. 5

Similar documents
CORPORATE PROFILE PETRONET LNG LIMITED

CORPORATE PROFILE. PETRONET LNG LIMITED October, 2015

CORPORATE PROFILE PETRONET LNG LIMITED MAY,

CORPORATE PROFILE. PETRONET LNG LIMITED March, 2012

ELIGIBILITY CRITERIA FOR QUALIFICATION OF EPC CONTRACTORS FOR LNG TERMINAL AT GANGAVARAM, VISAKHAPATNAM, ANDHRA PRADESH (INDIA)

CORPORATE PROFILE. PETRONET LNG LIMITED, June, 2018

GUJARAT STATE PETRONET LTD (GSPL)

LNG Business In India

GUJARAT STATE PETRONET LTD (GSPL)

PEER GROUPS CMP MARKET CAP EPS P/E (X) P/BV(X) DIVIDEND Company Name (Rs.) Rs. in mn. (Rs.) Ratio Ratio (%)

PEER GROUPS CMP MARKET CAP EPS P/E (X) P/BV(X) DIVIDEND Company Name (Rs.) Rs. in mn. (Rs.) Ratio Ratio (%)

LNG Infrastructure & Development. K.K. Sinha Director Essar Ports Ltd.

Table of Contents. Statement from MD & CEO...01 About the report Water Management...19 Waste Management...21

CINDA Significant Track Records

Extended Annual Review Report

Petronet LNG Ltd., India. LNG Terminal Design- Major Design Considerations

GAIL GGSPL FACT SHEET 2013 GAIL GLOBAL SINGAPORE PTE. LTD. A wholly owned subsidiary of GAIL (India) Limited. Efficient LNG ing

India: LNG Sector Overview

Natural Gas April- October 2018 update

INDIA: Dahej Liquefied Natural Gas Terminal Project

Prefeasibility Report for Proposed Floating LNG Terminals in Tapi River estuary at Hazira, Gujarat

marine loading arm mechanical loading arm loading arm MLA

KOGAS s Technical Capability and Plan on Off-shore Plant Business

Tadas Matulionis LNG Terminal Director April 26th, 2017 THE TRANSFORMATIVE POWER OF LIQUID GAS

17 May Shale Gas Cost And Technology Perspective. Kolkata

Capabilities in LNG

Fuelling for a cleaner future

The Adoption of FSRU For Cost-effective LNG Import Solution

Content. PwC. PwC. Impact of Natural Gas on Liquid Fuel Consumption and downstream Petroleum Sector. September 1, 2010

PREFEASIBILITY PROJECT REPORT (PPR) INSTALLATION OF LNG STORAGE AND REGASIFICATION FACILITY SEPTEMBER 2016

On Board Regasification for LNG Ships. 22 nd World Gas Conference WS 3-2 Tokyo 2003 Wayne Perry

Now Available PORTS IN INDIA Segment Analysis, Outlook and Opportunities. Report (PDF) Data-set (Excel) India Infrastructure Research

Chemicals and Petrochemicals Sector Profile

FIRST LNG IN INDIA: DAHEJ A SUCCESSFUL CHALLENGE AND A NEW ERA FOR INDIAN GAS MARKET

IMPACT OF US LNG ON LATIN AMERICAN AND CARIBBEAN GAS DEMANDS

Challenges and Opportunities

17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17)

Developing efficient and reliable LNG infrastructure to support Indonesia s fast-growing energy demand

GNL Mejillones, GenCo oriented

LNG Hub in Klaipėda. Mindaugas Aleška Head of Business Development Division SC Klaipėdos Nafta 1

LNG TERMINAL IN ŚWINOUJŚCIE AS A LNG GATE TO THE BALTIC SEA

Gorgon Project Update: Selected Images

Hearty Welcome. Corporate Presentation of. GAIL [India] Ltd

Singapore s Import of LNG

Norwegian Solutions for LNG in International Market

Motorways of the Sea Forum. Brussels, 16 th of June 2017

Port of Algoma. Focal Point of the Great Lakes Region

Connecting. markets. you to key

Third Quarter 2013 Presentation of financial results 19 November 2013

LNG Import Facility Infrastructure Options

Liquefied Natural Gas Terminals Services and solutions

Safety Overview of Indian experiences with LNG Road Transportation, Distribution and operation of small LNG storages

