Quarry, Mobile asphalt plant, Equipment Yard and Storage Garage

Similar documents
Cox's Construction Ltd. P.O.Box 157 Lawn A0E-2E0 Tel: (709) Fax: (709)

Jeremy s Construction Ltd.

ON Grade Construction Inc.

Murphy s Services Inc.

Environmental Assessment Registration Destination RV Resort

ENVIRONMENTAL ASSESSMENT REGISTRATION DOCUMENT

Harbour Improvements. St. Lunaire, NL. Environmental Registration Document

Environmental Assessment Application. for. Deer Lake Commercial Sub-Division. V & J Tectonic INC 11 Chaulk s Lane Deer Lake, NL A8A 1C8

Barr Road Quarry (Site N) Frequently Asked Questions Last updated: November 19, 2007

Environmental Assessment Approval

The rezoning application and proposed transportation facility warrants consideration.

1.0 Name of Undertaking: CRANBERRY CREEK. 2.0 Proponent: Mr. Robert McFatridge. (i) 143 West Street Stephenville, NL A2N 1E7. (ii)

REGISTRATION PURSUANT TO. PART X of THE ENVIRONMENTAL PROTECTION ACT FOR THE NUGGET POND CROWN PILLAR. Newfoundland and Labrador

Environmental Assessment. Registration Document

ENVIRONMENTAL ASSESSMENT REGISTRATION

Environmental Assessment Registration April 30 th, 2004

Breakwater Construction Mary s Harbour, NL Environmental Registration Document

Environmental Bill of Rights Draft Version DRAFT - For Consultation Purposes Only Ministry of the Environment

NPL. Presented by Chris O Brien, C.O.O. Newlab Plastics Ltd. P.O. Box Sugarloaf Road St. John s, NL A1A 5B2

INDEX FOR SPECIFICATIONS FOR AGGREGATE FOR BITUMINOUS PAVEMENT SCOPE... 2

Environmental Assessment Registration Form Newfoundland and Labrador Department of Environment and Conservation

AREA STRUCTURE PLAN SW W4M CAMROSE COUNTY BYLAW ## JULY 2017(REVISED) PREPARED BY: AUSTROM CONSULTING &VICINIA PLANNING & ENGAGEMENT INC.

RTGO Developers Inc 67 Shamrock Crescent, Corner Brook, NL A2H 7H5

Technical Summary. January 2014

Registration Request for Environmental Assessment

Environmental Assessment. Pinchgut Lake (West) Cabin Area Project. Corner Brook, NL

ADMINISTRATION OF AGGREGATE SOURCES INCLUDING EARTH AND ROCK BORROW SOURCES. Special Provision No. 199S38 March 2003

ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass

Harbour Improvements. La Scie, La Scie Harbour, NL. Environmental Registration Document

3.0 Natural Resource Management Policies. 3.4 Resource Extraction Policies

ENVIRONMENTAL ASSESSMENT EMULSION PLANT - CLIFFS RESSOURCES MINES

BEST MANAGEMENT PRACTICES PLAN FOR FUGITIVE DUST Greenwood Aggregates Company Limited Violet Hill Pit > Town of Mono, ON

Alberta Transportation The City of Edmonton The City of Calgary

Q. CONSTRUCTION IMPACTS

Grassy Mountain Coal Project Environmental Impact Assessment Project Summary Table

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village:

Matrix of Environmental Management Plan, Rehabilitation of Lehumo Lake Embankments

Rock Fill Layer Management and Maintenance Plan Former BNSF Site 13 Highway 99 Eugene, Oregon

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES

PROVINCE OF BRITISH COLUMBIA MINISTRY OF ENERGY AND MINES

CONSTRUCTION SITE REPROCESSING FACILITY APPLICATION

Introduction- Category 9

Environmental Guidelines for Construction Sites

Table 1.1: The Salient Features of the Project Proposed Quartz Mine Of M/s. Viswanadha Stone Crusher & 16 others

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are:

ADITYA BIRLA. EMil. Please find enclosed herewith the environmental statement report duly filled-in Form-V

GENERAL SPECIFICATION FOR THE MANAGEMENT AND DISPOSAL OF EXCESS MATERIAL

MQGP Supplemental Form 7/17/17

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department

EASTERN WASTE MANAGEMENT WHITBOURNE AREA WASTE RECOVERY FACILITY

Preliminary Disclosure; Application for Approval; Operating Permits, Volume 2: Licences and Approvals; and Abandonment Approval and

ENVIRONMENTAL ASSESSMENT REGISTRATION DOCUMENT

1. Proponent Information and Introduction

Goldboro Gold Deposit Development Open House Questions and Answers

Mitigation Monitoring Program Campus Master Plan 2015

Report to the Montrose County Board of County Commissioners Prepared by the Montrose County Planning and Development Department #1

CONSTRUCTION AND DEMOLITION DEBRIS DISPOSAL SITE GUIDELINES

ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0.

