Water & Energy Consulting Lon W. House, Ph.D.

Similar documents
What You Need to Know Before Requesting Interconnection

New Resource Implementation

Business Practice Manual for Distributed Generation Deliverability. Version

Rule 21 Tariff / Process Overview 6/17/2015

Renewable Market Adjusting Tariff (ReMAT) Feed-In Tariff (FIT)

Resource Adequacy Deliverability for Distributed Generation DG Deliverability Assessment Results

SCE s Renewable Market Adjusting Tariff (Re-MAT) Bidders Conference September 18, 2013

Generator Interconnection Procedures Overview

Generator Interconnection Process. Wholesale Distribution Overview

Cluster Study Process

1. Is there a preference between MW and MWh? RPS need for San Diego Gas & Electric is based upon a percentage of retail sales, which is in MWh.

Stakeholder Comments Template. Subject: Small and Large Generator Interconnection Procedures Draft Final Proposal and Meeting

Interconnection Specialists ensure all projects are treated in accordance with the current applicable tariff provisions

Delaware Electric Cooperative Generator Interconnection Application Long Form (For Use with Generators Greater than 100 kw)

Procedure: Station Power Portfolio Application

Resource Adequacy Deliverability for Distributed Generation DG Deliverability Assessment Results

Power Contracting for Legacy Small Hydro Facilities in PGandE s Service Territory

In the "Proforma_GenProfile tab, please populate the table with energy and ancillary services that are expected to be bid into the CAISO market.

Stakeholder Comments Template

Business Practice Manual for Reliability Requirements. Version 34

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

PG&E s Bidders Webinar

Creative Solutions for Large Scale Renewables

SCE s Experience In Energy Storage

Small Generator Interconnection Procedures (SGIP) (For Generating Facilities No Larger Than 20 MW)

California s Approach to Designing a Feed-in Tariff. Sara Kamins California Public Utilities Commission June 19, 2014

Registering Renewable Energy Generation for Tracking and Ultimate Sale of Renewable Energy Credits (REC s)

Business Practice Manual for The Transmission Planning Process

SCE Solar Programs Overview SOUTHERN CALIFORNIA EDISON

QF Settlement Agreement Overview QF Meeting Rosemead, CA. July 22, 2011

Renewable Auction Mechanism (RAM): New Procurement Tool for Distributed Renewable Generation National Summit on RPS

CHP Interconnection Equipment Analysis

VALUING ROOFTOP SOLAR

Small Generator Interconnection Procedures (SGIP) Customer Guide

California s Renewable Portfolio Standard

Form B GENERATION INTERCONNECTION APPLICATION (Non-Inverter Based Generation and Inverter Based Generation > 25 kw)

RDRP Stakeholder Initiative

PJM Strawman Proposal

NEW JERSEY BOARD OF PUBLIC UTILITIES N.J.A.C. 14:4-9 Net Metering and Interconnection Standards for Class I Renewable Energy Systems

Distributed Energy Resource Management System (DERMS)

Briefing on How Resource Adequacy Works in ISO s Current Balancing Authority Area

Stakeholder Comments Template. Generator Interconnection Procedures Phase 3 ( GIP 3 ) Issue Paper, posted March 1, 2012

DRAFT Work in Progress CAISO Integration of Renewable Resources Program (IRRP) - High-Level Program Plan -

Carbon Free Energy with Storage

California s Renewable Portfolio Standard Program

Peninsula Clean Energy could launch a CCE by Fall January October 2015 October 2015 February 2016 March 2016 October 2016

Interconnection Application

Developing a Comprehensive Methodology for Valuating Transmission Impacts for New Generation Developments

Operating Procedure PURPOSE... 1

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

Rule 21 Working Group 2

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

2018 Open Season Request for Offers Procedural Overview & Instructions

PID 276 Feasibility Study Report 4.4MW Distribution Inter-Connection Mermentau Substation

Reliability Demand Response Product

Appendix A. Glossary. For Request For Proposals For Long-Term Renewable Generation Resources For Entergy New Orleans, Inc.

