City of Charlotte BMP Maintenance and Inspection Check List Grassed Channels / Swales [Note: a separate form must be used for each BMP]

Similar documents
Appendix F Maintenance Inspection Checklists

Dry Swale Wet Swale Grass Channel Dry Well Permeable Pavement Bioretention DESIGN ELEMENTS

Extended Detention Basin Maintenance Plan for [[== Insert Project Name ==]]

Chapter 5.5 Inlets, Outlets, and Flow Control

Submittal Requirements. Post Construction Verification Document Plan Requirements

At least 2 feet above the seasonal high water table Overflow path or structure provided

Construction Inspection Checklists

Stormwater Quality Review Checklist - General

4.4.6 Underground Detention

Inspection and Maintenance of Stormwater Control Measures: Helping Protect Greensboro s s Water Quality and Water-Supply

The Pond Management Protocol. Tom Schueler Chesapeake Stormwater Network

4.12. Detention Basins

Stormwater Management Training for MS4 Municipal Employees

3.11 Sand Filter Basin

Georgia Stormwater Management Manual Appendix E

6.5 Extended Detention Basin

INFILTRATION TRENCH (AKA: soakage trench)

Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control

General Notes: Site photographs with captions follow. Close:

WET POND OPERATION & MAINTENANCE AGREEMENT

Operation & Maintenance Document Templates

Bioretention and the Visual Indicators Approach to Inspecting and Maintaining Stormwater BMPs

STORMWATER OPERATION AND MAINTENANCE AGREEMENT

WQ-06 SAND FILTER. 1.0 Sand Filter. Greenville County Technical Specification for: 1.1 Description

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual

INSPECTION & MAINTENANCE OF BMPs: PROGRAM COMPONENTS & ASSET MANAGEMENT

C-1. Infiltration System

Storm Water Standards 105

Permanent Stormwater Quality Best Management Practice INSPECTION AND MAINTENANCE FIELD GUIDE

Permanent Stormwater Quality Best Management Practice Inspection and Maintenance Field Guide

Chatham Park Stormwater Manual

APPENDIX G. Operations and Maintenance Activities

RADFORD UNIVERSITY BMP INSPECTION REPORT. Radford, Virginia. Located in: Project Number:

SC-01 Surface Outlet and Baffle Sediment Basin

SUBSURFACE INFILTRATION SYSTEM (Aggregate Filled)

3.7 Guidance for Large Bioretention/Biofiltration BMP Facilities

Sediment Basins and Skimmers. Jay Dorsey/John Mathews Ohio Dept. of Natural Resources, Division of Soil and Water Resources

BEST MANAGEMENT PRACTICES OPERATION AND MAINTENANCE PLAN FOR STORMWATER-MANAGEMENT STRUCTURES FORT CARSON, COLORADO

Constructed Wetland Use in Nonpoint Source Control

Suggested Stormwater Management Practices For Individual House Lots

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

Erosion Control Inspection Form

APPENDIX G Stormwater Control Operations and Maintenance Requirements

Minimum Design Criteria: Shaping the Future of Stormwater Management

APPENDIX G: CONSTRUCTION INSPECTION CHECKLISTS AND CERTIFICATION TEMPLATES

Standard Operating Procedure (SOP) For Sand Filter Basin (SFB) Inspection and Maintenance

Proper Construction of detention and sediment basins and their conversions

INFILTRATION BASIN & DETENTION POND

TEMPORARY SEDIMENT TRAP CODE

STORMWATER MONITORING GUIDELINES SOUTH OF DUNDAS STREET OPERATION, MAINTENENACE AND MONITORING OF STORMWATER MANAGEMENT PONDS

NDOT Stormwater Operations and Maintenance Plan

Engineered Stormwater Controls

WQ-08 ENHANCED DRY SWALE

ENGINEERING CHECKLIST SEDIMENT & STORMWATER MANAGEMENT BASIN CONSTRUCTION

BIOPOD TM BIOFILTER WITH STORMMIX BIOFILTRATION MEDIA. Inspection and Maintenance Guide

