Rajasthan State Pollution Control Board

Similar documents
Rajasthan State Pollution Control Board

J-11011/45/2009- IA II (I)

THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2

Environmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated

Environmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated

COMPLIANCE STATUS REPORT

Hind Energy & Coal Beneficiation (India) Ltd.

Calcom Cement India Limited

4. The ambient air quality monitoring stations We are monitoring the ambient air quality

DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT

PROJECT NAME: UTKAL ALUMINA INTERNATIONAL LTD. PERIOD OF COMPLIANCE: APRIL, 2013 TO SEPTEMBER, 2013.

SHREE CEMENT LTD..~..~..~ ii. Regd. Office:. 0. ~ ~. ~ BANGUR NAGAR, POS': BOX NO.33, BEAWAR , RAJASTHAN, INDIA ~ 66~~'" 'Its ~s 71 66

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN

JAYPEE NIGRIE SUPER THERMAL POWER PLANT

Environmental Clearance Compliance Half Yearly Report

RED CATEGORY CONSENT & AUTHORIZATION ORDER BY REGISTERED POST WITH ACKNOWLEDGEMENT DUE

Environmental Clearance Compliance Half Yearly Report

Accord Energy Corporation India Pvt. Ltd.

Shri Gurudatt Sugars Ltd., Gat No. 61/A, Akiwat - Takaliwadi Road, Takaliwadi , Taluka - Shirol, Dist Kolhapur, Maharashtra

Point wise compliance for the conditions stipulated in Environmental Clearance of (Phase- I & II)

PART A. 3. Production Capacity 3.6 Million TPA Cement 4. Year of Establishment th September 2015 PART B WATER AND RAW MATERIAL CONSUMPTION

Environment protection measures / technology

Environmental Clearance Compliance Half Yearly Report

State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests

JAYPEE NIGRIE SUPER THERMAL POWER PROJECT

PART A. M/s Shree Cement Ltd, (Grinding Unit) village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan

High efficient ESP s has been provided to maintain an emission level below 100mg/Nm 3 in CPP. Modification of ESPs and.

Janki Corp. Ltd., Six Monthly Compliance Report

Hind Energy & Coal Beneficiation (India) Ltd.

DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT

D:\My Documents\Legislative\Legislation BS\Consents\Six monthly compliance\cement\june 2017\COMPLIANCE STATUS.docx.docx

Clearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004

Name of Project: J.K. Cement Works (Unit: J.K. Cement Ltd.), Muddapur (Karnataka)

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA

ADITYA BIRLA. EMil. Please find enclosed herewith the environmental statement report duly filled-in Form-V

PROJECT NAME: UTKAL ALUMINA INTERNATIONAL LTD. PERIOD OF COMPLIANCE: OCTOBER 2014 TO MARCH 2015.

Chambal Fertilisers and Chemicals Limited CFG3 Project Environment Clearance_ Compliance Report (Feb 28, 2018)

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report

Scanned by CamScanner

EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT

MECON LIMITED RANCHI , INDIA

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

MECON LIMITED RANCHI , INDIA

COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE FOR THE PERIOD OF APRIL-2016 TO SEPTEMBER F. No. J-11011/309/2011-IA-ll (I)

.,~) si.j Encl.: As above W ~Z. CIN No,-U40104TG2001PTC Ref.: MoE&F, LKN/KPBK/l040124/340 Date:

STATE POLLUTION CONTROL BOARD, ORISSA Paribesh Bhawan, A/118, Nilakanthanagar,Unit-VIII, Bhubaneswar , INDIA

Consent For Operation (CFO-Air,Water)

2 No. Continuous Ambient Air Quality Monitoring System (CAAQMS) installed in downwind & upwind direction and are connected to APPCB server.

Telefax: 011: Dated:10 th May, 2013

(Period April 2017 ~ Sept. 2017)

20/09/2016. ,held on 25/04/2017

CLEARANCE LETTER NO.: 21/15/84-EN-I issued on PERIOD OF COMPLIANCE LETTER April -16 September -16

Environmental Clearance Compliance Half Yearly Report

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

BRGD Ingot Private Limited 4, D.L. Khan Road, Block-C, Flat No. 201, 2 nd Floor, P.S. Kalighat, P.O. Bhowanipur, Kolkata

Mangalam Cement Ltd. (Unit-II) Stack No.

J.K. Cement WORKS, MANGROL (RAJ) 25 MW Captive Power Plant & 10 MW Waste Heat Recovery Boiler

THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2

Application of Low and Non Waste Technology in the production process;

We are sending herewith the following for the month of September 2016.

