CHAPTER 17. HAZARDOUS MATERIALS AND WASTE

Similar documents
CHAPTER 17. HAZARDOUS MATERIALS AND WASTE

CHAPTER 18. HAZARDOUS MATERIALS AND WASTE

CHAPTER 14. ROADWAYS AND MARINE TRANSPORTATION

4.14 HAZARDOUS MATERIALS

Environmental Standard Operating Procedure Originating Office: MCAS Yuma Environmental Department

HAZARDOUS MATERIAL ASSESSMENT

USAG Fort Buchanan Sustainability and Environmental Management System (SEMS) Training for Environmental Compliance Officers (ECOs)

*************************************************************************** SECTION F20 SELECTIVE BUILDING DEMOLITION 02/18

WASTE MANAGEMENT PROGRAM

NSPI Oil Release Report (as per Environmental Emergency Regulations)

Title: Vehicle Equipment/Parts Replacement

6. ENGINEERING SYSTEMS REQUIREMENTS F20 SELECTIVE BUILDING DEMOLITION

Comments on Candlestick Point-Hunters Point Shipyard Phase II Development Plan Project Draft Environmental Impact Report.

SECONDARY CONTAINMENT RAINWATER MANAGEMENT

Section 3.11: Hazardous Materials

Regulatory Guide 2.19

3.11 HAZARDOUS MATERIALS

A.9 ENVIRONMENTAL HEALTH AND SAFETY

Standard Specifications for Ship Repair and Alteration Committee SSRAC

*************************************************************************** SECTION F20 SELECTIVE BUILDING DEMOLITION 09/16

CHAPTER 14 ENVIRONMENTAL REQUIREMENTS

4.12 HAZARDOUS MATERIALS

Appendix C3 Spill Prevention, Containment, and Countermeasures Plan Framework

APPENDIX F. SPILL CONTINGENCY PLAN (June 2004)

SPILL PREVENTION & RESPONSE

APPENDIX F. SPILL CONTINGENCY PLAN (January 2005)

4.12 HAZARDOUS MATERIALS

FINAL SAMPLING AND ANALYSIS PLAN FORT RUCKER WASTE CHARACTERIZATION AND ANALYSIS OF VARIOUS ENVIRONMENTAL MEDIA

Toxic Substance Management for Environmental Compliance Officers. LAVAUGHN BERRY TOXIC SUBSTANCES PROGRAM MANAGER

CHAPTER 2. OVERVIEW OF BEST MANAGEMENT PRACTICES AND PROPOSED MITIGATION MEASURES

UFGS (August 2004) UNIFIED FACILITIES GUIDE SPECIFICATION

Environmental Requirement Review Checklist and Certification

Environmental Standard Operating Procedure

PERFORMANCE SPECIFICATION ANTISEIZE THREAD COMPOUND, MOLYBDENUM DISULFIDE- PETROLATUM

CUMBERLAND COUNTY IMPROVEMENT AUTHORITY CUMBERLAND COUNTY SOLID WASTE COMPLEX SOIL ACCEPTANCE PROTOCOL

Environmental Restoration in Harbor and Port Areas

RCRA 101. Michael Gage

Chemical Hygiene Plan Evaluation Annual Report Academic Year August 23, 2018

PERFORMANCE SPECIFICATION ANTISEIZE THREAD COMPOUND, MOLYBDENUM DISULFIDE- PETROLATUM

Environmental Standard Operating Procedure (ESOP)

Management Instruction

JAPAN ENVIRONMENTAL GOVERNING STANDARDS

CHAPTER 14: DLA ENERGY FUNDING SUPPORT

APPLICATION FOR DANGEROUS GOODS TRAINING PROGRAM APPROVAL

New Policies and Best Practices for Handling Common Spills and Maintenance Waste. Release Reporting and Response

Chapter 11: Hazardous Materials A. INTRODUCTION

Appendix F.7 Hazardous Materials and Waste

ESTCP Funding Opportunities January 17, 2008

4.6 NO-ACTION ALTERNATIVE FOR CANTONMENT/HOUSING

8209 Acquisition ESOH Risk Management and HAZMAT Management

10 ESF 10 Oil and Hazardous. Materials Response

3.7 HAZARDOUS MATERIALS AND HAZARDOUS WASTE MANAGEMENT

Assessing the Impacts of TSCA Reform: A DoD Enterprise Wide Approach Acquisition, Technology and Logistics

Chapter 9. Hazards and Hazardous Materials

ALAMEDA COUNTY COMMUNITY DEVELOPMENT AGENCY PLANNING DEPARTMENT. The following is an overview of the draft document to be discussed.