BIOPOD TM BIOFILTER. with StormMix Biofiltration Media. Inspection and Maintenance Guide

Example 1: Pond Design in a residential development (Water Quantity calculations for a Wet Pond and Wet Extended Detention Pond)

Installation and Maintenance of Erosion Control BMPs

Standard for Wet Ponds

Infiltration Trench Factsheet

INSTRUCTIONS FOR FILING COVENANT AND AGREEMENT FORMS

Permeable Pavement. Pavements constructed with these units create joints that are filled with permeable

CENTRALIZED BMPS TYPICALLY PUBLICLY OWNED & MAINTAINED BMPS, TREATING A LARGE (>20 ACRES) URBAN DRAINAGE WITH MULTIPLE LAND

Block and gravel filters can be used where velocities are higher. Reduces the amount of sediment leaving the site.

Appendix E. Coordinating Erosion and Sediment Control With Low-Impact Development Planning

LINCOLN COUNTY PLANNING & INSPECTIONS DEPARTMENT

Operation & Maintenance (OM) Manual v01. Bioretention Systems ENGINEERED SOLUTIONS

Standards for SWMF s. (Stormwater Management Facilities) Lacombe County s Guide to Developing Stormwater Management Facilities

Practices that capture and temporarily store the WQ v before allowing it to infiltrate into the soil.

Presented by Henry L. Barbaro Stormwater Management Unit Supervisor MassDOT Highway Division

4.4.5 Grassed Swale (also known as Enhanced Swale or Biofiltration Swale)

INSPECTION, MAINTENANCE AND HOUSEKEEPING PLAN

Operation and Maintenance

COMPLETE CHECKLIST IN BLUE PEN AND SUBMIT ELECTRONICALLY OR BY MAIL TO THE ADDRESSES BELOW

Chapter 6 Sand Filtration Treatment Facilities

DTE Energy St. Clair Power Plant

LONG-TERM POLLUTION PREVENTION PLAN AND STORMWATER OPERATION AND MAINTENANCE PLAN Track and Field Renovation 250 Foundry Street, Easton, MA

Rhode Island Stormwater Design and Installation Standards Manual

Inflow pipe. Drain. Drain

Constructed Wetland Pond T-8

Appendix D Index. SWM/BMP Facility Site Photographs. Subshed 440 Facility Photo #

DETENTION TANK (AKA: detention vault, detention pipe)

GRASS-LINED CHANNEL (acre) CODE 840

Extended Detention Basin (EDB) Sedimentation Facility

Stormwater Quality Extended Detention Basin Operation and Maintenance (O&M) Manual. for: Located at: Prepared for: Prepared by:

BMP FACT SHEET DF-1 HOA Annual Self-Certification Report

4.8. Subsurface Infiltration

Water Resource Management Design and Construction Manual

4.3.3 Dry Extended Detention Ponds

4.8. Subsurface Infiltration

B. Install storm drain inlet protection to prevent clogging of the stormsewer and sediment loads to downstream stormwater facilities or waterbodies.

Single Family Residential Construction Erosion/Sediment Control Standards

ACTIVITY: Dewatering Operations AM 12

TABLE B.3 - STORMWATER BMP POLLUTANT REMOVAL EFFICIENCIES

Construction Site Inspections

BMP MAINTENANCE MANUAL

OPERATIONS AND MAINTENANCE MANUAL. Project: STORMWATER CONTROL STRUCTURE Wet Detention Pond. Cary, NC. Owners: Prepared By: Date:

Operation & Maintenance (OM) Manual v01. Bioretention Systems

Stormwater Erosion Control & Post-Construction Plans (Stormwater Quality Plans)

