Hampton Roads Climate Impact Quantification Initiative

Similar documents
CITY OF NORFOLK COASTAL STORM RISK MANAGEMENT STUDY

SEA LEVEL RISE AND STORM SURGE IMPACTS TO ROADWAYS

Flooding - Tidal and Rainfall. Presentation to City Council Informal Session May 24, John M. Keifer PE

Virginia Beach Comprehensive Sea Level Rise and Recurrent Flooding Planning Study

Green Streets and Highways 2010

FHWA Climate Change Adaptation Activities

FHWA Climate Change Adaptation Activities

Maryland Adaptation and Vulnerability Assessment Maryland State Highway Administration

FROM TIDES TO STORMS: PREPARING FOR NEW HAMPSHIRE S FUTURE COAST

Assessing Climate Change Vulnerability at the Port of Mobile, AL Gulf Coast Phase 2

Gulf Coast Study, Phase 2 Impacts of Climate Change and Variability on Transportation Systems & Infrastructure

ACKNOWLEDGEMENTS. Sincerely, Executive Director and Staff. Rockingham Planning Commission. 156 Water Street Exeter, NH (603)

Screening Transportation Assets for Vulnerability

Sea Level Rise Impacts on Municipal Stormwater Systems in Hampton Roads

Transparent Decision-Making

MEMO. Introduction. Network Models

Washington State DOT s Vulnerability Assessment: Asking the Climate Question

Collaboration: Sea Level Marin Adaptation Response Team Phase II

Climate Change Adaptation Strategies for Infrastructure Managers

Guidance for Incorporating Sea Level Rise into Capital Improvement Programs. Kelli Hammer Levy, Division Director

SECTION 6: MITIGATION STRATEGIES

Maryland Vulnerability Assessments Maryland Department of Transportation State Highway Administration

Coordinating Minnesota s Transportation Assets and Climate Change and Extreme Weather Vulnerability

AGENDA ITEM #13: MAP-21/FAST ACT SAFETY PERFORMANCE MEASURES AND TARGETS Keith Nichols, HRTPO

FHWA Resilience & Durability to Extreme Weather Pilot Program

New York State DOT Adaptation to Climate Change and Extreme Weather. Elisabeth Lennon New York State Department of Transportation

Kelli Hammer Levy, Division Director Pinellas County Environmental Management

Climate change adaptation Program summary

Hampton Roads Hazard Mitigation Plan

How HRTPO Helps Freight Move. Presented by Robert B. Case, PE, PhD Transportation Technical Advisory Committee Agenda Item #13 April 1, 2015

ICARP Adaptation Clearinghouse. SB1 Adaptation Planning Grant Initial Case Study. Santa Barbara County

U.S. Department of Transportation Climate Adaptation Plan 2014 Ensuring Transportation Infrastructure and System Resilience

Building Partnerships for Climate and Health Programs FINAL REPORT

Highway Climate Change Adaptation and Risk Management

Surface Transportation Resiliency Planning in Hillsborough County, FL

Appendix M. Summary of Local Sea Level Rise Planning Efforts. Draft

AASHTO 2015 EXTREME WEATHER SESSIONS

Flooded Bus Barns and Buckled Rails: Public Transportation and Climate Change Adaptation

VTrans2040. VTrans Multimodal Transportation Plan (VMTP) Regional Network 2025 Needs Assessment. HRTPO TTAC July 1, 2015

Planning for Sea Level Rise in the Ocean State

The Hampton Roads Region

Infrastructure Resiliency Planning & Strategy at the Municipal Level. Adapt, Thrive, and Survive Climate Impacts

Climate Change Vulnerability Assessment TxDOT Environmental Conference September 14, 2016

Water Infrastructure Resiliency Planning for the City of Norfolk. Cherryl Barnett, P.E., Engineering Manager, Department of Utilities

Resilient Dallas Update. Quality of Life & Environment Committee April 11, 2016

TRB Panel on the Future of the Interstate

Transportation and Climate Change Resource Center

RISK AND VULNERABILITY ASSESSMENT WITH CLIMATE CHANGE: MANCHESTER-BY-THE-SEA HAZARD MITIGATION PLAN ENHANCEMENT

2040 Addendum Performance-Based Planning November 2018

PRINCESS ANNE DISTRICT STORMWATER PROJECTS

Adapting to Rising Tides

Long Range Transportation Plans (LRTPs)