Analysis of Brownfield Cleanup Alternatives (ABCA) Christine O Keefe Brownfields/Voluntary Cleanup Program

CHAPTER 5. RELATIONSHIP BETWEEN SHORT-TERM USE OF THE ENVIRONMENT AND LONG-TERM PRODUCTIVITY

C9. CHAPTER 9 AFLOAT PRE-POSITIONING FORCE (APF) TABLE OF CONTENTS

THE DEPARTMENT OF THE NAVY ANNOUNCES PROPOSED PLAN/DRAFT REMEDIAL ACTION PLAN

DEPARTMENT OF THE ARMY HEADQUARTERS, US ARMY GARRISON, FT RUCKER FORT RUCKER, ALABAMA Fort Rucker Regulation 22 December 2014 No.

Safety, Health, and Environmental Standard

Appendix 8. Petroleum Hydrocarbon Products, Ammonium Nitrate and Explosives Management Plan

ENVIRONMENTAL GUIDELINES

9.0 Environmental Protection Program

NAVSEA STANDARD ITEM NUMERICAL INDEX

GUIDELINES FOR THE OPERATIONAL IMPLEMENTATION OF THE INTERNATIONAL SAFETY MANAGEMENT (ISM) CODE BY COMPANIES

Strategic Environmental Research & Development Program. SERDP Funding Opportunities CLU-IN Webinar December 14, 2007

3.9 HAZARDS AND HAZARDOUS Environmental Setting. Hazardous Materials Area of Influence. Polychlorinated Biphenyls

Hazardous Materials Technical Memorandum

Pollution Prevention Appendix W: Solid and Hazardous Waste

Appendix C4 Hazardous Materials Management Plan Framework

USACE Environmental Support to the Army and the Nation

6PROTECTIVE MEASURES

Hill Air Force Base, Utah. Final Environmental Assessment: Proposed Demolition of 12 Structures, Hill Air Force Base, Utah

DRAFT CLOSURE PLANS FOR THE U.S. DEPARTMENT OF ENERGY HAZARDOUS WASTE MANAGEMENT FACILITY AND RADIOACTIVE MATERIALS HANDLING FACILITY

World War II-era warehouses with asbestos-containing siding removed prior to demolition.

Environmental, Safety, and Occupational Health Plan Fiscal Year 2015

Papua New Guinea LNG Project. Environmental and Social Management Plan Appendix 6: Spill Prevention and Response Plan PGGP-EH-SPENV

Former Georgia-Pacific Mill Site

online environment regulatory and compliance training EPA Institute COURSE CATALOG

Secretary of Defense Secretary of the Navy. Environmental Restoration Installation. FY 2004 Environmental Award

ENVIRONMENTAL QUESTIONNAIRE AND DISCLOSURE STATEMENT

Former Mare Island Naval Shipyard

Agency of the year Award

Prepared for Florida State University Facilities Planning& Construction By Environmental Health & Safety Tallahassee, Fl

Page 1 of 5 Hazardous Materials Handling and Communication 08/30/2012

4.7 Hazards and Hazardous Materials

Subj: SUMMARY REPORT FOR ANNUAL INDUSTRIAL HYGIENE SURVEY OF NAVAL SUPPORT DETACHMENT, MONTEREY, ENVIRONMENTAL DEPARTMENT

Transportation and Emergency Planning*

HAZARDOUS MATERIAL REGULATIONS

REPUBLIC OF COSTA RICA CIVIL AVIATION GENERAL DIRECTION Air Navigation Management AIS/MAP P. O BOX SAN JOSE COSTA RICA AGA

Acquisition/Environmental Management Case Study for an Army Weapon System

T&D Facilities & Equipment: Environmental Issues - Program 51

APPENDIX C SUPPORTING DATA FOR ANALYSIS OF DOD SITES

SITE SPECIFIC SPILL PLAN For use of this form, see the Installation Spill Contingency Plan; the proponent is DPW-ENRD

