John H. Kerr Dam and Reservoir Virginia and North Carolina (Section 216)

Similar documents
Current Water Management Practices for Kerr Reservoir

16 September Water Management Wilmington District. US Army Corps of Engineers BUILDING STRONG

Does Water Resources Management in the Snake River Basin Matter for the Lower Columbia River? Or Is the Snake River Part of Another Watershed?

Exploring the Possibilities At Prado Dam

DES MOINES RIVER RESERVOIRS WATER CONTROL PLAN UPDATES IOWA ASCE WATER RESOURCES DESIGN CONFERENCE

An Investigation into the 2012 drought on Apalachicola River. Steve Leitman, Bill Pine and Greg Kiker

Cedar River Watershed Habitat Conservation Plan

Reservoir Drought Operations

NC Water Resources Planning April 4, Tom Fransen. North Carolina Division of Water Resources 1

WATER CONTROL PLAN FOR JOHN H. KERR DAM AND RESERVOIR REVISED JUNE 2016

Columbia River Operations

Wapato Access Feasibility Study

NON-TREATY STORAGE AGREEMENT JIM GASPARD

2017 Lake Hartwell Association

An Introduction to Environmental Flows

olumbia River Treaty The Columbia by Steve Oliver, Vice President, Generation Asset Management, Bonneville Power Administration 16 Oct

Cokato Lake (86-263) Wright County. Hydrologic Investigation

Assessment of Agricultural Flood Damages Along the James River in South Dakota

Missouri River Basin Water Management

US Columbia Operations Overview. Columbia Basin Advisory Committee

Draft Application for New License for Major Water Power Project Existing Dam

PEACE RIVER MANASOTA REGIONAL WATER SUPPLY AUTHORITY BOARD OF DIRECTORS MEETING December 5, 2018 ROUTINE STATUS REPORTS ITEM 1

Water Supply Reallocation Workshop

Water Supply Board Briefing. Water Operations Department March 22, 2016

Missouri River Basin Water Management Spring 2013 Public Meetings

Columbia Basin Operations and Flood Risk Management

Welcome STEP 1: STEP 2: STEP 3:

Warm Springs Hydro LLC 5203 South 11 th East Idaho Falls, ID

CRT Operations in Low Water Conditions

FERC Relicensing of Hawks Nest Project (FERC NO. 2512) Glen Ferris Project (FERC NO )

NON-TREATY STORAGE AGREEMENT

Missouri River Basin Water Management

Chapter VII. Falls Lake Project -- Water Control Plan

The Impacts of Climate Change on Portland s Water Supply

IOP Concept 5 Forecast 03 Apr 2007 to 31 Dec COE HEC-5 Simulation of IOP using hydrologic conditions of 2000 and 2001

Spokane Valley-Rathdrum Prairie Aquifer Storage and Recovery for Summer Flow Augmentation

BAKER RIVER PROJECT DRAFT WATER QUALITY MONITORING PLAN

Lake Okeechobee Operations and Blue-Green Algae Update

Lower Columbia River Pile Dike Assessment

Columbia River Treaty the setting

Maintaining Water Supply Resilience in Extreme Times

Folsom Dam Water Control Manual Update

Electric Forward Market Report

Management Objectives and Targets

WATER COMPLIANCE REPORT

DEAD RIVER DEAD RIVER HYDROELECTRIC PROJECT (P-10855)

2014/2024 Review Columbia River Treaty

July 31, 2012

Folsom Dam Water Control Manual Update

CENTRAL ASSINIBOINE INTEGRATED WATERSHED MANAGEMENT PLAN SURFACE WATER HYDROLOGY REPORT

San Antonio Water System Mitchell Lake Constructed Wetlands Below the Dam Preliminary Hydrologic Analysis

Camp Far West Hydroelectric Project Relicensing

Introducing the WBG Guidelines for selecting EFlow assessment methods. Cate Brown

Modernizing the Columbia River Treaty D.R. Michel, Executive Director, Upper Columbia United Tribes Jim Heffernan, Policy Analyst, Columbia River

For Bandon Utilities Commission

Glades Reservoir Environmental Impact Statement (EIS)

WaterNSW Water Operations Report. Murray-Lower Darling November 2017

Forecast Informed Reservoir Operations for Groundwater Recharge Prado Dam

WATER COMPLIANCE REPORT

Spring Forecast Based Operations, Folsom Dam, California

BC Hydro Generation system operation Columbia Basin Regional Advisory Committee

Yolo Bypass Salmonid Habitat Restoration & Fish Passage

ROGUE BASIN PROJECT CONSERVATION RELEASE SEASON OPERATING PLAN WATER YEAR 2018

Hetch Hetchy Water and Power

Hood River Basin Study

Appendix I: Fixed-400,000 af Flood Storage Operation

Keeyask Generation Project. Public Involvement. Supporting Volume. Environmental Impact Statement

