Installation Instructions SE-Serie

Similar documents
INSTALLATION MANUAL IN-GROUND

WARNING- THIS EQUIPMENT IS DESIGNED FOR ADULTS ONLY. ONLY HEALTHY PEOPLE AGES 13 AND UP SHOULD USE THE EQUIPMENT.

A Assembly instructions Maxi Cheops pyramid (registered design) Art B to set into concrete

SPECIFICATION FOR TUBULAR STEEL LIGHTING COLUMN. Reference is made in this Specification to the following:

Installation instructions. LORO-ATTIKASTAR siphonic drains

PSI Compakt Seals and Wall Sleeves with Fixed / Loose Flange

PRODUCT INFORMATION Dero Hoop Rack

Installation Instructions Easy Climb 1 Art

Assembly and users manual. Pallet racking Alfa

Smarter. Safer. Leaner.

Assembly instructions Fortuna Play Course Art part

Huck Seiltechnik GmbH Aßlar/Berghausen Germany

M501A ATTENTION! For outdoor use only Only for domestic use For children aged 3 to 12 years. Child's weight maximum 30 kg INSTALLATION INSTRUCTIONS

Conergy SolarFamulus II

Customer Support: (03)

Assembly instructions Mini Cheops Pyramid Art B to set into concrete

Foundation Frame RF-01

American Metal Specialties, Inc.

ASSEMBLY AND OPERATING MANUAL LTW SLIDE RAIL SYSTEM - Type PV

Cantilever Racking The ideal storage solution for oversized long goods

METAL & DUAL SEATED PISTON VALVES

ASSEMBLY ADVICE SAFETY ADVICE

INSTRUCTIONS FOR THE ASSEMBLY AND INSTALLATION OF THE VORTOX LIQUID SAMPLER

Instructions for 12 IGT system

Mounting instructions for Fitness bike

Rolling Towers. Layher Uni Light Tower Instructions for Assembly and Use. Mobile working platforms according to DIN EN 1004:

TECHNICAL MANUAL. PC Beam Shoe. Hidden Beam Shoe for Corbel System

Instruction Manual TWISTLOCK SAND VOLLEYBALL SOCKETS SVB23/SVB27

VESSEL & REACTOR VALVES. VR Series RISING DISC PROCESS VALVES. Sold by: G&W Industrial Sales

ifix INSTALLATION MANUAL PV flat roof installation system Version

FPM115MF ( <02>)

VERsacourt LED Light System Installation Instructions

FIXTURE CARRIERS TABLE OF CONTENTS S-WD-FC

ROAD CLOSURE GATE PLAN ESTIMATED QUANTITIES CONCRETE FOOTINGS FOR S. D. DEPT. OF TRANSPORTATION DECEMBER 1996 ELEVATION CABLE TIE DOWN FOOTING

ROOF MOUNT KIT OWNERS MANUAL

CANTILEVER IPE

Stainless steel. 1.6 Stainless steel IP 69 K. Premium Panel, protection category IP 69K

M505 ATTENTION! For outdoor use only Only for domestic use For children aged 3 to 12 years. Child's weight maximum 30 kg INSTALLATION INSTRUCTIONS

Installation Instructions Birds Nest Tower Art

Economic concrete distribution with stationary booms

Walraven Rooftop Solutions

Walraven Rooftop Solutions

D D TYPE A1, A2 & B MICHIGAN DEPARTMENT OF TRANSPORTATION 5-40 CONNECTION. L4" x 4" x 3/8" Brace. C8 x 4.25 Strut. WT9 x 17.5.

PC Beam Shoe. Corbel system to support beams. Technical Manual. Version: DK 4/2012 Design standard: DS EN Eurocodes + NA (Denmark)

SECTION VIBRATION CONTROLS FOR PLUMBING PIPING AND EQUIPMENT

RAPID Column Formwork For the highest requirements on concrete surfaces and edge formation. Product Brochure Issue 10/2017

CANTILEVER RACK SPECIFICATIONS PART 1 GENERAL 1.1 SCOPE 1.2 APPROVED MANUFACTURER 1.3 REGULATORY ORGANIZATIONS AND GROUPS 1.4 QUALITY ASSURANCE

SECTION HANDRAILS AND RAILINGS. A. Section Metal Fabrications: Associated metal supports.

INNOVATIVE SLOPE STABILISATION BY USING ISCHEBECK TITAN SOIL NAILS

PSG, TSG, SGS, SR Corrosion-resistant PFA and PTFE lining Indication of flow even at very low flow rates Optionally with integrated check valve

H 12 Heavy Duty Modern Tripod 8 Seat Swing Heavy Duty Hangers

Insulation boards PhoneStar

ASSEMBLY AND OPERATING MANUAL LTW EG CORNER - MANHOLE

Guide Specification. Dayton Superior, plastic and elastomeric architectural form liners. Select paragraphs below applicable to project.

