ANALYSIS OF HYDRAULIC FLOOD CONTROL STRUCTURE AT PUTAT BORO RIVER

Similar documents
The Impacts of Pelosika and Ameroro Dams in the Flood Control Performance of Konaweha River

Use of IDF Curves Design of a roof drainage system

Available online at ScienceDirect. Procedia Engineering 125 (2015 )

Analysis of Flood Routing

INTENSE STORM-RUNOFF ROUTING OF HATIRJHEEL-BEGUNBARI LAKE OF DHAKA CITY

CIMAHI RIVER BENCHMARKING FLOOD ANALYSIS BASED ON THRESHOLD OF TOTAL RAINFALL

Comparison of Rational Formula Alternatives for Streamflow Generation for Small Ungauged Catchments

MODEL FLOOD PEAK DISCHARGE BASED ON THE WATERSHED SHAPE FACTOR

Prediction of Flood Area Based on the Occurrence of Rainfall Intensity

SEES 503 SUSTAINABLE WATER RESOURCES. Floods. Instructor. Assist. Prof. Dr. Bertuğ Akıntuğ

MODELING BENGAWAN SOLO RIVER TO PREDICT THE AREA INUNDATION OF FLOOD

Flood control and safety evaluation of Banqiao reservoir

Dependable Flow and Flood Control Performance of Logung Dam, Central Java Province, Indonesia

Water Resources Engineering

Hydrology and Water Management. Dr. Mujahid Khan, UET Peshawar

Design of Peak Discharge Model Based on the Watershed Shape Factor

DRAINAGE OF IRRIGATED LANDS

Report. Inflow Design Flood Control System Plan St. Clair Power Plant St. Clair, Michigan. DTE Energy Company One Energy Plaza, Detroit, MI

ASSESSMENT OF DRAINAGE CAPACITY OF CHAKTAI AND RAJAKHALI KHAL IN CHITTAGONG CITY AND INUNDATION ADJACENT OF URBAN AREAS

FLOOD INUNDATION ANALYSIS FOR METRO COLOMBO AREA SRI LANKA

THE RATIONAL METHOD FREQUENTLY USED, OFTEN MISUSED

TABLE OF CONTENTS PART III - MINIMUM DESIGN STANDARDS Section 105 DRAINAGE SYSTEM DESIGN SPECIFICATIONS AND SCOPE 105.1

Estimation of Infiltration Parameter for Tehri Garhwal Catchment

SOUTHEAST TEXAS CONTINUING EDUCATION

Hydrotechnical Design Guidelines for Stream Crossings

The Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY

A simulation for the gated weir opening of Wonokromo River, Rungkut District, Surabaya

Chapter 1 Introduction

HYDROLOGIC-HYDRAULIC STUDY ISABELLA OCEAN RESIDENCES ISLA VERDE, CAROLINA, PR

JOURNAL OF APPLIED SCIENCES RESEARCH

Report. Inflow Design Flood Control System Plan Belle River Power Plant East China, Michigan. DTE Energy Company One Energy Plaza, Detroit, MI

UNIVERSITY OF BOLTON SCHOOL OF ENGINEERING. MSc CIVIL ENGINEERING SEMESTER TWO EXAMINATION 2017/2018 URBAN DRAINAGE SYSTEMS MODULE NO: BLT4022

What is runoff? Runoff. Runoff is often defined as the portion of rainfall, that runs over and under the soil surface toward the stream

Drainage Simulation of Detention Pond with Tidal Effect at the Outfall during a Storm Period

HY-12 User Manual. Aquaveo. Contents

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY

UPDATE OF ARC TP108 RUN-OFF CALCULATION GUIDELINE

CVEN 339 Summer 2009 Final Exam. 120 minutes allowed. 36 Students. No curve applied to grades. Median 70.6 Mean 68.7 Std. Dev High 88 Low 24.

Distribution Restriction Statement Approved for public release; distribution is unlimited.