Mangalam Cement Ltd.(Unit I)

ZZJ/CLAB-KSPCB/04/ Environmental Officer,

MIEL/NP/EMD/ 303/2015 Date:

Shriram Vinyl & Chemical Industries, : Kota Compliance Report of Environmental Clearance dated 12 th July 2017 and amended on 23 rd November 2017

19 th Compliance Report to EC No: F. No. J-11011/946/2007-IA-II(I)

ENVIRONMENTAL STATEMENT FORM-V SYNTHETIC GYPSUM MANUFACTURING PLANT M/S SHREE CEMENT LIMITED, BEAWAR, (RAJASTHAN) APRIL, 2010 to MARCH 2011 PART A

Cement Manufacturing Company Ltd. Page 1

. 0.:'. e:. :'} BANGUR NAGAR, POST BOX NO.33, BEAWAR , RAJASTHAN, INDIA Jji'665~" 1tS8;0 b AiS77..c,b

Compliance of Conditions laid down by MoEF for Expansion of Cement Plant (2.0 MTPA to 2.6 MTPA Clinker) at Village Suli April 2017 to September 2017

ANNEXURE-II CONSENT TO OPERATE AND ITS COMPLIANCE

ZZH/CLAB-KSPCB/04/ Environmental Officer,

Consent For Operation (CFO-Air,Water)

fgunqlrku ftad fyfevsm PIN Code

2 x 300 MW (STAGE-I)

COMPLIANCE REPORT TO THE CONDITIONS LAID IN THE ENVIRONMENTAL CLEARANCE

M/s Deccan Cements Limited, Bhavanipuram,Janaphad, Palakeedu, Suryapet. Telangana MoEF No: J-11011/572/2007-IA II(I) Dated

Indian Standard DRINKING WATER SPECIFICATION (Second Revision)

ENVIRONMENTAL STATEMENT FOR D.G.SETS OF M/s SHREE CEMENT LIMITED, BEAWAR (RAJASTHAN) FOR THE PERIOD FROM, APRIL 2009 TO MARCH 2010 PART A

HALF YEARLY COMPLIANCE REPORT

SHREE CEMENT LIMITED, Compliance Status of 300 MW (2x150 MW) Thermal Power Plant. At Village Andheri Deori, Tehsil-Masuda, District Ajmer (Rajasthan)

Mars Power & Steel Ltd.

Outward No:410229,24/04/2017

Six Monthly Compliance Status Report

ANNEXURE: MOU BETWEEN CLARIANT CHEMICALS (INDIA) LIMITED AND STAHL INDIA PVT LTD

Ref. - CTO No. F(CPM)/Baran(Chhabra)/1(1)/ dated 29/

Six Monthly Compliance status of Environment Clearance for Cement Plant (5300 TPD Clinker) at Village Lumshnong, Meghalaya January to June 2013

Sr. No. Date of starting the project and completion schedule. January 2012 January 2017 (Tentative)

SHREE CEMENT LIMITED, Compliance Status of 300 MW (2x150 MW) Thermal Power Plant. At Village Andheri Deori, Tehsil-Masuda, District Ajmer (Rajasthan)

Subject: Half yearly Report for the period of 1 st April 2013 to 30 th Sept., 2013 for Indmax Project

Hope you will find the same in order. Thanking You, For EMAMI PAPER MILLS LTD. Authorized Signatory

The following were present to supervise the proceedings:- 1. Sh. Varun Roojam, IAS. Additional Deputy Commissioner. Muktsar. 2. Er. G.S.

MONITORING THE IMPLEMENTATION OF ENVIRONMENTAL SAFEGUARDS Ministry of Environment & Forests Regional Office (W), Bhopal Monitoring Report Part-I

Subject: Half Yearly Report for the period of 1 st October, 2013 to 31 st March 2014 for Refinery Expansion Project

BHUSHAN STEEL LIMITED


F. No. J-11011/196/2007- IA II (I) Government of India Ministry of Environment and Forests (I.A. Division) Paryavaran Bhawan CGO Complex, Lodhi Road

GENERAL CONDITIONS. 7. The Applicant will adopt the prescribed norms, and standards provided in the national Building Code of India 2005.