Community Choice Aggregation (CCA) Reference Guide

Rule 21 Working Group 2

Webinar: PG&E and Solar

Jan Strack and Huang Lin March 14, 2017

Presentation to Lafayette City Council. Amy Dao Community Energy Manager Jan. 26, 2015

Information Document Protection System Information ID# R

Agenda Unified Planning Assumptions & Study Plan

The State of Wind Energy in New England

California s Energy Storage Mandate

Renewable Portfolio Standards

PG&E s Role in California s Clean Energy Future. Emma Wendt Pacific Gas and Electric Company January 25, 2011

Distributed Energy Resources Roadmap

Rule 21 Sheet 1 GENERATING FACILITY INTERCONNECTIONS

Rule 21 Working Group 2

In the matter of: Docket No. 13-IEP-IE Integrated Energy Policy Report. WORKSHOP RE: Transmission Planning and Permitting Issues (2013 IEPR)

DISTRIBUTED ENERGY RESOURCE INTERCONNECTION PROCESS REQUIREMENTS

LOAD SERVING ENTITIES PJM REGION

Renewable Energy Impact to Distribution Network Performance and Reliability. ENGR. ROBERTO D. ISIP JR. Head, Network Asset Planning, MERALCO

the most promising locations for new renewables in the Imperial CREZ.

ONCOR INTERCONNECTION APPLICATION AND PROCESS FOR DISTRIBUTED RESOURCES

DISTRIBUTED GENERATION INTERCONNECTION PROCEDURES. June 21, 2011

Storage as a Transmission Asset Stakeholder Comment Template

Generator Interconnection Driven Network Upgrade Cost Recovery. Draft Final Proposal

Renewable Energy Update. Sustainability/Energy Committee April 22, 2014

AMERICAN RENEWABLES GAINESVILLE REGIONAL UTILITIES GAINESVILLE RENEWABLE ENERGY CENTER

Southern California Edison Preferred Resources Pilot Portfolio Design Report Revision 2

An Introduction to Interconnection Policy in the United States

Operating Procedure PURPOSE... 1

Transmission Planning Process Unified Planning Assumptions and Study Plan March 31, 2017 FINAL

Modeling DER in Transmission Planning CAISO Experience

GARKANE ENERGY COOPERATIVE SMALL GENERATOR QUALIFIED FACILITY INTERCONNECTION APPLICATION

effective date 1/8/01

City of Pasadena Water and Power Department Power Division DISTRIBUTED GENERATION FACILITIES INTERCONNECTION REQUIREMENTS REGULATION 23

SUN for a Brighter Future

Photovoltaic Program Power Purchase Agreements Request for Offers 2012 Solicitation. Participants Forum. October 12, 2012

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA CLEAN COALITION COMMENTS ON RESOLUTION 3809-E AND 2557-E

SPP at a Glance. Located in Little Rock. Approximately 600 employees

SERVICE AGREEMENT FOR WHOLESALE DISTRIBUTION SERVICE. Between SOUTHERN CALIFORNIA EDISON COMPANY. And TECHNI-CAST CORPORATION

Part 1 Introduction and Overview

Transmission Planning Process Phase 3 Competitive Solicitation

Storage as a Transmission Asset:

CAISO s Plan for Integration of Renewable Resources

Dated: April 16, 2002

Original Cal. P.U.C. Sheet No E San Diego Gas & Electric Company San Diego, California Canceling Cal. P.U.C. Sheet No.

Transcription:

Water & Energy Consulting Lon W. House, Ph.D. 530.409.9702 (cell) lonwhouse@waterandenergyconsulting.com www.waterandenergyconsulting.com 2795 East Bidwell Street 10645 N. Oracle Rd. Suite 100-176 Suite 121-216 Folsom, CA 95630 Oro Valley, AZ 85737 office: 530.676.8956 office: 520.297.2643 Utility Generation Interconnection Process in California Interconnection Process Overview Perhaps the most challenging portion of any renewable energy project greater than 0.5 megawatt with a single point of interconnection (POI) is determining the applicability, feasibility, scope, and cost of the grid interconnection. The terms and conditions of the current NEM tariff (for systems 1MW and less) place the scope and cost burden of the interconnection on the utility. However, for Rule 21 and WDAT interconnections the burden shifts to the customer/project developer (including systems > 1MW using the RES-BCT tariff). For this reason it is prudent to retain an expert consultant that has experience with renewable energy project development and these interconnection application processes. The chart below depicts the division of distribution level and transmission level interconnection administrative processes. 1. Initial Project Review Initial project review with the customer: Provides details about the proposed generation source technology, characteristics, system size, system type, physical location, proposed tariff or sales agreement. If no project development has started, this information may not be available. Key Information: location, project technology, generator, size, point of interconnection (POI) details (e.g., utility pole numbers). 1

Initial Project Review (during the project development phase) Project attributes: Generation type, size, location Location attributes: IOU Network Maps Distribution Level Interconnection - Utility Transmission Level Interconnection - CAISO PG&E > 60KV; SCE > 200KV, some 66KV and 115 kv; SDG&E > 69KV; various other lines Pre- Fast Track Independant Study Cluster Rule 21 New Resource Interconnection New Resource Interconnectio n New Resource Interconnection Export (NEM-A, RES-BCT) Export WDAT Non Export (NEM< 1MW) Fast Track Group Study System Impact Study Supplemental Study CAISO New Resource Interconnection (>500kW) 2. Interconnection Strategy Development and Determination of Process Type Once the proposed POI location(s) is known, the IOU system network maps (PVRAM, DERiM, or SDG&E's Interconnection map) can provide some basic information to determine nearest lines, substations, and circuits (maps will provide the names of these infrastructure components, which can be used in preparing the pre-application form, see next step). The maps will also provide line/substation voltage, designation of transmission vs. distribution line/substation type, operating capacity (load) of the line/circuit, design capacity of the line/circuit, and if there are existing renewable energy systems present (interconnected on the line being viewed, in the area of the proposed POI). This information can determine if an Interconnection Request (IR) should be filed with the CAISO or one of the IOUs. Key Information: Interconnection controlled by utilities or the ISO, and space available on utility distribution system. 3. Pre- Process If the interconnection request is to be submitted to the local Utility, a pre-application form ($300) should be prepared and submitted to the applicable Utility in advance of the IR. The Utility is required to respond to the pre-app within 10 business days with network data (information found on the network maps, plus additional data). This additional information can include: Total Capacity (in MWs) available on the line Total Capacity (in MWs) of substation bus Approximate circuit distance between the proposed site and the substation Relevant line section(s) peak line load estimate Number of protective devices and voltage regulating devices between the proposed POI site and the substation/area Whether or not three-phase power is available at the site Limiting conductor rating from proposed POI to distribution substation. California Generation Interconnection Process, Page 2

