INDICATIVE FEASIBILITY BUDGET (RIBA STAGE 1) for ST JAMES'S CHURCH : WEYBRIDGE SURREY. June 2016

Similar documents
INDICATIVE FEASIBILITY BUDGET (RIBA STAGE 1) for ST JAMES'S CHURCH : WEYBRIDGE SURREY. June 2016

ESTIMATE FOR BUILDING WORKS BARONS COURT ROAD

BUDGET ESTIMATE - ISSUE No. 2

Mr. A Sample Foxes Cottage Bolton Road Bury St Edmunds IP32 2DB 6th January 2014

REMEDIAL WORKS REQUIRED. Allow to clean down brickwork and repoint/repair brick elevations.

SCHEDULE OF WORKS Extension and Alterations to 497 Herne Road, Ramsey St Mary s March 2013

NHF Form of Contract Documentation

Reliance House Investors Report. IR11 September 2018

Schedule T5. Tender Documents. This tender is for: Tender Documents: The documents issued for this tender include the following: Tender Schedules

SNAGGING REPORT. Plot 19 Snag Close Unfinished Avenue Oxford OX90 1AB. for. Mr T & Mrs N Sample

Guidance on U Values from Domestic Heating Design Guide

Project Solutions Design & Build

Duplex_Cost Summary_ SAMPLE 43,465 SUM) 19 ELECTRICAL SERVICES (PROVISIONAL 24,820 SUM) 20 MECHANICAL SERVICES (PROVISIONAL

NEW MNIR DESIGN INTERNATIONAL OPEN DESIGN COMPETITION COST PLAN ANALYSIS MNIR REDEVELOPMENT ELEMENTAL COST PLAN

STRUCTURAL ASSESSMENT SURVEY REPORT

Construction and the Built Environment. Unit 1: The Construction Industry for the 21st Century [GCB11] MONDAY 14 MAY, AFTERNOON

Project Specifications

TYPICAL QUOTATION MINIATURE SAMPLE

SCHEDULE OF FINISHES FOR THE AGREEMENT BETWEEN ZOTOS BROTHERS (PTY) LTD AND

SCHEDULE OF CONDITION IN RESPECT OF HEN & CHICKENS 143 DEANSGATE BOLTON BL1 1EX ON BEHALF OF PUNCH TAVERNS. Prepared by:

Our standard inclusions.

HILLSIDE ELEMENTARY SCHOOL. Overview: Livingston School District Hillside Elementary School

SPECIFICATIONS GENERAL. PAINT EXTERNAL House of Paints White WALL AND WALL FINISHING WINDOW AND DOOR SCHEDULE. INTERNAL White

LOOSE FILL ASBESTOS INSULATION

ANNEXURE B SECTION 1

Bill of Quantities Project: Tenant Installations Address: Suncadia, First Floor, Pretoria SAHRA/FAC/01/05/2018

LOT 25 Blueleaf Place. Brookfield $511,879 SUMMARY

CONSTRUCTION COST BREAKDOWN THIS IS FORM CCB

W i s d o m S m a r t C o l l e c t i o n. Aristotle series

SOUTH ELEVATION OF CLASSROOMS. NORTH ELEVATION OF CLASSROOMS (section through hall) HaysomWardMiller Architects CLASS ELEVATIONS

BILLS OF QUANTITIES FOR CONSTRUCTION OF MODEL DISPENSARY BLOCK AT MGUNGANI / SALAITA

CONTENTS. Commentary on construction implications. Estimated Construction Costs for Varying Cavity Thicknesses. Rev C

CONTRACT PRICE ADJUSTMENT PROVISIONS (CPAP)

CATAMARAN TOWER - 1 Seef Area Plot 19, 20

Premier Inn, Wilson Street, Middlesbrough, TS1 1AE. Site progress report. February 2017

Garage Conversions. Technical Issues

Denis Creedon, B.E., MIEI. CONSULTING ENGINEER

Specification Apartments (Erf FalFas)