PW # 2-18 TENDER FOR SUPPLY & APPLY CRUSHED GRANITE

MOUNTAIN VIEW COUNTY BYLAW NO. 14/16 TO AMEND BYLAW NO. 15/1

Terrace Airport Pit Aggregate Resource Assessment Technical Summary Provincial Pit Number 5235

MATERIAL SPECIFICATION FOR AGGREGATES - GENERAL

URBAN SETTLEMENT ZONE - RULES

Appendix 4. Soil Management Plan

Wellhead Protection Issues Related to Mining Activities Minnesota Rural Water Conference March 4, 2014

Goffs Quarry Environmental Assessment OVERVIEW FOR CONSULTATION

TIMBERLAND GOLF RESORT

meters (16 Inches) Transportation (T)

Environmental Plans and Procedures

REQUEST FOR TENDER - SERVICES RFT HOUSE DEMOLITION 7958 BEAVERDAMS RD., NIAGARA FALLS, ON.

HARDROCK PROJECT CONCEPTUAL EXPLOSIVES AND BLASTING MANAGEMENT PLAN

Introduction Category 15

Willow Ridge Wind Project Frequently Asked Questions. Popular Questions Who is the developer of the proposed project?

NEWNES JUNCTION SAND AND KAOLIN EXTRACTION PROJECT

IBEC will continue to have the authority and responsibility for maintaining and protecting the Indian Bay Watershed.

Water Pollution Control for Work in Sensitive Areas

PRE FEASIBILITY REPORT

EIA-EMP REPORT GRAVEL QUARRY (Category-B2)

Town of Caledon Official Plan Chapter 5 Town Structure & Land Use Policies

Construction Materials Industry Overview

55.3 AGGREGATE PRODUCTION AND STOCKPILING

Pressures from quarrying activities on the environment. Akis Kikas Senior Principal Auditor Audit Office of the Republic of Cyprus

ENVIRONMENT MANAGEMENT PLAN FOR STONE MINING

2018 Winter/Spring Gravel Stockpile

ENVIRONMENTAL MANAGEMENT PLAN. Developed for National Asphalt (Pty) Ltd. Generic Requirements

Chapter MINERAL EXTRACTION AND MINING OPERATIONS

McLUCAS & ASSOCIATES, INC. CONSULTING GEOLOGIST INDUSTRIAL MINERALS AND AGGREGATE SPECIALISTS

Mine Operation Plan (MOP) For New Mexico State Land Office Construction Materials Lease Lease Number: HA-

Refer to Chapter 3.0 (Description of Development) for a detailed site and development description.

Facilities Environmental Protection Plan: Burnaby Terminal

TABLE OF CONTENTS 5.0 FOREST MANAGEMENT PLANNING...

Project Overview & Scope of Work

1. PRE-FEASIBILITY REPORT

Attention. This presentation material can be used for academic purposes only.

BUMSTEAD PIT. Part Lot 27, Concession 7 Geographic Township of Holland Township of Chatsworth County of Grey

APPLICATION FOR A NEW WATER LICENCE, AMENDMENT OF LICENCE, OR RENEWAL OF LICENCE.

Risk Assessment Nagla

GENERAL SPECIFICATION FOR THE MANAGEMENT OF EXCESS MATERIALS

MASTER SITE DEVELOPMENT PLAN

PACIFIC SILICA AND ROCK QUARRY LTD. Aggregates and Quarry Materials Application Requirements List

Transcription:

Quarry, Mobile asphalt plant, Equipment Yard and Storage Garage Trans Canada Highway, 8.5 KM west of Springdale Jct, NL. Department of Environment and Conservation File Ref No. 200.20.2475 Prepared for. J & J Paving Limited.

