NETWORK USE OF SYSTEM CHARGES FOR CHP GENERATORS AND AUTOPRODUCERS PROPOSED DIRECTION BY COMMISSION FOR ENERGY REGULATION

Similar documents
The Treatment of Combined Heat and Power (CHP) under the Trading and Settlement Code A Draft Decision by the Commission for Electricity Regulation

COMMISSION STAFF WORKING PAPER

An Coimisiún um Rialáil Fóntas Commission for Regulation of Utilities. Decision Paper.

Future of Gas Entry Tariff Regime Draft Decision (CER/15/057)

GN 490 of 26 April 2007: Guidelines on allocation of additional powers and functions to municipalities

Compressed Natural Gas for transport Licensing arrangements

CER Information Paper Policy for Electricity Interconnectors Consultation Process and Call for Initial Comments

Proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

(Non-legislative acts) REGULATIONS

Joint TSO/DSO Group Processing Approach Pricing Principles Guidelines

Section 3 Firm Access Quantities and Associated Transmission Reinforcements

De-Energisation Code of Practice

CER s Decision. ESB Networks. Updated PSO Levy Cost Allocation. Methodology

European Parliament plenary vote, 17 January this Directive have the sole function of showing

Comments and proposal for amendments to Commission s proposal amending Dir. 2003/87/EC

THE ADDITIONAL REMUNERATION AND OTHER ALLOWANCES (2019) BILL (No. XXVI of 2018) Explanatory Memorandum

COMMISSION OF THE EUROPEAN COMMUNITIES. Amended proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

Renewable Generation - REFIT and Grid Connection

Role of the Public Electricity Supplier and the Supplier of Last Resort in the De-regulated Electricity Market

Explanatory Memorandum to the Environmental Permitting (England & Wales) (Amendment) Regulations 2018

Balancing Market Principles Statement

Council of the European Union Brussels, 30 November 2017 (OR. en)

FORESTRY AND LAND MANAGEMENT (SCOTLAND) BILL

DRAFT OPINION. EN United in diversity EN. European Parliament 2018/0161(COD)

Meeting the energy audit requirement of the Energy Efficiency Directive

BILL (No. XXI of 2017) Explanatory Memorandum. The object of this Bill is to provide for the payment of

An evaluation of the Irish Remote Interpreting Service (IRIS) Request for Tenders

In compliance with Art October 2001 PD issued: First party objection received: Third party objections: One, An Taisce,

Balancing Market Principles Statement

Stage 01: Modification Proposal. Grid Code. What stage is this document at? Purpose of Modification:

Australian Broadcasting Corporation. Australian Communications and Media Authority

WORKING PAPER ON NATURAL RESOURCES AND CONCESSIONS IN THE CONTEXT OF THE MAI

P7_TA-PROV(2011)0030 Financing instrument for development cooperation ***II

REPORT ON CONSULTATION ON DRAFT TRANSMISSION DEVELOPMENT PLAN

ERGEG Guidelines for Good Practice on Open Season Procedures (GGPOS) Ref: C06-GWG-29-05c 21 May 2007

EUROPEAN PARLIAMENT. Committee on the Environment, Public Health and Consumer Policy

Network Code. on Capacity Allocation Mechanisms

Energy from Renewable Sources Act

Incentive Guidelines Investment Aid for High-Efficiency Cogeneration

CLIMATE CHANGE (SCOTLAND) BILL

EBA/CP/2013/12 21 May Consultation Paper

Proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

STATEMENT OF CHARGES FOR CONNECTION TO NORTHERN IRELAND ELECTRICITY NETWORKS DISTRIBUTION SYSTEM. Effective from 28 th March 2018 Version 1.

CER CUSTOMER CHARTER JUNE 2012

***I DRAFT REPORT. EN United in diversity EN. European Parliament 2017/0294(COD)

(Information) INFORMATION FROM EUROPEAN UNION INSTITUTIONS, BODIES, OFFICES AND AGENCIES EUROPEAN COMMISSION

Scanpower Limited. Pricing Methodology Disclosure. For Pricing Effective 1 April 2010 to 31 March 2011

Proposal for a COUNCIL DECISION. on the position to be adopted, on behalf of the European Union, in the International Organisation for Vine and Wine

Dairygold Food Ingredients, Castlefarm Mitchelstown, Co. Cork Fax

Implementation of Cogeneration Directive (2004/8/EC) in Poland

GRID Implementation Plan SEA Screening Statement

Rationale for a Demand Side Unit with a Maximum Export Capacity < 10MW

COMMISSION STAFF WORKING DOCUMENT

The EFGCP Report on The Procedure for the Ethical Review of Protocols for Clinical Research Projects in Europe (Update: April 2011) Ireland

CONTEXT AND CONTENT OF THE PROPOSAL

STATEMENT OF CHARGES FOR CONNECTION TO NORTHERN IRELAND ELECTRICITY NETWORKS DISTRIBUTION SYSTEM. Effective from 1 st October 2017 Version 1.