LNG Supply Chain Infrastructure Configuration

India Sector Overview. Advancing Project Development in India through Public Private Partnerships

LONG TERM FUEL SECURITY FOR GAS BASED POWER GENERATION

Point-wise compliance to stipulated terms and conditions of the CRZ Clearance is as follows:

ACCELERATION OF SMALL SCALE LNG SUPPLY CHAIN INFRASTRUCTURE FOR CENTRAL AND EAST REGION OF INDONESIA

Platforms, Pipelines and Plants: Energy Infrastructure in India

LNG market update. Surge in LNG supply creates opportunities to open new markets

LNG Houston, February 6-7 th, The case for developing a Floating LNG Receiving Terminal on the US East Coast

Pre-Feasibility Report. for. Mangaluru Integrated Gas Project

CHAPTER 3: GENERAL DESCRIPTION OF THE PROPOSED COEGA INTEGRATED POWER PROJECT

WÄRTSILÄ MOBILE LNG: EASILY THE BEST

Floating storage and regasification barges

Petroleum Planning & Analysis Cell

PERP Program LNG Receiving Terminals New Report Alert

SHAPING THE NATURAL GAS MARKET OF CYPRUS

LNG Shipping: How Long Will The Good Times Last?

INTEGRATION OF LNG TERMINAL IN THE LITHUANIAN GAS SYSTEM 22 ND MAY, Mantas Šabanas Project Analytics Manager

Boosting Natural Potential

Petroleum Planning & Analysis Cell

Petronet LNG Limited (PETLNG)

PETRO TANKAGES INDIA Limited. Pre-Feasibility Report. Proposed LPG Storage of Petro Tankages India Ltd. (PTIL) at Bharana (Gujarat)

The VTTV Oil Storage Terminal Cyprus

Small scale LNG developments from the perspective of an infrastructure player

Mangaluru Integrated Gas Project

The New Global Gas Market Dynamic. Emmanuel Grand, FTI-CL Energy

CITY GAS DISTRIBUTION IN INDIA 2014 OIL AND GAS PIPELINES IN INDIA 2014

LNG supply Chain From the LNG receiving terminal to the LNG truck TrainMoS II

Höegh LNG The floating LNG services provider. Company and Market Update May 2012

Global Chemcial Service Provider.

The 3 rd International LNG Summit

The Foundation of Infrastructure

IN PORTS SECTOR. By Rajeeva Sinha Director, Mundra Port & SEZ Ltd.

6th Annual LNG Transport Handling & Storage 2016 Forum. FSRU as The Pivotal Point for Effective LNG Distribution

BY LLOYDS STEELS INDUSTRIES LTD. IN ASSOCIATION WITH FMC

LNG strategy and the outlook for global gas markets

MARITIME INDIA SUMMIT Anchored for Growth

Edgardo Curcio President AIEE

GAIL (INDIA) LIMITED

CHENIERE ENERGY, INC. Louisiana Energy Conference. June 2016

OLT Offshore LNG Toscana Alessandro Fino CEO

The Impact of US LNG Exports on India s Gas Market Jason Bordoff

DEVELOPING THE LNG INFRASTRUCTURE IN KLAIPEDA

Liquefied Natural Gas (LNG) Production and Markets. By: Jay Drexler, Dino Kasparis, and Curt Knight

Update on African regasification terminals March 15, 2016

Tapping growth potential in the Indian hydrocarbon value chain

Infrastructure. Services

Environmental and Social Impact Assessment [ESIA] for Proposed Liquefied Natural Gas (LNG) Project at Tema in the Greater Accra Region of Ghana

MAN Diesel & Turbo. MAN Diesel & Turbo Author Current topic

Transcription:

PETRONET LNG LIMITED, INDIA Current Activities : Agenda No. 5 44 th MEETING OF GENERAL ASSEMBLY OF THE INTERNATIONAL GROUP OF LIQUEFIED NATURAL IMPORTERS(GIIGNL) VENICE, ITLAY 5-8 October, 2014