A Study on Design-Flood Discharge of Tello River in Makassar-Indonesia

Control and mitigation of floods along transbasin diversion channel of Mekong tributaries and Nan river, Thailand

IJSER. within the watershed during a specific period. It is constructed

To estimate the magnitude of a flood peak the following alternative methods available: 1. Rational method 2. Empirical method

CE 2031 WATER RESOURCES ENGINEERING L T P C

Rainfall Analysis for Estimation of Peak Discharge and Soil Erosion on the Catchment Area of Musi Hydro-Power Plant, Bengkulu Indonesia

APPENDIX E APPENDIX E ESTIMATING RUNOFF FOR SMALL WATERSHEDS

APPENDIX E ESTIMATING RUNOFF FROM SMALL WATERSHEDS

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT DANIEL ASH POND B MISSISSIPPI POWER COMPANY

Dry Creek Flood Control Improvement Project

PERFORMANCE OF REPRESENTATIVE UNIT HYDROGRAPH DERIVED FROM DIFFERENT NUMBER OF CASES

MODULE 1 RUNOFF HYDROGRAPHS WORKSHEET 1. Precipitation

Dam Effects on Flood Attenuation: Assessment with a Distributed Rainfall-Runoff Prediction System

Outlet Structure Modeling

APPLICATION OF A HYDRODYNAMIC MIKE 11 MODEL FOR THE EUPHRATES RIVER IN IRAQ

ENGN.4010 ENGINEERING CAPSTONE DESIGN Watershed Analysis. CiA

Alpha College of Engineering. Fifth Semester B.E. Question Bank. Hydrology and irrigation engineering

10(a) Bridge and culvert design information

J. Basic. Appl. Sci. Res., 2(12) , , TextRoad Publication

Software Applications for Runoff Hydrological Assessment

Numerical Simulation of Flood Routing in Complex Hydraulic Schemes. The Routing System Computer Program

Dam-Breach Modelling of the Staw Starzycki Embankment in Tomaszów Mazowiecki

Discharge Estimation in a Backwater Affected River Junction Using HPG

Hydrologic engineering Hydraulic engineering Environmental engineering Ecosystems engineering Water resources engineering

Autumn semester of Prof. Kim, Joong Hoon

Review of Hydrological Potential in Combined Gin and Nilwala River Basins of Sri Lanka

Chapter 6. The Empirical version of the Rational Method

Seasonal Limited Water Level Control of Reservoir Based on Flood Utilization

Performance of Retarding Basin in Flood Disaster Risk Mitigation in Welang River, East Java Province, Indonesia

5/11/2007. WinTR-55 for Plan Reviewers Small Watershed Hydrology Intermediate WinTR-55 Training Modeling Multiple Sub-area Watersheds

STORM DRAINS AND IRRIGATION

A Stormwater Management Plan and Sediment Control Plan are required for all proposed developments within the City of Richmond.

ONE DIMENSIONAL DAM BREAK FLOOD ANALYSIS FOR KAMENG HYDRO ELECTRIC PROJECT, INDIA

CE Hydraulics. Andrew Kennedy 168 Fitzpatrick

Flood risk management and land use planning in changing climate conditions Mikko Huokuna Finnish Environment Institute, SYKE

Learning objectives. Upon successful completion of this lecture, the participants will be able to describe:

Detention Pond Design Considering Varying Design Storms. Receiving Water Effects of Water Pollutant Discharges

Development of a Computer Model of a Drainage System with Uncertainties in External Inflow and Channel Cross-section

Storm Sewer Design - Introduction

Hydrologic Study Report for Single Lot Detention Basin Analysis

FLOW REGULATING SYSTEM USING WEIR AND ORIFICE IN A MANHOLE

HYDROLOGIC MODELING CONSISTENCY AND SENSITIVITY TO WATERSHED SIZE

DEVELOPMENT OF PEAK RUNOFF HYDROGRAPHS FOR OBA AND OTIN RIVERS IN OSUN STATE, NIGERIA

Determination Of Runoff Value Using Kineros Model (Case Study In Sumpil Catchment, Indonesia)

PRELIMINARY DESIGN OF THE HYDRAULIC STRUCTURES DAM IN THE PISÃO RIVER

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GASTON GYPSUM POND ALABAMA POWER COMPANY

CONSISTENCY BETWEEN CUHP AND RATIONAL METHODS James C.Y. Guo, PhD, P.E., and Ben Urbonas, P.E., D.WRD 08/04/2008

Sump Pumps Office procedures for the Drainage & Grading section

Hydrology Days John A. McEnery 3 Department of Civil Engineering, University of Texas at Arlington, Arlington, Texas

The 2nd International Conference on Civil Engineering Research (ICCER) 2016 Contribution of Civil Engineering toward Building Sustainable City 27

Chapter 4 "Hydrology"

Learn how to design inlet grates, detention basins, channels, and riprap using the FHWA Hydraulic Toolbox and WMS

APPENDIX G HYDRAULIC GRADE LINE

Address for Correspondence

Hydrologic Engineering Center Hydrologic Modeling System (HEC-HMS) Sunil KUMAR Director, National Water Academy

DETENTION BASIN DESIGN USING RATIONAL HYDROGRAPHS

Dawson County Public Works 25 Justice Way, Suite 2232, Dawsonville, GA (706) x 42228

Introduction. Keywords: Oil Palm, hydrology, HEC-HMS, HEC-RAS. a * b*

What s so hard about Stormwater Modelling?

