Permits To Take Water (PTTW)

Similar documents
Re: Bottled Water Technical Guidance Document (EBR Registry Number: )

4.05. Groundwater Program. Chapter 4 Section. Background. Follow-up to VFM Section 3.05, 2004 Annual Report. Ministry of the Environment

WATER TAKING AND TRANSFER REGULATION, (O.REG. 285/99) DRAFT 2004

Irrigation Introduction. Rebecca Shortt Ontario ministry of Agriculture, Food and Rural Affairs 20 January, 2018

CBA National Environment, Energy and Resources Law Summit: Water Law 2011 Presented by Jennifer Danahy. Ontario Case Study: Findlay Creek Village

FREQUENTLY ASKED QUESTIONS GUELPH/GUELPH-ERAMOSA TIER 3 WATER BUDGET AND LOCAL AREA RISK ASSESSMENT STUDY

The Effluent Permitting Process under the Environmental Management Act. An Overview for Mine Project Applicants

Content Copy Of Original

Conservation Ontario s Response to Climate Ready: Ontario s Adaptation Strategy and Action Plan June 2011

Content Copy Of Original

GUIDE TO APPLYING FOR APPROVAL (AIR & NOISE)

Source Protection Bulletin: Requirements for Municipal Drinking Water Systems August 2018

GUIDE. DWWP Amendments Licence Amendments Licence Renewals & New System Applications. Municipal Residential Drinking Water Systems

Presentation to the Environmental Advisory Council Regarding PEI s New Water Act

Renewable Energy Approvals

Pursuant to Section 34 of the Ontario Water Resources Act, R.S.O this Permit To Take Water is hereby issued to:

On-Site Sewage Systems Maintenance Inspections

British Columbia s. VVater Act. Modernization. Policy Proposal on British Columbia s new Water Sustainability Act. December 2010

Overview of Ministry Contaminated Sites and Brownfields Program

SITE ALTERATION PERMIT INFORMATION PACKAGE FOR LAND OWNERS

Groundwater Management Challenges. Jason Moeckel Minnesota DNR Division of Ecological and Water Resources

Pits & Quarries in Ontario. Module 3 Aggregate Extraction & Source Water Protection

Streamflow and Weather Monitoring

WATERSHED. Maitland Valley. Report Card 201

Policy Review of Municipal Stormwater Management in the Light of Climate Change Summary Report

Permit To Take Water Inspection Report

Information Requirements Table for Liquid Waste

MUNICIPAL DRINKING WATER LICENCE

DFO s Fish Habitat Management Program

MUNICIPAL DRINKING WATER LICENCE

Lake Erie Source Protection Region. Guelph-Guelph/Eramosa Water Quantity Policy Development Study. Discussion Paper. Drinking Water Threats:

TRANSPORTATION AND ENVIRONMENTAL SERVICES Rapid Transit Initiative

MUNICIPAL DRINKING WATER LICENCE

Guide. Preparing a resource consent application to take surface water, including replacing a deemed permit

Agricultural Operation Strategy or Plan Development (AOSPD) Certificate Core Competencies

Update on Environmental Assessment Program Improvements & Municipal Class Environmental Assessment

Introduction. Mandate

OAK RIDGES MORAINE Groundwater Program

The Environment and Mining An Overview of Ontario s Regulatory Framework

MUNICIPAL DRINKING WATER LICENCE

PREVIOUS WORKS. Sewage Works #1

Content Copy Of Original

DRAINAGE. Actions for Tomorrow. Drainage. Actions Today

Content Copy Of Original

ORDINANCE NO. C.S. AN ORDINANCE REGULATING GROUNDWATER RESOURCES WITHIN THE COUNTY OF STANISLAUS

FOREST AND RANGE PRACTICES ACT

TABLE OF CONTENTS 8.0 CITY OF GUELPH...