Walraven Support System

SPECIFICATION SS-20 / 4 STEEL STRUCTURES FOR SUBSTATION AND SWITCHING STATION MATERIAL

ROOF MOUNT KIT OWNERS MANUAL

LEADING IN WELDING SAFETY CATALOGUE 2014 CONSTRUCTION. Version 14/01

Highways Square Trolley Pole. HSTP Range. Sales Direct: +44 (0) w: e: Highways Square Trolley Pole

SERIES SURGICAL LIGHTS

MODEL # MSC-4120-BM. Spring Breeze with Me and My Toddler Metal Swing Chair OWNER S MANUAL

RHA100 Sandite Applicator

Instructions for 12 and 15 IGT systems (12 pictured)

Made in U.S.A. Wave Style Bike Rack Submittal Sheet. Materials: 1.5 Schedule 40 Steel Pipe (1.

Cantilevered Rail System

Nexus Under Dispenser Containment System. Installation Instructions

Instructions for the use of the Link 4 Pallet Rack Lifter (PRL) model 5000

Building permits are not required for patios made of concrete or pavers on grade.

VESSEL & REACTOR VALVES. VD Series DISC VALVES PROCESS VALVES

Flat roof for the loading-optimized elevation (adhesive system)

PROVEN 15/TM1500 FOUNDATION INSTRUCTIONS

Safety Ladders: Made of Aluminium

Model # 338SM-OP. 9/30/2011 Page 1 of 12

SERIES SURGICAL LIGHTS

DOC NO. ISSUE Page Date. GVTG of LARGE COLUMN ASSEMBLY & INSTALLATION DIAGRAM GENERAL

Equipment for Engineering Education

A EN ROUND STORAGE SILO. Ø480cm, Ø560cm, Ø640cm, Ø720cm ASSEMBLY AND USER MANUAL. ARSKAMETALLI LTD

Mounting instructions for Multifunctional trainer wood


W E I N S P I R E W O R K

R E CYC L E RAC K. Green By Design

tracks for building maintenance units (BMU)

MAXIMO MXH Heated Formwork The cost-effective solution for concreting operations at low temperatures. Product brochure

HELIOSTAR 252, 218 HORIZONTAL, FREE INSTALLATION

SAS Micropile Manual. Basic dimensioning and design recommendations. Table of Content:

MODEL SPECIFICATIONS: Hydraulically Driven Steel Underpinning Pile Specifications

.1 ANSI/ASME B31.1, Power Piping, (SI Edition)..2 American Society for Testing and Materials (ASTM)

International GmbH ALUPURA

IMPORTANT. Use of safety surfacing (wood mulch) in compliance with ASTM specification F1292 is required. WARNING

PERI PD 8 The cost-effective shoring for slab tables and high loads

FITNESS PLAYGROUND ITEM NO: 8010

TECHNICAL MANUAL. PCs Corbel Hidden Corbel for Supporting Beams

Tactile Pad Installation Guide. All Surfaces.

Coating Specifications

SECTION METAL EQUIPMENT LOCKERS

Model # 800SM-PS3. 8/3/2016 Page 1 of 8

Modular Simplicity Dero

Distriubted by Material Storage Systems, Inc CANTILEVER. Distriubted by Material Storage Systems, Inc

Heartland Perma-Column 1841 E 1450 Rd. Lawrence, KS (785)

Made in U.S.A. Moai Bike Rack Submittal Sheet. Materials: Finishes: Mount Options: Capacity: Setbacks: 2 Bikes

Transcription:

SE 01-Twister SE 02-Twister & Stepper SE 03-Bike & Trapezius SE 04-Jump Tower SE 05-Arm Rotation SE 06-Balance Seat SE 07-Track Tracer SE 08-Roman Chair & Hyperextension SE 09-Double Airwalker SE 10-Airwalker System SE 11-One Arm Rotation SAYSU GmbH Outdoor Fitness Equipment Weitzesweg 16 A 61118 Bad Vilbel/ Germany Tel.: 0049 (0) 6101 802 707-0 Fax: 0049 (0) 6101 802 707-30 E-Mail: Web: info@saysu.de www.saysu.de 1