University of Delaware Sharp Campus October 30, 2017

[Docket No. FR-6082-N-01]

Freight and Rail Stakeholder Webinar. January 7, 2014

Adaptation to Extreme Weather Events and Climate Change

Gulf Coast Community Protection and Recovery District Storm Surge Suppression Study October 9, 2014

FHWA Sustainability and Resilience

CONGESTION MANAGEMENT PROCESS IN HAMPTON ROADS, VIRGINIA

A pan - European framework for strengthening Critical Infrastructure resilience to climate change EU-CIRCLE

NOVATO FLOOD CONTROL ZONE No. 1 Marin County Flood Control and Water Conservation District

Talking Freight Agenda Session Description: Overview of the MARAD StrongPorts Program

Southeast Florida Regional Climate Change Compact:

Click to edit title style

Stinson Beach Watershed Program

Transportation Vulnerability and Risk Assessment Pilot. American Planning Association Monday, April 16, 2012

Resilient and Sustainable Transportation Systems Technical Service Program

COASTAL STRATEGIES FOR DRAINAGE RESILIENCE

Evaluating Climate Adaptation Efforts: notes toward a framework

- Thank you Andrew for the introduction. - We ll be presenting on the our FTA pilot and how that work as evolved since then. BART presented on the

Marine Board Spring Meeting April 27, 2011 David M. Kennedy

Adapting to Rising Tides

Chapter 1 Introduction

Moving Forward 2040 Long Range Transportation Plan Bicycle Mobility Master Plan Transit Master Plan

TTAC STAFF REPORT. State Targets for the MAP-21/FAST Act National Highway Performance Program. MEETING DATE: August 2, 2018 AGENDA ITEM: 5

PERFORMANCE-BASED PLANNING AND PROGRAMMING

Downtown Estes Loop Project Frequently Asked Questions

GOALS AND PERFORMANCE MEASURES

Regional Transportation Studies Management Committee

Implementation of Climate Adaptation Measures

LOCAL WORK PROGRAM FOR FY Rockingham Planning Commission. July 1, 2015 June 30, 2016

The newly updated and comprehensive SWMP shall:

ADOT Experiences Analyzing and Using Climate Projections: Handling Scientifically-Informed Climate Data Downscaling

Effects of Climate Change on Transportation

Honorable Mayor and Members of the City Council. Watershed Management Plan and Measure M Recommendations

Port of San Diego Climate Mitigation and Adaption Plan

PERFORMANCE-BASED PLANNING AND PROGRAMMING

Eco-Logical Pilot Project - Free Bridge Congestion Relief Stakeholder Information Handout

Climate Change and Transportation

AGENDA ITEM #17: VIRGINIA S 2025 TRANSPORTATION NEEDS ASSESSMENT AND HB2: OIPI CONSULTANT

U.S. Update Connected Data Systems Program

Project Delivery. Rodger Rochelle, PE Technical Services Administrator. Mike Holder, PE Chief Engineer

Presentation Overview

FHWA Programs Supporting Freight

Transportation 101. What We ll Cover

America s Climate Choices Adaptation A Challenge to the Transportation Industry

CITY OF MOUNTAIN VIEW

Impact of Sea Level Rise on Roadway Design. Paul Carroll, PE

REGIONAL PUBLIC MEETING February 22, 2018, East Haven, CT. South Central Regional Multi-Jurisdiction Hazard Mitigation Plan Update

Regional Approaches to Resiliency

Transcription:

David Arthur Chief Energy Analysis and Sustainability The Volpe Center, USDOT Hampton Roads Climate Impact Quantification Initiative Task 1 Briefing Transportation Technical Advisory Committee (TTAC) Hampton Roads Transportation Planning Organization 9/7/16 Alan Strasser Project Coordinator and Stakeholder Liaison Steering Committee Member, USDOT CCC Rawlings Miller Climate and Infrastructure Specialist The Volpe Center, USDOT

DOT Climate Change Center 49 USC Section 102 (g) Office of Climate Change and Environment. FAA OST Climate Council PHMSA (A) research, strategies, and actions to reduce transportation-related energy use and mitigate the effects of climate change; and (B) address the impacts of climate change on transportation systems and infrastructure. FHWA FRA Bbbb Steering Committee Core Team NHTSA MARAD FTA FMCSA

