Florida Department of Environmental Protection. Bureau of Mining and Minerals Regulation. Regulation of Mines. Howard J. Hayes, Program Administrator

Similar documents
Regulation of Mines In South Florida

CHAPTER Council Substitute for Council Substitute for House Bill No. 197

Environmental Information Worksheet

DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF MINING AND RECLAMATION. Coal Refuse Disposal - Site Selection

SECTION H: SUPPLEMENTAL INFORMATION FOR APPLICATIONS FOR ENVIRONMENTAL RESOURCE PERMITS INVOLVING WATER MANAGEMENT SYSTEMS FOR MINES

Florida Department of Environmental Protection

CHAPTER 5: CONSERVATION ELEMENT

Division of Surface Water Response to Comments

DRAINAGE AND NATURAL AQUIFER GROUNDWATER RECHARGE ELEMENT

ATTACHMENT 1 GEPA CHECKLIST & Historical Archeological & Natural Heritage Preservation Documents

Operating and Reclamation Plan

ENVIRONMENTAL RESOURCE PERMIT APPLICANT S HANDBOOK VOLUME I (GENERAL AND ENVIRONMENTAL)

REQUIRED INFORMATION Please check the following boxes that apply to your lot or parcel and complete the other requested information.

Chapter MINERAL EXTRACTION AND MINING OPERATIONS

Before we get to the E&SC

Public Notice ISSUED: March 18, 2016 EXPIRES: April 18, 2016

Environmental Check List Georgia Environmental Policy Act

Storm Water Pollution Prevention Plan (SWP3) Checklist

State of Florida Department of Community Affairs Areas of Critical State Concern Implementation Status Report Apalachicola Bay Area

Southwest Florida Water Management District. Environmental Resource Permit Applications within the Southwest Florida Water Management District

ARTICLE 6 EXCAVATION OF MINERAL MATERIALS

ENVIRONMENTAL RESOURCE PERMIT APPLICATION

Nassau County 2030 Comprehensive Plan. Conservation Element (CS) Goals, Objectives and Policies. Goal

PUTNAM COUNTY COMPREHENSIVE PLAN EXHIBIT DD INFRASTRUCTURE ELEMENT

City of Valdosta Land Development Regulations

Nassau County 2030 Comprehensive Plan. Conservation Element (CS) Goals, Objectives and Policies. Goal

ENVIRONMENTAL RESOURCE PERMIT APPLICANT S HANDBOOK VOLUME I (GENERAL AND ENVIRONMENTAL)

SOUTH FLORIDA WATER MANAGEMENT DISTRICT. Question 13: Wetlands

AMENDMENTS TO BAYFIELD COUNTY ZONING ORDINANCE. Lake Superior Shoreland Lot Development Requirements.

INFRASTRUCTURE ELEMENT/NATURAL GROUNDWATER AQUIFER RECHARGE SUB-ELEMENT

CHAPTER GROUND WATER CLASSES, STANDARDS, AND EXEMPTIONS

STATE ENVIRONMENTAL POLICY ACT MITIGATED DETERMINATION OF NONSIGNIFICANCE

CCSD#1 Stormwater Standards

PERMANENT FARMING REQUEST FOR EXEMPTION CONFIRMATION LETTER

CHAPTER SURFACE MINING AND RECLAMATION PLAN REGULATIONS

CITY OF SANIBEL Planning Department - Public Works Department STORMWATER & DE-WATERING EROSION CONTROLS (WITH APPLICATION INFORMATION)

Public Notice ISSUED: 13 May 2014 EXPIRES: 12 June 2014

APPENDIX H: SFEIS FLOODPLAIN IMPACT ANALYSIS SECTION

Scientific Inadequacies of Evaluating Direct, Indirect and Cumulative Impacts from Phosphate Mining in the Peace River Watershed

COON CREEK WATERSHED DISTRICT PERMIT REVIEW

RULES OF THE ENVIRONMENTAL PROTECTION COMMISSION OF HILLSBOROUGH COUNTY CHAPTER 1-11 WETLANDS

Good morning, Chairman Yaw, Chairman Yudichak, Chairman Vulakovich, Chairman Costa,

Conservation, Open Space & Groundwater Recharge Element

Surface Water and Non-Wetland Surface Waters Delineation and Classification pursuant Chapter F.A.C.