Relicensing Study 3.8.1

ONTONAGON RIVER BOND FALLS HYDROELECTRIC PROJECT (P-1864)

Hydrology and Water Management in the upper Snake River Basin:

Intro to sustainable hydropower and environmental flows

Englishman River Program Status Update Prepared For: Drinking Water and Watershed Protection Technical Advisory Committee February 14, 2012

EXHIBIT E ENVIRONMENTAL REPORT. Klamath Hydroelectric Project (FERC Project No. 2082) Water Use and Quality. PacifiCorp Portland, Oregon

Water Planning and Stewardship Committee Item 6a February 8, 2016

2003 ANNUAL REPORT on INTERBASIN TRANSFERS For RTP South and the Towns of Cary, Apex, and Morrisville

INTERNATIONAL JOINT COMMISSION. Supplementary Order

AGENDA. DECEMBER 15, :30 PM Conference Room A. 1. Water Production, Groundwater Levels, and Lake Level Projections

MISSOURI RIVER BASIN WATER MANAGEMENT SPRING 2018 PUBLIC MEETINGS

Irrigation modeling in Prairie Ronde Township, Kalamazoo County. SW Michigan Water Resources Council meeting May 15, 2012

Columbia River Treaty 2014/2024 Review U.S. Army Corps of Engineers Bonneville Power Administration Review

Wood Canyon Emergent Wetland Project. City of Aliso Viejo 12 Journey, Suite 100 Aliso Viejo, CA 92656

Hood River Basin Study

Sustaining Colorado s Watersheds: Making the Water Quality Connections October 2-4, 2007

Summary of Flow and Water Quality Conditions Willamette Basin Science Review February 4-6, 2014

Impacts of Permit-Exempt Wells

Instream Flows in the San Antonio River Basin From Science to Environmental flow Standards. Steven J. Raabe, P.E

Los Angeles 3 rd Regional

Lower Tuolumne River Water Temperature Modeling Final Study Plan

SURFACE WATER WITHDRAWALS & LOW FLOW PROTECTION POLICY MICHAEL COLLEGE, P.E. SUSQUEHANNA RIVER BASIN COMMISSION

OSAGE RIVER BASIN OPERATIONS WATER MANAGEMENT

Temporary Use of Sediment Pool for Emergency Water Supply at Falls Lake

Solar, Wind and Market Power in the New Zealand Electricity Market (and hydro lake dynamics) Mina Bahrami Gholami and Stephen Poletti

Chakachamna Hydro. AEA Geothermal Conference

ACF STAKEHOLDERS: OVERVIEW AND PANEL DISCUSSION. Georgia Environmental Conference Savannah, GA August 2012

Available Yield from Reallocation in Federal Reservoirs Excluding Lake Aquilla. The USACE study evaluated four alternatives for each reservoir:

RESERVOIR YIELD : AN IMPORTANT ENVIRONMENTAL PARAMETER'

Monitoring Networks for Assessing Small Stream Hydropower Potential, Cosmos Hills, Alaska

Low Inflow Protocol for the Yadkin & Yadkin-Pee Dee River Hydroelectric Projects

Missouri River Basin Water Management

Water Operations 101. Jerry Johns and John Leahigh Department of Water Resources BDCP Steering Committee 5/8/09

Transcription:

John H. Kerr Dam and Reservoir Virginia and North Carolina (Section 216) Wilmington District, Corps of Engineers Stakeholder Update Presentation January 24, 2014 Authorized under Section 216 of Public Law 91-611, the River and Harbor and Flood Control Act of 1970, as amended. Non-federal Sponsors are the State of NC and Commonwealth of VA US Army Corps of Engineers

Lower Roanoke River Basin Land Use and Benefit Reaches Kerr Dam Potential Benefit Reach ~ 6 miles, ~500 acres in-stream Lower Roanoke River Potential Benefit Reach ~ 100 miles, ~91,500 floodplain acres 2

Measures Initially Analyzed 13 measures initially considered screened down to 5 for detailed analysis. Improve Lower Roanoke River Ecosystem. Evaluated Entire Ecosystem (35,000 CFS Footprint) by Environmental Benefits Analysis Model 1 Modify reservoir guide curve (MGC_35K) and more frequent release of 35,000 cfs from January - June. (Note: MGC_35K was formerly known as 6B) 2 MGC_35K Year Round 3 Quasi Run-of-River (QRR): When Kerr Reservoir water level is above guide curve, weekly outflow weekly inflow up to 35,000 cfs Improve DO Downstream of Kerr Dam. (Project in VA, but VA Has Withdrawn from the Study.) 4 Inject oxygen into the hypolimnion upstream of the dam 5 Place a fabric weir upstream of the dam 3