GENERAL SPECIFICATION

Carpentry/Carpenter CIP Task Grid

Typical detail: New roof with breathable underlay

*X227/12/01* X227/12/01 BUILDING CONSTRUCTION HIGHER NATIONAL QUALIFICATIONS 2014 FRIDAY, 6 JUNE 9.00 AM AM

Construction details:

OFFICE DEVELOPMENT COOIL SMITHY, BRADDAN

BUILDING CONSTRUCTION HANDBOOK. Ninth edition. Roy Chudley. and. Roger Greeno. O Routledge ^ Taylor ^Francis Croup LONDON AND NEW YORK

OPEN AIR MARKET(RUKANGA KASIGHAU MARKET SHED) Item Description Qty Unit Rate Total

Workshop 4e: M3NHF Schedule of Rates version 7 what s new? Speakers: David Miller (Rand Associates) Dominic Higgins (Rand Associates) Chaired by:

The Australian Catalog Content is compiled by Cadsoft Australia, for any further information contact:

Building use, location etc. Option 1 Domestic type Pitched Roof 15, insulation at rafter line (heated habitable room) UV001 NOV 2015 (V2)

Product & Installation Guide for New Build & Refurbishment Projects. exceeding the performance criteria of all current Building Regulations

Schedule of Condition

Powder Coated Merino. Colorbond Dune. Concrete Tiles- Concrete Tiles Slate Grey Finish. Colorbond Paperbark. Concrete Tiles- Concrete Tile -

RENDERS ARE INDICATION ONLY. Land. Home size 26sq. 28 Ajay Way, Kurunjang LEGACY 26 $545,500 ACTUAL HOUSE IMAGE PRESENTED BY

Our standard inclusions.

The Homeowner s Building Application Checklist for Constructing a Residential Addition

Scope of Work. Invitation to Bid Interior Renovation Works for the United Nations University, Macau (Phase 1) (UNUCS-ITB/001/2015)

Bathrooms. Custom cabinetry INCLUDED

Our standard inclusions.

COUNTY GOVERNMENT OF SIAYA: PROPOSED ECD BLOCK

Material Report - [Trade Contractors] for plan: [E:\SoftPlan14\Projects\Sample Drawings.spf\2-Storey sqft.spf] Page 1 of 5

Grant Engineering Ireland ULC Heat Loss Survey Form. Customer Details: Installer Details:

Home Report SINGLE SURVEY. Property address: Bendigo Road St.Ola Orkney KW15 1SX. Customer address: Bendigo Road St.Ola Orkney

SCHEDULE OF BUILDING OPERATIONS

CONSTRUCTION SMARTSCREEN

SCHEDULE OF CONDITION XXXX City of London, EC3V XXX

Example Building Condition Survey & Summary Report Address Address Address London

Standard Inclusions for

TN23 1HU MODERN OFFICE AND RETAIL SPACE IN THE HEART OF ASHFORD, KENT

TERRACE FACTORY - TYPE A1

PRODUCT & INSTALLATION GUIDE

SINGLE FAMILY HOME SPECIFICATIONS

NATASA COURT, Kyriacou Matsi Av. & Kykkou Str., Ayios Dometios, Nicosia

Assessing the costs and benefits of reducing waste in construction

KGN-BDD TENDER FOR SUPPLY OF LABORATORY EQUIPMENT AND PROVISION OF CIVIL WORKS FOR THE OLKARIA CIVIL ENGINEERING LABORATORY.

EKATERINI COURT I 48 Kyriacou Matsi Avenue 2409 Egomi, Nicosia,Cyprus. EKATERINI COURT IV, Kantaras Avenue, Strovolos, Nicosia

How to fill in your Timber Frame Order Form

TABLE OF CONTENTS Public Safety Building

TECHNICAL INFORMATION SHEET NUMBER 1a

TITLE: ABLUTION BLOCK WITH BIODIGESTER. ITEM No. D E S C R I P T I O N UNIT QTY

Executive Inclusions PRELIMINARIES:

Schedule of Condition

The Pattison. At a Glance m Study m. 17.

The Banksia. At a Glance m Study m. 18.

