MATERIAL ALLOWANCES AND UNIT PRICES

Similar documents
SECTION GENERAL REQUIREMENTS PART 1 - GENERAL I 1 GENERAL REQUIRMENTS

Bi-Directional Static Load Testing of Drilled Shafts

Bi-Directional Static Load Testing of Drilled Shafts

SPECIAL SPECIFICATION 6664 Level (3) Communications System

SPECIAL SPECIFICATION 6658 Time Warner Communications System

SECTION BASIC ELECTRICAL MATERIALS AND METHODS

DOCUMENT ADDENDA AND MODIFICATIONS

SPECIAL SPECIFICATION. Water and Sewer System and Appurtenances

SECTION UNIT PRICES. A. This Section specifies administrative and procedural requirements for the unit prices.

Bid Form. Schedule 2 Alternate Bid No. 4: Install gutters and downspouts. (100% Local Funded)

SECTION MEASUREMENT AND PAYMENT

Division IV Section 4100 Measurement and Payment PUBLIC WORKS DEPARTMENT

1993 SPECIFICATIONS CSJ SPECIAL SPECIFICATION ITEM 4110 CONCRETE ENCASED DUCT BANK

B. RESIDENTIAL MASTER PLUMBER $ $ $

City of Tacoma Tacoma Public Utilities Tacoma Power. REQUEST FOR BIDS PG F Alder Lake Park Sewage Treatment Expansion

Addendum No. 1 GORDON WATER MAIN REPLACEMENT PWP Bid No.: WA TMWA Capital Project No.: October 3, 2018

ITEM L-119 AIRPORT OBSTRUCTION LIGHTS DESCRIPTION

SECTION CONCRETE CURBS, GUTTERS AND SIDEWALKS

CW 3530 MANUAL IRRIGATION SYSTEM TABLE OF CONTENTS

The following Specifications of the Special Provisions have been revised and/or added (in red):

MEASUREMENT & PAYMENT (CITY FUNDED PROJECTS)

ITEM 555 CHAIN LINK FENCING

SECTION A1 EXCAVATION AND BACKFILL GENERAL

City of Pekin- Zoning and Inspections Department 111 S. Capitol Street, Pekin, Illinois (309)

17.0 CONSTRUCTION OF OPEN DRAINAGE SYSTEMS

Town of Milton Halton Paramedic Services Station No. 17 and Milton Fire Station No. 5 Tender No and

ITEM 706 PIPE SLOPE DRAIN

SUPPLEMENTAL TECHNICAL SPECIFICATION

APPENDIX A MEASUREMENT AND PAYMENT

SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS

SECTION STORM DRAINAGE

ITEM 461 STRUCTURAL PLATE STRUCTURES. Galvanized steel plates shall conform to AASHTO M167 and aluminum plates shall conform to AASHTO M219.

SPECIAL SPECIFICATION 6666 Charter Communications System

ITEM 460 REINFORCED CONCRETE PIPE Description. This Item shall govern for the furnishing of reinforced concrete pipe.

Item Name Description Unit of Measure Mobilization Per WSDOT Lump Sum

UPRR INDUSTRIAL LEAD BRIDGE T-WALL RETAINING WALL SYSTEM 5.0 x 7.5 UNITS DESIGN UNIT 018 WORK PACKAGE 04

SPECIAL SPECIFICATION 7441 Remove Components of Existing Traffic Management System

1ARCHITECTURE TABLE OF CONTENTS

Item 247 Flexible Base

Item 247 Flexible Base

SECTION MEASUREMENT AND PAYMENT

SECTION 2831 ITEM F-162 CHAIN-LINK FENCES

TECHNICAL SPECIFICATION

SECTION STEEL H PILES. A. Section includes steel H piles embedded into drilled concrete piers.

TOWN OF LABRADOR CITY FORM OF TENDER TLC SUPPLY & INSTALLATION OF CONCRETE FLOOR

Rapid Axial Load Testing of Drilled Shafts

INSTALLATION OF AIRFIELD LIGHTING UNDERGROUND ELECTRICAL DIRECTIONAL BORE DUCT

DEPARTMENT OF TRANSPORTATION STATE OF GEORGIA SPECIAL PROVISION. Section 550 Storm Drain Pipe, Pipe-Arch Culverts, and Side Drain Pipe

Reinforced Soil Slopes (RSS)

SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION

[ADD / DELETE / MODIFY FOLLOWING ITEMS AS APPROPRIATE TO THE PROJECT:]

SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES

SECTION EROSION CONTROL DEVICES

2010 IDC WATER AND SEWER CONSTRUCTION PACKAGE III 12/11/2009 SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B RA

SECTION 410 FENCES All materials shall be new and without flaws or defects of any type GENERAL

City of Omaha Plans and Permits Commercial Alterations and Conversions Building Permit Submittal Checklist

ST. TAMMANY PARISH PATRICIA P. BRISTER PARISH PRESIDENT

SECTION C1 DUCTILE IRON PIPE AND FITTINGS GENERAL

Final Estimates Level 2

CHAPTER 2 REVIEW QUESTIONS

CONTRACT PROPOSAL/CONTRACT ACCEPTANCE HIGDON LOOP ROAD BRIDGE

San Antonio Water System Standard Specifications for Construction ITEM NO. 813 WATER SERVICE FOR FIRELINES

C. Requirements of this Section relate to customized fabrication and installation procedures, not production of standard products.

186 TH AIR REFUELING WING KEY FIELD, MERIDIAN, MS ADDENDUM #1 PERFORMANCE WORK STATEMENT

RFB for Wastewater Force Main #3. October 2, Addendum 3: Clarifications and Questions from Pre-Bid Meeting Answered

CITY OF UNION, OREGON TECHNICAL SPECIFICATIONS SECTION 9 UNDERGROUND UTILITIES

ADDENDUM NO. 1 TO THE INVITATION TO BID - ITB # RAMP & SIDEWALK REPAIR PROJECT CITY OF ANN ARBOR, MICHIGAN

SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DRILLED SHAFTS

c. Sprinkler layout. Sprinkler layout may be modified to adjust for field conditions provided it complies with part

SECTION PUBLIC WATER SERVICE CONNECTIONS

The work required for this project includes, but is not limited to, the following items, not listed in order of execution.

RESIDENTIAL BUILDING PERMIT GUIDE FOR MULTI-FAMILY DWELLINGS

REGIONAL CONSTRUCTION STANDARDS

PLUMBING BUILDING SCOPE OF WORK

Ice Rink Renovation & New Clubhouse

SECTION UTILITY POLYETHYLENE CONTAINMENT PIPE SYSTEMS

Building Permit Application

SECTION MEASUREMENT AND PAYMENT

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012

City of Westerville Guide to Commercial Inspections

April 11, 2017 INVITATION TO TENDER ITT No. PS CONTRACTOR FOR MARPOLE PLACE RESTORATION. ADDENDUM No. 5

SECTION UNIT PRICES. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION PAVING AND SURFACING

SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS

Standards and Procedures Security Room Construction/Renovations At University of North Carolina Wilmington

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

BID FORM (LUMP SUM CONTRACT)

CITY OF FARGO SPECIFICATIONS REMOVALS

SPECIAL SPECIFICATION 5989 Settlement Gauge

Document Supplementary Conditions State of Ohio Standard Requirements for Public Facility Construction

CITY OF FARGO SPECIFICATIONS REMOVALS

ADDENDUM 2 - JULY 14, 2015

Community Services Dept., City of Mississauga Subdivision Requirements Manual Page 1 of 5 Specifications Revised: September 26, 2005

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 300 EARTHWORK, GRADING, AND GRAVELING

INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2

SPECIAL PROVISIONS - SP2014 BOOK Page 1 October 8, 2013

SPECIAL SPECIFICATION 5925 Polyvinyl Cloride (PVC) Sewer Pipe and Fittings

NOTE TO THE SPECIFYING ARCHITECT REGARDING SECTION STAGE EQUIPMENT (TWO PROSCENIUMS)

SECTION C10 CLEANING AND CEMENT LINING GENERAL

(D) Surface Slope Bituminous patch in front of the truncated domes must not exceed 5% measured perpendicular to the flow line or edge of roadway.

