Section 25 Aggregate Subbase

Similar documents
SECTION 28 AGGREGATE BASE COURSE (FAA P-208) [For base course under runway and taxiway surfaces, use Section 29, FAA Item P-209.]

MSCAA /04 ITEM P-219 RECYCLED CONCRETE CRUSHED AGGREGATE BASE COURSE DESCRIPTION MATERIALS

Item P-219 Recycled Concrete Aggregate Base Course

UNIFIED FACILITIES GUIDE SPECIFICATIONS

ITEM 252 IN-PLACE FULL DEPTH COLD FLEXIBLE PAVEMENT RECYCLING

ITEM 247 FLEXIBLE BASE

CITY OF LETHBRIDGE SECTION INFRASTRUCTURE SERVICES Page 1 of 7 GRANULAR BASE PREP

UFGS (August 2004) UNIFIED FACILITIES GUIDE SPECIFICATIONS

TECHNICAL SPECIFICATION

CITY OF SAN ANGELO ITEM 275 PORTLAND CEMENT TREATED MATERIALS (ROAD MIXED)

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PORTLAND CEMENT. Section PORTLAND CEMENT STABILIZED SUBGRADE

ITEM 275 PORTLAND CEMENT TREATED MATERIALS (ROAD MIXED)

SPECIAL SPECIFICATION 3157 Cold Processed - Recycled Paving Material (RPM) for Use as Aggregate Base Course

SECTION EARTHWORK

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY. Section CEMENT STABILIZED BASE COURSE. 1. Foundation course of cement stabilized crushed stone.

ITEM 231 CEMENT STABILIZED CRUSHED AGGREGATE BASE COURSE

Item 247 Flexible Base

Item 247 Flexible Base

UNIFIED FACILITIES GUIDE SPECIFICATIONS. References are in agreement with UMRL dated January 2018

ITEM 231 CEMENT STABILIZED CRUSHED AGGREGATE BASE COURSE

INDEX DESCRIPTION MATERIALS APPROVAL FOR BASE COURSE CONSTRUCTION MEASUREMENT PAYMENT 6

Special Provision Item P-152 Excavation and Embankment

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT).

ITEM 260 LIME TREATMENT FOR MATERIALS USED AS SUBGRADE (ROAD MIXED)

SECTION AGGREGATE BASE COURSE

BASE CONSTRUCTION MATERIALS A Aggregate

SECTION BITUMINOUS CONCRETE PAVING

SECTION 3: SUB BASE AND BASE COURSES

DIVISION 2100 SITEWORK

OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISIONS FOR SUBGRADE STABILIZATION

SECTION ASPHALT PAVING

DIVISION 4100 SITEWORK

SECTION FLEXIBLE PAVING

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

Section LIME-STABILIZED SUBGRADE. A. This Section includes foundation course of lime-stabilized subgrade material.

SPECIAL SPECIFICATION 2093 LIME/CEMENT STABALIZED SUBGRADE

UNIFIED FACILITIES GUIDE SPECIFICATIONS

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT).

TECHNICAL SPECIFICATION

1995 Metric CSJ SPECIAL SPECIFICATION ITEM Fly Ash Treatment of Materials

Cement Stabilized Aggregate Base

SECTION 402 PLANT MIX BITUMINOUS SURFACE LEVELING

CITY OF FARGO SPECIFICATIONS AGGREGATE BASES

SPECIAL PROVISIONS TO ITEM P-304 CEMENT TREATED BASE COURSE

DIVISION 300 BASES AND GRANULAR SURFACES SECTION 301 LIME TREATED SUBGRADE

UNIFIED FACILITIES GUIDE SPECIFICATIONS

A. Texas Department Transportation 2004 Standard Specifications for Construction of Highways, Streets and Bridges (TxDOT):

County of Park PARK COUNTY WYOMING PRIVATE SOURCE GRAVEL POWELL AREA PRODUCE TO STOCKPILE REQUEST FOR QUOTE

UNIFIED FACILITIES GUIDE SPECIFICATIONS

SECTION BITUMINOUS CONCRETE PAVEMENT

SECTION TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING

TOWN OF LAFAYETTE SPECIFICATIONS FOR HIGHWAY CONSTRUCTION. June 1984

Cement Stabilized Aggregate Base

The Work under this Section consists of performing all operations necessary to complete construction of the leveling course on the prepared subbase.