ZONING ORDINANCE FOR THE ZONED UNINCORPORATED AREAS ARTICLE 1500 OF PUTNAM COUNTY, WEST VIRGINIA Page 149 ARTICLE 1500 DRAINAGE AND STORM SEWERS

Transcription:

City of Charlotte BP aintenance and Inspection Check List Grassed Channels / Swales [Note: a separate form must be used for each BP] Project Name: Project Address: Owner s Name: Owner s Address: Recorded Book and Page Number of the Lot: BP Name and Location: Inspection Date: Inspector: Inspector Address/Phone Number: Date Last Inspected: Type of Inspection: Visual aintenance Item Satisfactory Unsatisfactory Inspection Frequency Comments/Actions Required 1. Debris Cleanout Clear of trash and debris 2. Vegetation anagement Grass height (maintain 2-6 inch height) Unwanted vegetation present Ground cover well established (yearly reseeding needed) 3. Erosion Evidence of soil erosion in swale or contributing areas 4. Dewatering Evidence of standing water 5. Sedimentation Sediment accumulation 6. Energy dispersion / check dams Condition of dispersion devices Condition of check dams Inspect pea gravel diaphragm and replace / repair as necessary 7. iscellaneous W- W- Q W=Weekly, =onthly, Q=Quarterly, =early (revision 6/07) 1

If applicable: Attach to this form documentation of BP maintenance escrow account activity. This may be provided in the form of a bank statement which includes the current balance, as well as deposits and withdraws for the previous 12 months. aintenance Actions Taken: [If any of the above items were marked U for unsatisfactory, explain the actions taken and time table for correction. Attach additional pages as necessary.] Additional Comments: I do hereby certify that I conducted an inspection of the BP described herein. I further certify that at the time of my inspection said BP was performing properly and was in compliance with the terms and conditions of the approved maintenance agreement required by the Post- Construction Stormwater Ordinance. Certification: Inspectors Signature Date (seal) [Note: The Post-Construction Stormwater Ordinance requires that inspections be conducted of all BPs beginning within one (1) year from the date of as-built certification and each year thereafter and that these inspections be completed by a North Carolina Professional Engineer or Landscape Architect. All inspections must be documented and submitted using this form. The inspection form must be signed and sealed by the inspector and mailed to the Storm Water Administrator at the following address: Storm Water Administrator, Charlotte Storm Water Services, 600 East Fourth Street, Charlotte, NC 28202.] 2

City of Charlotte BP aintenance and Inspection Check List Wet Pond [Note: a separate form must be used for each BP] Project Name: Project Address: Owner s Name: Owner s Address: Recorded Book and Page Number of the Lot: BP Name and Location: Inspection Date: Inspector: Inspector Address/Phone Number: Date Last Inspected: aintenance Item Satisfactory Unsatisfactory Inspection Frequency Comments/Actions Required 1. Debris Cleanout Clear of trash and debris 2. Vegetation anagement Banks / surrounding areas mowed Unwanted vegetation present Condition of wetland plants 3. Erosion Evidence of soil erosion on banks or contributing drainage areas and outlet 4. Sedimentation Forebay sediment inspection (cleanout every 7 years or when 50% full) Pond volume measurement (dredge every 20 years or when 25% of permanent pool volume lost) 5. Energy dissipators Condition of dissipater at inlets Condition of dissipater at outfall 6. Inlet Condition of pipe and / or swale (cracks, leaks, sedimentation, woody vegetation) 7. Outlet Condition of orifice (drawdown device) Condition of riser outlet and trash rack 8. Emergency spillway and dam Condition of spillway 3