DOT s Role in Hampton Roads Past: HR Climate Change Vulnerability Assessment Pilot Project (2011) HR Military Transportation Needs Study (2013) SLR and Storm Surge Impacts to Roadways in HR (2016) Currently: Participated on HR Pilot 2014-2016 Drafted DOT Quantification Study with HR Stakeholder support Ongoing: Support through FHWA Virginia Divisional Office, other modes 3

Building on Successful FHWA Pilots + FHWA currently finishing up 9 pilots studies 4

Objectives and Benefits of Quantification Initiative Collaborating with HR stakeholders to develop cost tool that provides methods for: Voluntary grantee consideration of financial impacts in infrastructure planning due to CC/severe weather Augmenting science-based implementation of the Federal Flood Risk Management Std. (EO 13690) Managing U.S. DOT facilities (EO 13653) Addresses key questions (e.g., asset management and loss of use) 5

Quantifying Exposure Public + Private/Direct + Indirect =? Rank Zip Code PRIVATE Asset (Direct) Value PRIVATE Indirect) PUBLIC Asset (Direct) PUBLIC (Indirect) 1 23456 $5,557,775,200??? 2 23322 $4,263,567,600??? 3 23464 $4,036,204,000??? 4 23452 $3,979,341,900??? 5 23454 $3,892,053,300??? 6 23451 $3,592,192,700??? 7 23435 $2,331,233,800??? *Total $ 27,652,368,500??? Public + Private (Direct and Indirect) Resiliency and repair to Base XYZ Cost of disruption and new ROWs for roads and bridges to Base XYZ Cost of disruption and new ROWs for roads and bridges into ports PDQ and tourist destinations PDQ Core Logic, Storm Surge Report, 2014

HRTPO/HRPDC Collaboration Informally during HR Pilot (2014-2016) Staff-level comments on DOT report (2016) Working meeting at HRTPO/HRPDC (July 7, 2016) HRPTPO/HRPDC and Navy presented at DOT meeting (August 25, 2016) 7

Status Received and addressed over 500 comments from about 10 agencies (federal, state, local) Incorporated feedback to address: Reorganization of report (HRTPO/HRPDC) Technical specs for bridges (e.g., FHWA, VDOT) Consistency in asset information detail Right-of-way (ROW) costs (utilities/fhwa) Floodplains 8

Findings Assets and Data Significant asset information for bridges and roads Collected and continue to receive information regarding asset sensitivities to extreme weather 9

Findings Indirect Impacts Data available for Key economic sectors in the region Critical infrastructure facilities Right-of-Way Considerations Social vulnerabilities 10

Findings Adaptation Summarizes local adaptation costs/measures: Norfolk s Coastal Resilience Strategy Flood Mitigation for City of Norfolk CITY OF NORFOLK NEIGHBORHOOD PROPOSED ADAPTATION AND MITIGATION PROJECTS ASSESSED PROPERTY VALUE IN THE WATERSHED ESTIMATED COST PROJECT COST AS % OF PROPERTY VALUE THE HAGUE PRETTY LAKE MASON CREEK Floodwall Tide gate Pump Station Berms/Closure walls Floodwall Tide Gate Pump Station Structure elevation Pump Station New storm culvert Peripheral Berms Structure elevation $1,624 M $60 M 3.7% $1,812 M $50 M 2.8% $1,604 M $30 M 1.9% TOTAL NA $5,040 M $140M 2.8% 11

