Installation Guide LVP Glue Down

Similar documents
LVP GLUE DOWN INSTALLATION GUIDE PAGE 1 of 6

LOOSE LAY INSTALLATION GUIDE PAGE 1 of 6

IVC US Residential Installation Guide - LVT. Leading the Way

Endurance Product Guide

IVC US. Light Commercial Installation Guide - Sheet Vinyl. Leading the Way

IVC US Commercial Installation Guide - LVT. Leading the Way

IVC US. Commercial Installation Guide - Sheet Vinyl. Leading the Way

Commercial Resilient Sheet Flooring

LUXURY VINYL GENERAL INSTALLATION INSTRUCTIONS FOR DRYBACK FLOORING

LUXURY VINYL GENERAL INSTALLATION INSTRUCTIONS FOR LOCKING FLOORING

ENGINEERED LUXURY VINYL GENERAL INSTALLATION INSTRUCTIONS FOR ANGLE-TO-ANGLE FLOORING

ALETTE GLUE DOWN INSTALLATION INSTRUCTIONS

LUXURY VINYL GENERAL INSTALLATION INSTRUCTIONS FOR LOOSE LAY FLOORING

American Guild Vinyl Flooring - Steadcrest Collection Installation Instructions

ENGINEERED WATERPROOF FLOORING GENERAL INSTALLATION INSTRUCTIONS FOR VÄLINGE 2G LOCKING FLOORING

PRE-INSTALLATION INSTRUCTIONS. QuietX Acoustical Luxury Vinyl INSTALLATION INSTRUCTIONS. Concrete Substrates CONTENTS:

MARATHON & MARATHON PLUS RUBBER TILE

IVC US Residential Installation Guide - Sheet Vinyl. Leading the Way

Specification and Installation

VESDURA ENGINEERED VINYL PLANK INSTALLATION GUIDE

Click Refresh with In*Step Locking System

INSTALLATION INSTRUCTIONS

ALL DRAWINGS/ILLUSTRATIONS ARE LOCATED AT THE END OF THE INSTRUCTIONS.

PREMIUM LUXURY VINYL FLOORING LOOSE LAY INSTALLATION & MAINTENANCE

Installation Instructions Vinyl Glue Down Flooring - Pro

Scuba Seal Installation / Floor Care Instructions With Video Link

INSTALLATION INSTRUCTIONS

Luxury Vinyl Planks with Interlocking Joints (Glueless) Installation Instructions

EXPANKO RESILIENT FLOORING PRE-INSTALLATION GUIDELINES

1. TEST BEFORE STARTING INSTALLATION All substrates to receive moisture sensitive floor covering must be tested for moisture.

TEXAS GRANITE COMMERCIAL VINYL TILES

Chapter 2. Basic practices. Topics. 7 Basic practices. Notes. 2.5 Existing flooring and adhesive residue Job site conditions 8

Product Size Thickness Installation direction Seams treatment

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

Rigid Core (White Label) Planks with Interlocking Joints (Glueless) Installation Instructions

General Commercial Limited Warranty LVT

BENTLEY ELEMENTS COLLECTION LVT

RITZ FLOORING LVT INSTALLATION INSTRUCTIONS

INSTALLATION GUIDELINES FOR STA-TITE VINYL PLANK AND TILE

DURAfusion - Installation Instructions

StrataWorx Tile. Installation Guidelines 1. CONDITION YOUR SITE AND TEST 2. PREPARE THE FLOOR

KOSTER AMERICAN CORPORATION

Modular Carpet Tile Installation Instructions

Premium Glueless Luxury Vinyl with Interlocking Joints Installation Instructions

SECTION RESILIENT TILE FLOORING. A. Section includes vinyl composition floor tile and accessories indicated and as specified.

Moisture barrier for protection of flooring assemblies up to 99.5% relative humidity

ELECTROSTATIC FLOORING Installation Instructions

ALL DRAWINGS/ILLUSTRATIONS ARE LOCATED AT THE END OF THE INSTRUCTIONS.