Underground Before the installation you have to decide on which underground the equipment will be installed. Possible undergrounds are (more precisely defined in DIN 1176-1.2008; table F.1): Concrete/stone Bitumen Top soil lawn shock absorbing underground according to DIN EN 1177 Loose material only for equipment with longer posts (on request): o Sand o Gravel o Mulch o Wood chips Unit According to DIN 1176-1 table F.1 SE 01-Twister SE 02-Twister & Stepper Drop height <0,6m (<1,0m)** Concrete/ stone/ bitumen Only when underground installation Top soil/ lawn Shock absorbing underground (according to drop height) Loose material* + + - <0,6m + + + - SE 03-Bike & Trapezius <1,0m - + + - SE 04-Jump Tower <0,6m + + + We advise against using sand SE 05-Arm Rotation <0,6m + + + - SE 06-Balance Seat <0,6m + + + - SE 07-Track Tracer <0,6m + + + - SE 08-Roman Chair & Hyperextension <0,6m + + + - SE 09-Double Airwalker <0,6m + + + - SE 10-Airwalker <0,6m + + + - SE 11-One Arm Rotation <0,6m + + + - * Upon request we can manufacture adjusted equipment for use with loose material, we advise against the use of sand or coarse gravel ** drop height <0,6m when underground installation; drop height >1m when above-ground installation 2

Under-ground installation with loose material If you use loose material like sand, gravel, mulch or wood chips, then you have to built the foundation 200mm below ground level and bevel the foundation around the mounting plate (see page 4). After installation, the anchoring will be filled up to ground level with the filling material. Then only the main column of the equipment rises out of the ground. The top ends of the screws have to be carried out in compliance with DIN EN 1176-1:2008 (D) 4.2.5. Under-ground installation with other underground For underground installation the foundation is created 60mm below ground level and the anchoring will be filled up to the ground level (see mark on main column) with the filling material. Then only the main column of the equipment rises out of the ground. The top ends of the screws have to be carried out in compliance with DIN EN 1176-1:2008 (D) 4.2.5. Above-ground installation Not possible when using loose material. For above-ground installation the foundation is created at ground level. In this case the anchoring should be covered with the plastic foundation covering (soon available!). The top ends of the screws have to be carried out in compliance with DIN EN 1176-1:2008 (D) 4.2.5. Concrete, stone or bitumen undergrounds are NOT licit with units that have a drop height of >60cm (see DIN EN 1176-1). This concerns the units SE 01-Twister and SE 03-Bike & Trapezius. Foundation system 1 or 2 The following overview shows you, which of the foundation system is used for which units: units SE 01-03, SE 05-06, SE 08-09, SE 11: foundation system 1 continue on page 5 unit SE 04: foundation system 2 continue on page 6 unit SE 07, SE 10: foundation system 3 continue on page 8 3

Beveling of the foundation with loose filling material To avoid edges of the foundation looking out of the covering, it is required to bevel the foundation along the mounting plate on all sides as shown in figure (a) (see DIN EN 1176-1). Figure (a)applicable only when loose filling material is used! Beveling of the foundation in case of above- ground installation with loose material Ground level R=100mm 200mm 400mm 45 4

Foundation system 1 SE 01-Twister SE 02-Twister & Stepper SE 03-Bike & Trapezius SE 05-Arm Rotation SE 06-Balance Seat SE 08-Roman Chair & Hyperextension SE 09-Double Airwalker SE 11-One Arm Rotation 1. Dig a hole for the foundation as shown in figure (b), with the minimum dimensions of (l) 700mm, (w) 700mm, (h) 1000mm. 2. Position the foundation anchor in the hole as shown in figures (b) and (d). 3. Ready-made C25 concrete should be used. Approximately 0,49m³ concrete is needed for every hole. 4. Fill the hole with concrete up to in the case of underground installation: 60mm under ground level. In the case of underground installation with loose filling material: 200mm under ground level, and bevel the concrete foundation according to figure (a). in the case of above-ground installation up to ground level. Figure (b) Equipment fixing bolt Mounting plate 1000mm Foundation anchor concrete foundation hole min. dimensions (l) 700mm, (w) 700mm, (h) 1000mm 700mm 700mm Please note The size of the hole fort he foundation is depending on the consistency oft he ground. The dimensions mentioned above are applicable for normal conditions with firm ground. If the ground is extremely soft, a much bigger foundation is needed. Use only appropriate material and follow the installation instructions closely!!! Next: positioning the foundation anchor continue on page 7 5