Technical Guidance Document for Environmental Audit Reports

CHEMICAL CONTRACTORS DC WATER CONTRACTOR SAFETY PROGRAM CONTRACT PROVISIONS FOR CHEMICAL DELIVERIES 1. RESPONSIBILITY FOR COMPLIANCE

SECTION V REGULATED WASTE MANAGEMENT

IV. ENVIRONMENTAL IMPACT ANALYSIS H. HAZARDS AND HAZARDOUS MATERIALS

JBER ENVIRONMENTAL AWARENESS. 673d Air Base Wing Home of America s Arctic Warriors

Transcription:

CHAPTER 17. HAZARDOUS MATERIALS AND WASTE 17.1 INTRODUCTION The potential impacts of hazardous materials and waste on human health and the environment is largely dependent upon their types, quantities, toxicities, and management practices. This chapter contains a discussion of potential environmental consequences associated with implementation of the alternatives within the region of influence (ROI) under the proposed action. For a description of the affected environment for all resources, including current hazardous substance handling, storage, transportation, and management plans, techniques, approaches, and potential mitigation measures refer to the respective chapter of Volume 2 (Marine Corps Relocation Guam). The locations described in that Volume include the ROI for the aircraft carrier berthing component of the proposed action (Apra Harbor), and the chapters are presented in the same order as the resource areas contained in this Volume. 17.2 ENVIRONMENTAL CONSEQUENCES 17.2.1 Approach to Analysis 17.2.1.1 Methodology This section describes potential hazardous materials and waste impacts and proposed mitigation measures as they relate to the proposed increase in the number of days for aircraft carrier berthing in Apra Harbor. This berthing is planned to be increased from an average of 16 to 63 days annually. Specifically, these potential impacts were assessed for the general public as well as various media (i.e., soils, surface water, groundwater, air, and biota) relative to offshore and onshore activities. 17.2.1.2 Determination of Significance The determination of significance was based upon existing hazardous substance management practices, proposed mitigation measures, and expected or potential impacts and environmental consequences of the proposed action. This determination evaluated the overall ability to mitigate or control environmental impacts and consequences to soils, surface water, groundwater, air, and biota. This determination considered current conditions and potential consequences relative to the anticipated ability of the hazardous substance management infrastructure system to accommodate added hazardous substance demand on the overall system. Specifically, for hazardous substances to be considered a significant impact, the following would have to occur: Leaks, spills, or releases of hazardous substances to environmental media (i.e., soils, surface water, groundwater, air, and/or biota) resulting in unacceptable risks to human health and/or the environment Violation of applicable federal, state, or local laws or regulations regarding the transportation, storage, handling, use, or disposal of hazardous substances 17.2.1.3 Issues Identified During Public Scoping Process As part of the analysis, concerns relating to hazardous substances that were mentioned by the public, including regulatory stakeholders, during the public scoping meetings were addressed. These include: Volume 4: Aircraft Carrier Berthing 17-1 Hazardous Materials and Waste