CB04. Outback House. Case Study. Creative Spaces Australia. by Casey Brown Architecture

Preliminary Inspection Plan Certification On Site Inspection. Ancillary Design... Ancillary Construction Inspecti... Testing Requirement

Preliminary Inspection Plan Certification On Site Inspection. Ancillary Design... Ancillary Construction Inspecti... Testing Requirement

THE BEST INCLUSIONS ALTI 202

CONDITION REPORT and PROPOSED WORKS January 2014

architraves. d. Sliding doors to

W i s d o m S m a r t C o l l e c t i o n. Inspiration series

Planning Applications Received

Construction Technology Revision Guide

An introduction to Part L U-values

HASTINGS HOUSE FOREGATE STREET WORCESTER


Duplicate Instructed Pending Resolved Unknown. Unresolved. Category Date AI REF Job No Project Zone Draft Instruction Explanatory Notes Status

W i s d o m H o m e s C o l l e c t i o n. Ambassador series

Our standard inclusions.

SCHEDULE OF FINISHES

Town of Falmouth FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage COSTS FOR SUBSTANTIAL IMPROVEMENTS / REPAIR OF SUBSTANTIAL DAMAGE:

Transcription:

INDICATIVE FEASIBILITY BUDGET (RIBA STAGE 1) for INTERNAL REPAIRS AND REDECORATIONS OF THE CHURCH HALL at ST JAMES'S CHURCH : WEYBRIDGE SURREY June 2016 SAWYER & FISHER (EPSOM) LTD THOMAS FORD & PARTNERS Chartered Quantity Surveyors 177 Kirkdale Unit B Aviary Court London 138 Miles Road SE26 4QH Epsom Surrey KT19 9AB 1799.03 Church hall 22-06-16/Cover 1 22/06/2016

June 2016 COLLECTION ST JAMES'S CHURCH CHURCH HALL External Elevations Roofs Sloping 40,200 Flat 40,200 40,200 New Foyer Extension 69,200 Internal 119,600 229,000 Mechanical and Electrical Installation 75,000 EXTERNAL WORKS UNDERGROUND DRAINAGE 17,000 INCOMING SERVICE MAINS 321,000 Main Contractor preliminaries @ 16% 51,360 Scaffold External to part of Church Hall 8,000 Temporary roof over Church Hall Internal Church Hall - 372,360 8,000 8,000 380,360 Main Contractor's overheads & profit @ 5% 19,018 399,378 Contingency sum @ 10% 39,938 439,316 Say 440,000 1799.03 Church hall 22-06-16/Collection 2 22/06/2016

June 2016 NOTES 1 This Indicative Feasibility Budget excludes the following: i) Professional Fees ii) VAT iii) Local Authority Fees and Charges iv) Fittings and fixtures v) Items as listed within this Indicative Feasibility Budget vi) External elevation and reroofing of all roofs vii) Mechanical installation 2 This Indicative Feasibility Budget is based upon the following information and details: i) Brief notes taken on site in the morning meeting with Thomas Ford & Partners 8 February 2016 ii) Thomas Ford & Partners' drawings (693055) Survey: SK06 P1 Outline Section EX101 P2 Parish centre ground floor plan EX010 P2 Site plan EX100 P2 Church Plan As Proposed: GA-100 P1 GA-100 P3 GA-101 P2 GA-010 P3 Church Building Church Plan Parish Centre ground floor plan Site Plan iii) Electrical Installation budget is an allowance at present and requires to be checked with Eng Design Ltd 3 This Indicative Feasibility Budget is based upon current costs as at 1st quarter 2016, no allowance has been made for inflation between then and the time of tender 4 This Indicative Feasibility Budget is based on outline floor plan as listed above without the benefit of detailed survey drawings, confirmed brief, specification etc. Therefore the cost included must be treated with caution 5 Building cost per m2 Church Hall 441 = 945/m2 ( 439,316 441 = 996) 1799.03 Church hall 22-06-16/Notes 3 22/06/2016