Transcription:

PART 1 - GENERAL 1.1 SECTION INCLUDES ADDITIONS AND RENOVATIONS TO WEST YORK AREA HIGH SCHOOL - #1231 SECTION 012200 MATERIAL ALLOWANCES AND UNIT PRICES A. Measurement and payment criteria applicable to portions of the Work performed under a unit price payment method. B. Defect assessment and non-payment for rejected work. 1.2 AUTHORITY A. Measurement methods delineated in the individual specification sections compliment the criteria of this section. B. Take all measurements and compute quantities. The Owner s Representative shall verify measurements and quantities. C. Assist Owner s Representative by providing necessary equipment, workers, and survey personnel as required. 1.3 MATERIAL ALLOWANCES A. Quantities indicated in the Bid Form, as defined in individual Specification sections, are for Bidding and Contract purposes only and are in excess of quantities required to complete the Work indicated on the Drawings. Quantities and measurements supplied or placed in the Work will be verified by the Owner s Representative and shall determine payment. B. If the actual Work requires more or fewer quantities than those quantities indicated, provide the required quantities at the unit sum/prices contracted. C. If the actual Work requires a 10 percent or greater change in quantity than those quantities indicated, the Owner may claim for a Contract Price adjustment. D. Inspection: Inspect products covered by an allowance promptly upon delivery for damage or defects. E. Preparation: Coordinate materials and their installation for each allowance with related materials and installations to ensure that each allowance item is completely integrated with related construction activities. F. Material Allowances: 1. Include in the Contract Sum all material allowances defined in the Contract Documents. No portion of the material allowance shall to be utilized without approval from Owner. 2. Quantities: Where allowance is stated as for a certain quantity: a. The Contract Sum will be considered to include the quantity indicated. b. Actual quantities will be determined by measurement, and the contract sum will be adjusted by Change Order using the unit price stated. c. Return unused materials to the manufacturer or supplier for credit to the Owner, after installation has been completed and accepted. d. At the project closeout s Final Payment, credit the remaining unused material allowance amounts to the Owner by change Order. All unused material allowances will be held until Final Payment. MATERIAL ALLOWANCES AND UNIT PRICES 012200-1

1.4 MEASUREMENT OF QUANTITIES ADDITIONS AND RENOVATIONS TO WEST YORK AREA HIGH SCHOOL - #1231 A. Measurement Devices: 1. Weigh Scales: Inspected, tested and certified by the applicable state Weights and Measures department within the past year. 2. Platform Scales: Of sufficient size and capacity to accommodate the conveying vehicle. 3. Metering Devices: Inspected, tested and certified by the applicable State department within the past year. B. Measurement by Weight: Concrete reinforcing steel, rolled or formed steel or other metal shapes will be measured by handbook weights. Welded assemblies will be measured by handbook or scale weight. C. Measurement by Volume: Measured by cubic dimension using mean length, width and height or thickness. D. Measurement by Area: Measured by square dimension using mean length and width or radius. E. Linear Measurement: Measured by linear dimension, at the item centerline or mean chord. F. Stipulated Sum/Price Measurement: Items measured by weight, volume, area, or linear means or combination, as appropriate, as a completed item or unit of the Work. 1.5 PAYMENT A. Unit Prices: 1. Indicate unit prices for each item on Bid Form. 2. The Owner reserves the right to reject the Contractor s measurement of work-in-place that involves use of established unit prices, and to have this Work measured by an independent surveyor acceptable to the Contractor at the Owner s expense. 3. Accepted unit prices will be included in the Agreement. 4. Accept Unit Prices will be used to adjust the Final Contract Sum. The same accepted unit price will be used for addition to, or deduction from the Contract Sum. B. Payment Includes: Full compensation for all required labor, supervision, Products, tools, equipment, plant, transportation, services and incidentals; erection, application or installation of an item of the Work; overhead and profit. C. Final payment for Work governed by unit prices will be made on the basis of the actual measurements and quantities verified by the Owner s Representative and accepted by the Architect/Engineer multiplied by the unit sum/price for Work which is incorporated in or made necessary by the Work. 1.6 DEFECT ASSESSMENT A. Replace the Work, or portions of the Work, not conforming to specified requirements. B. If, in the opinion of the Architect\Engineer, it is not practical to remove and replace the Work, the Architect\Engineer will direct one of the following remedies: 1. The defective Work may remain, but the unit sum/price will be adjusted to a new sum/price at the discretion of the Architect\Engineer 2. The defective Work will be partially repaired to the instructions of the Architect\Engineer, and the unit sum/price will be adjusted to a new sum/price at the discretion of the Architect\Engineer. C. The individual specification sections may modify these options or may identify a specific formula or percentage sum/price reduction. MATERIAL ALLOWANCES AND UNIT PRICES 012200-2