Strategic policy. International Relations

LFC Block Operational Agreement Ireland and Northern Ireland

Committee on Civil Liberties, Justice and Home Affairs. of the Committee on Civil Liberties, Justice and Home Affairs

COMMISSION DELEGATED REGULATION (EU) No /.. of

Derogation Criteria for the High Voltage Direct Current Network Code

Electricity Distribution Network Code. made under the Electricity Act 1994

E U R O P E A N E C O N O M I C A R E A

UNMIK REGULATION NO. 2004/22 ON THE PROMULGATION OF A LAW ADOPTED BY THE ASSEMBLY OF KOSOVO ON ELECTRICITY

Projects of Common Interest Manual of Permit Granting Process Procedures

EXPLANATORY MEMORANDUM

Regulatory arrangements for the Qualifications and Credit Framework. December 2007 QCA/07/3434

UNC 0616: Capacity Conversion Mechanism for Interconnection Points. UNC Modification. 01 Modification. 02 Workgroup Report

(15 August to date) INTERGOVERNMENTAL RELATIONS FRAMEWORK ACT 13 OF 2005

LEGAL SERVICES (SCOTLAND) BILL

LEGISLATIVE CONSENT MEMORANDUM AGRICULTURE BILL

Response to: CER/15/284 - Review of Connection and Grid Access Policy: Initial Thinking & Proposed Transitional Arrangements

Official Journal of the European Union DIRECTIVE 2003/54/EC OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL. of 26 June 2003

THE NEW LAW FOR RENEWABLE ENERGY SOURCES IN GREECE AND MEASURES FOR THE DEVELOPMENT OF PHOTOVOLTAIC APPLICATIONS IN THE COUNTRY

Proposal for a COUNCIL DECISION

The adoption of the Electronic Communications Convention by Montenegro: Policy choices and Impact

Market Review. Broadcasting Transmission Services in Ireland. Response to Consultation and Decision Notice Reference: ComReg 13/71.

Compromise proposal on Article 14.7

LEGISLATIVE CONSENT MEMORANDUM TRADE BILL

Green Impact Report: Emissions to air and fossil fuels avoided External review of Green Bond to be issued by Banque Centrale Populaire

Redeployment Policy. Human Resources. Contents

THE PRINCIPLE OF SUBSIDIARITY

Cogeneration in Portugal

FORESTRY AND LAND MANAGEMENT (SCOTLAND) BILL

***I DRAFT REPORT. EN United in diversity EN. European Parliament 2018/0110(COD)

OPERATING CODE NO. 6 (OC6)

Structural Assistance Act

EBA/CP/2016/ December Consultation Paper. Draft Guidelines on supervision of significant branches

Proposal for a DIRECTIVE OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

Renewable Energy Consumers and Producers ( RECAP )

SCOTTISH INDEPENDENCE REFERENDUM (FRANCHISE) BILL

5. Dealt with in Brussels by The Transport, Telecommunications and Energy Council Working Party on Land Transport

DS3 Rate of Change of Frequency Modification Recommendation to the CER

RE: Renewable Gas Forum Ireland Opening Statement & Executive Summary

Official Journal of the European Union L 347/303

Supplier of Last Resort in Prepayment Electricity. Consultation Paper. An Coimisiún um Rialáil Fóntas Commission for Regulation of Utilities

Central Bank of Ireland

Proposal for a COUNCIL DECISION

Free movement of information and data protection, including international aspects

Committee on the Environment, Public Health and Food Safety. of the Committee on the Environment, Public Health and Food Safety

Transcription:

NETWORK USE OF SYSTEM CHARGES FOR CHP GENERATORS AND AUTOPRODUCERS PROPOSED DIRECTION BY COMMISSION FOR ENERGY REGULATION CER/03/167 July 2003