This information is very useful in evaluating the potential cost effectiveness of the proposed interconnection strategy (which is an important scope/cost component of the overall generation system/project cost estimate). Once a decision is made in R11-09-011 there will be several enhancements to the Pre-Interconnection Request: Primary Service Package ($225), available within 10 business days: Primary Service Package: Nominal Distribution circuit voltage and wiring configuration - i) Relevant line section(s) absolute minimum load, and minimum load during the 10 AM 4 PM period (provided when SCADA data is available). ii) Existing upstream protection including: (a) Device type (Fuse Breaker, Recloser) (b) Device controller (device make/model ex: 50E/50T) (c) Phase settings [IEEE Curve, Lever, Min Trip (A), Inst Trip(A)] (d) Ground settings [IEEE Curve, Lever, Min Trip (A), Inst Trip(A)] (e) Rated continuous current (f) Short Circuit interrupting capability (g) Confirm if the device is capable of bi-directional operation iii) Provide the Available Fault Current at the proposed point of interconnection including any existing distributed generation fault contribution. Behind Meter Interconnection ($800), available within 30 business days: Behind The Meter Interconnection Package (Package does assume a physical verification based on field confirmation) - i) Relevant line section(s) absolute minimum load, and minimum load during the 10 AM 4 PM period (provided when SCADA data is available) ii) Transformer data (a) Existing service transformer kva rating (b) Primary Voltage and Secondary Voltage rating (c) Configuration on both Primary and Secondary Side (i.e., Delta, Wye, Grounded Wye, etc.) (d) Characteristic impedance (%Z) (e) Confirm if the transformer is serving only one customer or multiplecustomers10 (f) Provide the Available Fault Current on both the Primary and Secondary Side iii) Secondary Service Characteristics (a) Conductor type (AL or CU) and size (AWG) (b) Conductor insulation type (c) Number of parallel runs (d) Confirm if the existing secondary service is 3 wire or four wire. iv) Primary Service Characteristics (a) Conductor type (AL or CU) and size (AWG) (b) Conductor insulation type (c) Number of parallel runs (d) Confirm if the existing primary service is three wire or four wire Key Information: Interconnection availability, preliminary cost estimates. 4. Tariff or Sales Agreement There are a multitude of tariff/sales options available in California, depending upon the characteristics of the generator, the location of the generator, and the POI, as the following table shows. Almost all of the options are available to generation connected at the utility distribution level. Generation connected at the transmission level (generally: PG&E > 60KV; SCE > 200KV, some 66KV and 115 kv; SDG&E > 69KV; various other lines) has many more limitations - generally being unavailable for utility tariffs (NEM, RESBCT) and many utility purchase solicitations (e.g., REMAT). California Generation Interconnection Process, Page 3

Interconnection Level QF REMAT RESBCT Transmission or Distribution Distribution Distribution Public Agency Solicitations Transmission or Distribution IOU Utility Solicitations Transmission or Distribution Summary Variable price sale of exported energy Fixed price contract for exported energy Generation rate energy component allocated to benefiting accounts energy rates Generation rate decided as part of response to RFP Utility solicitations for various products Criteria QF certification by FERC Renewable generator, < 3MW, connected to distribution system Government agency, renewable generator, <5MW Have to meet utility RPS requirements Varies as to size and criteria RAM: 3-20MW, RPS: >0.5MW, Renewable RFP: > 20MW, RA: 1 MW, PRP RFO: <100MW Penalties none if produce less kwh than contracted if produce more electricity than benefiting accounts can absorb if deviate from generation proposed in RFP response depends upon solicitation Program availability Unlimited utility specific cap utility specific cap varies varies Comments Energy prices determined by gas prices Current hydro/wind price 8.923 cents/kwh, have 18 months to come on line Have to allocate generating energy to individual benefiting accounts Price depends upon winning bid. Price depends upon winning bid Interconnection Rule 21 export or WDAT or SGIA Rule 21 export Rule 21 NEM (modified) Rule 21 export or WDAT or SGIA Rule 21 export or WDAT or SGIA California Generation Interconnection Process, Page 4

Interconnection Timeline New ISO Meter and Telemetry >500kW New Scheduling Obligations 4-5 months 7-9 months 4-5 months 4-5 months varies Yes Yes No Yes Yes Yes Yes No Yes Yes Reporting Requirements CEC and WREGIS CEC and WREGIS CEC and WREGIS CEC and WREGIS CEC and WREGIS Price Determined by Ngas prices and annual capacity prices Contract Tariff Proposal Proposal anytime bi-monthly anytime in response to RFP in response to RFP Price changes Monthly with gas prices Fixed for duration of contract With tariff energy rate changes Depends upon Depends upon Escalation Rates RECs Analysis With gas prices transferred to utility Forecast of future gas prices 0 transferred to utility Amount of exported energy Tariff Changes - Energy component only owned by applicant Exported energy value vs. benefiting account energy value Depends upon transferred to utility Depends upon Depends upon transferred to utility Depends upon Generation Sales Options Characteristics Summary Key Information: Tariff or sales agreement to pursue and how to pursue it. California Generation Interconnection Process, Page 5