OVERVIEW 1. Dahej LNG Terminal 2. Kochi LNG Terminal 3. Gangavaram Terminal on East Coast 4. Direct Marketing 5. Petronet & GIIGNL Technical Study Group

DAHEJ LNG TERMINAL Located at Dahej in Gujarat in the Gulf of Cambay Commencement of Operations in 2004 Capacity (mmtpa) : 5.0 10.0 15.0 (2004) (2009) (2016) LNG Cargoes unloaded : 1240 + 7.50 mmtpa LNG imported from Qatar under long term contract Terminal meets almost 25% of India s gas requirement Truck Loading facility can handle 3000 loadings/ yr. Capacity expansion to 15 mmtpa (provision for 20 mmtpa) Second Jetty : Commissioned in April, 2014 Expansion status : All EPC contracts awarded Scheduled Completion : November, 2016 Expanded Capacity contracted with GAIL, GSPC, IOCL & BPCL

DAHEJ LNG STORAGE TANKS 4

DAHEJ REGAS FACILITIES WITH AIR-HEATER

DAHEJ SECOND JETTY

TRUCK LOADING FACILITY Petronet has Implemented first LNG Truck Loading Facility (TLF)in India at its Dahej LNG Terminal for customer who do not have access to gas pipelines in year 2007 Regasification Facilities set up at Customers ends Total number of truck loaded : 7000+ Capacity of available trucks : 15 & 7.5 (Tons) Petronet is installing additional eight bays of truck loading to meet the amplified demand

SATELLITE LNG HUB & LNG BY ROAD LNG By Road VAPORISATION FACILITIES VAPORISATION FACILITIES Satellite Hub

KOCHI PLANT OVERVIEW

KOCHI LNG TERMINAL LNG Terminal located in Special Economic Zone with Codeveloper status Capacity 5.0 mmtpa Long term contract of 1.44 mmtpa LNG from Exxon Mobil s Gorgon Project (Australia) supply to commence by end 2015 - back to back GSA with GAIL, IOCL and BPCL Time Charter Party executed for 4 th vessel. Kochi terminal commissioned in September, 2013 Truck loading facility supply to commence in July 2014 Currently operating at very low capacity in absence of major part of the pipelines connecting Tamil Nadu, Bangalore & Mangalore markets

KOCHI - FACILITIES 11

KOCHI - MARINE FACILITIES

THIRD TERMINAL AT EAST COAST Proposed Capacity: 5 mmtpa Location: Gangavaram, Andhra Pradesh DFR, FEED and various other preproject activities completed. Clearances obtained. Estd. Project cost: 800 million USD Gangavaram

GANGAVARAM TERMINAL LNG terminal to be developed as SPV with GPL as partner MOEF has accorded Environmental and CRZ Clearance. State Government approval received Terminal proposed to be commissioned in 2017 Facilities to include 2 Storage tanks, marine & regasification facilities To commence earlier supplies, FSRU option being examined through which supplies can commence in 2016 Understanding reached for connectivity with East West & Mallavaram-Bhilwara pipelines. In discussions with Kakinada - Srikakulam Pipeline Actively working on Customers tie up

GANGAVARAM Proposed land for plant sitting Proposed berth location

CATCHMENT REGIONS OF PETRONET S TERMINAL Dahej LNG Terminal Gangavaram LNG Terminal Kochi LNG Terminal

DIRECT MARKETING Petronet exploring opportunities to supply LNG to Coastal area consumers through small LNG Vessels in India and neighbouring countries Direct Marketing by focusing on the following areas: Signed HOAs & supplied RLNG to bulk end consumers in Power, Refineries & Fertilizers Sectors LNG/LCNG supplies through Trucks, to LNG hubs, Satellite Stations at customer s premises in regions not serviced by pipelines under the Brand name of

PETRONET & GIIGNL TECHNICAL STUDY GROUP Petronet actively participates and contributes in the activities of Technical Study Group of GIIGNL Petronet Technical team participated in: Report on emissions to Environment from LNG import terminals Compilation of incident data base & Study on Failure on demand Integration of CCGT power plant with LNG import terminal Petronet would propose Technical Study Group to take up updating of existing standards under the programme in coordination with other LNG bodies

Thank You THANK YOU Kochi LNG Terminal