Address management practices for hazardous substances including hazardous wastes, toxic substances, hazardous materials, and munitions and explosives of concern (MEC) Describe the potential overall impacts of hazardous substances from construction and operation of proposed projects Identify the projected hazardous waste types and volumes Identify expected hazardous substance storage, disposal, and management plans Evaluate measures to mitigate generation of hazardous waste including pollution prevention Discuss how hazardous substances on land and from ships would be managed Discuss the potential for impacts to environmental media from spills, accidents, and/or releases of hazardous substances Identify existing installation restoration sites 17.2.2 Alternative 1 Polaris Point (Preferred Alternative) 17.2.2.1 Hazardous Materials The proposed increase in aircraft carrier berthing days would result in increased opportunities for adverse environmental consequences related to petroleum, oils, and lubricants (POL) hazardous materials. POL includes gasoline, aviation fuels, diesel, oil and grease, kerosene, and other related products. It is expected that these products primarily would be used as part of ongoing operation and maintenance functions. The quantity of hazardous materials generated by these activities over a cumulative total of approximately 63 days per year is estimated to be 160 pounds (lbs) (73 kilograms [kg]). Due to the projected increase in the volume of hazardous materials, Alternative 1 Polaris Point (referred to as Alternative 1) would have the potential to result in an impact (i.e., to soils, surface water, groundwater, air, or biota). However, the increase in hazardous materials would be handled and disposed of per applicable Best Management Practices (BMPs) and Standard Operating Procedures (SOPs) (see Volume 7); therefore, the increase in volume would result in less than significant impacts. Note that BMPs and SOPs are not considered mitigation measures thus no proposed mitigation measures are identified in this chapter. 17.2.2.2 Toxic Substances The primary toxic substances being addressed on Guam prior to any Department of Defense (DoD) expansion include: asbestos containing materials (ACM), lead-based paint (LBP), polychlorinated biphenyls (PCB), and radon. LBP and PCBs in Guam are transported by licensed transporters and disposed of in accordance with applicable federal, state, and local laws and regulations. ACM is disposed of at federal facilities on Guam. The collection, transportation, and disposal of these toxic substances is arranged for by the Defense Reutilization and Marketing Office (DRMO). There would be negligible environmental consequences because in 1979, the USEPA banned most uses of PCBs and LBP was banned in 1978. In addition, ACM would not be generated during the increased aircraft carrier berthing events. If existing toxic substances are encountered during Alternative 1 activities, licensed contractors would be used to ensure that all DoD, federal, state, and local PCB, ACM, and LBP testing, handling, and disposal protocol, procedures, and requirements are followed. Therefore, toxic substances would result in less than significant impacts as a result of Alternative 1 activities and no potential mitigation measures would be required. Volume 4: Aircraft Carrier Berthing 17-2 Hazardous Materials and Waste

17.2.2.3 Hazardous Waste Increased days of aircraft carrier berthing would result in an increase in the transport and/or transfer of hazardous waste. Increases in the transport/transfer of solvents, adhesives, lubricants, corrosive liquids, aerosols, and other hazardous wastes would be expected. The volume of hazardous wastes generated from Alternative 1 activities is estimated to be 1,500 lbs (680 kg) per year. Due to this projected increase in the volume of hazardous waste generated, Alternative 1 would have the potential to result in significant impacts (i.e., to soils, surface water, groundwater, air, or biota). However, the increase in hazardous waste would be handled and disposed of per applicable regulations and BMPs and SOPs (see Volume 7); therefore, the increase in volume would result in less than significant impacts. 17.2.2.4 Radiological Material Operation Emergency response, emergency repair, and radioactive waste management capabilities exist at Polaris Point. There would be less than significant impacts on the existing operations, and the slight increases in hazardous substances would be managed in accordance with existing BMPs and SOPs (Volume 7). All radioactive waste management operations would be in conformance with Naval Sea Systems Command (NAVSEA) regulations. No radioactive waste would be brought ashore on Guam, therefore, these activities would result in less than significant impacts. 17.2.2.5 Summary of Alternative 1 Impacts Table 17.2-1 summarizes Alternative 1 impacts. Table 17.2-1. Summary of Alternative 1 Impacts Area Project Activities Project Specific Impacts Onshore Less than significant impacts to soils, surface water, groundwater, air, Construction and/or biota related to construction activities Less than significant impacts to soils, surface water, groundwater, air, Operation and/or biota related to operation activities Offshore Less than significant impacts to soils, surface water, groundwater, air, Construction and/or biota related to construction activities Less than significant impacts to soils, surface water, groundwater, air, Operation and/or biota related to operation activities 17.2.2.6 Alternative 1 Proposed Mitigation Measures No mitigation measures are identified for potential hazardous materials impacts. Potential BMPs and SOPs include, but are not limited to those summarized in Table 17.2-2 and Table 17.2-3 which also summarizes potential effects and impacts, related to Alternative 1. Volume 7 contains a complete list of applicable BMPs and SOPs. The BMPs and SOPs would be used to: Prevent, contain, and/or clean up spills and leaks to protect human health and the environment Provide personnel training and operational protocol and procedures to protect human health and the environment Ensure DMRO ability to properly manage and dispose of anticipated hazardous materials Protect overall human health, welfare, and the environment Properly identify, manage and dispose of MEC associated with construction and operation of the expanded mission facilities Volume 4: Aircraft Carrier Berthing 17-3 Hazardous Materials and Waste