Background: Autoproducers Direction 1. On 17 April 2002 the Commission issued a direction to the Transmission System Operator ( TSO ) and to the Distribution System Operator ( DSO ) on the treatment of autoproducers for the purpose of setting connection and use of system charges 1. The direction followed an extensive process of public consultation and had been preceded by the circulation of a consultation paper and an earlier draft of the final direction. The direction was accompanied by a separate Explanatory Memorandum and a Summary of Comments received on the earlier Consultation Paper (CER/02/38), both published on the Commission s website. 2. The Direction dealt mainly with the network use of system charges which should be applied to autoproducers and, in particular, the extent to which autoproducers should be regarded for charging purposes as generators, final customers or both. The Direction distinguished between two categories of autoproducers: (a) those with a Maximum Import Capacity (MIC) greater than or equal to their Maximum Export Capacity (MEC) (b) those with an MEC greater than their MIC. 3. In essence the Direction provided that the autoproducers in category (a) would in future be treated as demand users of the system only. They would be liable for the prevailing fixed monthly capacity based use of system charges and connection charges applicable to final customers irrespective of whether they were importing or exporting electricity to the system in that month. By contrast, autoproducers in category (b) would be liable for the prevailing fixed monthly capacity based charges applicable to generators. 4. The rationale for the April 2002 Direction was dealt with in detail in the preceding documentation and summarised in the accompanying Explanatory Memorandum. The Commission recognised the special position of autoproducers who both import from and export to the system on a consistent basis and on a scale different to other generators. The Commission was satisfied that the prevailing network charging regime, which was derived historically on generator only and a final customer only basis, should take account of the special position of autoproducers and should be adapted to incorporate the principle of predominant use being made of the network by the autoproducer. Autoproducers and CHP Generators 5. The term autoproducer is defined in Directive 96/92/EC as follows: autoproducer shall mean a natural or legal person generating electricity essentially for his own use. 1 See CER/02/33 The Treatment of Autoproducers in the Distribution and Transmission Charging Regime 2

This definition focuses exclusively on the purpose for which electricity is being generated by the person and ignores the process (e.g. CHP, CCGT etc) by which the person is generating the electricity. 6. The Directive does not, in fact, deal in any detail with autoproducers as a distinct category. It confines itself in this regard to providing that autoproducers and independent producers should have access to authorisations, to national electricity network systems and to dispute settlement regimes on objective, transparent and nondiscriminatory terms. The recitals to the Directive shed little or no further light on the concept of autoproducers or any perceived special treatment they might warrant. Interestingly, the term autoproducer has been dropped from the new Council/Parliament Directive which has replaced Directive 96/92/EC. 7. The term autoproducer does not feature in the Electricity Regulation, 1999 or in subsequent secondary legislation. 8. By contrast, there is considerable statutory guidance on the concept of combined heat and power (CHP) generation. This concept is sometimes seen as something of a proxy for an autoproducer. The concept of CHP focuses on the process rather than the purpose of the generating activity. The 1999 Act defines combined heat and power in the following terms: combined heat and power means the simultaneous production of utilisable heat and electricity from an integrated thermo-dynamic process where the overall process operating efficiency, based on the gross calorific value of the fuel used and defined as the ratio of energy output usefully employed to the energy input, is greater than 70 per cent. And where the integrated thermo-dynamic process satisfies such technical, operational, economic and environmental criteria as may be specified by the Minister from time to time, following consultation with the Commission. The Act provides for a special licensing regime for CHP generators and suppliers. Since 2001 CHP suppliers are free to supply all customers, not just eligible customers. 9. At EU level, the concept of CHP generation or cogeneration and the case for its active promotion has been dealt with in some detail in various energy policy documents and environmental Directives 2. More recently, Council and Parliament are examining a draft Directive on the Promotion of Cogeneration in the Internal Energy Market 3. The 2 See, for example, Commission Communication A Community Strategy to Promote Combined Heat and Power (CHP) and to Dismantle Barriers to its Development (COM (97)514); European Council Conclusions of 30 May 2002 (8835/00) and of 5 December 2000 (1400/--); Directives 96/61/EC, 2001/80/EC and 2000/96/EC on pollution control. 3 See 2002/0185(COD) 3

purpose of the draft Directive is to create a framework for the promotion of cogeneration to be followed by the Member States. It defines cogeneration in the following terms: cogeneration shall mean the generation in one process of thermal energy and electrical and/or mechanical energy. For practical reasons and based on the fact, that the use of the heat output for difference purposes requires different temperature levels of the heat, and that these differences influence efficiencies of the cogeneration, cogeneration shall be divided into three classes: industrial cogeneration, heating cogeneration and agricultural cogeneration. 10. At National level, the benefits of CHP are clearly recognised. The Governments Green Paper on Sustainable Energy concludes, on this issue, that industry with a high year round heat demand can make energy efficiency gains from CHP. In the National Development Plan 4m has been allocated for the encouragement of high efficiency CHP. As part of the National Climate Change Strategy, the Government sets a target of a reduction of 0.25Mt of CO2 by increasing the penetration of CHP. The Issue: CHP Generation and the Direction on Autoproducers 11. Most, if not all, autoproducers as defined in the Commission s April 2002 Direction are likely to be CHP generators. It does not follow, however, that all CHP generator will constitute autoproducers. This is because of the restrictions of the concept of autoproducer by virtue of the essentially for its own use condition in the Direction. It is true that the Direction acknowledged the possibility of an autoproducer having an MEC greater than its MIC. Nevertheless, the Commission considers that it would be straining definitions beyond reason, and beyond the Commission s intentions at the time of the Direction, to argue that all CHP generators are autoproducers, regardless of how much of the electricity generated at the plant is intended for on site use and how much for export to the system. This would make the term essentially for their own use in the definitions of Autoproducer redundant or meaningless. It would also be very difficult to reconcile with the Commission s accompanying Explanatory Memorandum which stated; The direction maintains requirement for such generation to be consumed to a single premises. Put simply, the Direction confined itself to those autoproducers who would use most if not all of the electricity they generated to meet demand on the same premises. The Case for Extending the Direction to all CHP Generators 12. The Commission has been considering the question of whether it has a particular duty to promote CHP generation and, if so, the manner and scale such promotion might take. If it has such a duty, this would not mean, of course, that every Commission decision would have to be tilted, as it were, in favour of CHP generators but rather that, after a period of time, there would be an onus on the 4