Suggested Specification for Tri-Patch Versatile Concrete Patching Compound

Installation ECOWORX / ECOLOGIX INSTALLATION 1. CONDITION YOUR SITE AND TEST 2. PREPARE THE FLOOR

Text applicable to Parterre luxury vinyl tile, plank and resilient sheet flooring unless otherwise evident.

Luxury Vinyl Plank Installation Manual 2017

Modular Carpet. Installation Instructions. Ecoflex AIR Cushion Back Ecoflex ICT Vinyl Back Ecoflex NXT PVC Free Back

Rubber Flooring Installation Guidelines

FlexLok Adhesive Tabs for Carpet Tile

Installation Guide. LooseLay Flooring

GLUE-DOWN LUXURY VINYL TILE

DO-IT-YOURSELF SELF ADHESIVE PLANK INSTALLATION

INSTALLATION MATRIX IVC FIBERGLASS SHEET VINYL

AttainSilence & Attain

KINETICS INSTALLATION GUIDELINES ISOLayment QT-F (FLAT)

Wellmade HDPC Engineered Vinyl Plank/Tile Installation Guide

RESILIENT FLOORING: Hot and Heavy - Secoya

Contract Installation Instructions

Pry Bar or Pull bar Hammer Spacing Wedges Rubber Mallet Safety Equipment (Goggles and Mask)

Karndean Designflooring Gluedown Installation Instructions

INSTALLATION MANUAL FULLY ADHERED INSTALLATIONS

LUXURY VINYL PLANK & TILE INSTALLATION GUIDE I

1.1 DESCRIPTION OF WORK A. Provide new resilient flooring and base where noted on drawings.

Moisture barrier for protection of flooring assemblies up to 99.5% relative humidity

RESILIENT FLOORING: Select Step Wood

CONTRACT PAGE 1 OF 5

Carpet Tile & Plank Direct Glue Down

ARCHITECTURAL GUIDE SPECIFICATIONS - DESCRIPTIVE

Union County Vocational - Technical Schools Scotch Plains, New Jersey

TECHNICAL SERVICES Pro Gen Installation Instructions

ALTERNA ENGINEERED Tiles & Plank

INSTALLATION GUIDELINE 5MM LOOSE LAY LUXURY VINYL

MANNINGTON COMMERCIAL GENERAL INSTALLATION GUIDE. Welcome

ARDEX GUIDE SPECIFICATION ARDEX GPS GENERAL PATCH & SKIMCOAT Trowelable underlayment

The. GARRISON Collection. Garrison Glue Down Vinyl Installation Instructions -

Signature Sports Flooring Installation Instructions. For SignaDeck Premium Rubber Tiles

Specification and Installation

SECTION SUBSURFACE PREPARATION FOR FLOOR FINISHES

General Guidelines: Substrate Evaluation & Preparation

UNDERLAYMENT INSTALLATION INSTRUCTIONS

Features. Specifications. VersaShield MBX slashes up to half the total cost with a quick and effective concrete moisture mitigation up to 99.5% RH.

SECTION RESILIENT TILE FLOORING

Amtico QuickStix LVF Installation

STAIR TREAD INSTALLATION

Medi-Flex TRUE TM SHEET RUBBER INSTALLATION INSTRUCTIONS

INSTALLATION GUIDELINE 5MM LOOSE LAY LUXURY VINYL

General Commercial Installation Guide LAMINATE

IVC US Residential Installation Guide - Laminate. Leading the Way

Xulon Luxury Vinyl Planks- Click. Installation Guide

Replay Rubber Multi-functional and Sports Flooring

Section RESILIENT TILE FLOORING INCLUDING VINYL COMPOSITION TILE

MEDLEY XL INSTALLATION & MAINTENANCE INSTRUCTIONS LUXURY VINYL

Installation and Maintenance

Transcription:

734 SOUTH RIVER STREET CALHOUN, GEORGIA 1.844.225.3100 www.encorehospitalitycarpet.com Installation Guide LVP Glue Down Materials Required for Installation: Tape Measure Square ruler Chalk line Utility knife Hand/Seam roller 75 lb roller Acceptable Subfloors: Wood subfloor Wood subfloor must be American Plywood Association (APA) rated subfloor grade as specified and warranted by the manufacturer. All wood subfloors require a double layer construction. Porous wood subfloors must be primed. (HF225 Primer) Any failure of the subfloor or flooring due to the subfloor is not the responsibility of Happy Feet International. Happy Feet International does not recommend installing resilient flooring over wood flooring or subfloors applied directly over concrete or sleeper-construction floors. Concrete See Grade Levels below. All concrete subfloors require moisture testing. Grade Levels: Suspended: An acceptable suspended floor is a concrete or wood substrate with a minimum of 18 (460mm) of well-ventilated air space beneath it. Happy Feet International recommends that a moisture vapor barrier be placed on the ground below the air space. On-Grade: An acceptable on-grade floor is a concrete substrate in direct surface contact with the ground at the surrounding ground level. The concrete slab should be protected from moisture penetration and incorporate a permanent, effective moisture vapor retarder with a minimum thickness of 0.010 and a permeance of 0.1 per ASTM F710.

Below-Grade: An acceptable below-grade floor is a concrete substrate partially or completely in contact with the ground below the average surrounding ground level. The concrete slab should be protected from moisture penetration and incorporate a proven moisture vapor barrier. The concrete slab should be protected from moisture penetration and incorporate a permanent, effective moisture vapor retarder with a minimum thickness of 0.010 and a permeance of 0.1 per ASTM F710. Approved Substrates: Concrete Portland Based Underlayment's Terrazzo APA Approved Plywood Fiber Cement Underlayment Radiant Heated Subfloors (not exceeding 85 F (29 C) Properly Prepared VCT Properly Prepared Sheet Vinyl (single layer, fully adhered) Unacceptable Surfaces: Cushion-back vinyl Laminate Any floating floor system Carpet Happy Feet International will not warrant or accept responsibility of any kind for flooring failures related to the use of unacceptable substrates and surfaces. Floor Preparation: The smoothness and cleanliness of concrete subfloors must meet or exceed the requirements of ASTM F710. Fill all holes and cracks with a latex fortified Portland cement based patching compound. Happy Feet International only recommends the use of latex fortified Portland cement based products as a satisfactory patching or leveling compound. The floor should be flat 3/16 in a 10 foot span. Happy Feet International recommends priming extremely porous floors with a Premium Acrylic Latex Primer to prevent over absorption of adhesives, dust containment, and to insure a better bond of the adhesive to the subfloor/underlayment.

Moisture Testing: All concrete slabs, both old and new, must be tested for moisture transmission using the Calcium Chloride Moisture Test according to ASTM F1869. Moisture vapor transmission should not exceed the recommended levels of 3 lbs. per 1,000 sq. ft. in 24 hours. This test should be performed and documented prior to installation. Also test for relative humidity in concrete floor slabs using in-situ probes, which should be no more than 80% RH per ASTM F2170 before, during and after installation. These acceptable moisture readings are only applicable when using HF9100 Transitional Adhesive. Storage and Handling: Acclimate the flooring a minimum of 48 hours before installation in the area it is to be installed. Conditions between 65 F and 85 F (18 C and 29 C) are required before, during and after installation. Cartons should be evenly stacked no more than two high on a flat surface and away from any heating/cooling ducts or direct sunlight. Floor must be clean, smooth, flat and dry. Remove all foreign substances such as wax, grease, dirt, construction marks and contaminants, and any substance or chemical that would interfere with a good bond. Avoid using sweeping compounds. Do not install over substrates that have been chemically cleaned. The flatness of wood subfloors or underlayment must not exceed on variation of 3/16 in 10 feet. PH Levels: ph on concrete substrates must be between 7 and 9. Inspection of flooring material prior to installation is required. Any defects should be immediately reported to the retail store from which the flooring was purchased before installation. (Within 24hrs of install) Happy Feet International will not be responsible for labor costs to repair or replace material with defects that were apparent before or noticed at the end of an installation. The job site and all flooring material and adhesive must be kept for 48 hours before, during and after installation between 65 F and 85 F (18 and 29 C). Please Note: If removal of existing resilient floor covering is required, follow all recommended Resilient Floor Covering Institute (RFCI) work practices at www.rfci.com Happy Feet International only recommends the use of Portland cement based products as a satisfactory patching or leveling compound for the installation of all Happy Feet International flooring products.