Foundation system 2 SE 04-Jump Tower 1. Dig a hole for the foundation as shown in figure (c), with the minimum dimensions of (l) 800mm, (w) 800mm, (h) 1000mm. 2. Position the foundation anchor in the hole as shown in figures (c) and (d). 3. Ready-made C25 concrete should be used. Approximately 0,64m³ concrete is needed for every hole. 4. Fill the hole with concrete up to in the case of underground installation: 60mm under ground level. In the case of underground installation with loose filling material: 200mm under ground level, and bevel the concrete foundation according to figure (a). in the case of above-ground installation up to ground level. Figure (c) Equipment fixing bolt Mounting plate 1000mm Foundation anchor concrete foundation hole min. dimensions (l) 800mm, (w) 800mm, (h) 1000mm 800mm 800mm Please note The size of the hole fort he foundation is depending on the consistency oft he ground. The dimensions mentioned above are applicable for normal conditions with firm ground. If the ground is extremely soft, a much bigger foundation is needed. Use only appropriate material and follow the installation instructions closely!!! Next: positioning the foundation anchor continue on page 7 6

Positioning the foundation anchor The foundation anchor included in the delivery should be positioned in the concrete as shown in figure (d). The equipment fixing bolts have to be above the concrete. Avoid concrete remaining on the mounting plate or the equipment fixing bolts. The parts of the foundation anchor rising out of the concrete must stay free from any soiling. In order to ensure an exact upright position of the main column after the installation, the mounting plate of the foundation anchor has to be adjusted absolutely horizontally by using a level while concrete casting. Figure (d) Equipment fixing bolt ground level resp. -60mm and -200mm (loose material) foundation anchor concrete Next: equipment installation continue on page 10 Foundation system 3 7

Installation Instructions SESE- SE 07-Track Tracer SE 10-Airwalker For these units, a twin anchoring system is used. 1. Dig a hole for the foundation as shown in figure (c), with the minimum dimensions of (l) 2x700mm, (w) 700mm, (h) 1000mm. 00mm. 2. Position the foundation anchor in the hole as shown in figures (e) and (f).. 3. Ready-made C25 5 concrete should be used. Approximately 0,49m³ concrete is needed for every hole. hole 4. Fill ill the hole with concrete up to in n the case of underground installation: installation 60mm under ground level. In the case of underground installation with loose filling material: 200mm under ground level, and bevel the concrete foundation according to figure (a). in the case of above-ground ground installation i up to ground level. Figure (e) SE 07: 1736mm 1736 SE 10: 986mm 986 Mounting plate 1000 mm Equipment fixing bolt Foundation anchor concrete foundation hole min. dimensions (l) 2x700mm, mm, (w) 700mm, (h) 1000mm min. 700mm Please note min. 700mm 700mm The size of the hole for the he foundation is depending on the consistency oft he ground. The dimensions mentioned above are applicable for normal conditions with firm ground. If the ground is extremely soft, a much bigger foundation is needed. Use only appropriate material and follow the installation instructions closely!!! closely!! Next: positioning the foundation anchor continue on page 9 8

Positioning of the foundation anchor The foundation anchor and distance piece included in the delivery should be positioned in the concrete as shown in figure (f). The equipment fixing bolts have to be above the concrete. Avoid concrete remaining on the mounting plates or the equipment fixing bolts. The parts of the foundation anchor rising out of the concrete must stay free from any soiling. In order to ensure an exact upright position of the main columns after the installation, the mounting plates of the foundation anchor have to be adjusted absolutely horizontally by using a level while concrete casting. Figure (f) SE 07: 1736mm SE 10: 986mm Equipment fixing bolt ground level resp. -60mm and -200mm (loose material) foundation anchor concrete min. 700mm min. 700mm The foundation can be carried out as two separate foundation blocks or one countinous block. Next: equipment installation continue on page 10 9

Mounting of equipment Before mounting the totally assembled delivered equipment to the foundation, it has to be assured the concrete has dried completely. The drying time is changing depending on the weather conditions. The drying time of concrete at normal weather conditions is approximately 15 days. After the concrete has dried, the respective equipment can be mounted on the foundation anchor by screwing the included nuts onto the equipment fixing bolts as shown in figure (g). Take care there are no foreign particles or any soiling between the equipment and the foundation anchor, so the fixing plate of the equipment is flush to the mounting plate of the foundation anchor. To avoid dismounting of the equipment by unauthorised persons, the nuts can be welded to the equipment fixing bolts. Figure (g) equipment nut, washer, nut mounting plate equipment screw thread Filling material: e.g. lawn, shock absorbing material, etc. Max. 60mm from top of flange Figure (h) Cover the anchoring with filling material or the plastic foundation covering after mounting the equipment (see figure(h)). Please regard the regulations of DIN EN 1176 and EN 1177 if applicable. Stand Juni 2011 10