Commission to show tangible evidence in some of its decisions of measures targeted at promoting CHP generation. 13. Two particular provisions in the 1999 Act are relevant here. These are the duties on the Commission in Section 9(5). to take account of the protection of the environment. to encourage the efficient use and production of electricity. CHP generation in particular promotes both these objectives in the following manner. The Act defines CHP as having efficiency of greater than 70%. This can be compared to other methods of generating electricity such as by Combined Cycle Gas Turbine technologies which have an efficiency in the region of 50% to 55% or single cycle technologies which generally have an efficiency less than 40%. Clearly, CHP has environmental benefits. This benefit is increased if the primary fuel for CHP is natural gas, as the carbon intensity and hence CO2 emissions are considerably reduced when compared with other fossil fuels. As referred to above the Government s National Climate Change Strategy requires a reduction by 0.25Mt per year of CO2 by increasing the penetration of CHP by approximately 250MW by 2010. In the Irish Energy Centre report entitled An Examination of the Future Potential of CHP in Ireland published in December 2001 concludes by stating that, CHP is recognised as being one of the key technology responses to Ireland s achievement of its Kyoto protocol commitments and significant potential exists for its expansion. In addition, the Commission believes that account must be taken of developments on this issue at European level where it is envisaged that a direction with the intension of promoting CHP is currently being considered on the basis of its environmental benefits. Conclusion 14. The Commission is satisfied that there is a strong case for extending the principles underlying the Direction on Autoproducers to licensed CHP generators, regardless of how much of the electricity they generate is intended for their own use and how much for export to the system. Specifically, the Commission proposes the following, For the purposes of the Commission s Direction entitled The Treatment of Autoproducers in the Distribution and Transmission Charging Regime (CER/02/37) a licensed CHP generator shall be deemed to be an Autoproducer. 5

Other issues with the Autoproducers Direction 15. In the course of applying the current Autoproducers direction both network operators have raised a number of practical implementation issues. The following is a list of these issues and the Commission s proposals to deal with them. Definition of an Autoproducer 16. A number of autoproducers sub-contract the operation and maintenance of the generating unit to a third party. In fact, in certain cases the generating unit on the customer s premises is provided by the third party and it is the third party which holds the generating licence, the customer having a contract for the output or a portion of the output. The Commission had envisaged that this situation would be covered by the Direction. However, the definition of an Autoproducer currently included in the Direction could be interpreted as not covering this situation. Therefore, the Commission proposes to amend the definition of an Autoproducer to the following: Autoproducer means a person who has entered into a connection agreement with the Distribution System Operator or Transmission System Operator and who generations and consumes electricity in a Single Premises or on whose behalf and under contract to whom another person generates electricity on or in that Single Premises, essentially for its own use. Application of Direction 17. The Autoproducers direction does not specify when the direction will apply to a customer, i.e. once its connection agreement is modified, generating unit is installed etc. The Commission proposes the following, The Autoproducers direction will apply to the autoproducer in the charging period following the period in which the generating unit was commissioned and has satisfactorily completed the applicable Grid Code or Distribution Code tests, which ever is relevant, and has complied with the relevant provisions of its connection agreement. Where the generating unit is decommissioned the customer is required to notify the TSO or DSO immediately and the applicable charges will be reviewed and any changes to the charging regime will apply in the charging period following the decommissioning of the generating unit. The Commission invites comments on the above proposals, preferably in electronic format. The Commission may publish the comments as received unless they are explicitly described as commercially sensitive. The closing date for the receipt of comments is 15 th August 2003, at 5.00pm. All comments should be forwarded to: John O Connell Commission for Energy Regulation Plaza House 6

Tallaght Dublin 24 E-mail joconnell@cer.ie 7