ENVIRONMENTAL MANAGEMENT PLAN. Hotel Project for Mohamed Ilyas & Ms. Alamzahan

Transcription:

M/s Raj West Power Private Limited Village- Bhadresh, Tehsil:Barmer District:Barmer Sub: Ref: Sir, Consent to Operate under section 25/26 of the Water (Prevention & Control of Pollution) Act, 1974 and under section 21(4) of Air (Prevention & Control of Pollution) Act, 1981. Your application for Consent to Operate dated 11/08/2015 and subsequent correspondence. Consent to Operate under the provisions of section 25/26 of the Water (Prevention & Control of Pollution) Act, 1974 (hereinafter to be referred as the Water Act) and under section 21 of the Air (Prevention & Control of Pollution) Act, 1981, (hereinafter to be referred as the Air Act) as amended to date and rules & the orders issued thereunder is hereby granted for your Stage I (Unit I & II) plant situated at Village- Bhadresh Tehsil:Barmer District:Barmer, Rajasthan, subject to the following conditions:- 1 2 That this Consent to Operate is valid for a period from 01/01/2016 to 31/12/2018. That this Consent is granted for manufacturing / producing following products / by products or carrying out the following activities or operation/processes or providing following services with capacities given below. Particular Type Quantity with Unit ELECTRICITY Product 270.00 MW 3 4 That this consent to operate is for existing plant, process & capacity and separate consent to establish/operate is required to be taken for any addition / modification / alteration in process or change in capacity or change in fuel. That the quantity of effluent generation along with mode of disposal for the treated effluent shall be as under: Page 1 of 7

Type of effluent Max. effluent generation (KLD) Recycled Qty of Effluent (KLD) Disposed Qty of effluent (KLD)and mode of disposal Domestic Sewage 75.000 NIL 75.000 On Land For Plantation/Horticulture Trade Effluent 9800.000 NIL 9,800.000 Dust suppression/plantation/horticult ure 5 That the sources of air emmissions along with pollution control measures and the emission standards for the prescribed parameters shall be as under: Sources of Air Emmissions Pollution Control Measures Parameter Prescribed Standard Boiler( 2NOS.) ESP SO2 600 mg/nm³ Particulate Matter NOx 50 mg/nm³ 300 mg/nm³ Hg and its compounds 0.03 mg/nm³ D.G. Sets (2 nos.)( 1000KVA EACH) ACOUSTIC ENCLOSURE, ADEQUATE STACK HEIGHT NOx (as NO2) (at 15% O2) day basis in ppmv NMHC (as C) (at 15% O2) PM (at 15% O2) 710 mg/nm³ 100 mg/nm³ 75 mg/nm³ Page 2 of 7

CO (at 15% O2) 150 mg/nm³ 6 That the domestic sewage shall be treated before disposal so as to conform to the standards prescribed under the Environvent (Protection) Act-1986for disposal Into Inland Surface Water. The main parameters for regular monitoring shall be as under. Total Suspended Solids Parameters Standards Not to exceed 100 mg/l ph Value Between 5.5 to 9.0 Oil and Grease Total Residual Chlorine Total Kjeldahl Nitrogen ( as N ) Biochemical Oxygen Demand (3 days at 27 C) Sulphide ( as S ) Ammonical Nitrogen Chemical Oxygen Demand Not to exceed 10 mg/l Not to exceed 100 mg/l Not to exceed 30 mg/l Not to exceed 2.0 mg/l Not to exceed 75 mg/l Not to exceed 250 mg/l 7 That the trade effluent shall be treated before disposal so as to conform to the standards prescribed under the Environment (Protection) Act-1986 for disposal Into Inland Surface Water. The main parameters for regular monitoring shall be as under Page 3 of 7

Parameters Standards Total Suspended Solids Not to exceed 100 mg/l ph Value Between 5.5 to 9.0 Oil and Grease Biochemical Oxygen Demand (3 days at 27 C) Phosphate Free Available Chlorine Copper as Cu) Zinc (as Zn) Iron ( as Fe ) Chromium (Total) Chemical Oxygen Demand Not to exceed 10 mg/l Not to exceed 30 mg/l Not to exceed 5 mg/l Not to exceed 0.5 mg/l Not to exceed 250 mg/l 8 That this consent to operate is being issued for production capacity of 2 x 135 MW (Unit 1 & 2) thermal power plant. 9 That the total project cost of the unit shall not exceed 5360.71 crores including the cost of land, building, plant & machinery. 10 That the industry shall comply with all the conditions as imposed by MOEF, Government of India vide its office letter no. F. No. J-13011/58/2006-IA II(I) dated 20/07/2007 while issuing EC to your project. 11 That all the conditions imposed vide letter no F (Tech)/Barmer(Barmer)/3(1)/ 2008-2009/6820-6823 dated 30/10/2012 shall be complied. 12 That the Charter of Corporate Responsibility for Environment Protection specified for Thermal Power Plants shall be complied. 13 That the industry will comply with the standards as prescribed vide MOEF notification No. GSR 826(E) dated 16th Nov,2009 with respect of National Ambient Air Quality Standards. 14 That the unit shall provide and maintain adequate dust collection and extraction system to control fugitive dust emissions at coal crusher, coal crusher, coal transfer points and coal handling and storage areas. Page 4 of 7