Summary of Costs and Benefits for the Initial Array of Measures Being Evaluated Benefits/Costs/Impacts Fabric Weir Reservoir O 2 Injection MGC_35K MGC_35K yr_rnd QRR Environmental Benefits (AAHU) 254 254-288 -170 1,976 Acres affected 501 501 91,491 91,491 91,491 Recreation Reservoir vs. Existing no change no change nearer guide curve nearer guide curve nearer guide curve Flood Storage vs. Existing no change no change better better better Construction and O&M Cost Initial Construction Costs Only ~ $10 million > $10 million $0 $0 $0 O&M Low High $0 $0 $0 Losses Hydropower (AA$) $0 $0 ~ $2.3 million (2.0%) ~$2.9 million (2.5%) ~$3.8 million (3.3%) Agriculture Impact (AA$)* $0 $0 ~$50,000 ~$200,000 ~$250,000 * about 1,600 acres and 63 landowers 4

Why New Alternative? QRR only alternative with ecological benefit o However neither the State of North Carolina nor the Corps has the authority to acquire impacted agricultural land; o Therefore State of North Carolina does not support QRR unless agricultural impacts resolved. Develop a new alternative with wetter winter & springs and drier summers compared to existing conditions. Also have minimal impacts to agricultural land during growing season. New alternative : QRR_Growing Season Minimum Energy 5

QRR _Growing Season Minimum Energy Elevation (ft-msl) 302.5 302.0 301.5 301.0 300.5 300.0 299.5 299.0 298.5 298.0 297.5 297.0 296.5 296.0 295.5 John H. Kerr Dam and Reservoir Existing Operations, Quasi-Run-of-River (QRR), and QRR with Growing Season Minimum Energy (QRR_GSME) Guide Curves 295.0 1-Jan 1-Feb 1-Mar 1-Apr 1-May 1-Jun 1-Jul 1-Aug 1-Sep 1-Oct 1-Nov 1-Dec Date QRR_GSME Guide Curve QRR Guide Curve Existing Guide Curve Kerr Lake Level (ft-msl) Existing Operations* QRR Year-Round* QRR with Growing Season Minimum Energy (QRR_GSME)* Roanoke Rapids Releases (cfs), year-round Below 300 Up to 8,000 300-312 Up to 20,000 312-315 Up to 25,000 315-320 Up to 35,000 320-321 85% of inflow or up to 35,000, whichever is higher Roanoke Rapids Releases (cfs), year-round Roanoke Rapids Releases (cfs) Above Guide QRR Curve (GC): Outflow ~=Inflow up to December 1 through March 31: Above QRR_GSME Guide Curve 35,000 cfs based on a weekly average inflow. Below GC: (GC): Outflow ~=Inflow up to 35,000 cfs based on a weekly average inflow. Minimum energy (equal or exceeds FERC minimum releases Below GC: Minimum energy (equal or exceeds FERC minimum releases at Roanoke Rapids Dam). Above 320: Existing Operations. at Roanoke Rapids Dam). Above 320: Existing Operations. QRR_GSME GC April 1 through November 30: Below guide curve: Minimum Energy Guide curve to 301.5: Up to 8,000 cfs Above 321 Inflow 301.5-312: Up to 20,000 cfs Above 312: Existing Operations *April 1-June 15, abide by fishery releases, if feasible 6

Summary of Costs and Benefits for the Initial Array of Measures Being Evaluated Benefits/Costs/Impacts Fabric Weir Reservoir O 2 Injection MGC_35K MGC_35K yr_rnd QRR_GSME QRR Environmental Benefits (AAHU) 254 254-288 -170-572** 1,976 Acres affected 501 501 91,491 91,491 91,491 91,491 Recreation Reservoir vs. Existing no change no change nearer guide curve nearer guide curve nearer guide curve nearer guide curve Flood Storage vs. Existing no change no change better better less during summer better Construction and O&M Cost Initial Construction Costs Only ~ $10 million > $10 million $0 $0 $0 $0 O&M Low High $0 $0 $0 $0 Losses Hydropower (AA$) $0 $0 ~ $2.3 million (2.0%) ~$2.9 million (2.5%) ~$3.5 million (3.0%) ~$3.8 million (3.3%) Agriculture Impact (AA$)* $0 $0 ~$50,000 ~$200,000 Similar to Existing ~$250,000 * about 1,600 acres and 63 landowners. ** Greater impacts because area between 20 and 35k cfs discharge flooded less frequently than under existing operations 7

Final Measures and Alternatives MGC_35k, MGC_35k_yr_rnd and QRR_GSME not viable due to decrease in habitat units. QRR is a viable alternative since it has ecological benefits. o However neither the State of North Carolina nor the Corps has the authority to acquire impacted agricultural land; o Therefore State of North Carolina does not support QRR unless agricultural impacts resolved. 8

Path Forward Discussion 9