Detailing guide for senior living facilities

Similar documents
Chapter 7. Drains and cleanouts. Drains and cleanouts 34. Topics. Notes. 7.1 Existing rectangular or square drains and floor sinks 35

Safety flooring the complete system

Chapter 3. System accessories. Topics. 13 System accessories. Notes. 3.4 Visedge DS vinyl securing strip Accessory diagrams 14

NBS M50 ALTRO WHITEROCK DIGICLAD WALL CLADDING

An introduction to Altro Walls products, accessories and fittings.

RECOMMENDED FINISHES

WARMUP TILED SHOWER SOLUTION

Division Resilient Athletic Flooring

Student Services & Classroom Addition. A. This Section includes the following sanitary drainage piping specialties:

Union County Vocational - Technical Schools Scotch Plains, New Jersey. A. This Section includes the following sanitary drainage piping specialties:

NBS M50 ALTRO STRONGHOLD 30 SAFETY FLOORING COMBINED PARAGRAPHS.

TILE TILE

PLYWOOD FLOATING FLOOR

MAG-MIFAB. Floor Drains/Grated Outlets Balcony, Roof & Side Drains/Outlets Cleanouts

BioPrism Solid Surface

FreeStyle Linear Drain with Full Mortar Bed Adapter Kit

Chapter 4. Adhesives, tapes and sealants. Topics. 19 Adhesives, tapes and sealants. Notes. 4.4 Contact adhesives and double faced tapes 22

Altro Whiterock wall designs product datasheet. Designed for possibilities. Made for people. Designer patterns on durable wall panels

Lock Installation Instructions for BT Strand Lock, BT Strand Engineered & BT Bamboo Engineered

SECTION RESILIENT SHEET FLOORING

Easy Drain. INSTALLATION MANUAL Xs - Linear shower drain FOR WOODEN OR CONCRETE SUBFLOORS

1 PVC or ABS drain with strainer

Floor Insulation Underlayment Section Sound Control Matting

ENKASONIC FLOOR UNDERLAYMENT 9110

SECTION RESILIENT SHEET FLOORING

2. Subfloor Preparation - Removal of Existing Floor Coverings

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

Infinity - Century Combination Installation Instructions Gelcoat & Solid Surface Bathware

1. Decks, balconies, and sun porches 2. Walkways, ramps, and stairways 3. Patios and courtyards

SECTION STORM DRAINAGE PIPING SPECIALTIES PART 1 - GENERAL 1.01 RELATED DOCUMENTS

1. The subfloor must be structurally sound and able to withstand live and dead loads with a deflection limitation of L/360.

DRAINS AND CLEANOUTS. 1. Division 7 - Thermal and Moisture Protection Piping (Plumbing).

DRAINS AND CLEANOUTS. 1. Division 7 - Thermal and Moisture Protection Piping (Plumbing).

SECTION CERAMIC and QUARRY TILE

Multi-Piece EasyStep Product Installation Instructions

Wet Areas Using Plasterboard

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 22 PLUMBING. A. This Section includes the following storm drainage piping specialties:

STAINLESS STEEL DRAINAGE PRODUCTS

SECTION DRAINS AND CLEANOUTS. 1. Division 7 - Thermal and Moisture Protection Piping (Plumbing).

fusion shower pan on wood joists installation guide

Assembly Instruction. wedi Fundo Primo Shower System

DIVISION 22 PLUMBING SECTION INTERIOR SANITARY WASTE AND VENT PIPING SYSTEM

CTC PROFILES FOR CARPET

STEP UP SHOWER BASE INSTALLATION GUIDE FOR TIMBER AND CONCRETE FLOORS

For wooden fabricated underlay e.g. plywood, care must be taken to store the material in an area where it will not become damp or contaminated.

IVC US. Light Commercial Installation Guide - Sheet Vinyl. Leading the Way

WET AREA CONSTRUCTION AUSTRALIA SEPTEMBER 2006 DESIGN MANUAL

Multi-Piece EasyStep Product Installation Instructions

ALTRO WHITEROCK CHAMELEON Architectural Guide Specification CSI/CSC SectionFormat [3-part] CSI PageFormat

NBS M50 ALTRO AQUARIUS SAFETY FLOORING COMBINED PARAGRAPHS.