Content Copy Of Original

Summary Assessment of Provincial Legislative Framework ONTARIO 1

WATER SUPPLY WELLS - REQUIREMENTS AND BEST MANAGEMENT PRACTICES

The aims of the Kaipara River Catchment Water Allocation Strategy are:

AN ACT to renumber (1); to renumber and amend (3) and

You have applied in accordance with Section 53 of the Ontario Water Resources Act for approval of:

AGRICULTURAL IRRIGATION POLICY

Central Greenwaste and Firewood Monitoring Programme Biennial Report Technical Report

Water Rights And Summer Stream Conditions

OurFuture. Protecting. March Ontario Provincial Plans and Conservation Authorities

CONSERVING OUR FUTURE

( ) Page: 1/10 NOTIFICATION

Subject Restricted Areas Section 13, Public Lands Act. Number same

The Public Trust Doctrine and Groundwater Law in Wisconsin

ORIGINAL EFFECTIVE DATE

Proposed Food and Organic Waste Framework

Technical Bulletin. Permit to Take Water Program Monitoring and Reporting of Water Takings. November 2006

Ontario s Approach to Drinking Water Source Protection

Content Copy Of Original

Ministry of the Environment and Climate Change. Follow-Up on VFM Section 3.12, 2014 Annual Report RECOMMENDATION STATUS OVERVIEW

Technical Rules - March 2017

Technical Rules: Assessment Report. Clean Water Act, 2006

Surface Water Management Strategy

Content Copy Of Original

The Wetland Biofilter System:

Hello my name is Joy Loughry and I am with the groundwater technical unit of the Minnesota department of natural resources. Today I am going to talk

Overview of Water Management in Alberta Lessons for the Okanagan Basin?

Responsible Mining in the Lake Superior Basin Dec. 2013

CLOCA Rural & Agricultural Guide to Permits

Presentation to RCCAO: Excess Soil Management: A Guide for Best Management Practices. Central Region Operations Division.

Unify efforts to address water resources for the Big Sky area and surrounding zone of influence in three co-equal water resources focus areas:

Water - policy and government regulation for heavy oil and oilsands development

Environmental Regulation & Mine Permitting in Ontario

L.I WATER USE REGULATIONS, 2001 ARRANGEMENT OF REGULATIONS

Policy # Section Biodiversity Policy and Program Development

E2. Water quantity, allocation and use

Nevada Water Law. Water Permits The application process To acquire a water permit, an application must be made on an approved form and filed

FACT SHEET: Water Rights and Property Rights

Jordan River Basin. Planning for the Future. Salt Lake County Watershed Symposium (August 11, 2011) Todd Stonely Utah Division of Water Resources

Section 1: Activity Description

Reasons for Ministers Decision

Theresa McClenaghan Executive Director and Counsel Canadian Environmental Law Association October 2011

The Pipelines Regulations, 2000

Content Copy Of Original

SCRCA SECTION 28 WETLAND POLICY

Bureau of Drinking Water & Groundwater Wisconsin DNR

Monarch Castlepoint Kipling South Development Limited Bathurst St Vaughan, ON L6A 4B6

Chapter 24 Government Relations Safe Drinking Water in Northern Settlements 1.0 MAIN POINTS

Approval and Permitting Requirements Document for Renewable Energy Projects

Content Copy Of Original

Description Section. 52,100 tonnes of steel tube processed per year; 26,900 tonnes of steel coil processed per year;

University of Rhode Island Cooperative Extension Strategic Plan Public Input Meeting

Canada-Ontario Domestic Action Plan for Lake Erie Phosphorus Reduction. Agriculture Sector Working Group April 19, 2017

Transcription:

Permits To Take Water (PTTW) Presentation to: CTC Source Protection Committee Provided by: Harald Schraeder Ministry of the Environment Operations Division Program Specialist (Water) April 7, 2009 1

Objectives Overview of PTTW Program: Purpose & Principles, Law & Policy, Fast Facts PTTW Program Delivery: Application process, Notification/Consultation What a PTTW Does What a PTTW Does Not Do Compliance High Use Watersheds PTTW & Ontario Low Water Response Questions 2

Purpose: PTTW Program Purpose & Principles Ensure fair sharing of water; promote stewardship of the resource; prevent unacceptable interference with other use of water; recognize and safeguard the right of the ecosystem to water for optimal function and to sustain the inherent natural variability of ecosystems. Principles: Enable reasonable use of water and protect the ecosystem Prevent unacceptable interference with other water values Use adaptive management Consider cumulative (additive) effects of water takings Risk management; manage uncertainty reasonably Consult & enfranchise the public about decisions that affect their water 3