Potential Activity (Cause) Hazardous materials associated with increased aircraft carrier berthing days Table 17.2-2. Hazardous Materials Consequences, BMPs, and SOPs Potential Effect Potential Impacts BMPs and SOPs Increased transport of hazardous materials to Guam Increased hazardous materials transfer and use on Guam Spill, leak, or release impacts during transport/transfer between DoD locations resulting in increased risks of environmental media contamination (soil, surface water, and groundwater) Adverse impacts and increased risks to human health and/or the environment including terrestrial and marine ecosystems Update/implement hazardous materials management plans and facility response plans Update/implement spill prevention, control and countermeasure (SPCC) plans (training, spill containment and control procedures, cleanup, notifications, etc.). Also, ensure personnel are trained in accordance with spill prevention, control, and cleanup methods Implement aggressive hazardous materials minimization plans that substitute hazardous materials for non-hazardous materials as applicable Ensure DoD and contractor personnel are trained as to proper labeling, container, storage, staging, and transportation requirements for hazardous materials As necessary, expand DRMO s sufficient hazardous materials storage, transportation, and disposal capacity prior to any expected increases Verify through surveillance and inspections full compliance with federal, state and local, regulations and adherence to DoD requirements. Implement corrective actions as necessary Minimize the risk of uncontrolled leaks, spills, and releases through industry accepted methods for spill prevention, containment, control, and abatement Legend: DRMO = Defense Reutilization and Marketing Office, HMMP = Hazardous Material Management Plan, SPCC = Spill Prevention Control and Countermeasures. Volume 4: Aircraft Carrier Berthing 17-4 Hazardous Materials and Waste

Potential Activity (Cause) Hazardous waste transport to Guam and transfer on Guam Table 17.2-3. Hazardous Waste Consequences, BMPs, and SOPs Potential Effect Potential Impacts BMPs and SOPs Increased transport of hazardous waste to Guam Spill, leak, or release impacts during transport/transfer between DoD locations resulting in increased risks of environmental media contamination (soil, surface water, and groundwater) Adverse impacts and increased risks to human health and/or the environment including terrestrial and marine ecosystems Update/implement hazardous waste management programs and facility response plans Update/implement SPCC plans (training, spill containment and control procedures, cleanup, notifications, etc.) Also, ensure personnel are trained in accordance with spill prevention, control, and cleanup methods Ensure DoD and contractor personnel are trained as to proper labeling, container, storage, staging, and transportation requirements for hazardous waste Implement aggressive hazardous waste minimization plans that substitute hazardous waste for nonhazardous waste as applicable As necessary, expand DRMO s sufficient hazardous materials storage, transportation, and disposal capacity prior to any expected increases Verify through surveillance and inspections full compliance with federal, state and local, regulations, and adherence to DoD requirements. Implement corrective actions as necessary Minimize the risk of uncontrolled leaks, spills, and releases through industry accepted methods for spill prevention, containment, control, and abatement Legend: DRMO = Defense Reutilization and Marketing Office, HMMP = Hazardous Materials and Management Plan, SPCC = Spill Prevention Control and Countermeasures. 17.2.3 Alternative 2 Former Ship Repair Facility (SRF) The potential increased opportunity for adverse impacts relative to hazardous materials, toxic substances, and hazardous waste primarily would be a function of the number of aircraft berthing days and not a function of the various berthing options. Variances between the alternatives would result in negligible differences in the overall potential hazardous substance impacts. 17.2.3.1 Summary of Alternative 2 Impacts The impacts for Alternative 2 would be the same as for Alternative 1. 17.2.3.2 Alternative 2 Proposed Mitigation Measures Because the impacts for Alternative 2 would be the same as for Alternative 1, the same BMPs and SOPs would be used for Alternative 2 that would be used for Alternative 1. Due to the use of BMPs and SOPs, no mitigation measures are identified for Alternative 2. Volume 4: Aircraft Carrier Berthing 17-5 Hazardous Materials and Waste

