INSTALLATION MANUAL MULTI DECK HOT MERCHANDISERS MD Versions. Solid back 3 level Pass through 3 level

Similar documents
INSTALLATION MANUAL COLD DELI 3/4/5 MERCHANDISERS

TRS100 Rapid Assay System Pre-Installation Guide

Low-profile, 11U high cabinets hold networking equipment, servers, and phone equipment.

E-Series Installing E-Series U Cabinet

Pre-installation Manual. Plate Processor 68/85 Thermal

V-STACK36 Vertical Stacker

RENA XPS-3000 Base. User Guide. SC2000 Media Transport System

SYSTEM 600 BILL CHANGER INSTALLATION INSTRUCTIONS Congratulations...

Gerber Scientific Products

Model BF 260 Incubators Avantgarde.Line with forced convection

ALUMAX. High Amperage Power Solutions

Installation plan. Washer-extractor PW 6107 EL. en - GB M.-Nr / 01

Model BF 56 Standard-Incubators with forced convection

Professional Weighing Equipment. K-Series Scales. Operation Manual KHR 6000 KHR 123 KHR 502 KHR 3001

RapID Raw Materials Verification System

Automatic Key Cutting MachineCONDOR XC-MINI CONDOR. Automatic Key Cutting Machine XC-MINI. User Manual

Model: 770 Light Vehicle Scale Size: 8 x30 x5 Size: 10 x30 x5 Capacity: 40K CLC: 20K Capacity: 60K CLC:30K Installation, Set-Up and Operation Manual

Installation plan. Tumble dryer. PT 8807 EL (Electrically heated) en - US Mat. NR / 02

Model FD 115 Drying and heating chambers Avantgarde.Line with forced convection

AirBench EX Operation and Maintenance

Installation recommendations. Washer-extractor PW 6080 EL AV/LP. en - GB Mat. no / 01

TeraFrame HD Cabinet System Supplemental Installation Guide

INDeX Rack Installation Notes

31-SDMS-03 REV. 01 SPECIFICATIONS FOR

! CAUTION: Read and follow these instructions.

DJ Switch 10F V2 ORDERCODE 50365

Gerber. Scientific Products. Dear Gerber Sabre Customer:

Pre-Installation Guide

Agilent Technologies 7620-AS Sample Changer Site Preparation Checklist Hardware Site Preparation Specification

THE AGRIPO SYSTEM... 3 HOW DOES IT WORK?... 4 INFORMATION AND ORDERING... 5

ENERGY-DISTRIBUTION. TwinLine N 44 The new system of floor-standing cabinets in IP44

Model: LoLander Series Truck Scale Model: LL FT Model: LL FT Installation, Set-Up and Operation Manual

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF POWER SUPPLY EQUIPMENT

MODEL VCR-RK-1 RACK-MOUNT

Saphyr System Safety Guide for Saphyr P/N 60325

LOW PROFILE FLOOR SCALE

Thank you for purchasing the SC-CONVERSION System 500/600 Conversion Kit. This Kit is available in two different versions:

Display Cabinet. Model DC-14R owner s manual. Manufacturing Numbers: P/N Rev. A 12/16

Instructions for the use of the Link 4 Pallet Rack Lifter (PRL) model 5000

INSULATION GUARD MEG (Code ) INSTRUCTION MANUAL ( M / 99A ) (c) CIRCUTOR S.A.

Model # 338S-PR. 5/1/2014 Page 1 of 12

Connectors. Multi-purpose connecting clamps. Stainless steel cross connectors

Operating Instructions April 2010 milltronics WD600

Installation Manual. Retractable Ceiling Column Models 8301 & 8301PC

MODEL GEK E3 Guard Enclosure Kit. Operator s Manual for Morse Guard Enclosure Kit Model GEK E3 for Can Tumbler Model E3

MODEL GEK E1 Guard Enclosure Kit. Operator s Manual for Morse Guard Enclosure Kit Model GEK E1 for Can Tumbler Model E1

Protective Capony RTC-16

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

Automatic Key Cutting Machine - CONDOR XC-007 CONDOR. Automatic Key Cutting Machine XC-007. User Manual V1.2

Model KB 23 Cooling incubators with compressor technology

Model KB 720 Cooling incubators with compressor technology

MODEL LMO-P MINI PROOFER INSTALLATION, OPERATION & MAINTENANCE MANUAL RETAIN THIS MANUAL FOR FUTURE REFERENCE

Model KMF 115 Constant climate chambers with expanded temperature / humidity range

Installation and Operation Manual

Operation Manual. Professional Weighing Equipment. MRB Series Mid Resolution Balances. MRB 500g MRB 1200g MRB 2500g MRB 6000g MRB 10000g