Foundation in Law Water takings greater than 50,000 L/day regulated under the OWRA & its companion Water Taking Regulation. Since 1960 OWRA has regulated the rate of taking, source of taking, duration of surface water and groundwater taking. Water taking for domestic purposes (ordinary household and farm use), direct watering of livestock, and firefighting is exempted. Regulation of water taking does not assign water rights or place priorities on uses; this is expected to be addressed by planning decisions, which a PTTW is intended to implement, e.g. MEA, decision of a consent authority or tribunal. Strong provisions to support inspection & compliance, MOE works collaboratively with other agencies. Policy development in 2004 and 2007 reflect recent legal obligations on the province to safeguard and sustain Ontario water 4

PTTW Policy Changes - 2004 Amendments to the Water Taking Regulation (O. Reg. 387/04) in 2004 strengthened Ontario s ability to better monitor and manage Ontario s water resources with respect to impacts of climate change and a growing demand for water. Key regulatory changes related to PTTW Program Delivery: Phased in reporting of actual water taking by permit holders (started 2005; phases completed by 2008). Refusal of new or increased takings for specified purposes that remove water from high use watersheds. Notification to municipalities and conservation authorities of permit applications. MOE must consider Water availability (e.g. water balance, existing uses, planned municipal use) Issues relating to natural functions of the ecosystem; water availability (e.g. planned municipal use, low water conditions) Use of water (e.g. water conservation and reasonable prospect of use) 5

PTTW Policy Changes - 2007 Responding to the impacts of climate change was one of the forces driving the need for the Great Lakes Sustainable St. Lawrence River Basin Sustainable Water Resources Agreement. Ontario pushed hard to include recognition of climate change and the need for precaution in the Agreement and we succeeded. OWRA carries this commitment forward by establishing authority to introduce additional environmental criteria to further restrict intra-basin water transfers in response to cumulative impacts and climate change considerations. Consistent with the Agreement, OWRA addresses possible threats of climate change and increasing demands on Great Lakes Basin waters. OWRA authorizes a permit to include conditions that require conservation measures be taken in relation to a water taking, and could also require that conservation audits be conducted to determine if water is being used efficiently. Conservation of our water is always a key priority. Climate change makes conservation even more imperative. 6

PTTW Fast Facts March 31, 2008-6,611 active permits (see Table on next slide): In total, these allow a maximum daily taking of about 1.4 billion cubic metres. Actual total taking is considerably less; currently acquiring a more complete understanding via data reporting to the Water Taking Reporting System. Over half of all PTTW are issued for agricultural taking (43%) or municipal/other communal water supply (18%). Agricultural taking accounts for less than 0.5% of maximum permitted taking volume under all PTTW. Permitted water taking is almost evenly split between surface water sources (i.e. taking from lakes, rivers and creeks) and groundwater sources (i.e. taking from wells and dugout ponds). On average, 1,300 applications for permits are received each year. These applications are for new or expanded takings and about one-third are submitted to replace ( renew ) permits that will expire. 7

8

Example Category 1, 2 and 3 PTTW submissions Application to renew a PTTW to take water from a dugout pond for irrigation of crops for sale Category 1 (low risk) Base Application + Schedule 1 (Water Conservation) Fee exempted, not required to be posted on EBR Application for a new, short term (less than 30 days) taking, (e.g. pump test) Category 2 Base Application + Schedule 1 + Schedule 2 (surface water) or 3 (groundwater) Qualified Person certification $750 fee; Not required to be posted on EBR Application for groundwater extraction for a new bottled water manufacturing facility Category 3; If in a High Use Watershed -> Denied Base Application + Schedule 1 + Study (prepared by a Qualified Person) $3000 fee; Posted to EBR Application by a group of farmers to develop alternate watering sources by converting to groundwater in the headwaters of a trout stream Each taker to submit a Category 3 application (see above requirements) Director may require a cumulative impact assessment by the group 9