June 2016 CHURCH HALL EXTERNAL Elevations ROOFS Sloping roofs 1 Strip existing roof covering, boarding etc 2 Clear out voids 4,800 3 Allowance to repair existing roof structure (from interior) 3,200 4 Insulate roof void (from below) 8,500 5 Ventilate roof void 1,700 6 Form new roof light opening through existing roof over main hall 7 New softwood roof boarding (to underside) and battening out 14,300 8 New roof covering, Terne coated stainless steel sheet roofing 9 New gutter between roof in Terne coated stainless steel sheet roofing 10 Allowance to repair existing fascia and soffit boards 900 11 i) Powder coated aluminium rainwater gutter and pipe work ii) Excludes allow for repairs to existing rainwater gutters and roof slopes 5,000 12 New softwood gutter boarding, framework 13 Decorate fascia boards and soffit boards 1,800 14 New roof lights with electric motor opening to main hall 15 Lead capping detail to last 16 Timberwork in connection with new kerb detail 17 Plasterboard to lining of roof light opening on softwood framework To Collection 40,200 Flat roofs 1799.03 Church hall 22-06-16/Budget 4 22/06/2016

NEW FOYER EXTENSION 1 Remove existing extension, grub up foundations, break out slab etc 2,400 2 New foundation to external wall 2,400 3 Excavate to reduce level and cart away 100 4 150 mm Reinforced (mesh) ground floor slab over hardcore, dpm etc 900 5 New external cavity wall construction with faced brick outer skin, blockwork inner, insulated cavity etc 13,800 6 Glazed screen and pair of external doors 17,000 7 Stone sill/threshold detail to last 3,500 8 Treated sawn softwood roof construction and boarding 4,700 9 Terne coated stainless steel sheet roofing 6,400 10 Insulate roof void 900 11 Ventilation to roof void 400 12 Leadwork in connection with roofing 500 13 Softwood fascia and soffit detail 600 14 Powder coated aluminium rainwater gutter and pipework 3,400 15 Insulation and floor screed 1,100 16 Choir matting 1,000 17 Plaster to walls 1,300 18 Treated sawn softwood studding to form store cupboard insulated 800 19 Plasterboard over plywood to both sides of last 800 20 Plasterboard to soffit 300 21 Softwood skirting detail 400 22 Pair of cupboard and door frames 3,500 23 Allowances for: Shelving and coat fittings 1,000 Steps Handrail 600 24 Decorations 1,400 To Collection 69,200 1799.03 Church hall 22-06-16/Budget 5 22/06/2016

INTERNAL Note: Existing toilets are to remain, therefore 1 Strip out existing carpet, vinyl floor finish etc, kitchens, etc 2,500 2 Remove existing glazing to main hall 900 3 Remove existing concrete external fins to main hall 4 Hack off wall tiling and clear away 800 5 Allowance for repairs to: Ceiling plaster 1,500 Wall plaster 11,100 Floor screed Existing skirtings 400 Boarded ceiling and exposed roof construction to main hall 1,400 6 Latex to screed 2,200 7 Allowance for new flooring elsewhere 7,900 8 Vinyl flooring to hall, kitchen, new skirting detail 13,600 9 Extend storage cupboards in foyer Remove existing cupboard door and frame, set aside and later refix 300 New treated sawn softwood studding to form extension to, insulated 1,200 Cover last with plasterboard one side and board to match existing the other side 2,000 New skirting 100 10 Overhaul existing doors 4,100 11 Overhaul existing stage folding doors 2,000 12 Allowance for: Store shelving 400 Kitchen installation 25,000 Sanitaryware Disabled toilet fittings Roller shutter to kitchen 2,500 Lining/architrave detail to existing roof lights 1,200 Wall tiling 6,000 Window glazing to hall (say) 19,000 13 Decorations 13,500 To Collection 119,600 1799.03 Church hall 22-06-16/Budget 6 22/06/2016

MECHANICAL AND ELECTRICAL INSTALLATION 1 Allowance to overhaul existing mechanical installation within the Church Hall and renew electrical installation 66,150 2 Lighting and AV installation 66,150 4 Allowance for BWIC with above @ 10% 6,615 72,765 Say, To Collection 75,000 EXTERNAL WORKS UNDERGROUND DRAINAGE Allowance for external repair to existing underground surface water drainage installation 17,000 INCOMING SERVICE MAINS 1799.03 Church hall 22-06-16/Budget 7 22/06/2016