Selecting Projects for Accelerated Bridge Construction

Similar documents
STRUCTURE AND BRIDGE DIVISION

Accelerated Construction: A Path Forward by Texas Department of Transportation 512/ All Rights Reserved

INNOVATIVE CONTRACTING GUIDELINES

Shoulder Widening Prioritization Discussion

December 2018 ABC UTC Webinar Featured Presentation: Connecticut DOT s ABC Decision Process Methodology

Appendix B. Benefit-Cost Technical Memorandum

Exhibit A Mn/DOT Contract No

PROJECT DESIGN SERVICES (PLAN REVIEW)

Traffic Management Guide to Concrete Overlay Solutions. Dale S. Harrington P.E. Representing CP Tech Center

THE COMMONWEALTH OF MASSACHUSETTS NON-NHS BRIDGE R&R POLICY

Attachment A FTA DCE Worksheet Section II, NEPA Class of Action

Overview of the Project Development Process. Brian Blanchard, PE Assistant Secretary for Engineering and Operations

Innovative Bridge Designs in Colorado by Pete Chomsrimake, P.E. ABC Project SME, CDOT Staff Bridge

S.P TH 65 (3rd Avenue Bridge) Industry Informational Meeting October 31, 2017

CHAPTER 3 SCOPE SUMMARY

I-90 Pavement Rehab VE Study

Reconstruction Project Update

JOB BB0903 HWY. 71B INTCHNG. IMPVTS. (S) JULY 25, 2018

Constructability Guidelines

SAMPLE. in Comments section the structure number and the

Members of the Board of Directors. Laurena Weinert, Clerk of the Board

CHITTENDEN COUNTY REGIONAL PLANNING COMMISSION Winooski/Burlington, US RTs 2 & 7 Bridge Scoping Study ADVISORY COMMITTEE MEETING NO.

MNDOT PAVEMENT DESIGN MANUAL

Research Initiatives at TxDOT Related to Utilities and Right of Way

7 Transportation Improvement strategies

Presented By: Debbie Hunt Florida Department of Transportation District Seven Director of Transportation Development October 16, 2013

SONG - Homework #2. Transportation Network Development System Analysis. The main objectives of this assignment are to help student

Questions Due: 12/11/14; Proposals Due 12/30/14: each by 2:00PM Central Standard Time

Coordinating Minnesota s Transportation Assets and Climate Change and Extreme Weather Vulnerability

ODOT Bridge and Pavement Funding Allocation Business Process. Bruce Johnson 11 th IBSMC, Mesa Arizona 4/24/17

I-65/I-70 North Split Interchange Reconstruction Project Frequently Asked Questions

NYSDOT Roadway Inventory. Both On and Off the State System

Cost Estimating Guideline February, 2017

Red Wing Bridge Alternates

EXHIBIT A. SCOPE OF SERVICES District-Wide Traffic Operations/Safety Studies (Work Group 6.1)

Field Guide on. Safe Maintenance and. Work Zone Operations

Inspector's Role and Responsibilities. Inspection Policies & Procedures. Requirements for Certification and Re Certification. Inspector's Skills

Service Agreement District/Landscape Architecture Unit (Office of Technical Support)

KANSAS WORK ZONE SAFETY AND MOBILITY PROCESSES AND PROCEDURES

SECTION TRAFFIC CONTROL. A. The following is a list of standards which may be referenced in this section:

Table of Contents Local Agency Guidelines Section B August 2011

Alder Drive / Blair Road Bridge Replacement Projects

Project Initiation Form

US 36 Truss Bridge Rehabilitation Schedule-Critical Deadline Met with Teamwork and Innovation

MnDOT Flash Flood Vulnerability and Adaptation Assessment Pilot Project DISTRICT 6 VULNERABILITY ASSESSMENT

Welcome!! Temporary Traffic Control During Maintenance and Short Duration Activities. Training Course 1-1

I535 NB off ramp to I35 SB over I35 and the Burlington Northern Santa Fe (BNSF) Railroad I535 NB off ramp to I35 NB over I35 and the BNSF

DRAFT SCOPE 1.0 General Requirements

Fall 2018 Engineer Trainee Recruitment Preference Sheet

Chapter 1. General Design Information. Section 1.02 Structure Selection and Geometry. Introduction

State of Ohio. Department of Transportation ~ Innovative Contracting Manual

Iowa Department of Transportation Intelligent Work Zone Deployments

Minnesota s Transportation Asset Management Plan (TAMP) SASHTO 2014 Tuesday, August 26, 2014