D. The authority of the Architect\Engineer to assess the defect and identify payment adjustment is final. 1.7 NON-PAYMENT FOR REJECTED PRODUCTS A. Payment will not be made for any of the following: 1. Products wasted or disposed of in a manner that is not acceptable. 2. Products determined as unacceptable before or after placement. 3. Products not completely unloaded from the transporting vehicle. 4. Products placed beyond the lines and levels of the required Work. 5. Products remaining on hand after completion of the Work. 6. Loading, hauling, and disposing of rejected Products. 1.8 SCHEDULE OF MATERIAL ALLOWANCES A. The Material Allowance listed below shall be include in the Base Bid. The total value of the Material Allowance shall be calculated by multiplying the quantity by the corresponding Unit Price. Unused quantities of the Material Allowance shall be credited to the Owner based on using the remaining quantities and their respective unit prices. Should the quantities required exceed those of the Material Allowance the Unit Prices shall govern and be the basis of determining the additional compensation due to the Contractor. B. General Trades Contract: 1. Material Allowance #G1: Provide Cementitious underlayment for restoration of floors to receive new finishes. Section 035400 - Cementitious Underlayment. Base bid shall include an amount to provide 5000 square feet of underlayment at a thickness of 1/8 inch based on Unit Price #G1. 2. Material Allowance #G2: Provide two tons of structural steel to be installed in areas directed by the Architect or Construction Manager based on Unit Price #G2 3. Material Allowance #G3 Excavate and remove from site 1000 CY unsuitable soil materials up to 2 depth excluding rock conditions based on Unit Price #G3 4. Material Allowance #G4: Provide 1000 CY imported suitable soil replacement up to 2 depth including compaction to road base standards based on Unit Price #G4 C. Plumbing Contract: 1. Material Allowance #P1: 20 linear ft. 4" diameter PVC soil pipe, installed below grade including cutting, patching, excavation, and all appurtenances necessary, based on Unit Price #P1. 2. Material Allowance #P2: 50 linear ft.: ½ diameter copper pipe with 1 inch of insulation, installed, including fittings, hangers, and all appurtenances necessary based on Unit Price #P2. 3. Material Allowance #P3: Five (5):1/2" ball valves, installed based on Unit Price #P3. 4. Material Allowance #P4: 50 linear ft. 1-1/2 diameter copper pipe with 1 inch of insulation, installed, including fittings, hangers, and all appurtenances necessary based on Unit Price #P4. 5. Material Allowance #P5: 50 linear ft. 3/4 diameter steel pipe (nat. gas) installed, including fittings, hangers, and all appurtenances necessary based on Unit Price #P5 6. Material Allowance #P6: Five (5): 2" ball valves, installed based on Unit Price #P6. 7. Material Allowance #P7: 50 linear ft. 4 diameter cast iron storm water pipe with ½ insulation, installed based on Unit Price #P7. 8. Material Allowance #P8: Ten (10) sprinkler heads installed, based on Unit Price #P8. 9. Material Allowance #P9: 20 linear ft. 1 diameter steel pipe (sprinkler) installed, including fittings, hangers, and all appurtenances necessary based on Unit Price #P9. D. H.V.A.C. Contract: 1. Material Allowance #H1: 20-1-1/4 Ball Valves, installed, based on Unit Price #H1. 2. Material Allowance #H2: 20-12 x 8 volume damper based on Unit Price #H2. 3. Material Allowance #H3: 4 Digital Temp Sensors based on Unit Price #H3 MATERIAL ALLOWANCES AND UNIT PRICES 012200-3

4. Material Allowance #H4: 4 Digital Humidity Sensors based on Unit Price #H4 5. Material Allowance #H5: 2000 lbs Galvanized steel ductwork installed, including insulation, based on Unit Price #H5 E. Electrical Contract: Refer to Section 260010 - General Electrical Requirements for Unit price descriptions and quantity allowances to be included in the Base Bid. 1. Material Allowance #E1: Duplex Receptacle & Wiring: b. Allowance Quantity: 75 assemblies 2. Material Allowance #E2: Exit Sign & Wiring: 3. Material Allowance #E3: 2 x 4 Type F1 Light Fixture & Wiring: 4. Material Allowance #E4: 2 x 4 Type F2 Light Fixture & Wiring: 5. Material Allowance #E5: Heat or Smoke Detector & Wiring: 6. Material Allowance #E6: Duct Detector & Wiring: 7. Material Allowance #E7: Fire Alarm Pull Station & Wiring: 8. Material Allowance #E8: Fire Alarm Visual Device & Wiring: c. Material Allowance #E9: Fire Alarm Addressable Device & Wiring: d. Description: Refer to Section 260010. e. Allowance Quantity: 15 assemblies 9. Material Allowance #E10: Fire Alarm Speaker: 10. Material Allowance #E11: Intercom Speaker & Wiring: 11. Material Allowance #E12: Secondary Clock & Wiring: 12. Material Allowance #E13: C4 Outlet: b. Allowance Quantity: 50 assemblies F. Fire Protection Contract: 1. Material Allowance #FP1: Ten (10) sprinkler heads installed, based on Unit Price #FP1. 2. Material Allowance #FP2: 20 linear ft. 1 diameter steel pipe (sprinkler) installed, including fittings, hangers, and all appurtenances necessary based on Unit Price #FP2. 1.9 SCHEDULE OF UNIT PRICES A. The Base Bid for each prime contract shall include the Material Allowances specified above. Should the quantities required exceed those of the Material Allowance the Unit Prices shall govern be the Basis of determining the additional compensation due to the Contractor: MATERIAL ALLOWANCES AND UNIT PRICES 012200-4

