Dear Home Owner: Certificate Holder: Mr. xxxxxx Unit yyyyyy 3410 N. Lake Shore Drive Chicago, IL ADDITIONAL INSURED LANGUAGE:

Similar documents
Lancaster Condominiums CONSTRUCTION RULES AND GUIDELINES

REMODELING CONSTRUCTION GUIDELINES

Gramercy Place Condo Association, Inc.

Windsor Gardens Association Modifications Submittal Package

A. Objectives of the Architectural Review Committee Shall Be:

RENOVATION APPLICATION FOR UNIT: OWNER'S NAME: phone: fax: SUBMISSION CHECKLIST

UNIT # CONSTRUCTION / RENOVATION PACKAGE

CHECKLIST REMODELING, RENOVATIONS, CONSTRUCTION, AND REPAIRS. Sign and return the Ilikai Marina Renovation Policies agreement

PLANNING, PROPERTY AND DEVELOPMENT DEPARTMENT. Construction requirements for LOWER LEVEL DEVELOPMENT. in residential dwellings

RENOVATIONS SIMPLE FORM FOR APARTMENT ALTERATIONS

City of Guntersville Residential Building Permit

Paperwork and Contractors

$ Plan Review Fee when Permit Application is submitted BASEMENT REMODEL BUILDING PERMIT APPLICATION. Status Sticker OFFICIAL USE ONLY

EXHIBIT B TO AGREEMENT BETWEEN PENSACOLA HABITAT FOR HUMANITY AND SUBCONTRACTOR. Scope of Work. Plumbing. Division 055 Plumbing Rough

New Jersey Home Inspection - Standards of Practice

Unit Modification Requirements Quick Guide

COMPANY: CERTIFIED HOME INSPECTIONS ADDRESS: 92 NORTH RD. CITY, STATE, ZIP: NUTLEY NJ PHONE:

Inspection Report. Prepared for: Gil Turiel. Property Address: 545 Briar Run Court Loganville, GA Date: July 17, 2011

Permit Posting and Inspection Procedures

APPLICATION FOR FINISHED BASEMENT PERMIT

RENOVATIONS APPLICATION FORM

HORIZONS - MARINA DISTRICT ARCHITECTURAL COMMITTEE

MUTUAL OPERATIONS. 1) Assurance of the presence of a Contract between all interested parties;

A Summary of the Basic Duties of Maintenance, Repair and Replacement for CARRIAGE PARK CONDOMINIUM ASSOCIATION

Residential Bathroom Remodels

Inspection Report. Prepared for: Tonia Mann. Property Address: 2557 Briar Valley Way Dacula, GA Date: March 01, 2012

Renovation instructions

LANSING HOUSING COMMISSION NOTICE OF REQUEST FOR PROPOSALS RFP No. 1-AMP Christopher Christopher Repair

REQUEST FOR QUALIFICATIONS ARCHITECTURAL/ENGINEERING SERVICES

Inspection Report. Prepared for: Yossi Berg. Property Address: 4925 Diggers Way Sugar Hill, GA. Date: July 20, 2011

LANSING HOUSING COMMISSION NOTICE OF REQUEST FOR PROPOSALS RFP No

CITY OF FATE SINGLE FAMILY BUILDING PERMIT PACKET. Adopted Codes:

COMMERCIAL PROJECT INFORMATION

ITB-DOT-17/ ER EXHIBIT A Scope of Work Remodeling of the Restrooms at Fort Myers Operations Center

N.J.A.C. 13: NEW JERSEY ADMINISTRATIVE CODE Copyright (c) 2015 by the New Jersey Office of Administrative Law

THE WHARF TERRACES RENOVATIONS POLICY

Home Inspection Report

The Grande Excelsior Lanai Screen Enclosures Requirements for Decorators, Contractors and Subcontractors

RESIDENTIAL BASEMENT ALTERATIONS GUIDE

ADDENDUM NO. 1. TO SCOPE OF WORK: Section 0220, Form 01004/5

Contractor/Owner initials are verification that items #1 and #2 and items (a) thru (g) above are included in the submitted plan/drawing.

Alabama Home Inspections

KIHEI KAI NANI CHECKLIST FOR UNIT UPGRADES Updated May, 2015

CITY OF GRANDE PRAIRIE

RENTAL INSPECTION CHECKLIST. Helpful Definitions: Egress: the free and unobstructed access to the exterior of a habitable space.

Everett Water Department Rules. & Regulations. Notification Page 2. Public Water Mains Page 2. Private Water Mains Page 2. Water Conservation Page 3

HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS

RESIDENTIAL PROJECT INFORMATION

Title 13 PUBLIC SERVICES

CEDARBRAE GARDENS CONDOMINIUM CORP.

REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES

Uniform Construction Code

Columbia County Health Care Center Added Amenities

Inspection Report. Property Address:

City of Edwardsville Safe Housing Program Rental Property Registration and Inspection. Rental Property Guide

Inspection Report. Prepared for: Yaron Sternberg. Property Address: 926 Hemingway Road Stone Mountain, GA. Date: April 15, 2011

229 Rehoboth Avenue Telephone P.O. Box 1163 Fax

WINDSOR GARDENS ASSOCIATION

TRAINING BULLETIN SALVAGE 1 March 15, 1997 SALVAGE OPERATIONS

PREPARING RESIDENTIAL PROPERTY FORTHE HOUSING HABITABILITY INSPECTION

HARPER WOODS BUILDING DEPARTMENT PROCEDURES FOR OBTAINING CERTIFICATE OF OCCUPANCY

TYPICAL APARTMENT FLOOR PLAN

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 01 GENERAL REQUIREMENTS SECTION CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

Variance Requests Excerpted from Fairlington Mews Condominium Association Welcome Handbook Updated Reprinted

Basement Build-Out Guidelines

CITY OF ANDERSON BUILDING AND CODES 601 South Main Street

Building Regulations; Construction 11

BASEMENT FINISH CONSTRUCTION PLANS REFERENCE: 2015 INTERNATIONAL RESIDENTIAL CODE. PERMITS

Inspect Hawaii. Property Inspection Report

Handyman & Maintenance Cost Estimator

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

Sams & Associates York Field Services

A UCC Building permit is not required for the exceptions listed below for COMMERCIAL application: (403.42): Building construction for the following:

THE RESTORE LOUISIANA REIMBURSEMENT ESTIMATE

ANNEX A.1 TECHNICAL SPECIFICATIONS. Open Call for Tender. No F/SE/10/05. Provision of Building Inspection, Maintenance, Alteration and Repair services

BUILDING DIVISION 120 Malabar Road, S.E., Palm Bay, FL Phone: (321) Fax: (321)

Homeowners Building Permit Guide

Residential Sewer Backup Prevention Program

HOMEOWNER PERMITS AND ELECTRICAL WIRING GUIDE

Residential Construction Minimum Required Inspections

Project Address Applicant: (Please Print) Plan review Engineer: Phone: Date

Pulaski County, Virginia

BRADDOCK ROAD YOUTH CLUB

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

The Compass ( 270 Lisgar Street, Brighton ) Features General Site Work 1. Construction Drawings 2. Building, Plumbing Electrical and Entrance Permits

Rebuilding your Home after the storm? Adding on, renovating, or remodeling your home? Here's information YOU need to know about the 50% Rule.

Inspection Report. Prepared for: Tonia Mann. Property Address: 56 Riverview Place Douglasville, GA Date: September 19, 2012

Contractor Policy Manual

1280 Maryland Avenue, SW, #280 Washington, DC 20024

Listed below are some of the major items that the food service establishment must have to be in compliance to receive food service permits.

9) Home Inspection: As defined in Section 1-10 of the Act.

TITLE 68: PROFESSIONS AND OCCUPATIONS CHAPTER VIII: DEPARTMENT OF FINANCIAL AND PROFESSIONAL REGULATION

INFORMATION GUIDE SECOND DWELLING UNITS BUILDING CODE BASICS

C ITY OF D ARIEN Community Development Department 1702 Plainfield Road Phone: (630) Fax: (630)

HALTON COMMUNITY HOUSING CORPORATION

Town of Falmouth FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage COSTS FOR SUBSTANTIAL IMPROVEMENTS / REPAIR OF SUBSTANTIAL DAMAGE:

Appendix 2: Term Sheet. SECTION 37 TERM SHEET FOR CITY SPACE AT THE CONDOMINIUM TO BE CONSTRUCTED AT 200 DUNDAS STREET EAST (the "Project")

Nassau County Building Department Nassau Place Yulee, Florida MEMORANDUM

Section Standards of Practice. a) The following are terms commonly used in the writing of home inspection reports.

Work Write Up / Specification of Repairs HUD DIVISION 1. MASONRY HUD DIVISION 2. SIDING. Toll Free

Transcription:

Dear Home Owner: For your information, construction work can be done in the unit Monday through Saturday, during the hours of 8:00 am to 6:00 pm. Deliveries and equipment must be taken through the back and up the freight elevator. The unit owner must reserve the freight elevator ahead of time for such deliveries and is on a first come first serve basis. Debris must be removed from the building and not thrown down the garbage chute. The Condo Association also requires a Certificate of Insurance listing the unit owner & unit number as the Certificate Holder as well as the 3410 LAKESHORE DRIVE CONDOMINIUM ASSOCIATION and its Management Company, OSHER MANAGEMENT SERVICES, INC. as additional insured. The certificate should read: Certificate Holder: Mr. xxxxxx Unit yyyyyy 3410 N. Lake Shore Drive Chicago, IL 60613 ADDITIONAL INSURED LANGUAGE: 3410 Lakeshore Drive Condominium Association and its management, Osher Management Services, Inc. If you need further information, please feel free to contact our office at 773.477.0006. Sincerely, Shlomo Osher, Property Manager Osher Management Services, Inc. Rev. 12/2014 1 P a g e