Condition of dam (ie. leaks, holes, woody vegetation) 9. echanical devices Inspection of all valves, etc. (should be exercised yearly) 10. Visual Inspection Appearance of water (ie. sheen, muddy, oily, clear, algae, etc) osquito larvae 11. Forebay embankment Condition of forebay embankment (breached?) 12. Water elevation Is pond at normal pool elevation? 13. iscellaneous W=Weekly, =onthly, Q=Quarterly, =early (revision 6/07) If applicable: Attach to this form documentation of BP maintenance escrow account activity. This may be provided in the form of a bank statement which includes the current balance, as well as deposits and withdraws for the previous 12 months. aintenance Actions Taken: [If any of the above items were marked U for unsatisfactory, explain the actions taken and time table for correction. Attach additional pages as necessary.] Additional Comments: I do hereby certify that I conducted an inspection of the BP described herein. I further certify that at the time of my inspection said BP was performing properly and was in compliance with the terms and conditions of the approved maintenance agreement required by the Post- Construction Stormwater Ordinance. Certification: Inspectors Signature Date (seal) [Note: The Post-Construction Stormwater Ordinance requires that inspections be conducted of all BPs beginning within one (1) year from the date of as-built certification and each year thereafter and that these inspections be completed by a North Carolina Professional Engineer or Landscape Architect. All inspections must be documented and submitted using this form. The inspection form must be signed and sealed by the inspector and mailed to the Storm Water Administrator at the following address: Storm Water Administrator, Charlotte Storm Water Services, 600 East Fourth Street, Charlotte, NC 28202.] 4

City of Charlotte BP aintenance and Inspection Check List Wetland [Note: a separate form must be used for each BP] Project Name: Project Address: Owner s Name: Owner s Address: Recorded Book and Page Number of the Lot: BP Name and Location: Inspection Date: Inspector: Inspector Address/Phone Number: Date Last Inspected: aintenance Item Satisfactory Unsatisfactory Inspection Frequency Comments/Actions Required 1. Debris Cleanout Clear of trash and debris 2. Vegetation anagement Banks / surrounding areas mowed Unwanted vegetation present (replant semiannually to maintain design densities) Condition of wetland plants 3. Erosion Evidence of soil erosion on banks or contributing drainage areas and outlet 4. Sedimentation Forebay sediment inspection (cleanout every 7 years or when 50% full) Sedimentation level in wetland (cleanout every 20 years or when plants are being impacted) 5. Energy dissipators Condition of dissipater at inlets Condition of dissipater at outfall 6. Inlet Condition of pipe and / or swale (cracks, leaks, sedimentation, woody vegetation) 7. Outlet Condition of orifice (drawdown device) Condition of outlet 8. echanical devices 5

Inspection of all valves, etc. (should be exercised yearly) 9. Visual water inspection Appearance of water (ie. sheen, muddy, oily, clear, algae, etc) Water level maintained at permanent pool osquito larvae 10. Dam / Embankment Seepage through embankment Woody vegetation on embankment 11. iscellaneous W=Weekly, =onthly, Q=Quarterly, =early (revision 6/07) If applicable: Attach to this form documentation of BP maintenance escrow account activity. This may be provided in the form of a bank statement which includes the current balance, as well as deposits and withdraws for the previous 12 months. aintenance Actions Taken: [If any of the above items were marked U for unsatisfactory, explain the actions taken and time table for correction. Attach additional pages as necessary.] Additional Comments: I do hereby certify that I conducted an inspection of the BP described herein. I further certify that at the time of my inspection said BP was performing properly and was in compliance with the terms and conditions of the approved maintenance agreement required by the Post- Construction Stormwater Ordinance. Certification: Inspectors Signature Date (seal) [Note: The Post-Construction Stormwater Ordinance requires that inspections be conducted of all BPs beginning within one (1) year from the date of as-built certification and each year thereafter and that these inspections be completed by a North Carolina Professional Engineer or Landscape Architect. All inspections must be documented and submitted using this form. The inspection form must be signed and sealed by the inspector and mailed to the Storm Water Administrator at the following address: Storm Water Administrator, Charlotte Storm Water Services, 600 East Fourth Street, Charlotte, NC 28202.] 6