1.3 Work shall include all reinforcement and accessories necessary to complete installation.

ZS880 Linear Shower Drain Installation Instructions

Contents. Timber framing to be installed in accordance with AS:1684 Metal framing to be installed in accordance with BCA Volume: 2

A. This Section includes the following sanitary drainage piping specialties:

Wall Protection Installation Guidelines

SECTION TILING

Premium wall cladding. Complete system. Installation guide. Preparation Profiles Sheet preparation and installation After care

adjustable fusion shower pan surface mounted on subfloor installation guide

SGS Inc. Architectural Drainage Products. Shower Grate Shop Inc. Support

***************************************************************************************************************

SECTION GYPSUM BOARD ASSEMBLIES

adjustable fusion shower pan on wood joists installation guide

Insulation. First Revison October DC14 Drainage Mat INSTALLATION GUIDE FOR RESIDENTIAL & COMMERCIAL APPLICATIONS

Eco-Grip Flooring Installation Manual Version: 2018/12

84 Lapping & Jointing 86 Service Pipe Penetrations 87 Sealing to Cavity Wall Constructions 88 Protecting Membranes System Components.

USG DUROCK BRAND INFINITY DRAIN SHOWER SYSTEM Shower Floor and Drain Installation Guide

30mm Height Linear Drain Shower Trays

The better way to build TM. Installation Manual NAILBASE PANELS

Instructions for laying Parmate Engineered Flooring

Eco-Grip Flooring Installation Manual Version: 2018

PTY LTD. Paskaseal SRB. Screed Replacement Base

Home of the Bates Family Residential

Home of the Bates Family Residential

Typical Installation Details

84 Lapping & Jointing 86 Service Pipe Penetrations 87 Sealing to Cavity Wall Constructions 88 protecting Membranes 90 System Components.

BRANZ Appraisal Certificate # 461 (2010) Internal wet areas.

NBS M50 ALTRO XPRESSLAY SAFETY FLOORING COMBINED PARAGRAPHS.

Technical Services. Product MM INCH Installation direction Seam treatment GTI CONTROL (welded) 625 X 625 mm 24.5 x 24.

UNDERLAYMENT INSTALLATION INSTRUCTIONS

GUIDELINES FOR SANITARY DESIGN AND CONSTRUCTION OF MILK PRODUCTS PLANTS (rev )

WEB BASED APPLICATION SPECIFIC INSTALLATION INSTRUCTIONS

ARCHITECTURAL GUIDE SPECIFICATIONS - DESCRIPTIVE

Single Source Comprehensive Warranty. ARDEX Americas. Swimming Pool Guide

Specification for Engineered, Laminate and Bamboo Installation

SURESILL WATER MANAGEMENT GUIDE

Easy Drain. Basic Drain ZERO. INSTALLATION MANUAL Basic Drain Zero - Linear shower drain

WCU ALUMNI TOWER MASONRY & ENVELOPE REPAIRS

WALK-IN SHOWER BASE INSTALLATION GUIDE FOR CONCRETE FLOORS

Specification for Engineered, Laminate and Bamboo Installation

Our Ref: LJD/TTA June 2013

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

Planning and installation instructions

Real Stone Cladding mm sandstone ashlar. Thin Sandstone Ashlar Catalogue

DARTMOUTH COLLEGE DESIGN January 3, 2012 & CONSTRUCTION GUIDELINES

ARCHITECTURAL GUIDE SPECIFICATIONS

Technical Specification Aug 2012

MOISTURE MANAGEMENT. Providing roofing and waterproofing solutions. Zionsville High School Roof Asset Management Plan

MAJESTIC FLOOR MEMBRANE PRODUCT GUIDE

DALLAS-FORT WORTH INTERNATIONAL AIRPORT

FLOOR COVERING Arch206 BC-II Spring 2016

Transcription:

Detailing guide for senior living facilities Creating an integrated system with Altro flooring and wall cladding is an ideal solution for areas in which hygiene and water resistance are a top concern. Within the senior living market these areas may include showers, nurse-assisted bathing areas, commercial kitchens, medical rooms and indoor swimming facilities. Proper installation techniques are critical in these areas, which is why Altro products must be installed as per the instructions in this guide and the Altro installation guide. Failure to comply may void the limited product warranty. Overview Senior living is institutional by nature, and health codes tend to reinforce this. That s why designers are looking at performance benefits and high quality commercial installation techniques when choosing floor and wall finishes. In this segment, the potential for injury and illness is very high, which is why proper detailing and transitions are sensitive and require a quality installation. 2014 Facilities Guidelines Institute Guidelines for Design and Construction of Residential Health, Care and Support Facilities The new standard for residential facilities provides minimum recommendations for new construction and renovation of nursing homes, hospice facilities, assisted living facilities, independent living settings, adult day care facilities, wellness centers and outpatient rehabilitation centers. Key points relating to installation techniques: To reduce Hospital-Acquired Infections, surfaces must be non-absorbent, non-porous and smooth Flooring surfaces shall provide smooth transitions between different flooring materials Flooring surfaces must be cleanable and wear resistant Slip resistant flooring required in bathing areas and rooms, ramps and entries Slip resistant flooring required in kitchens with all joints sealed Areas subject to wet cleaning methods should have homogeneous, heat-welded flooring with the material flash-coved. TECH>INSTALL>DETAILING GUIDE FOR SENIOR LIVING