SLR/Storm Surge Scenario Economic Storyline Asset Transportation Asset (Direct) Value Level of Costs of repairs flood impact (business as usual) Costs/Benefits of adaptive measures including ROWs to reduce flood impact 1 $5,557,775,200 L $ $ Economic Consequence of Event- Driven Disruption under Economic Storyline Impact on Commuters Impact on Port Access Impact on Military Access 2 $4,263,567,600 M $ $ 3 $4,036,204,000 L $ $ 4 $3,979,341,900 H $ $ $ $ $ $ 5 $3,892,053,300 L SLR/Storm $ Surge Scenario $ 6 $3,592,192,700 Economic Storyline H $ Transportation Level of $ 7 $2,331,233,800 M $ Transportation $ Economic Consequence of Event- Driven Disruption under Economic Storyline Costs/Benefits of SLR/Storm Surge Scenario Impact Economic Impact Consequence of Event- Costs of repairs adaptive measures Impact on Asset Port Driven Military Disruption under Asset Economic (Direct) ValueStoryline flood impact (business as usual) including ROWs to Commuters Access Economic Access Storyline reduce flood impact Costs/Benefits of 1 $5,557,775,200 SLR/Storm L Surge Level $ Scenario $ Impact Economic Impact Consequence of Ev of Costs of repairs adaptive measures Impact on Asset Port 2 $4,263,567,600Asset (Direct) Value flood impact (business as usual) including ROWs to M $ $ Commuters Driven Military Disruption under Economic Storyline Access reduce flood impact Economic Access Storyline 3 $4,036,204,000 1 $5,557,775,200 Costs/Benefits of L L $ $ $ $ Impact on Impact o Transportation Level of Costs of repairs adaptive measures Impact on Asset Port Military 2 $4,263,567,600Asset (Direct) 4 $3,979,341,900 M Value flood impact $ (business as usual) $ H $ $ $ including $ ROWs to $ Commuters $ Access Access reduce flood impact 5 $3,892,053,300 3 $4,036,204,000 1 L $5,557,775,200 L $ $ $ L $ $ $ 6 $3,592,192,700 4 $3,979,341,900 2 H $4,263,567,600 H $ M $ $ $ $ $ $ $ $ $ 7 $2,331,233,800 5 $3,892,053,300 3 $4,036,204,000 M L $ $ $ $ L $ $ 6 $3,592,192,700 H $ $ 4 $3,979,341,900 H $ $ 7 $2,331,233,800 5 $3,892,053,300 M L $ $ $ $ 6 $3,592,192,700 $ $ $ 12

In Progress Explore tools and resources in HR to be leveraged: Project Prioritization Tool: Economic Viability Criteria Closer review of transportation asset management Roadway User Costs Tool adapted by HR Other local transportation planning models used Examples of additional tools/resources: Labor/dock strike analysis available for port analysis IRRIS feasibility for military scenarios Customized GIS-based supply/chain models 13

Next Steps Continue to gather HR stakeholder input prior to starting Task 2 (Currently). Finalize Task 2 SOW (currently) Commence Task 2 (Fall 2016) Explore joint studies with Navy, HRTPO, and HRPDC (sec. 3) 14

Thank you for your attention! Questions and Comments? 15

Additional Slides 16

Why Hampton Roads? Vulnerable- 2 nd Only to New Orleans for SLR and storm surge Federal/Military Importance- Nation s largest concentration of federal facilities and world s largest naval station (NSN) Extensive Transport Network- High density of multi-modal transportation infrastructure Flooding for Hampton Roads and Norfolk (2008 2012)

Augments Gulf Coast 2: Vulnerability Assessment & Adaptation 18

Methodology and Status Current Task (1) Developing a baseline of the transportation system : Modal assets: size, scale, geographic location, function Asset condition, structural integrity, asset vulnerabilities and exposure Summary of HR studies on exposure, impact, adaptation, indirect consequences Tools and resources for economic quantification Future Tasks (9/16-8/31/17) Task 2: Determining a methodology for estimating future costs using different scenarios and time scales Task 3: Small-scale pilot analysis using different scenarios and time scales Task 4: Region-scale using different scenarios and time scales 19

Outreach and Collaboration Intensive consultations with HR Pilot Project (Pilot) over a two-year period (20 meetings). Supports HR Pilot (2015): Planning activities need to address the c/b of proposed actions to aid in decision making. Presented at the three HR forums 20

Pathways Forward Pathway 1: Economic impact analysis of direct/indirect consequences associated with coastal flooding affecting transportation facilities. Engage VDOT/HRPTO/Local Stakeholders to test appropriate and robust economic methodologies that identify direct economic costs, economic drivers (e.g., tourism) and indirect consequences Consider potential adaptive strategies to reduce economic costs associated with coastal flooding. Pathway 2: Pathway 1 + Incorporating the findings into existing transportation asset management system Identify entry points to which the economic quantification study can link into the existing transportation asset management (TAM) system Such an analysis allows for potentially actionable and implementable results such as providing costeffective planning for developing an action plan to reduce climate-related risks. 21

Inundation Scenario Without Inundation With Inundation Scenario 22

Tunnel Add Economic Storyline Bridge Example Economic Storylines: - Port Activities - Peak Season - Non Peak Season - Military Activities: - Engagement - Non-engagement Bridge Bridge Highway PORT 23