STATE AID GUIDE FOR: Updated: December 16, 2005

State of Good Repair (SGR) Program Bridge Prioritization Formula. Structure and Bridge Division

Review of Plans and Specs from a Constructability Perspective

Risk assessment for bridge management systems. Paul D. Thompson

State-Aid Bridge News July 20, 2004

Smarter Work Zones Webinar Series

Adaptation of HERS-ST Models for the South Carolina Interactive Interstate Management System

Actively Managing Your Work Zones: The 6B Solution

Responses to questions received following I-526 Wando Bridge closure As of May 31, 2018

Memo Pavement Investment Guide

Accelerated Construction Guidelines

Clear Creek Road (PM 1.82 & 0.25) Bridge Replacement Projects. Public Meeting, Wednesday, November 20, 2013 Pleasant Valley Middle School

I-90 ALLSTON INTERCHANGE

DISTRICTWIDE MODAL DEVELOPMENT OFFICE (MDO) RAIL CONSULTANT SERVICES SCOPE OF SERVICES FM# Ad # 19627

Historic Bridge Programmatic Section 4(f) Guidelines and Standards of Uniformity

A three-stage process was implemented in order to develop and evaluate the project concepts and provide recommendations for the project.

MnDOT Contract Exhibit A - Scope of Services

SCOPE 1.0 General Requirements

Winnipeg River Bridge on PR313 at Lac du Bonnet. June 2014

Bridge Construction. Nick Haltvick North Region Bridge Construction Engineer May 17, Bridge Office mndot.gov/bridge/construction.

I-290 Construction Approach. April 2016

2030 Transportation Policy Plan SUMMARY PRESENTATION. Land Use Advisory Committee November 15, 2012

MANAGING CONSTRUCTION SCHEDULES. Kelly Selman, P.E. Dallas District. Date. Dallas District October 10, 2017

EXHIBIT A SCOPE OF SERVICES FOR FINANCIAL PROJECT ID TRANSPORTATION SYSTEM MANAGEMENT & OPERATIONS (TSM&O) GENERAL CONSULTANT SERVICES

Article 16 Traffic Impact Analysis

PUBLIC NOTICE MEDINA COUNTY HIGHWAY ENGINEER SHAW ROAD BRIDGE REPLACEMENT - DESIGN REQUEST FOR STATEMENT OF QUALIFICATIONS (RFQ)

Broadway Grade Separation Study. Palo Alto Rail Committee Meeting November 29, 2017

Preventive Maintenance Project & Treatment Selection

Local Bridge Removal Policies and Programs

ATTACHMENT F EXAMPLE SIMPLE CONCEPTUAL CTD (CONTRACT TIME DETERMINATION) FOR 25% DESIGN STAGE

Georgia Department of Transportation Railroad Coordination Submission Checklist

The Ohio Department of Transportation Asset Management Playbook Plays for Success

Developing a Sustainable Pavement Management Strategy for Resurfacing Low Volume Roads in New Brunswick

BOSTON REGION METROPOLITAN PLANNING ORGANIZATION

3. THE RANGE OF PROJECTS PROPOSED FOR EVALUATION

APPENDIX Q Preparation Guidelines for Project Scope Summary Report (Freeway Maintenance Access) Table of Contents

Rehabilitation of West Main Street Culvert and Shirley Street Bridge. Town of Ayer. November 22, 2016

APPENDIX A. NEPA Assessment Checklist

APPENDIX F: CALTRANS COST ESTIMATE TEMPLATE (included in Appendix AA of the CALTRANS Project Development Procedures Manual)

Construction Coordination & Management Planning MassDOT-Highway/MBTA. 495/MetroWest Partnership Briefing July 11, 2018

Programmatic Implementation of ABC: Module 3 Innovative Contracting and ABC

General Guidelines for the Preparation of Traffic Impact Studies

Atlantic Street Bridge Project CTDOT Project Nos (Phase 1) & (Phase 2)

APPENDIX I. Florida Department of Transportation and Florida Highway Patrol Open Roads Policy RFP-DOT-16/ JR

State of Good Repair (SGR) Program Bridge Prioritization Formula. Structure and Bridge Division

August 10, 2016 TRAFFIC CONTROL REQUEST TCRF Rev. 3

EXHIBIT A SCOPE OF SERVICES FOR. FINANCIAL PROJECT ID(S). Various Projects DISTRICT 2 VARIOUS COUNTIES

Transcription:

Selecting Projects for Accelerated Bridge Construction In January of 2017, the Engineering Services and Operations Division Directors issued a memo instructing Districts to consider accelerated bridge construction (ABC) methodologies. To assist in determining which bridges are best suited for ABC a three stage process has been developed to provide a rational, consistent, objective, and defensible method of selecting appropriate projects. The three stage process should be used as a tool to evaluate the suitability of ABC but should not be viewed as an absolute control in decision making. Other considerations not incorporated in the process may be significant in decision making for any individual project at the discretion of the district. Complete details for each of the 3 stages is included on the Bridge Office ABC website at: http://www.mndot.gov/bridge/abc/ A brief summary of each of the three stages is provided below including a process flowchart: Stage 1 Stage 1 includes an initial screening and ABC rating based on a set of quantifiable, objective measures which includes; User costs (in the form of daily vehicle operating costs) Average annual daily traffic (on and under the bridge) Heavy commercial average annual daily traffic (on and under the bridge) Detour length Traffic density, measured as (vehicles per day) divided by roadway width on the bridge Each trunk highway bridge in the state (excluding culverts, railroad, and pedestrian bridges) has been evaluated, and scores for each of the above criteria were summed to form an overall weighted score, which was normalized to a recommendation of Yes or regarding further consideration of ABC. Bridges with a Yes outcome should be evaluated in Stage 2 for further consideration of ABC. Bridges with an outcome of are only evaluated in Stage 2 if requested by the District, who may be aware of unique circumstances that may make ABC a viable alternative. When beginning to scope new bridges, bridge replacements, or major bridge rehabilitation projects the results of the Stage 1 analysis should be considered and the results of the Stage 1 analysis should be included on the bridge page of the MnDOT Project Scoping Worksheets and the Bridge Office Form A (available at http://ihub/bridge/design/pdf/planning-section-scoping-worksheet-form-a.docx) submitted to the Bridge Preliminary Plans Unit (for new or replacement bridges). The result of the Stage 1 analysis for each bridge in each district (excluding culverts, railroad, and pedestrian bridges) is available on the Bridge Office website. The Stage 1 results are also included in the BRIM spreadsheet and on the "Structure Inventory" sheet (see last page for example) for each bridge. Stage 2 Stage 2 of the ABC selection process allows the Project Manager to consider issues that are much more subjective and site specific than those identified in Stage 1. Also, since accelerated construction techniques and methodologies often involve traffic detours, lane or road closures and extended work hours, there are compromises and trade-offs inherent in such projects. Therefore, close coordination with the District Traffic Engineer, Construction Resident Engineer and District Bridge Engineer is required to complete the Stage 2 assessment. The Stage 2 assessment form can be downloaded from the Bridge Office website. The District Project Manager (with input from appropriate subject experts) is responsible for completing the Stage 2 assessment before the project goes into the State Transportation Investment Plan (STIP). ABC Memo 2