Transparency & Accountability Environmental Assessment Act (EAA) must be met (where applicable) must be met before the issuance of many Certificates of Approval and Permits to Take Water Environmental Bill of Rights (EBR) Environmental Registry posting of water taking proposals gives opportunity for public input into the approvals process. - Exemptions/exceptions have the effect that about 70% of water taking proposals are not required to be posted (implement EAA or tribunal decision, are environmentally insignificant, equivalent public consultation occurred, for emergencies, applications for public bodies, < 1 year taking; for irrigation of agricultural crops). - Where required, proposals are posted on the EBR for a minimum 30 day commenting period, following which the PTTW Director posts a Decision Notice to advise the outcome of the Ministry s consideration of an application and in a way that responds to comments received (provides a link to the actual PTTW). Environmental Review Tribunal (ERT) is the quasi-judicial tribunal that provides impartial environmental adjudication of PTTW related appeals. 10

11

What Does a PTTW Generally Do? Identifies the water taker & sources; specifies taking purposes (e.g. irrigation). Permits water taking in accordance with the application, unless modified. Establishes an expiry date (up to 10 year term). Specifies maximum taking rate (L/min), duration (hrs/day; days/yr), amount (L/day). Requires monitoring & record keeping of water taking events. Requires notification of complaints & actions taken to resolve same. Requires any taking not to cause flow to be stopped or reduced to a rate that causes negative impact; not to cause any negative impact to any groundwater supplies in prior use. Allows the Ministry to suspend or reduce the permitted taking. All of which is subject to the Ministry s inspections (planned/responsive), investigation 12 and enforcement actions.

What Does a PTTW Not Do? Allow taking to interfere with any other public or private uses of the water or any ecological functions. Allow maximum taking when source condition is not able to supply this without resulting in interference or ecological impact. Allocate a right to water. Guarantee a supply of water for any taking event. Regulate return flow, discharge or effluent quality. Relieve a water taker from any other legal obligations (e.g. to access the water on another property). Govern the installation, construction, operation, etc., of the means by which water is taken. 13

PTTW & Compliance INSPECTIONS: Operations Division (OD) conducts about 200 planned inspections annually (Drinking Water Management Division also undertakes inspections of PTTW related to drinking water systems). Considering only OD inspections, the majority of issues are related to administrative reasons (e.g., not monitoring or keeping records as required by permit condition). INCIDENTS: PTTW incidents represent about 1% of all pollution related incidents annually; average of about 360 PTTW incidents annually in recent years. Typical incidents involve PTTW non-compliance, taking without PTTW, interference with other water users, and water level complaints. Abatement measures are determined based on the use of informed judgment (an assessment of compliance history and health and environmental consequences). 14

Complementing Source Protection Planning High Use Watersheds Ontario Low Water Response 15

High-Use Watersheds In these areas, specified water takings can be denied or restricted from August 1 to September 11. Applies to new or expanded: Beverage manufacturing Fruit or vegetable canning or pickling Ready-mix concrete manufacturing (permanent sites only) Aggregate processing (only products and slurries) Product manufacturing or production Following 2 slides illustrate the maps used to inform regulation of water taking in areas of high demand Average Annual Flow Map (water taking may be refused) Summer Low Flow Map (water taking may be excluded August 1 to September 11) 16

17

18

Ontario Low Water Response MOE sits on and shares PTTW data with community-based Water Response Teams (WRT). MOE and other agencies outreach to water takers at declaration of Low Water Condition to request reductions in takings. Conditions built into Permit require restrictions during low water conditions such that natural environment is protected and interferences with other uses do not occur. Frequency and degree of OLWR Levels are considered in PTTW application review. PTTW Directors may require assessment of impact by a group of takers on water balance/sustainable yield (cumulative effects assessment); adaptive management studies triggered by frequent/anticipated low water condition (e.g., Big Creek, Innisfill Creek). Targeted inspection programs. 19

2007 saw some of the most prolonged and extensive low water conditions in recent history. The following year, 2008 was the wettest on record. 20

Internet Resources The Ministry has published a complete set of Fact Sheets, Technical Bulletins, Guidelines, Manuals, Application Forms and links to other resources at the PTTW web site: http://www.ene.gov.on.ca/envision/water/pttw.htm Water Taking Charges for Industrial & Commercial Water Users (O. Reg. 450/07) Interactive Water Use Mapping Tool; used by applicants to complete submissions Surface Water & Hydrogeological (Groundwater) Studies Guidance Documents Water Taking Reporting System PTTW fee exemption for conservation water taking (wetland & wildlife habitat projects) 21

Questions? 22