SECTION 301 SELECTED MATERIAL SUBBASE DESCRIPTION

SECTION CONTROLLED LOW STRENGTH MATERIAL

Stanford University Facilities Design Guidelines SECTION ASPHALT UNIT PAVING. A. ASTM C-33 Standard Specification for Concrete Aggregates.

ITEM 223 LIME-FLY ASH STABILIZED SUBGRADE Description. Mix and compact water, lime and fly ash (LFA), and subgrade in the roadway.

SECTION EMBANKMENT

Construction Specification 28 Lime Treated Earthfill

SECTION EXCAVATION AND EMBANKMENT. B. Subbase Grading A samples for gradation analysis.

STANDARD SPECIFICATIONS JANUARY 2015 S-4 GRANULAR BASE and AGGREGATES TABLE OF CONTENTS

SECTION AGGREGATES

PAVER PLACED SURFACE TREATMENT

URS CORPORATION NY Contract No. C REPUBLIC AIRPORT RUNWAY 1-19 RUNWAY SAFETY AREA (RSA) IMPROVEMENTS ADDENDUM NO. 3 TO:

Student Services & Classroom Addition

SECTION 14 EMBANKMENT

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 850 CEMENT TREATED FREE DRAINING BASE APRIL 18, 2008

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 874 ULTRATHINBONDED ASPHALT CONCRETE. April 20, 2007

Percent Passing by Weight. 105% Payment #200

Union County Vocational - Technical Schools Scotch Plains, New Jersey

MIDLAND COUNTY ROAD COMMISSION

100% Payment. 105% Payment #

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Reinforced Soil Slopes (RSS)

Draft Specifications and Design Guidelines for Use of Scrap Tires in Embankment Construction

SECTION 2200 PAVING CITY OF BELTON, MISSOURI STANDARD SPECIFICATIONS

SECTION MECHANICALLY STABILIZED EARTH RETAINING WALLS

SECTION RIPRAP, BOULDERS, AND BEDDING

C. Foundation stabilization for pipe and utility structures.

Cement Stabilized Soil (CSS) (Portland cement)

SPECIFICATIONS FOR FULL DEPTH RECLAMATION WITH CALCIUM CHLORIDE

55.3 AGGREGATE PRODUCTION AND STOCKPILING

B. [LIST ANY SPECIAL CONDITIONS UNIQUE TO THIS PROJECT THAT DEAL WITH LIME-FLY ASH OR FLYASH STABILIZATION]

asphalt (PWMA) processes in accordance with these Specifications. PWMA processes include organic 9

B. Borrow: Satisfactory soil imported from off-site for use as fill or backfill.

SECTION ASPHALT CONCRETE

Allen & Sherriff Architects, Inc Yonge Street, S202, Richmond Hill, Ontario L4C 5K9 Tel: Fax: File Ref.

SECTION SITE GRADING. Part 1 - General Work Included Related Requirements Reference Standards...

SECTION FILL AND BACKFILL

ITEM 404LVT (Low Volume Traffic) ASPHALT CONCRETE Revised June 5, 2015

SECTION TRENCHING, BACKFILLING AND COMPACTION. B. Provide necessary sheeting, shoring and bracing.

53.9 ASPHALT SURFACE TREATMENT

LS 2519 CONCRETE PAVER PAVEMENT RECONSTRUCTION

SECTION INTERLOCKING PRECAST CONCRETE UNIT PAVERS

UNIFIED FACILITIES GUIDE SPECIFICATIONS

SECTION ASPHALT PAVING

SECTION 402 HOT MIX ASPHALT, HMA, PAVEMENT

Transcription:

Black text from standard FAA spec Strikeout text deletions from FAA standard spec Blue text additions to FAA standard spec Red text notes to the Engineer/won t appear in spec I. DESCRIPTION A. GRANULAR SUBBASE 1. on prepared subgrade 2. To dimensions, lines and grades, on plans B. MATERIAL MAY BE: 1. P-154 Aggregate Subbase 2. Processed Miscellaneous Base (PMB) II. FAA ITEM P-154 A. MATERIALS 1. Hard, durable 2. May be mixed or blended with fines 3. Capable of being compacted into dense, stable subbase 4. Free of organics, lumps, excessive foreign material 5. Pit-run acceptable if spec is met. 6. Quality Requirements a) Gradation per Table 1: TABLE 1 GRADATION REQUIREMENTS SIEVE DESIGNATION (SQUARE OPENINGS) PER ASTM C 136 AND ASTM D 422 PERCENTAGE BY WEIGHT PASSING SIEVES 3 inch (75.0 mm) 100 No. 10 (2.0 mm) 20-100 No. 40 (0.450 mm) 5-60 No. 200 (0.075 mm) 0-8 b) Other Requirements: (1) Atterberg limits: (a) For Portion passing No. 40: (i) LL not more than 25 (ii) PI not more than 6 (iii) as tested by ASTM D 4318 (2) Max material finer than 0.02 mm: 3% 7. Testing Frequencies: a) Particle size distribution: (1) Preliminary (2) Once per day during construction B. CONSTRUCTION METHODS 1. General a) Subbase to be shaped and compacted within specified tolerances b) If not sufficiently stable, Contractor shall add fine-grained material to bind. (1) Shall be sufficient so that subbase stable under construction traffic. (2) Addition shall not increase soil constants above the limits specified 2. Operation in Pits 25-1

a) Operations in pits at Contractor s expense. b) Product from pits shall be uniform and in conformance with this section. 3. Preparing Underlying Course a) Engineer to approve condition of underlying course prior to placing subbase 4. To protect drainage begin placement at crown, or high side of pavement structure 5. Materials Acceptance in Existing Condition a) May be obtained from pits, stockpiles or crushing plant b) Intent is that no further mixing will be required on grade. c) Shall be placed on grade in: (1) uniform condition (2) containing approximately correct moisture (a) minor moisture deficiency/excess can be correctly be sprinkling/aeration. (3) conforming to gradation, quality and consistency requirements (4) not requiring further mixing d) Final operation to be blading/dragging to obtain (1) uniform surface (2) true to line and grade 6. Plant Mixing a) General (1) If necessary to mix materials, shall be done at: (a) central plant (b) traveling mixing plant (2) Mixed with proper amount of water (3) Transport to grade without undue loss of moisture b) [OPTIONAL: Mixed in Place (1) If mixing in place approved, Engineer to designate relative components Contractor to determine proportions necessary to meet spec. (2) Deposit material on grade, followed by binder or filler (3) As many layers as the Engineer may direct as the Contractor deems necessary to meet the requirements of this section. (4) Mix with necessary equipment until thoroughly mixed (a) Correct segregated areas (b) Add necessary moisture as directed by the Engineer. (5) Shape and compact to meet: (a) density requirements (b) thickness (c) grade] 7. General Methods for Placing a) Construct in layers (1) 3 to 8 in thickness (2) deposit and spread evenly (a) uniform thickness (b) uniform width (3) Spread no more than 2,000 square yards ahead of rolling. (a) Sprinkling to be kept within this limit b) If multiple layers required, requirements herein shall apply similarly to each layer. c) Caution shall be exercised to prevent incorporation of subgrade, shoulder, foreign material 8. Finishing and Compacting 25-2