Available online at ScienceDirect. Procedia Engineering 154 (2016 )

Transcription:

Civil Engineering Forum Volume XXII/ - May 03 ANALYSIS OF HYDRAULIC FLOOD CONTROL STRUCTURE AT PUTAT BORO RIVER Ruhban Ruzziyatno Directorate General of Water Resources, Ministry of Public Works, Republic of Indonesia Email: cantek.ditgasira@gmail.com ABSTRACT Putat Boro River is one of the main drainage systems of Surakarta city which drains into Bengawan Solo river. The primary problem when flood occur is the higher water level of Bengawan Solo than Boro River and then backwater occur and inundates Putat Boro River. The objective of the study is to obtain operational method of Putat Boro River floodgate to control both inflows and outflows not only during flood but also normal condition. It also aims to know the Putat Boro rivers floodgate operational function to reduce inundation. Putat Boro river water level variation and Bengawan Solo river water level variation were used for simulation of Boro river floodgate routing. The simulation used 0-year inflows, 50-year inflows, and 00-year inflows return period and Boro water level variation are +8.50 m, +83.00 m and +84.00 m. The results of the study show that the effective opening of floodgate are 0.35 m - 0.55 m for +8.05 m of Bengawan Solo water level, 0.50 m 0.65 m for +8.55 m of Bengawan Solo water level and 0.70 m 0.85 m for +83.48 m of Bengawan Solo water level, for reducing water level of Boro river flooding. Keywords: Flood, drainage systems, floodgate and flow routing. INTRODUCTION Flood that occurs periodically in dense populated area, particularly in urban area has caused damages and losses to physical structures, even loss of human lives. Flood in 966 inundated almost /3 of Surakarta city including urban area. Inundation attained m up to m depth and caused 90 people died. Boro River is one of many drainage canals flowing into Bengawan Solo River. Its catchment comprises Sewu, Pucang Sawit, Jagalan, Purwodiningratan, and Tegalharjo sub district, Jebres district, Surakarta city. Flood that occurs almost every year is affected by backwater phenomena. It occurs when water level of Bengawan Solo River is higher than ground level of catchment of Boro River. The flood control of Putat Boro River has three gates. FLOOD ROUTING AND FLOW OVER GATE SYSTEM Flood routing is used to determine flood hydrograph at a point based on monitored hydrograph at another point upstream on a watercourse. Flood hydrograph can be traced from riverbed or a dam (Soemarto, 989). There are some flood routing methods, a wellknown one is Muskingum developed by Mc Carthy (938 in Ven Te Chow, 989) as shown in Equation () S I. Q. () where S is storage change in the i-th time interval (m 3 ), I is volume of inflow (m 3 ), Q is volume of outflow in the i-th time interval (m 3 ), and t is interval of duration (second, hour, day). The foregoing equation can be elaborated as follows. ( I ( I ( I n n n I I I S ) ( Qn Qn () n ) H ) ( Qn Qn A (3) ). ( Qn Qn ). A H (4) n ) n. where I n is inflow in the beginning of (m 3 ), I n+ is inflow in the end of (m3), Q n is outflow in the beginning of (m 3 ), Q n+ is outflow in the end of m 3 ), A is the water surface area at an observed time (m ), and is change in water elevation during (m). The following equation is used for flood routing analysis through sliding floodgate. Q K.. a. b gh (5) where Q is discharge (m 3 /s), K is sinking flow factor, is discharge coefficient, a is floodgateopening (m), b is floodgate width (m), g is acceleration due to gravity (m/s ), and h is depth of water in front of floodgate above threshold (m). 365