LEADING IN WELDING SAFETY CATALOGUE 2014 CONSTRUCTION. Version 14/01

Model KT 115 Cooling incubators with thermoelectric cooling

Pre-installation Manual CONCEPT 301 D/401 D/501 D

FFTR1821QB6A FFTR1821QM6A FFTR1821QS6A FFTR1821QW6A

A. Provide a complete Distribution Panelboard system as indicated on the drawings, and as specified herein.

CT-20 Conveyor Stacker

FORM HEADWALL. FORM HEADWALL (floor mount) (floor mount) Installation Manual

XN24 for Package Production. Site Preparation Guide XN24

MATERIAL SPECIFICATION FOR UNINTERRUPTIBLE POWER SUPPLY SYSTEMS FOR LED TRAFFIC SIGNALS

BakeMax Dough Mini Moulder BMMDM02

nual k Excella E-1 Open Air Shaker N) manual New Brunswick Excella E-1 Open Air Shaker Operating manual

XAP Series Busduct Storage, Installation, and Maintenance

Installation. Natrix

Calibrate Accessory Actuators Instructions

T. SUNDUPALLI BRANCH (04427)

S-5 Bulk Filler System

USER S MANUAL release 2.0

MANUAL. ENGLISH Antenna Booster Ordercode: D1425. Highlite International B.V. Vestastraat EX Kerkrade the Netherlands

09/04 Rev MANUAL Jumbo Stacker. Setup, Service

Environmental simulation chamber for cyclical temperature

1995 Metric CSJ SPECIAL SPECIFICATION ITEM Fiber Optic Dynamic Lane Control Sign

Laboratory Refrigerator Model: ,-01,-02,-03,-04,-05,-06,-07,-08, -09,-10,-11,-12,-13,-14

1675 Locust Street Red Bud, IL Phone: Fax: WARRANTY & TERMS

REPTILE 66-4 FREEDOM BREEDER

SECTION Manufactured Metal Casework FLEXIBLE LABORATORY FURNITURE SYSTEM (OPTIMA) USA VERSION

Model # 338S-OP. 9/30/2011 Page 1 of 13

UNDERGROUND SERVICES (RESIDENTIAL) SINGLE FAMILY RESIDENTIAL, DUPLEXES, OR TOWNHOUSES

Model # 338SM-OP. 9/30/2011 Page 1 of 12

Model # 338S-P. 7/31/2012 Page 1 of 13

SUPPLY NETWORK ANALYZER CVM-SP SERIES INSTRUCTION MANUAL ( M / 01A

Manufacturer of Coolers, Freezers, Step-Ins, Refrigeration Trailers and Sliding Doors COOLER AND FREEZER INSTALLATION MANUAL

42U SmartRack White Standard-Depth Rack Enclosure Cabinet with doors, side panels & shock pallet packaging

DRYWALL DOLLY 900 LB. CAPACITY

Better by being quick to translate market trends into products. In this way, our innovative strength helps you to secure competitive advantages.

MAN488 Issue 3 WBS/FBS MAINTENANCE BYPASSES AUTOMATIC VERSION

Model # 338S-RDP. 7/31/2012 Page 1 of 13

Installation of Vacuklav 24-B. 1 General features. Figure 1

ASSEMBLY & USER INSTRUCTIONS - UBETRACK MOBILE STORAGE SYSTEM

FORM FOOTWALL. FORM FOOTWALL (floating) (floating) Installation Manual

RUBBER BANDS 500 USER'S MANUAL. IGS Audio Igor Sobczyk 3 Maja 76d, Mysłowice, Poland ph:

OPERATOR S MANUAL Model 56A Prefeed / Dereeler

VARIO XX28 Stainless Steel Time And Temperature Controlled Electric Model

INSTALLATION MANUAL RECTANGULAR COLUMN

Innovations 2017 Workspace furnishings

Computer Room Floor Grille

Transcription:

INSTALLATION MANUAL MULTI DECK HOT MERCHANDISERS MD 60-100 - 120 Versions Solid back 3 level Pass through 3 level MD 60-3 solid back MD 100-3 pass through - NOTICE - This manual is prepared for the use of trained Service Technicians and should not be used by those not properly qualified. If you have attended a trianing for this product, you may be qualified to perform all the procedures in this manual. This manual is not intended to be all encompassing. If you have not attended a training for this product, you should read, in its entirety, the repair procedure you wish to performto determine if you have the necessary tools, instruments and skills required to perform the procedure. Procedures for which you do not have the necessary tools, instruments and skills should be performed by a trained technician. Reproduction or other use of this Manual, without the express written consent of Fri-Jado, is prohibited. WWW.FRIJADO.COM

EMPTY PAGE Page 2

Index Index... 3 General technical data... 4 Unpacking... 5 Unpacking MD 60-100 - 120... 5 Installation... 8 Location... 8 Installation... 8 General... 8 Casters... 9 Thermometer (9229800)... 9 Before first use... 9 Instructions for operators... 9 Placing and connecting... 10 Multi Deck 60-3 level... 10 Multi Deck 100-3 level... 11 Multi Deck 120-3 level... 12 Page 3