B. General Trades Contract: 1. Unit Price #G1: Provide cementitious underlayment for restoration of floors to receive new finishes where directed by the Architect or Construction Manager per square foot. 2. Unit Price #G2: Provide structural steel where directed by the Architect or Construction Manager per ton. 3. Unit Price #G3: Excavate and remove from the site unsuitable soil materials up to 2 depth excluding rock conditions where directed by the Architect or Construction manager per cubic yard. 4. Unit Price #G4: Provide suitable soil replacement up to 2 depth including compaction to road base standards where directed by the Architect or Construction manager per cubic yard. C. Plumbing Contract: 1. Unit Price #P1: 4" diameter PVC soil pipe below grade. Provide required cutting, patching, excavation and support material and labor to install per linear foot. 2. Unit Price #P2: 1/2" diameter copper pipe with 1 inch of insulation. Provide support material and labor to install per linear foot. 3. Unit Price #P3: 1/2 Ball Valve. Each 4. Unit Price #P4: 1-1/2" diameter copper pipe with 1 inch of insulation. Provide support material and labor to install per linear foot. 5. Unit Price #P5: 3/4" diameter steel pipe (Gas). Provide support material and labor to install per linear foot. 6. Unit Price #P6: 2 Ball Valve. Each 7. Unit Price #P7: 4 diameter cast iron storm water pipe with ½ insulation. Provide support material and labor to install per linear foot. 7. Unit Price #P8: Sprinkler head Each 8. Unit Price #P9: 1" diameter steel pipe (Sprinkler). Provide support material and labor to install per linear foot. D. H.V.A.C. Contract H.V.A.C. Contract: Provide all miscellaneous and incidental material and labor required to install the coordination work items listed below. 1. Unit Price H-1: Provide 1-1/4 Ball Valve in loop water piping and insulated fitting in accordance with applicable Division 23 Sections. Per assembly. 2. Unit Price H-2: Provide 12 x 8 volume damper in accordance with applicable Division 23 Sections. Per assembly. 3. Unit Price H-3: Digital Temp Sensors and labor to install and program. Each. 4. Unit Price H-4: Digital Humidity Sensors and labor to install and program. Each. 5. Unit Price H-5: Galvanized steel ductwork. Per lbs. E. Electrical Contract: Refer to Section 260010 - General Electrical Requirements for Unit Price descriptions and unit of measurement. 1. Unit Price #E1: Duplex Receptacles and Wiring: 2. Unit Price #E2: Exit Sign and Wiring: 3. Unit Price #E3: 2x4 Type F1 Light Fixture and Wiring: 4. Unit Price #E4: 2x4 Type F2 Light Fixture and Wiring: 5. Unit Price #E5: Heat or Smoke Detector and Wiring: 6. Unit Price #E6: Duct Detector and Wiring: 7. Unit Price #E7: Fire Alarm Pull Station and Wiring: MATERIAL ALLOWANCES AND UNIT PRICES 012200-5

8. Unit Price #E8: Fire Alarm Audible/Visual Device and Wiring: 9. Unit Price #E9: Fire Alarm Addressable Device & Wiring 10. Unit Price #E10: Fire Alarm Speaker: 11. Unit Price #E11: Intercom Speaker and Wiring: 12. Unit Price #E12: Secondary Clock and Wiring: 13. Unit Price #E13: C4 - Outlet: PART 2 - PRODUCTS Not Used PART 3 - EXECUTION Not Used END OF SECTION MATERIAL ALLOWANCES AND UNIT PRICES 012200-6