Volume XXII/ - May 03 Civil Engineering Forum Value of K and µ for sinking flow factor and discharge coefficient (Ministry of Public Works, 986) are provided in Figure and Figure, respectively. Peak discharge is analyzed by using rational method (Sri Harto, 000), (Chow, 964) as follows Q p = k C I A (6) where Q p is peak discharge (m 3 /s), k is 0.78, C is runoff coefficient which depends with characteristic of the catchment area (0 C ) (Chow, 988), I is rainfall intensity during time concentration (mm/hour), and A is watershed area (km ). where t c is time concentration (hour), L is river length (km), and S slope of the river (m/m). 3 METODOLOGICAL APPROACH The research uses some secondary data obtained from several source, there are Main Project of Bengawan Solo River Region Development, Bengawan Solo River Basin organization, and Public Works Office of Solo (see flowchart in Figure 3). a) Watershed map is gained from visual earth map with scale of :5.000 that is resulted storage characteristic as shown in Figure 4. b) Daily rainfall maximum data which is used to analyze design rainfall with specified return period, then flood hydrograph can be presented as in Figure 5. c) Putat Boro watershed characteristic d) Daily water level maximum in Jurug obtained from AWLR. Figure. Value of K for sink flow factor. 0.6 0.5 0 3 4 5 6 7 8 9 0 3 4 5 6 7 8 9 0 h /a Figure. Value of for discharge coefficient. Kirpich (940) developed a formula to analyze time concentration (Chow et al, 988) as follows. 0.385 0.87. L t c (7) 000. S Figure 3. Research flow chart. 366

Civil Engineering Forum Volume XXII/ - May 03 Figure 4. Inundated area and storage volume of Boro River. Table. Simulation result with Qp-0 years 6 4 Time concentration H upstream H downstream + 8.50 m + 83.00 m + 84.00 m 0 8 6 4 0 8 6 4 Qp- Qp-5 Qp-0 Qp-5 Qp-50 Qp-00 + 8.05 m + 8.55 m - 0.0 m - 0.40 m + 83.48 m - - 0.0 m - 0.50 m 0.0 m - 0.55 m 0.0m - 0.50 m 0.0 m - 0.60 m 0.0m - 0.75 m Graphic results are depicted from Figure 6 to Figure 0 0 0. 0.4 0.6 0.8..4.6.8 Time (hour) Figure 5. Flood hydrograph of Boro River with several return periods. 4 RESULTS AND DISCUSSIONS Simulation of flood analysis through Putat floodgate applies return period of 0, 50, and 00 years and +84.00 m maximum water level in Boro River (H upstream ). If it is exceeded, there will be the overflow from Boro River). Peak discharges are presented below. Figure 6. Q 0 -H upstream =8.5 m and H downstream =8.05 m 4.. Inflow with a return period of 0 years Based on 6.4 m 3 /s Qp Boro, + 8.50 m, + 83.00, and + 84.00 m Boro River level, and + 8.05 m, + 8.55, + 83.48 m Bengawan Solo (H downstream ) River level, varying results of Putat floodgate-opening are obtained as shown in Table. Figure 7. Q 0 - H upstream =83.00 m and H downstream =8.05 m 367

Volume XXII/ - May 03 Civil Engineering Forum 4.. Inflow with a return period of 50 years From.87 m 3 /s Qp Boro, + 8.50 m, + 83.00, and + 84.00 m Boro River level, and + 8.05 m, + 8.55, + 83.48 m Bengawan Solo (H downstream ) River level, varying results of Putat floodgate-opening are obtained as shown in Table. Table. Simulation result with Qp-50 years Figure 8. Q 0 - H upstream =84.00 m and H downstream =8.05 m H upstream H downstream + 8.05 m + 8.55 m - + 8.50 m + 83.00 m + 84.00 m 0. m - 0.45 m + 83.48 m - - 0. m - 0.55 m 0. m - 0.60 m 0. m - 0.55 m 0. m - 0.70 m 0. m - 0.90 m Graphic results can be seen from Figure to Figure 7 Figure 9. Q 0 - H upstream =83.00 and H downstream =8.55 m Figure. Q 50 - H upstream =8.50 m and H downstream =8.05 m Figure 0. Q 0 - H upstream =84.00 m and H downstream =8.55 m Figure 3. Q 50 - H upstream =83.00 m and H downstream =8.05 m Figure. Q 0 - H upstream =84.00 m and H downstream =83.48 m 368