a) After spreading, thoroughly compact by rolling and sprinkling, if necessary. b) Provide sufficient rollers to compact material to specified density. c) Compact to: (1) 100% maximum density in accordance with: (a) If more than 30% retained on ¾ sieve: (i) AASHTO T-99 (ii) AASHTO T-180 (b) ASTM D 1557 (>60,00# aircraft) (c) ASTM D 698 (< 60,000 # aircraft) (2) In place density per: (a) ASTM D 1556 (b) ASTM D2922 (3) At moisture content within +/- 2% optimum (a) If material is too free-draining to retain optimum moisture, may make field-determination of proper compaction moisture content. (4) Testing frequency: (a) Before and after compaction (b) Every 1,000 cubic yards (5) If nuclear density gauges allowed, refer to Section [ ] of these Specifications, Nuclear Gauges. d) If soft, yielding, undulations > ½ inch in 16 feet: (1) loosen surface (2) refill and recompact e) Areas inaccessible to rollers may be compacted with mechanical/hand tampers. f) When sprinkling, do to allow manner/quantity of free water to reach underlying course. 9. Surface Test After compaction test for: a) Smoothness (1) ½ inch in 16-ft (2) parallel and perpendicular to centerline b) Accuracy of grade and crown c) Scarify, reshape, recompact if not accepted 10. Thickness. a) Determine by: (1) depth tests or cores (a) Every 500 square yards or less (b) Deficiency more than ½ inch: (i) Correct by scarify, rework, recompact (c) Contractor to repair core holes at his own expense. (2) Survey 11. Protection a) Subbase work not allowed on: (1) wet subgrade (2) frozen subgrade 12. Maintenance a) Contractor shall maintain completed sections with standard motor graders rollers until: (1) accepted (2) next course ready to be placed III. PROCESSED MISCELLANEOUS BASE (PMB) 25-3

A. GENERAL 1. In lieu of P-154 if approved by the Engineer 2. PMB material shall conform to Greenbook Section 200-2.5 Processed Miscellaneous Base. 3. Construction methods shall be as per P-154, above. 4. When noted in the plans as acceptable, PMB may be: a) Contractor-provided b) Contractor-produced from job-site demolition products (1) may be produced on site from crushing [concrete][and][or][and/or][asphalt] pavement. (2) See Section 14 Removals (3) Crushing paid under Section [ ] of these specifications, Removals. B. [OPTIONAL: PMB FOR HAUL ROADS: 1. Contractor to stake alignment which eliminates conflicts with: a) lights b) signs c) drainage structures d) other airfield structures and utilities 2. Alignment to be approved by the Engineer prior to placement of PMB 3. Contractor to maintain haul roads throughout project.] IV. SUBMITTAL REQUIREMENTS A. MATERIAL QUALITY V. METHOD OF MEASUREMENT A. P-154 OR PMB 1. Per [Cubic Yard] or [Square Yard] placed of type specified placed, compacted and accepted 2. Cubic yard quantity measured in final position based on either: a) depth tests/cores - 1 test per 500 sq yds (1) Thickness tests more than ½ inch in excess of plan thickness shall be computed and paid as plan thickness + ½ inch. b) Average end area method computed to nearest 0.01 ft. 3. Subbase quantities not to be included in other excavation quantities. VI. BASIS OF PAYMENT A. PAID AT CONTRACT UNIT PRICE UNDER ITEM NUMBER: 1. 25.1 Granular Subbase P-154 - per [cubic yard][square yard] 2. 25.2 Processed Miscellaneous Base (PMB) - per [cubic yard][square yard] 3. Includes all: material, preparation, hauling, placing, labor, equipment, tools, incidentals 4. Crushing on-site materials for PMB paid under Section [ ] of these specifications, Removals. 5. No separate payment for work in areas of night or limited-time construction area. VII. TESTING REQUIREMENTS A. ASTM C 136 SIEVE ANALYSIS OF FINE AND COARSE AGGREGATES B. ASTM D 422 PARTICLE SIZE ANALYSIS OF SOILS 25-4

C. ASTM D 698 MOISTURE-DENSITY RELATIONS OF SOILS AND SOIL-AGGREGATE MIXTURES USING 5.5 LB (2.49 KG) RAMMER AND 12-IN (305 MM) DROP D. ASTM D 1556 DENSITY OF SOIL IN PLACE BY THE SAND-CONE METHOD E. ASTM D 1557 TEST FOR LABORATORY COMPACTION CHARACTERISTICS OF SOIL USING MODIFIED EFFORT F. ASTM D 2922 DENSITY OF SOIL IN PLACE BY THE NUCLEAR DENSITY METHOD G. ASTM D 4318 LIQUID LIMIT, PLASTIC LIMIT, AND PLASTICITY INDEX OF SOILS VIII. END OF SECTION 25 25-5