Only a complete construction packet will be accepted. The following items must be submitted: -Detailed Scope of Work from all contractors * Detail exactly what brand/system is being installed - Insurance Certificates from * General Contractor * Plumber * Electrician - Copies of License * General Contractor * Plumber * Electrician * Licenses must be available for inspection by the Property Manager while performing work. An approval letter will be issued by the Management Office. After you have received the approval letter, construction work should be scheduled with the Management Office and you can begin. 2 P a g e

REMODELING POLICY AND PROCEDURES A construction packet must be prepared and submitted to Management at least two weeks prior to commencing work, and the Board of Directors must approve the proposal, if remodeling encompasses any of the following: 1. Electrical wiring or plumbing. 2. Any material penetration of the concrete floor slab or the ceiling. Work on the concrete slab should always be coordinated with Management and only be conducted by authorized persons. 3. Any changes to the water risers upstream of the unit shutoff valves, drain lines, unit entrance doors, building communication systems or electric circuit breakers. 4. Any demolition of any existing walls or portion thereof or construction of any partitions. 5. Installation of new flooring, except for carpeting. Special Requirements and Limitations 1. The installation or replacement of garbage disposals and washers and dryers is prohibited. 2. Work in the unit is to be conducted between the hours of 8:00 AM and 6:00 PM Monday through Saturday. No work allowed on Sunday and National Holidays. 3. To prevent damage to hallway carpeting and decorating, provisions must be made outside and/or inside the unit so that workmen will not track debris into hallways or scratch or damage the walls. 4. The use of floor runners must be used when bringing in equipment or materials or taking out of equipment or materials. 5. The use of industrial air hammers is not permitted without Board approval. 6. All debris must be put into covered containers within the unit and removed at owners expense. Unit owners will be charged for removal of debris or any extra cleaning of the Common Elements, if necessitated by the remodeling of their units. 7. Association s carts cannot be used for construction purposes. 8. Any damage whatsoever that is caused to the building, whether it is the property owned by the Association or other unit owner of the condominium, by the work done in an individual unit, shall be repaired at the expense of that unit owner upon notice from the Association. 9. Any workman using flammable materials shall include a small fire extinguisher as part of his equipment. 10. All contractors must submit to Management a current Certificate of Insurance or other evidence of financial responsibility before work is allowed to start. 3 P a g e

11. The certificate should read: Certificate Holder: Mr. xxxxxx Unit yyyyyy 3410 N. Lake Shore Drive Chicago, IL 60613 ADDITIONAL INSURED LANGUAGE: 3410 Lakeshore Drive Condominium Association and its management, Osher Management Services, Inc. If you need further information, please feel free to contact our office at 773.477.0006. 4 P a g e

Air Conditioning Installation Procedures Procedures for installation of extra window air condition units for those who wish to install additional units are as follows: 1. All additional window units must be approved by the Board of Directors. 2. All extra window air conditioning units must be lined up with all other units in your tier so they are all in the same windows vertically up and down the building. 3. All through-brick installations must have a G E Air Conditioner Sleeve installed with the unit. 4. All installation firms must provide a copy of their Certificate of Insurance, naming 3410 Lakeshore Drive Condominium Association and its management, Osher Management Services, Inc. as additional insured. NOTE: Prior to commencing the contractor performing the job has to provide property Management Office with a copy of his General Liability Insurance naming 3410 Lakeshore Drive Condominium Association and its management, Osher Management Services, Inc. as additional insured. 5 P a g e

ELECTRICAL REQUIREMENTS Per Rules & Regulations # IV/A/1: Nothing shall be done in any Unit or in, on or to the Common Elements that would impair the structural integrity of the building. A Unit Owner must receive written approval from the Board of Directors to proceed with any alterations, additions or improvements to his/her Unit prior to such improvements taking place. The Board shall have final approval on all unit and Common Elements alterations. 1. All electrical work must be completed by a licensed electrician in a safe and workmanlike manner in accordance with all code requirements. 2. Electrical panels must provide an unobstructed clearance for minimum of thirty (30) inches. Adjustable shelves and removable closet rods are considered obstructions. 3. No wall, floor, or ceiling electrical boxes may be buried after removal of a receptacle or fixture until all wiring in use has been removed. 4. Electrical panels must be covered or protected at all times. 5. Ground Fault Interruption receptacles must be used in all bathrooms and kitchens, five (5) feet from a water source. 6. All steam room, sauna, or dishwasher electrical components and enclosures must be approved by the Building Management or its agents prior to installation in the Unit. 7. All work to be completed on telephone lines must be completed by a qualified low voltage telephone-line specialist (AT&T). 8. Installation of additional circuits breakers to the electrical panel must receive the prior approval of Building Management. NOTE: Prior to commencing the contractor performing the job has to provide property Management Office with a copy of his General Liability Insurance naming 3410 Lakeshore Drive Condominium Association and its management, Osher Management Services, Inc. as additional insured. (Rev. October 2007) 6 P a g e