Civil Engineering Forum Volume XXII/ - May 03 4..3 Inflow with a return period of 00 years From 4.63 m 3 /s Qp Boro, + 8.50 m, + 83.00, and + 84.00 m Boro River level, and + 8.05 m, + 8.55, + 83.48 m Bengawan Solo (H downstream ) River level, varying results of Putat floodgate-opening are obtained as shown in Table 3. Table 3. Simulation result with Qp-00 years Figure 4. Q 50 - H upstream =84.00 m and H downstream =8.05 m H upstream H downstream + 8.50 m + 83.00 m + 84.00 m 0. m - 0. m - 0. m - + 8.05 m 0.45 m 0.45 m 0.60 m 0. m - 0. m - + 8.55 m - 0.60 m 0.70 m 0. m - + 83.48 m - - 0.90 m Graphic are depicted from Figure 8 to Figure 3 Figure 5. Q 50 - H upstream =83.00 m and H downstream =8.55 m Figure 8. Q 00 - H upstream =8.50 m and H downstream =8.05 Figure 6. Q 50 - H upstream =84.00 m and H downstream =8.55 m Figure 9. Q 00 - H upstream =83.00 m and H downstream =8.05 m Figure 7. Q 50 - H upstream =84.00 m and H downstream =83.48 m Figure 0. Q 00 - H upstream =84.00 m and H downstream =8.05 m 369

Volume XXII/ - May 03 Civil Engineering Forum For + 83.48 m H downstream and 0 years of Q p, the floodgate-opening that can result maximum reduction of Boro River level is approximately 0.70 m (see Figure ), 0.85 m for 50 years of Q p, (see Figure 7), and 0.85 m for 50 years of Q p (see Figure 3). If the floodgate is opened more than those values, it may cause backwater from Bengawan Solo River (H downstream ). Figure. Q 00 - H upstream =83.00 m and H downstream =8.55 m Figure. Q 00 - H upstream =84.00 m and H downstream =8.55 m 5 CONCLUSIONS AND RECOMMENDATIONS 5. Conclusions According to the result of flood routing simulation towards Putat Floodgate using 0 years, 50 years, and 00 years of return period of flood hydrograph with variation in water elevation of Boro River, +8.50 m, +83.00 m dan +84.00 m, it can be concluded that : a) For +8.05 m Bengawan Solo Rivel level, the effective floodgate-opening is 0.35 m 0.55 m b) For +8.55 m Bengawan Solo Rivel level, the effective floodgate-opening is 0.50 m 0.65 m c) For +83.48 m Bengawan Solo Rivel level, the effective floodgate-opening is 0.70 m 0.85 m d) Putat Floodgate can be operated with the maximum floodgate-opening as long as no backwater occurs 5. Recommendations The followings are some recommendations to optimize flood control system as the main goal. Figure 3. Q 00 - H upstream =84.00 m and H downstream =83.48 m The results of simulation show that for water level of Bengawan Solo River (H downstream ) + 8.05 m and 0 years of Q p, the floodgate-opening that can lower water level of Boro River maximally is 0.35 m - 0.45 m (can be seen at Figure 6, Figure 7, and Figure 8),while the floodgate-opening for 50 years of Q p is 0.40 m - 0.5 m (can be seen at Figure, Figure 3, and Figure 4), and about 0.40 m - 0.55 m for 00 years of Q p (can be seen at Figure 8, Figure 9, and Figure 0). When Bengawan Solo elevation (H downstream ) rises up to + 8.55 m due to 0 years of Q p, the floodgateopening for maximum level reduction is approximately 0.50 m - 0.55 m (can be seen at Figure 9 and Figure 0), 0.55 m - 0.65 m for 50 years of Q p (see Figure 5 and Figure 6), and 0.55 m - 0.65 m for 00 years of Q p (see Figure and Figure ). a) Operating management of Putat Floodgate should be improved by referring to the gate operational guide. b) Procurement of pump needs to be realized to prevent backwater occurrence due to the overflow from Bengawan Solo River. REFERENCES Chow, V.T., Maidment, M.R., and Mays, L.W. (988), Applied Hydrology, McGraw-Hill, New York. Ministry of Public Works. (986). Standar Perencanaan Irigasi KP-04 [Irrigation Design Standard KP-04], Publisher Agency of Public Works Ministry, Jakarta. Soemarto. (989). Hidrologi Teknik [Hydrology Engineering], PPMTT, Malang. Sri Harto, Br. (000). Hidrologi Teori, Masalah dan Penyelesaian [Hidrology Theory, Problems and Solving], Nafiri, Yogyakarta. 370