A sampling of the questions in the Stage 2 tool include: Is it likely that this project will include complex traffic control schemes, long detours, extended duration, or significant user impacts due to bridge construction? Is bridge construction on the critical path of this project? Could additional width be needed on culverts, bridges, or shoulders to maintain traffic on the existing route or the detour route? For each of the questions, a response of Yes,, Possibly, or t Applicable (N/A) is recorded. The more questions that are answered with Yes or Possibly, the more likely that accelerated bridge construction techniques may provide a viable solution. The responses in the second stage assessment also help in beginning to identify which ABC techniques and/or alternative contracting methods may be most appropriate. After thoroughly reviewing the responses to the Stage 2 questions, the District Project Manager, with assistance from other appropriate experts and the Bridge Office will make a final determination regarding whether or not further consideration of ABC is warranted. The District has complete discretion in making the final decision regarding whether or not ABC techniques are included in a bridge project (if a bridge project is to be funded with Statewide Performance Program bridge (SPPB) funds, the SPPB Program Manager needs to be included in the final decision of whether or not to use ABC techniques), and is also responsible for documenting final decisions in Stages 2 and 3 and for sending copies of the completed Stage 2 form to the Bridge Office Preliminary Plans Unit with the original document retained by the Project Manager. The entire Stage 2 process should be finalized and the completed Stage 2 form sent to the Bridge Office before a bridge project is entered into the STIP. Stage 3 If the conclusion of the Stage 2 assessment indicates that further consideration of ABC is warranted, the Project Manager will work with the Bridge Office Preliminary Plans Unit, Bridge Final Design Unit, Regional Bridge Construction Engineer, and other specialty disciplines (District Traffic, Resident Construction Engineer, and Office of Construction and Innovative Contracting) to discuss project specific details and move forward in selecting appropriate ABC alternatives and techniques. This stage also considers alternative contracting methods that may help accelerate construction or reduce work zone impacts, including: A+B, lane rental, no excuse bonuses, incentives/disincentives, design build, and construction manager general contractor (CMGC). The goal of the Stage 3 process is to identify a final construction method, technique or contract administration method, or a combination of these methods. Information regarding the Stage 3 assessment can be downloaded from the Bridge Office website. The Bridge Office website also includes an extensive list of links and other information regarding potential ABC options. Additional Information All of the tools described above are available on the Bridge Office website, along with additional background information, and a list of bridges for each district that have a Stage 1 outcome of Yes and are scheduled to be let in the next 5-10 years. ABC Roles & Responsibilities The following is a guide to the roles and responsibilities for successful scoping and implementation of ABC projects: District Project Manager (PM): As the primary leader of project development the PM is responsible for reviewing the Stage 1 ABC outcome ( Yes,, or N/A ) as soon as a bridge project is identified for scoping. If the Stage 1 result is Yes, the PM should immediately begin completing the Stage 2 assessment, involving the necessary experts as required. If the Stage 2 assessment recommends further development of ABC alternatives, the PM is responsible for scheduling and facilitating meetings to compare ABC alternatives (Stage 3) and making final recommendations. The PM is also responsible for finalizing the Stage 2 form and sending the completed form to the Bridge Office prior to adding a bridge project to the STIP. ABC Memo 3

District Bridge Engineer: Provide support to the PM throughout the scoping phase including assistance with the Stage 2 and 3 assessments. Consider the use of ABC during the scoping phase (site visits, existing bridge assessment, etc.) District Traffic and Resident Construction Engineer: Provide support to the PM throughout the scoping phase including assistance with the Stage 2 and 3 assessments. Bridge Office Regional Bridge Engineer: Consider the use of ABC during the scoping phase (site visits, existing bridge assessment, etc.). Provide support and expertise to the Bridge Office Preliminary and Scoping Engineer positions for Stages 2 and 3. During final design through construction, provide support and expertise to designers and construction staff. Bridge Office Scoping Engineers: Prior to the project entering the STIP, help PM and District Bridge Engineer scope the bridge needs and identify options, costs, traffic staging, construction scheduling for bridge rehabilitation and replacement work. If requested by the District Bridge Engineer or PM, provide support with the Stage 2 assessment. Bridge Scoping Coordinator: Provide support to PM and District Bridge Engineer throughout scoping phase and provide guidance on Stage 2 & 3. Develop and maintain ABC resource information. Aid in scheduling & facilitating meetings with the Bridge Office and the PM/District. Bridge Office Preliminary Plans Unit: Provide support to the PM throughout the scoping and preliminary design phase including assistance with the Stage 2 & 3 assessments. Consider the use of ABC during the scoping phase (site visits, existing bridge assessment, etc.) Bridge Office Final Design Unit: Provide support to the PM throughout Stage 3 and final plan preparation. Bridge Office Estimating Unit: Provide preliminary and final cost estimates during Stages 2 and 3. Should be aware of the Stage 1 outcome prior to preparing the first preliminary cost estimate. ABC Memo 4

Accelerated Bridge Construction Decision Process Flowchart Prior to adding a bridge project to the Capital Highway Investment Plan (CHIP). ABC Stage 1 Rating or N/A ABC Stage 1 Rating Yes Does ABC mitigate critical issues not identified in Stage 1? Yes Project Manager completes Stage 2 Assessment Will likely need input from traffic, construction, and bridge experts Skip Stage 2 and 3. PM must complete Stage 2 Assessment prior to adding a bridge project to the State Transportation Investment Plan (STIP) Stage 2 Assessment concludes ABC should be further evaluated Yes Project Manager facilitates Stage 3 discussions Submit a copy of the completed Stage 2 assessment to the Bridge Office Preliminary Plans Unit (MS 610). Time and cost estimates likely needed for each alternative Stage 3 identifies viable ABC alternatives Yes Use conventional construction Select final ABC alternative

ABC Stage 1 Conclusion