Common Uses: Leveling Substrates Filling holes Filling cracks Embossing existing resilient floor, ceramic tile or VCT Leveling non water-soluble adhesives Trowel Specifications Type of Installation Trowel Size & Notch Spread Rate Over porous substrates (Vinyl Tile & Plank, Rubber Tile, Vinyl & Rubber Stair Treads) Over porous substrates (Solid Vinyl Sheet Goods, Rubber Sheet Goods) Over non-porous substrates (Vinyl Tile & Plank, Rubber Tile, Vinyl & Rubber Stair Treads) Over non-porous substrates (Solid Vinyl Sheet Goods, Rubber Sheet Goods) 1/16" x 1/16" x 1/16" Sq. 1.6mm x 1.6mm x 1.6mm Sq 1/16" x 1/32" x 1/32" U 1.6mm x 0.8mm x 0.8mm U 1/16" x 1/32" x 1/32" U 1.6mm x 0.8mm x 0.8mm U 1/16" x 1/32" x 5/64" U 1.6mm x 0.8mm x 2mm U 250 sq. ft. per gal 350 sq. ft. per gal 350 sq. ft. per gal 400 sq. ft. per gal Filling saw cuts and/or construction joints *Trowel dimensions are width x depth x spacing. Coverage is approximate and may vary depending on porosity of substrate and the angle at which the trowel is held. IT IS THE INSTALLER S RESPONSIBILITY TO APPLY THE PROPER AMOUNT OF ADHESIVE FOR THE JOB CONDITION. Do not fill actual expansion joints or other moving joints with elastomeric fillers that are designed to absorb movement in concrete slabs. Cementitious underlayment, patches and resilient flooring installed across true expansion joints will often buckle or crack when the slabs move. Usually architects will specify expansion joint covers for the use with various floor coverings. WARNING: For installation over old resilient floor coverings or when considering removing existing resilient floors, please be advised that these products may possibly contain asbestos fibers or crystalline silica. Please follow all recommended Resilient Floor Covering Institute (RFCI) work practices at www.rfci.com

Cutting: Tiles and planks may be cut with a small tile cutter or scored and snapped. Precautions: Planks/tiles may be walked on immediately; however, the floor should be protected with plywood when moving heavy furniture and appliances back into the room. Start of Installation: The adhesive, floor covering, and area to receive flooring must be maintained at a temperature of 65 to 85 F and at a relative humidity of 30% to 60% for 72 hours before, during, and after installation. Follow the flooring manufacturer s guidelines regarding site conditions and installation. Porous Surfaces: May be used either wet or as a pressure sensitive adhesive over porous surfaces. To use wet, apply adhesive with the recommended trowel and allow to flash off for 5-10 minutes before installing flooring. Lay tile, plank or sheet goods into wet adhesive according to flooring manufacturer's instructions. Adhesive must transfer to floor product to ensure proper bond. To use as a pressure sensitive adhesive, dry to a tacky state and then install flooring according to flooring manufacturer s instructions within 3 hours. Non-Porous Surfaces Tile & Plank: Apply with the recommended trowel, allow to dry completely from yellow to tan, and lay in the tile or plank according to the flooring manufacturers instructions within 3 hours. The highly aggressive pressure sensitive grip prevents slippage and minimizes seam gaps. Drying time is 45-90 minutes and will vary depending on temperature and humidity. Installation over areas of incomplete drying can result in job failure. Please note: If our HF225 Primer or HF9100 Transitional Adhesive is not used, then the warranty is voided. DO NOT use a damp cloth or damp mop on the new flooring for at least 14 days after the installation. This will allow planks/tiles to become seated in the adhesive and prevent excess moisture from interfering with the adhesive bond.