Table of Content 1.0 NAME OF UNDERTAKING 2.0 PROPONENT 2.1 Name of Corporate Body 2.2 Address 2.3 Chief Executive Officer 2.4 Principle Contact Person 3.0 THE UNDERTAKING 3.1 Nature of the Undertaking 3.2 Purpose for the Undertaking 4.0 DESCRIPTION OF THE UNDERTAKING 4.1 Geographic Location Figure 1. Figure 2. Figure 3. 4.2 Physical Features 4.2.1 Project Site Description 4.2.2 The Present Environment 4.3 Construction 4.3.1 Access to Site 4.3.2 Clearing and/or Grubbing 4.3.3 Pit Development 4.4 Potential Sources of Pollution During Construction 4.4.1 Air Quality/Noise 4.4.2 Waste Production 4.4.3 Hydrocarbon Release

4.5 Operation 4.6 Potential Sources of Pollution during Operation 4.6.1 Air Quality/Noise 4.6.2 Waste Production 4.6.3 Hydrocarbon Release 4.7 Potential Resource Conflicts 4.8 Occupations 4.8.1 Construction Phase 4.8.2 Operations Phase 4.9 Project Related Documents 5.0 APPROVAL OF THE UNDERTAKING 6.0 SCHEDULE 7.0 FUNDING 8.0 SUBMISSION

1.0 NAME OF UNDETAKING Quarry, Mobile asphalt plant, equipment yard and storage garage Trans Canada Highway, 8.5 KM west of Springdale Jct, NL. 2.0 PROPONENT 2.1 Name of Corporate Body J & J Paving Limited. 2.2 Address P.O. Box 428 7A Tipping place Corner Brook NL A2H 6E3 2.3 Chief Executive Officer Junior England President P.O. Box 428 7A Tipping Place Corner Brook NL A2H 6E3 2.4 Principle Contact Person Junior England President P.O. Box 428 7A Tipping Place Corner Brook NL A2H 6E3

3.0 THE UNDERTAKING 3.1 Nature of the Undertaking This proposed project involves the development of a 6 hectares gravel, sand and rock pit located near Springdale Jct for use as asphalt aggregate projects in central NL. 3.2 Purpose for the Undertaking The purpose of this project is to remove gravel, sand and rock for future use as aggregate in asphalt construction projects. 4.0 DESCRIPTION OF THE UNDERTAKING 4.1 Geographic Location For site plan please see figure 1 The proposed project is located approximately 8.3 km west of Burnt Berry pond, Nl. The quarry is located on NTS map 12H08. Entrance location can be found on NTS map 12H08 ----UTM zone 21 550503E 5478404N map datum NAD27 See Figure 2 and Figure 3

Figure 1

Figure 2

Figure 3 4.2 Physical Features 4.2.1 Project Site Description The gravel, sand and rock pit will be the primary feature associated with this pit. There will also be a scale house, mobile asphalt plant and storage shed/ garage on the site. This site will be accessed by existing access from trans Canada Highway

4.2.2 The Present Environment The proposed 6 hectares quarry is an extension to an existing quarry area in central NL. The site is surrounded by black spruce and birch trees. Moss, laurel and kalmia are present in areas within the boundary of the proposed quarry. Previous use of this area as a quarry goes back over 50 years to the 1965 construction of the Trans Canada Highway. The area has previously had temporary asphalt plants set up many times over decades of highway construction and maintenance. Wildlife often found in these areas include black bear, moose, snowshoe hare, Fox and coyote. 4.3 CONSTRUCTION The construction phase of this site development will primarily consist of :. Clearing and Grubbing. Pit development and associated control measures. mobile asphalt plant, silo and conveyor system as well as weigh scales and office building are already on leased portion of this site. Site has existing gravity flow water supply and water settling tanks on leased area of the quarry The activities on the leased portion have been approved by Dept of Natural Resources Quarry permit number 132382 and Development permit number 189315 4.3.1 Site Access Site access will be via the existing quarry pit road access presently being leased and operated by J & J Paving Limited There will be no new access or road construction 4.3.2 Clearing and Grubbing All timber of size suitable for salvage will be removed and utilized. Grubbed overburden material will be separated and stockpiled for future site remediation.

4.3.3 Development The total pit has an area of approximately 6 hectaress. The proponents plan on first operating the Southern side of the pit and work Northward to eventually use the full pit property. As mentioned, overburden material suitable for later use will be separated and stockpiled until needed for use in pit closing and site remediation. 4.4 Potential Sources of Pollution during Construction The construction phase of this development will involve overburden clearing via use of heavy equipment. This activity has inherent potential for pollution. Potential sources of pollution include noise, waste, air emissions and hydrocarbon release from heavy equipment. 4.4.1 Air/Noise Pollution There exists the potential for an increase in dust creation and noise emission during the pit development. As with the existing pit, both potential pollution events are kept minimal with the proper use of mitigating measures such as:. Machinery will be properly muffled. Machinery will comply with all provincial and municipal noise bylaws. Machinery will have appropriate emission control mechanisms. Machinery will only travel on approved roads within the pit boundary. Construction will be done during daylight hours to limit impact upon any nearby wildlife 4.4.2 Domestic Wastes There exists the potential to create domestic waste during construction. The potential impact upon the immediate environment will be kept to a minimum by adhering to the Newfoundland and Labrador Waste Management Regulations.