5. Interconnection Request (IR) Process Utility Rule 21 If the initial assessment shows the interconnection strategy to be cost effective (as defined by the overall project budget), the IR will be prepared and submitted to the applicable utility (requires: site drawings, Single Line Diagrams, Evidence of Site Exclusivity, POI data, Generator system info, Transformer data, Load Flow Dynamics program results). The different types of IRs are described below. It is important to note that the interconnection application process must be managed carefully to allow coordination with several different processes. For example, as the SCE interconnection application flow diagram below shows, the interconnection application must sync with PPA (Power Purchase Agreement) negotiations, ISO NRI (New Resource Implementation), and any other local utility requirements (like back-feed power service or standby power needs). The IR process options include: Fast Track: Projects need to be eligible for the Fast Track process before initial review and Supplemental review are performed. Fast Track eligibility is determined based on the generator type, size, voltage of the line, proposed location of POI. If the project passes initial review in the screening process, and supplemental review screens, the project can proceed through the application process without having to go through the independent study process. Only projects connecting via an inverter will pass fast track. Independent Study: A request for interconnection under the Independent Study Process can be made at any time during the year. The Independent Study Process consists of a Detailed Study Process, i.e.: System Impact Study followed by the Facilities Study (if necessary), and can take six to nine months to complete. Distribution Group Study and Cluster Study: In the Distribution Group Study (Rule 21, distribution level) and Cluster Study (CAISO transmission level) process, projects are grouped by geographical and system areas to be studied together as a group: Utility network upgrades required to support the group are identified and the cost of the upgrades are then allocated to projects in that clustered group. The Cluster Study Process consists of a Phase I Interconnection Study and a Phase II Interconnection Study. A request for interconnection under the Distribution Group Study can be submitted at specific 6 month study periods in Sept and March. Cluster Study Process can only be submitted during a Cluster Window. For each calendar year, a Cluster Window is open from April 1 and to April 30 of that year. Please see following section for CAISO interconnection details. Utility Wholesale Distribution Access Tariff (WDAT OR WDT) The Utility Wholesale Interconnection is regulated by FERC (Federal Energy Regulatory Commission). The Utility WDAT uses one of three interconnection processes: Fast Track, Independent Study, or Cluster. The characteristics of these three interconnection applications is shown below. California Generation Interconnection Process, Page 6

Fast Track: Projects need to be eligible for the Fast Track process before initial review and supplemental review are performed. Fast Track eligibility is determined based on the generator type, generator size, voltage of the line, and location of the Point of Interconnection. Eligibility to request a Fast Track review means that the project can be evaluated under the initial review and the supplemental review screens. Independent Study: A request for interconnection under the Independent Study Process can be made at any time during the year. The Independent Study Process consists of an Interconnection System Impact Study and an Interconnection Facilities Study. Cluster Study: In the Cluster Study Process, projects are grouped by geographical and system areas to be studied together (as a cluster). Upgrades are identified for the clustered group, and the cost of the upgrades is allocated to projects in that clustered group (in accordance with the guidelines of the GIP). The Cluster Study Process consists of a Phase I Interconnection Study and a Phase II Interconnection Study. A request for interconnection under the Cluster Study Process can only be submitted during a Cluster Window. For each calendar year, a Cluster Window is open from April 1 and to April 30 of that year. California ISO A schematic of the CAISO interconnection process is shown below. Depending upon the characteristics of the generation, type and size of generator and the line the generator is connecting to; the CAISO has three interconnection paths: Fast track, California Generation Interconnection Process, Page 7