Altro flooring to Altro wall cladding Overlap joint method (preferred) The preferred method of installing Altro WALL SUBSTRATE WHITEROCK flooring with Altro Whiterock is the overlap DOUBLE-SIDED TAPE joint method. This installation is made by using a cove former to run the safety flooring 6-8 up the wall. Altro Whiterock 2 ALTRO WHITEROCK SANITARY SEALANT is then overlapped 2 over the safety 2 OVERLAP 2 flooring. The overlap of the product ensures a complete seal from floor to wall transition and does not need to rely on heat welding to achieve that seal. 4-6 COVE FORMER SAFETY FLOOR SUBFLOOR Altrofix adhesive Heat welded joint method WHITEROCK Occasionally a heat welded transition from Double sided tape Grooved & Heat Welded Joint WSBU 200 PVCu INFILL WALL SUBSTRATE floor to wall is necessary. In instances like these, use the heat welded joint method. This installation is done by installing Altro Whiterock wall cladding first, with the bottom of the panel being 4-6 above the floor. Altro flooring is then installed using a cove former to run the material up the wall with a small amount of overage extending above the wall cladding. Using the wall cladding as a cutting guide, the SAFETY FLOOR extra flooring is trimmed away and then heat welded with the wall cladding. This COVE FORMER installation method is more labor intensive and requires precision with the heat welding gun. OR FLO SUB

Cove methods Altro Whiterock Altro Whiterock vinyl panels vinyl panels or similar or similar Most Altro sound Most Whiterock sound and dry and substrates dry vinyl substrates panels or similar Silicone Silicone sealant sealant (by wall (by contractor) wall contractor) Most sound and dry substrates Altro C-4 Altro cap C-4 strip cap strip Silicone sealant (by wall contractor) Altro C-7 Altro cap C-7 strip cap strip Sit on cove Sit on cove AltroMastic AltroMastic Sit on cove AltroMastic Altro Altro flooring Altro C-4 flooring cap strip.080" to.080".14" to.14" (2mm to (2mm 3.5mm) to 3.5mm) Min. Altro 4" (100mm) flooring.080" Self to cove.14" Cove (2mm former Cove to 3.5mm) former Min. 4" (100mm) Self cove Cove former Altro C-7 cap strip Altro flooring Altro flooring.080" to.080".14" to.14" (2mm to (2mm 3.5mm) to 3.5mm) Altro flooring.080" to.14" Cove former Cove (2mm former to 3.5mm) Cove former Sit on Sit cove on cove detail detail C-4 detail C-4 detail C-7 detail C-7 detail Altro floor Alt.080" to.08.1 (2mm to (2mm 3.5 Sit on cove detail C-4 detail C-7 detail Approved Approv adhesive adhes Glazed Glazed wall tile tile wall or or tile or vinyl wall vinyl cladding wall cladding Masonry Masonry nail fixing nail fixing hole drilled hole in in drilled vinyl in first vinyl first Existing Existing Wall Finish Wall Finish AltroMastic AltroMastic Quarry Quarry tile skirting tile skirting or or similar similar existing existing skirting skirting Ceramic Ceramic tile tile bullnose bullnose overlap overlap WSBU200 WSBU200 0.75 ins or Altro C-8 Altro cap C-8 strip cap strip Altro C-11 Altro cap C-11 strip cap strip Sanitary Sanitary sealant sealant Altro flooring Altro flooring.080" to to.080".14" to.14" (2mm to to (2mm 3.5mm) to 3.5mm) Most sound Most sound and and dry substrates dry substrates Altro flooring Altro flooring.080" to.080".14" to.14" (2mm to (2mm 3.5mm) to 3.5mm) Altro flooring Altro flooring.080" to.080".14" to.14" (2mm to (2mm 3.5mm) to 3.5mm) Cove former Cove former Quarry Quarry tile floor tile floor Cove former Cove former C-8 detail C-8 detail C-11 C-11 detail detail Ceramic Ceramic tile bullnose tile bullnose overlap overlap detail detail