17.2.4 No-Action Alternative The no-action alternative means that there would be no increase in aircraft carrier visits and the current tempo would continue at Kilo Wharf. Hazardous materials and wastes, toxic substances, and emergency response to radioactive incidents would be comparable to the action alternatives, but the volume of waste generated would be less. 17.2.5 Summary of Impacts Table 17.2-4 summarizes the potential impacts of each action alternative and the no-action alternative. A text summary is provided below. Table 17.2-4. Summary of Impacts Alternative 1 Alternative 2 No-Action Alternative Soils, Surface Water, Groundwater, Air, and/or Biota Impacts LSI LSI Less than significant adverse impacts The impacts would be the same as for would occur Alternative 1 As with all operations using hazardous substances, there is a possibility for an inadvertent leak, spill, or release NI No added impacts Legend: LSI = less than significant impact; NI = no impact. The proposed increase in aircraft carrier berthing days would result in increased opportunities for adverse environmental impacts. These potential impacts could occur due to increased transportation, handling, use, and disposal of hazardous materials and hazardous wastes. However, there are various BMPs and SOPs (Volume 7) in place to prevent unintended releases of these substances. These include, but are not limited to: Spill prevention control and countermeasures plans Facility response plans Waste management plans Pollution prevention plans Hazardous material/waste management plans Mandatory personnel hazardous material and hazardous waste training Waste minimization plans Waste labeling, storage, packaging, staging, and transportation procedures DoD hazardous materials/hazardous waste management requirements Federal, state, and local laws and regulations Ensure that site planning and activities are conducted in accordance with Naval Ordnance Safety and Security Activity (NOSSA) Instruction 8020.15B Explosives Safety Review, Oversight, and Verification of Munitions Responses (Navy 2009). Despite expected increases in hazardous materials and hazardous wastes, less than significant impacts are anticipated as long as the BMPs and SOPs discussed above and in Volume 7 are implemented and related plans and procedures updated and modified as appropriate to meet the potential increased demand upon Volume 4: Aircraft Carrier Berthing 17-6 Hazardous Materials and Waste

DRMO regarding hazardous substance transportation, handling, storage, use, and disposal. Note that a Joint Military Master Plan provides specific details regarding several new facilities. These new facilities will be required to store, handle, and dispose of the estimated increases in hazardous substances that would occur from the potential DoD unit transfers to Guam. 17.2.6 Summary of Proposed Mitigation Measures No mitigation measures are identified. Potential BMPs and SOPs are not considered mitigation measures and include, but are not limited to those summarized in Table 17.2-5 that may be used for both offshore and onshore aircraft carrier activities. A comprehensive listing of BMPs and SOPs is included in Volume 7. Table 17.2-5. Summary of BMPs and SOPs Alternative 1 Alternative 2 Onshore and Offshore Activities Update/implement HMMP s and HWMP s. Update/implement facility response plans. Update/implement SPCC plans (training, spill containment and control procedures, clean up, notifications, etc.). Ensure DoD personnel are trained as to proper labeling, container, storage, staging, and transportation requirements for hazardous substances. Also, ensure they are trained in accordance with spill prevention, control, and clean-up methods. Implement aggressive hazardous waste minimization plans that substitute hazardous waste for nonhazardous or less toxic waste as applicable and use LEEDS criteria. As necessary, expand DRMO s sufficient hazardous materials storage, transportation, and disposal capacity prior to any expected increases. Verify through surveillance and inspections full compliance with federal, state and local, regulations and adherence to DoD requirements. Implement corrective actions as necessary Minimize the risk of uncontrolled leaks, spills, and releases through industry accepted methods for spill prevention, containment, control, and abatement. Ensure that site planning and activities are conducted in accordance with Naval Ordnance Safety and Security Activity (NOSSA) Instruction 8020.15B Explosives Safety Review, Oversight, and Verification of Munitions Responses (Navy 2009). The BMPs and SOPs would be the same as for Alternative 1. Legend: HMMP = Hazardous Materials Management Plan; HWMP = Hazardous Waste Management Plan; SPCC = Spill Prevention Control and Countermeasures Volume 4: Aircraft Carrier Berthing 17-7 Hazardous Materials and Waste

This Page Intentionally Left Blank. Volume 4: Aircraft Carrier Berthing 17-8 Hazardous Materials and Waste