15 That the particulate emissions from the stack of various sections of the power plant shall not exceed 100 mg/nm³. 16 That the industry shall maintain opacity meter with each boiler stack to monitor the emission level of particulate matter. The monthly observation will be submitted to R.O office along with the reason/clarification for any recorded violation of the prescribed standards. 17 That low Nox burners shall be installed at the boiler feeding system. 18 That the level of SPM within distance 3-10 M from dust generating source/plant shall not exceed to 600 mg/nm³ in ambient air. 19 That for the control fugitive emission guidelines /code of practice as issued by CPCB will be followed. 20 That the project proponent shall undertake measures and ensure that no fugitive fly ash emissions take place at any point of time. 21 That the fly ash shall be collected in dry form and its 100% utilization shall be ensured by 28/02/2013. Ash to be disposed off in the ash pond shall be through HCSD system. 22 That no industrial effluent will be discharged outside from the factory premises in to a stream or well or sewer or on land and the effluent generated from power plant shall be used for ash quenching, control of fugitive emissions and plantation. 23 That the industrial effluents generated from R.O. rejects, DM plant & cooling tower shall be neutralized & be used for plantation, horticulture and ash quenching purpose. No industrial effluent will be discharged inside or outside the factory premises into a stream or well or sewer or on land. 24 The domestic effluent shall be treated up to prescribed standards and shall be used for plantation/ green belt development within the premises. 25 Ash pond shall be lined with HDPE/LDPE lining or any other suitable impermeable media such that no leachate takes place at any point of time. Adequate safety measures shall also be implemented to protect the ash dyke from getting breached. 26 That no ground water shall be abstracted without prior permission from the State Board and the Central Ground Water Authority. 27 That suitable flow measuring devices/meters on the intake source of water, inlet and outlet of effluent treatment/sewage treatment plant shall be installed and maintained. Daily record of water consumption, effluent generation and its treatment and utilization shall be maintained. 28 That the industry shall undertake suitable measures for rain water harvesting for artificial recharge of ground water. Page 5 of 7

29 30 31 32 33 The industry shall comply with the MoEF, Government of India, Notification date 14th September 1999 with till the date amendments relating to fly ash management and shall provide relevant details to the State Board, MoEF, Government of India. That the unit shall install flow meters at inlet and outlet of STP and at outlet of ETP. That the unit shall submit details of solid waste generated from the plant to Regional Officer of the State Board, Balotra. That the Thermal power plant shall meet the limits of Boiler (specified in condition no.5) latest by 07/12/2017, as per the Notification dated 07.12.2015 issued by the Ministry of Environment, Forest and Climate Change, Government of India. Further, the industry shall also submit action plan for implementation of the aforesaid standards within one month of issue of this letter. That the Thermal power plant shall comply with water consumption limit as specified in the Notification dated 07/12/2015 issued by the Ministry of Environment, Forest and Climate Change (MoEF&CC). 34 That, not withstanding anything provided hereinabove, the State Board shall have power and reserves its right, as contained under section 27(2) of the Water Act and under section 21(6) of the Air Act to review anyone or all the conditions imposed here in above and to make such variation as it deemed fit for the purpose of Air Act & Water Act. 35 That the grant of this Consent to Operate is issued from the environmental angle only, and does not absolve the project proponent from the other statutory obligations prescribed under any other law or any other instrument in force. The sole and complete responsibility to comply with the conditions laid down in all other laws for the time-being in force, rests with the industry/ unit/ project proponent. 36 That the grant of this Consent to Operate shall not, in any way, adversely affect or jeopardize the legal proceeding, if any, instituted in the past or that could be instituted againt you by the State Board for violation of the provisions of the Act or the Rules made thereunder. This Consent to Operate shall also be subject, besides the aforesaid specific conditions, to the general conditions given in the enclosed Annexure. The project proponent will comply with the provisions of the Water Act and Air Act and to such other conditions as may, from time to time, be specified, by the State Board under the provisions of the aforesaid Act(s). Please note that, non compliance of any of the above stated conditions would tantamount to revocation of Consent to Operate and project proponent / occupier shall be liable for legal action under the relevant provisions of the said Act(s). Page 6 of 7

This bears the approval of the competent authority. Yours Sincerely Group Incharge[ HDF ] Copy To:- 1 Regional Officer, Regional Office,, Balotra. 2 Master File. Group Incharge[ HDF ] Page 7 of 7