Capstrip and cove former details Altro flooring installed with a C7 and C8 cap strips are pictured below. These strips are the most commonly used. C7 cap strips are used to finish your Altro flooring installation to dry wall (and no other wall finish is being installed). C8 cap strips are used when Altro flooring is being installed with a ceramic tile wall finish. C4 cap strips are available for installing Altro Whiterock in an alternative method. We still recommend the overlap method on the majority of installations. Door frame C7 Cove former reduced to architrave Door frame C8 Cove former reduced to architrave

using Altro contact tape of appropriate width for transition. Using Altrofix 30 two part polyurethane adhesive, install Altro sheet vinyl on smooth, dry, suitable substrate and weld to wet room transition. Shower transition trim Altro Aquarius to shower transition trim to sheet vinyl Heat weld 0.098 0.02 2.35 1.33 1.33 4.75 Sheet vinyl Altro Aquarius in shower Altro sheet vinyl to Altro or other sheet vinyl transition Altro Altrofix sheet vinyl polyurethane installed using appropriate adhesive Altro adhesive on smooth, dry, suitable substrate. Transition to be heat welded with Altro weldrod. If seaming to other manutacturer s sheet flooring use that manufacturer s weldrod. Sound substrate Flooring transitions D - Wetroom transition (Gradus WT series, or equivalent) Sheet vinyl Sheet vinyl For additional technical help please call 800.377.5597 or email info@altrofloors.com Heat weld Altro LVT/plank to Altro sheet vinyl transition Altro LVT/plank and sheet vinyl installed using appropriate Altro adhesive on smooth, dry, suitable substrate. PVC seam sealer used to bond flooring together. A heat weld can also be used at this transition. Sound substrate Carpet tile with PVC backing explore altro.com PVC cement B Altro sheet vinyl Vinyl shim A Sound substrate Sheet vinyl to other sheet vinyl transition Carpet tile to sheet vinyl A - Subfloor leveler system (Johnsonite LS-40, or equivalent) B - PVC cement (Oatey heavy duty - clear, or equivalent) For additional technical help please call 800.377.5597 or email info@altrofloors.com Seam sealer C explore altro.com Sheet vinyl LVT/pank Sound substrate Sheet vinyl to LVT plank C - PVC seam sealer (Lonseal Lonsealer, or equivalent) C - PVC seam sealer (Lonseal Lonsealer, or equivalent)

Drains New round drains and cleanouts Clamping drains are the best choice for proper installations, and the only choice for areas where water penetration concerns are a priority. These drains are readily available from plumbing supply distributors. They may be installed at time of concrete placement or retrofitted. They are screw on and height adjustable. They come in a variety of drainage pipe diameters and cover sizes. We prefer the larger cover sizes. The following are acceptable drains: Zurn Z 415, Mifab F1100-FC, Wade 1100-FC, Josam 30000-AD, Watts FD 100-FC, Smith 2051 MIFAB F1100-FC Floor Drain with Surface Membrane Clamp 7 (175) or 9 (230) floor covering vandal resistant stainless steel screws fc nickel bronze strainer surface membrane clamp strainer adjustment body height Sample of an approved clamping drain Note: In most cases, it will be necessary to weigh down the drain area to allow the Altrofix 30 two-part adhesive to setup. Caution: Failure to weigh down the drain area during this process may cause a bubble or a pucker in the Altro floor covering, to which there is no remedy.

Modifying an existing drain Remove the drain cover plate. With a quality cementitious patching compound, finish the subfloor flush with the drain perimeter. Note: If drain body is higher than the concrete surface, it must be either ground-off or chipped out and lowered. If the drain body is lower than the concrete surface, you must slightly grind the concrete surface to allow for a slight slope-to-drain profile. Using a small hand held electric grinder, remove the square shoulder on the inside edge of the drain body to create a 45-degree slope into the drain. Similarly, remove the square shoulder from the perimeter of the back side of the drain cover plate creating a 45-degree slope to match the drain body. Replace the cover plate screws for the purpose of land marking the screw holes and preventing the adhesive from filling the holes during the gluing process. Diagram A Square shoulders Square shoulders Diagram B Square shoulder Square shoulder Diagram C Altro flooring covering Gluing and cutting process Apply adhesive (Altrofix 30 two-part polyurethane or approved polyurethane adhesive) on the floor, around, and onto the sloped perimeter of the drain. Place the Altro floor covering over the drain, and fit cut only to the inside diameter of the drain plate screws. Note: Cutting to the outside of the screws will cause the material to be short of the drain plate once it is re-installed. Cut small windows in the Altro floor covering at the drain plate screws only. After all final fitting is completed, warm material with a hot air blower and secure the drain plate cover in place. This process pinches the Altro floor covering between the drain body and the drain plate cover.

Full installation details available on altro.com 800 377 5597 USA / 800 565 4658 CAN support@altrofl oors.com www.altro.com For technical support please call and speak with our Technical Services department.