City of Charlotte BP aintenance and Inspection Check List Bioretention [Note: a separate form must be used for each BP] Project Name: Project Address: Owner s Name: Owner s Address: Recorded Book and Page Number of the Lot: BP Name and Location: Inspection Date: Inspector: Inspector Address/Phone Number: Date Last Inspected: aintenance Item Satisfactory Unsatisfactory Inspection Frequency Comments/Actions Required 1. Debris Cleanout Clear of trash and debris 2. Vegetation anagement Banks / surrounding areas mowed Unwanted vegetation present Condition of plants Condition of mulch - ust be double hammered hardwood, 3 inches deep (replace at least every 3 years and renew yearly) 3. Erosion Evidence of soil erosion on banks or contributing areas 4. Sedimentation Forebay (if present) sediment inspection (cleanout when 50% full) Evidence of sediment in bioretention cell 5. Energy dissipators Condition of dissipater at inlets Condition of dissipater at outfall Inspect pea gravel diaphragm (replace as needed) 6. Inlet Condition of pipe of swale (cracks, leaks, sedimentation, woody vegetation) 7. Outlet Condition of outlet / drop box 7

8. Dewatering (drawdown must be between 48 hours and 120 hours) Evidence of standing water 9. Overall functionality Evidence of bypass P Index test results for soil media (indicate 2 test results and date last tested) 10. iscellaneous W=Weekly, =onthly, Q=Quarterly, =early, 2=every 2 yrs. (revision 6/07) If applicable: Attach to this form documentation of BP maintenance escrow account activity. This may be provided in the form of a bank statement which includes the current balance, as well as deposits and withdraws for the previous 12 months. aintenance Actions Taken: [If any of the above items were marked U for unsatisfactory, explain the actions taken and time table for correction. Attach additional pages as necessary.] Additional Comments: I do hereby certify that I conducted an inspection of the BP described herein. I further certify that at the time of my inspection said BP was performing properly and was in compliance with the terms and conditions of the approved maintenance agreement required by the Post- Construction Stormwater Ordinance. Certification: Inspectors Signature Date (seal) [Note: The Post-Construction Stormwater Ordinance requires that inspections be conducted of all BPs beginning within one (1) year from the date of as-built certification and each year thereafter and that these inspections be completed by a North Carolina Professional Engineer or Landscape Architect. All inspections must be documented and submitted using this form. The inspection form must be signed and sealed by the inspector and mailed to the Storm Water Administrator at the following address: Storm Water Administrator, Charlotte Storm Water Services, 600 East Fourth Street, Charlotte, NC 28202.] 8

City of Charlotte BP aintenance and Inspection Check List Dry Pond [Note: a separate form must be used for each BP] Project Name: Project Address: Owner s Name: Owner s Address: Recorded Book and Page Number of the Lot: BP Name and Location: Inspection Date: Inspector: Inspector Address/Phone Number: Date Last Inspected: aintenance Item Satisfactory Unsatisfactory Inspection Frequency Comments/Actions Required 1. Debris Cleanout Clear of trash and debris 2. Vegetation anagement Banks / surrounding areas mowed Unwanted vegetation present 3. Erosion Evidence of soil erosion on banks, contributing drainage areas or bottom of pond 4. Sedimentation Forebay (if present) sediment inspection (cleanout every 7 years or when 50% full) Sediment level in pond 5. Energy dissipators Condition of dissipater at inlets Condition of dissipater at outfall 6. Outlet / Inlet Condition of orifice (drawdown device) / trash rack Condition of outlet Condition of inlet 7. echanical devices Inspection of all valves, etc. (exercise yearly) 8. Dewatering Evidence of standing water 9. Structural Integrity Evidence of structural damage (leaks, cracks, 9