GENERAL TECHNICAL DATA General technical data This manual covers the Multi Deck 60-100-120 Hot 3 level series Merchandiser cabinets. The cabinets come in 3 sizes: 60, 100 and 120 centimeter. Multi Deck 60-3 level - Merchandiser 600 mm wide. Multi Deck 100-3 level - Merchandiser 1000 mm wide. Multi Deck 120-3 level - Merchandiser 1200 mm wide. All of the information, illustrations and specifications contained in this manual are based on the latest product information available at the time of printing. Type MD 60-3 MD 100-3 MD 120-3 Power (W) 2400 3500 4300 Fuses needed with power connection 230V, 1N ~ 50Hz ( 1 phase with zero ) 1x 16 A 1x 16 A _ Fuses needed with power connection _ 400V, 3N ~ 50Hz ( 3 phases with zero ) 3x 16 A 3x 16 A Standard plug from factory single pole Two-pole earthed plug 16 A Standard plug from factory 5- pole Acc IEC309 and CEE-form Technical Data _ 16 A 3P+N+E 16 A 3P+N+E Net weight (kg) 155 200 215 Gross weight (kg) 182 235 253 Height (mm) 1420 1420 1420 Width (mm) 600 1000 1200 Depth (mm) 800 800 800 Tools Standard set of tools. Metric wrenches, sockets and hex socket key wrenches. Multi-meter and AC current clamp meter. Insulation value tester (Megger) Temperature tester. Page 4 Service Manual Multi Deck 60/100/120-3 level form 9123792 rev.11/2009

INSTALLATION Unpacking Unpacking of the unit. Put the unit on his location. Unpack and install all separately packed parts. Remove all vinyl protection. Check if there is enough free space around the unit. Check the electrical supply. Check all settings and make a test run with all functions switched on. Give instructions to the operator. Unpacking MD 60-100 - 120 and removing from pallet NOTE: Perform this action safely with two people Remove the crate from the unit by taking of the following parts: 1: top. 2+3: front and back. 4: sides. Follow the instructions as given in the next pages. After the unit is unpacked, you can apply the bottom plinth as shown in the pictures on the separate instruction sheet. Read the instructions before proceeding. Page 5

INSTALLATION B Unit after removal of the crate. A Carefully roll the unit from the pallet. Remove the lockup beam on the back of the unit. Page 6

INSTALLATION C Remove transport safety from the shelves (4x). Remove protective cover of stainless steel shelves, bottom and skirts. D Page 7

INSTALLATION Installation Immediately after unpacking the merchandiser, check for possible shipping damage. If the merchandiser is found to be damaged, save the packaging material and contact the carrier within 15 days of delivery. Prior to installation, test the electrical service to assure that it agrees with the specifications on the machine data plate located on the right side panel near the controls. Location The merchandiser must be installed on a level surface. The installation location must allow adequate clearances for servicing and proper operation. Installation The connecting cable for the unit must be equipped with an approved plug connection. If use is to be made of a permanent connection, the connecting cable must be connected to a manual on/off switch that is installed near the unit in a clear visible manner. General The minimum temperature of the environment should be 20 C for the Multi Deck 60/100/120 hot and Classic Deck hot. The maximum temperature of the environment should be 22 C and the relative humidity should be maximum 65%. Note: Strong air-currents due to draughty doors, air-conditioninig outlets etc. will be detrimental to the proper operation. Note: The minimum temperature of the hot products that are loaded inside the Multi Deck must be 85 C. Note: The maximum load per shelf is 20 kg. The load must be equally distributed over the shelf. Page 8

INSTALLATION Casters Each merchandiser is furnished on 4 casters of 80 mm. The Multi Deck 60 has 2 rigid casters on the back side and 2 locking swivel casters on the customer side. The Multi Deck 100/120 is furnished with 2 swivel casters on the back side and 2 locking swivel casters on the customer side. Thermometer (9229800) If a separate thermometer is ordered you can click this with the magnets under the 2 top shelves and also on the ceiling. Also in the 2 top shelves, on the left and right hand side in the front, there are 2 knock-outs of Ø 2.5 mm. Tap these small holes out and fit the thermometer with two screws. Before first use Operate the Multi Deck 60/100/120 at maximum temperature setting to insure the proper working of the unit. Instructions for operators After installation of the Multi Deck, the operator of the unit has to be instructed. The instruction has to cover the following subjects: How to switch the unit on. Working of the unit. Run through the user manual. How to react for information or service calls. Page 9

1 PLACING Placing and connecting Description belonging to the lables on the drawings Label Description 1 Power cable, length 2,5 meters * *) length is measured from the point where the cable comes out of the unit Multi Deck 60-3 level Page 10

PLACING Multi Deck 100-3 level 1 Page 11

1 PLACING Multi Deck 120-3 level Page 12

EMPTY PAGE Page 13

Fri-Jado B.V. P.O. Box 560 4870 AN Etten-Leur The Netherlands tel +31 76 50 85 400 info@frijado.com www.frijado.com