Per Rules & Regulations # IV/A/1: FLOOR COVERING REQUIREMENTS Nothing shall be done in any Unit or in, on or to the Common Elements that would impair the structural integrity of the building. A Unit Owner must receive written approval from the Board of Directors to proceed with any alterations, additions or improvements to his/her Unit prior to such improvements taking place. The Board shall have final approval on all unit and Common Elements alterations. Residents may not install hard floor coverings without adequate sound deadening insulation between the covering and the concrete. All floors, except in bathrooms, must conform to the specifications listed below unless written permission is obtained from the Board of Directors. 1. Carpeting must be placed over at least 31-ounce 3/8 foam rubber, or 80-ounce sponge rubber, or equivalent sound resistant padding. 2. Regiment floor tile must be installed over sound conditioned felt paper, or a minimum of ¼ dense cork, so as to reduce transmission to the same level as the carpeted areas. 3. Any type of hardwood flooring must be installed over ¼ dense cork and two (2) layers of 3/8 plywood stapled together. Plywood may NOT be fastened to the concrete floor! 4. Parquet, Pergo, Interlock or any laminated floor must be installed over ¼ dense cork or a product entitled Combo Ulay (generic name, Tuplex ). 5. Marble, flexstone, ceramic tiles and similar material shall be installed over ¼ dense cork. 6. In every installation process, appropriate sound deadening material shall be added or used to minimize sound or noise transmission. NOTE: Prior to commencing the contractor performing the job has to provide property Management Office with a copy of his General Liability Insurance naming 3410 Lakeshore Drive Condominium Association and its management, Osher Management Services, Inc. as additional insured. (Rev. October 2007) 7 P a g e

Per Rules & regulations # IV/A/1: PLUMBING REQUIREMENTS Nothing shall be done in any Unit or in, on or to the Common Elements that would impair the structural integrity of the building. A Unit Owner must receive written approval from the Board of Directors to proceed with any alterations, additions or improvements to his/her Unit prior to such improvements taking place. The Board shall have final approval on all unit and Common Elements alterations. 1. All plumbing work is to be completed by a licensed plumber in a safe and workman like manner and in accordance with all code requirements. 2. The Chief Engineer for the Building must be present when the actual work begins. Two (2) days notice is required through the Management Office. 3. The relocation of any water risers, waste lines, or venting stacks is strictly prohibited. 4. All connections made to the building venting or plumbing must be pre-approved. 5. Individual shut-off valves are required for all newly installed fixtures. Any drain line, which exceeds a five-foot run from the fixture to the main waste line is required to be properly ventilated. 6. All steam rooms or permanently installed humidifier components must be approved by the Building Management prior to installation. 7. All steam rooms or permanently installed humidifier components must be approved by the Building Management prior to installation. 8. When remodeling bathrooms and kitchens, all Sloan Valve toilets and one handle faucets shall be removed. Only tank toilets and two handle faucets are to be used in individual units (Rev. 12.10.14). 9. The two main shut-off valves in the bathroom will be replaced at time of remodeling (Rev. 12.10.14). WATER SHUT-OFF PROCEDURES 1. Water shut-off are scheduled on Tuesday, Wednesday, and Thursday between the hours of 10:00 a.m. until 12:00 p.m 2. Requests for water shut-off must be submitted to the Management Office for scheduling at a minimum of 72 hours advance of the dated needed. There is a $50.00 fee for the shutoff which needs to be paid at time of request by the unit owner. 3. The Owner should state in his/her request, the reason for the water shut-off. 4. The Owner should inform their contractor/plumber that they must be on site by 10:00am. If the contractor/plumber is not here by 11:00am, the Management Office will cancel the shutoff for that day, and will not be rescheduled until the next available date. The Association will not take any responsibility for payment or reimbursement of fees to unit owners or contractors. 5. Plumber/contractor must have all materials on site before the water is shut-off. The Association will not supply any materials without charge. 6. Only one riser will be turned off or scheduled per workday. 8 P a g e

7. All shut-off valves and supply lines may NOT have any plastic parts. The proper shut-offs and supply lines may be purchased from the Association. NOTE: Prior to commencing the contractor performing the job has to provide property management office with a copy of his General liability Insurance naming 3410 Lakeshore Drive Condominium Association and its management, Osher Management Services, Inc. as Additional insured (Rev. October 2007) 9 P a g e