etc) 10. Emergency Spillway & Dam Condition of spillway Condition of dam 11. iscellaneous W=Weekly, =onthly, Q=Quarterly, =early (revision 6/07) If applicable: Attach to this form documentation of BP maintenance escrow account activity. This may be provided in the form of a bank statement which includes the current balance, as well as deposits and withdraws for the previous 12 months. aintenance Actions Taken: [If any of the above items were marked U for unsatisfactory, explain the actions taken and time table for correction. Attach additional pages as necessary.] Additional Comments: I do hereby certify that I conducted an inspection of the BP described herein. I further certify that at the time of my inspection said BP was performing properly and was in compliance with the terms and conditions of the approved maintenance agreement required by the Post- Construction Stormwater Ordinance. Certification: Inspectors Signature Date (seal) [Note: The Post-Construction Stormwater Ordinance requires that inspections be conducted of all BPs beginning within one (1) year from the date of as-built certification and each year thereafter and that these inspections be completed by a North Carolina Professional Engineer or Landscape Architect. All inspections must be documented and submitted using this form. The inspection form must be signed and sealed by the inspector and mailed to the Storm Water Administrator at the following address: Storm Water Administrator, Charlotte Storm Water Services, 600 East Fourth Street, Charlotte, NC 28202.] 10

City of Charlotte BP aintenance and Inspection Check List Sand Filter [Note: a separate form must be used for each BP] Project Name: Project Address: Owner s Name: Owner s Address: Recorded Book and Page Number of the Lot: BP Name and Location: Inspection Date: Inspector: Inspector Address/Phone Number: Date Last Inspected: aintenance Item Satisfactory Unsatisfactory Inspection Frequency Comments/Actions Required 1. Debris Cleanout Clear of trash and debris 2. Street Sweeping Parking lot street sweeping 3. Erosion Evidence of soil erosion around contributing areas 4. Sedimentation chamber Sediment level in chamber (pump yearly or when 50% full) 5. Sand media Condition of media (skim annually, replace as necessary) 6. Outlet / Inlet Condition of outlet Condition of inlets and grates 7. echanical devices Inspection of all valves, etc. 8. Dewatering Evidence of filter clogging 9. Structural Integrity Evidence of structural damage (leaks, cracks, etc) 10. Overall functionality Evidence of odors Evidence of bypass Q 11

11. iscellaneous W=Weekly, =onthly, Q=Quarterly, =early (revision 6/07) If applicable: Attach to this form documentation of BP maintenance escrow account activity. This may be provided in the form of a bank statement which includes the current balance, as well as deposits and withdraws for the previous 12 months. aintenance Actions Taken: [If any of the above items were marked U for unsatisfactory, explain the actions taken and time table for correction. Attach additional pages as necessary.] Additional Comments: I do hereby certify that I conducted an inspection of the BP described herein. I further certify that at the time of my inspection said BP was performing properly and was in compliance with the terms and conditions of the approved maintenance agreement required by the Post- Construction Stormwater Ordinance. Certification: Inspectors Signature Date (seal) [Note: The Post-Construction Stormwater Ordinance requires that inspections be conducted of all BPs beginning within one (1) year from the date of as-built certification and each year thereafter and that these inspections be completed by a North Carolina Professional Engineer or Landscape Architect. All inspections must be documented and submitted using this form. The inspection form must be signed and sealed by the inspector and mailed to the Storm Water Administrator at the following address: Storm Water Administrator, Charlotte Storm Water Services, 600 East Fourth Street, Charlotte, NC 28202.] 12

City of Charlotte BP aintenance and Inspection Check List Infiltration Trench [Note: a separate form must be used for each BP] Project Name: Project Address: Owner s Name: Owner s Address: Recorded Book and Page Number of the Lot: BP Name and Location: Inspection Date: Inspector: Inspector Address/Phone Number: Date Last Inspected: aintenance Item Satisfactory Unsatisfactory Inspection Frequency Comments/Actions Required 1. Debris Cleanout Clear of trash and debris 2. Vegetation anagement Banks / surrounding areas mowed Unwanted vegetation present 3. Erosion Evidence of soil erosion around contributing areas 4. Sedimentation Forebay sediment inspection (cleanout yearly or when 50% full) Evidence of sediment in trench 5. Energy dissipators Condition of dissipater at inlets Condition of dissipater at outfall 6. Surface aggregate Condition of stone or mulch 7. Dewatering Evidence of standing water Check water level in observation well 8. Overflow spillway Condition of spillway 9. Overall functionality Evidence of bypass 13