Independent Study, or Cluster. Each has different costs, different timelines, and different responsibilities. A summary of the different CAISO interconnection processes is provided below. CAISO New Resource Interconnection (NRI) Upon completion of a successful interconnection application, the generator must enter the ISO New Resource Interconnection process if it is greater than 500KW interconnected to the utility distribution system, or if it is connected to the transmission system. NRI uses a "bucket system" for deliverables and has strict timelines for deliverables. The bucket timelines and deliverables are depicted below. Buckets 1 and 2 Full Network Model Preparation. Required submittals include: Remote Intelligence Gateway (RIG) and Metering Submittals, Interconnection Agreement, Communication Block Diagram, Three Line Drawings, A Single Line Drawings, Remote Intelligent Gateway Details Form, Topographical Map, Generator Dynamic Model File, Generator Positive Sequence Load Flow Data, Network Information, and the RIG Initial Spreadsheet. Bucket 3 Regulatory Contracts, Model Testing, and Forecast Preparation. Generator Resource Data Template Initial Spreadsheet, Meter Configuration Worksheet, Site Information Form for Solar Resources, Regulatory Contracts Information Request Sheet(s), and the Schedule 1 Template. Bucket 4 Market Preparation. Scheduling Coordinator (SC) Selection and Acceptance Letters, Generator Resource Data Template Final Spreadsheet, Participating Intermittent Resource Program Letter of Intent, California Energy Commission (CEC) Pre-certification, Control and Protection Documentation, 24/7 Contact Information form, Device Certificate Request Form for California Generation Interconnection Process, Page 8

RIGs, RIG and/or Metering Pretesting Email Notification, RIG and Meter ISO Testing Scheduled, CPS Subscribers Agreement for Remote Intelligent Gateways (RIGs), Energy Control Network Connectivity (ECN) Security Requirements and Agreement. Bucket 5 Trial Operations Approval. RIG Resource Site Narrative Document, Interconnection Approval Letter from Participating Transmission Owner (PTO), Interconnection Customer Synchronization Request Email, Test Energy Schedule. Bucket 6 Trial Operations. CAISO Internal Approval Process for Synchronization, 24 Hour Notice for Initial Sync, Contacting the ISO Real-Time Desk, Meter Certification Documents Must Be Accepted Before Commercial Operations, Metering Calculation Worksheet, CAISO Metering Certification form, Metering Calculation to Point Of Receipt Document, and Site Verification Data Sheet. Bucket 7 Commercial Operation. Commercial Operational Date Declaration, Metering and Telemetry Certificate of Compliance, Participating Transmission Owner (PTO) Final Approval Letter, Interconnection Customer COD or COM Notification, Generator Interconnection Agreement Exhibit E Letter, Distribution Connected COD Letter, Metering and Telemetry Certificate of Compliance, Participating Transmission Owner (PTO) Final Approval Letter, Metering and Telemetry Certificate of Compliance, Participating Transmission Owner (PTO) Final Approval Letter, Full Build-out of the Resource Completion form, Partial COM with Concurrent Trial Operation, Interconnection Customer COD Notification, Generator Interconnection Agreement Exhibit E Letter, Distribution Connected COD Letter, Interconnection Customer Commercial Operation for Markets Process & Notification, Commercial Operation for Markets (COM) Letter. Other Regulatory Permits/Approvals Needed There are a host of various regulatory agencies from which permits and reporting are required. The most relevant ones for water agency renewable generation projects are described in the following table. Regulatory Agency Acronym Permit/Approval Required Federal Energy FERC Qualifying Facility (QF); if small Regulatory hydro then need a Small Hydro Commission License or Exemption Energy Information Agency Western Regional Energy Generating Information System California Independent System Operator California Energy Commission Utilities Scheduling Coordinator Environmental Documents EIA WREGIS CAISO CEC PG&E, SCE, SDG&E, etc. SC California Environmental Quality Act (CEQA) Generator Registration Qualified Reporting Entity (QRE) Generating Unit ID, annual QRE reporting Full Network Model (FNM) registration, New Resource Integration (NRI), Metering, Interconnection, Generating Resource Assessment, System Assessment Renewable Portfolio Standard (RPS) Certification, Generating Plant ID Interconnection (if distribution level), Power Purchase Agreement (PPA) if selling to utility, tariff agreements if using electricity on site SC agreement required for ISO CEQA document; if small hydro may need U.S. Army Corps of Engineers 404 permit and California Department of Fish California Generation Interconnection Process, Page 9

State Water Resources Control Board SWRCB and Wildlife 1602 permit If small hydro need Nonconsumptive Water Use Right, 401 permit California Generation Interconnection Process, Page 10