4.4.3 Hydrocarbon Release Pit activities could possibly result in the accidental spilling of hydrocarbons such as diesel fuel, engine oil, and hydraulic fluid. To reduce the likelyhood, and subsequent impact if a spill did occur, the following mitigation measures will be in effect.. Emergency spill kits will be onsite at all times. Servicing of machinery will be done offsite and at appropriate locations. All employees will receive spill response training prior to operations 4.5 Operation This pit operation will utilize standard excavation methods to collect the materials needed by J & J Paving Limited. Operations within the pit will include the excavation and loading of granular materials, crushing and screening of aggregates as well as the transportation of these materials. These materials will be used to manufacture asphalt during the construction season. Materials such as overburden and over-sized rock will be stockpiled for later use. Reject asphalt will be stored at Eastern end of existing pit for future recycling. Typical equipment found in a quarry / plant operation will include:. Dump trucks. Front-end loaders. Excavators. Crusher/screening and mobile asphalt plant A quarry of this nature will be in operation from May until October. 4.6 Potential Sources of Pollution during Operation The potential sources of pollution during operating activities are similar to those during the construction phase. They include air, noise, domestic waste and hydrocarbon release.

4.6.1 Air/Noise Pollution There exists the potential for an increase in dust creation and noise emission during the pit development. As with the existing pit, both potential pollution events are kept minimal with the proper use of mitigating measures such as:. Machinery will be properly muffled. Machinery will comply with all provincial and municipal noise bylaws. Machinery will have appropriate emission control mechanisms. Machinery will only travel on approved roads within the pit boundary. Construction will be done during daylight hours to limit impact upon any nearby wildlife 4.6.2 Domestic Wastes There exists the potential to create domestic waste during the construction of this pit. The potential impact upon the immediate environment will be kept to a minimum by adhering to the Newfoundland and Labrador Waste Management Regulations. Sewage facilities are already existing on the leased portion of the quarry. This consists of septic system with holding tank. 4.6.3 Hydrocarbon Release Pit operations could possibly result in the accidental spilling of hydrocarbons such as diesel fuel, engine oil, and hydraulic fluid. To reduce the likelyhood, and subsequent impact if a spill did occur, the following mitigation measures will be in effect.. Emergency spill kits will be onsite at all times. Servicing of machinery will be done offsite and at appropriate locations. All employees will receive spill response training prior to operations

4.7 Potential Resource Conflicts during Operation The proposed quarry site is 12 km East of nearest community, which is Sheppardville, NL. and 14 km west of Springdale As such, the site will not have any effect on these residential area. Environmental protection measures will include:. Waste materials will be removed daily. Erosion prevention will be enabled by only clearing the land as needed.. Spill kits will be present and maintained by staff. Spill response training will be provided for staff working on site 4.8 Occupations Site construction and operation will involve the following occupations as classified by the National Occupations Code (NOC) 2011. The positions will be filled by direct hire. 4.8.1 Construction Two heavy equipment operators(noc 7521) for a period of 2 weeks. 4.8.2 Operation The operation of the quarry will be carried out by two heavy equipment operators (NOC 7521) and three truck drivers (NOC 7511) for approximately 20 weeks annually. 4.9 Project Related Documents The operation and expansion of this quarry will be done by J & J Paving Limited as previously approved by Dept of Natural Resources on Quarry permit number 132382 and Development permit 189315

5.0 Approval of the Undertaking The following permits will/may be required in order for this project to proceed.. Quarry Materials Act and Quarry Minerals Regulations: Quarry Permit----- Provincial Government.. Environmental Protection Act/Assessment Regulations: Permit to Proceed. Provincial Government. 6.0 Schedule Document submission/registration -----May 2016 Government Review/Decision -----July. 2016 Pit Construction/Operation ---July, 2016 7.0 Funding Funding for this project will be provided solely by J & J Paving Limited. 8.0 Submission Junior England May 27, 2016 President J & J Paving Limited