10. iscellaneous W=Weekly, =onthly, Q=Quarterly, =early (revision 6/07) If applicable: Attach to this form documentation of BP maintenance escrow account activity. This may be provided in the form of a bank statement which includes the current balance, as well as deposits and withdraws for the previous 12 months. aintenance Actions Taken: [If any of the above items were marked U for unsatisfactory, explain the actions taken and time table for correction. Attach additional pages as necessary.] Additional Comments: I do hereby certify that I conducted an inspection of the BP described herein. I further certify that at the time of my inspection said BP was performing properly and was in compliance with the terms and conditions of the approved maintenance agreement required by the Post- Construction Stormwater Ordinance. Certification: Inspectors Signature Date (seal) [Note: The Post-Construction Stormwater Ordinance requires that inspections be conducted of all BPs beginning within one (1) year from the date of as-built certification and each year thereafter and that these inspections be completed by a North Carolina Professional Engineer or Landscape Architect. All inspections must be documented and submitted using this form. The inspection form must be signed and sealed by the inspector and mailed to the Storm Water Administrator at the following address: Storm Water Administrator, Charlotte Storm Water Services, 600 East Fourth Street, Charlotte, NC 28202.] 14

City of Charlotte BP aintenance and Inspection Check List Filter Strips with Flow Dispersion [Note: a separate form must be used for each BP] Project Name: Project Address: Owner s Name: Owner s Address: Recorded Book and Page Number of the Lot: BP Name and Location: Inspection Date: Inspector: Inspector Address/Phone Number: Date Last Inspected: aintenance Item Satisfactory Unsatisfactory Inspection Frequency Comments/Actions Required 1. Debris Cleanout Clear of trash and debris 2. Vegetation anagement Grass height (maintain 2-6 inch height) Unwanted vegetation present Ground cover well established (yearly reseeding needed) 3. Erosion Evidence of soil erosion in filter strip and below dispersion device 4. Drainage Evidence of standing water Evidence of bypass Check outlet pipes for clogging 5. Sedimentation Sediment accumulation Sediment in gravel diaphragm (if present) 6. Energy dispersion / check dams Condition / functionality of dispersion devices Debris on dispersion devices Condition of check dams W- W- 15

Inspect pea gravel diaphragm (replace as needed) 7. iscellaneous W=Weekly, =onthly, Q=Quarterly, =early (revision 6/07) If applicable: Attach to this form documentation of BP maintenance escrow account activity. This may be provided in the form of a bank statement which includes the current balance, as well as deposits and withdraws for the previous 12 months. aintenance Actions Taken: [If any of the above items were marked U for unsatisfactory, explain the actions taken and time table for correction. Attach additional pages as necessary.] Additional Comments: I do hereby certify that I conducted an inspection of the BP described herein. I further certify that at the time of my inspection said BP was performing properly and was in compliance with the terms and conditions of the approved maintenance agreement required by the Post-Construction Stormwater Ordinance. Certification: Inspectors Signature Date (seal) [Note: The Post-Construction Stormwater Ordinance requires that inspections be conducted of all BPs beginning within one (1) year from the date of as-built certification and each year thereafter and that these inspections be completed by a North Carolina Professional Engineer or Landscape Architect. All inspections must be documented and submitted using this form. The inspection form must be signed and sealed by the inspector and mailed to the Storm Water Administrator at the following address: Storm Water Administrator, Charlotte Storm Water Services, 600 East Fourth Street, Charlotte, NC 28202.] 16