STATE OF MISSOURI CLEAN WATER ACT SECTION 401 WATER QUALITY CERTIFICATION 2012 GENERAL AND SPECIFIC CONDITIONS

LAKE COUNTY STORMWATER MANAGEMENT COMMISSION GENERAL PERMIT NUMBER 3 AUTHORIZING MINOR MAINTENANCE DREDGING ACTIVITIES

NOTICE OF PREPARATION

SECTION 10: WETLANDS PROTECTION

SOUTHERN WATER USE CAUTION AREA REVIEW

U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG LOS ANGELES DISTRICT

Florida Department of Environmental Protection Florida Surface Water Quality Antidegradation Policies, with Emphasis on Application to Wetlands

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014

ORDINARY FARMING REQUEST FOR EXEMPTION CONFIRMATION LETTER

INFRASTRUCTURE ELEMENT Goal, Objectives and Policies

Public Notice ISSUED: 5/6/2014 EXPIRES: 6/5/2014

Mining and Our Natural Resources

U.S. Army Corps of Engineers. Regulatory Branch Program Overview

Model Riparian Buffer Ordinance.

Errata sheet for the Connecticut General Permits May 2, 2017

MARION COUNTY COMPREHENSIVE PLAN 2035

Regulatory Programs Administered by Indiana DNR, Division of Water presented by George Bowman

CHAPTER 4 - EROSION & SEDIMENT CONTROL AND STORMWATER MANAGEMENT ORDINANCE OF DUBUQUE COUNTY, IOWA. Adopted March 29, 2010.

SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT ENVIRONMENTAL RESOURCE PERMIT APPLICANT S HANDBOOK VOLUME II

Notice No Closing Date: 25 FEB 2019

SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT ENVIRONMENTAL RESOURCE PERMIT APPLICANT S HANDBOOK VOLUME II

Missouri River Flood Response Activity

Responses to Comments from State Agencies

STATE ENVIRONMENTAL POLICY ACT MITIGATED DETERMINATION OF NONSIGNIFICANCE

beginning with the end of the quarter following the issue date of the Operating Permit.

Public Notice: Wetland/Waterway/Water Quality Regulations

Suggested Stormwater Management Practices For Individual House Lots

ANCR INDIVIDUAL RESPONSES SUMMARY: 2/11/04 WATER RESOURCES GOALS AND OBJECTIVES

CHAPTER 20.8 SURFACE MINING AND LAND RECLAMATION REGULATIONS

U.S. Army Corps of Engineers, Sacramento District 1325 J Street, Room Sacramento, California

Errata sheet for the Connecticut General Permits March 26, 2019

Public Notice of Application for Permit

Draft Mine Closure Plan. 17 October 2018 Longlac & Geraldton

Infrastructure Element

Chapter CONSTRUCTION SITE EROSION CONTROL

LARGE NONCOAL SURFACE MINING PERMIT SUMMARY-CHECKLIST

4 COMMITMENTS 4.1 LAND USE AND LAND COVER

Phase II: Proposed (regulated) Impervious in disturbed area (ac) Long Lake Existing Impervious in disturbed area (ac)

Portland District Regulatory Branch Permit Streamlining for Restoration Projects

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK

Information Paper Flood Recovery and Repair Activities in the Galveston District, U.S. Army Corps of Engineers

STANDARDS TO ADDRESS THE ENVIRONMENTAL FACTORS

Public Notice ISSUED: July 13, 2018 EXPIRES: August 13, 2018

CATEGORY a protection of the natural environment, its ecosystems and biodiversity.

Public Notice NATIONWIDE PERMIT REISSUANCE FOR THE STATE OF OHIO

Wakulla County Comprehensive Plan July 2013 GOALS, OBJECTIVES AND POLICIES

(1)(A)Inventory of the following existing natural resources on the USFSP Campus or within the context area adjacent to the University.

U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG LOS ANGELES DISTRICT

STORMWATER MANAGEMENT GOALS, OBJECTIVES, AND POLICIES

EXHIBIT # ATTACHMENT #

Public Notice of Application for Permit

ROADS: OPERATION AND MAINTENANCE

EXHIBIT # ATTACHMENT #

Legal Perspectives on Florida Wetland Jurisdiction

Appendix D Coastal Zone Management Act and Florida Coastal Management Program Federal Consistency Determination

Appendix A Stormwater Site Plan Report Short Form

Transcription:

Florida Department of Environmental Protection Bureau of Mining and Minerals Regulation Regulation of Mines Howard J. Hayes, Program Administrator April 2011

What is a mine? Nonphosphate mine: Subsections 378.403(5)(10)(12)&(16), F.S. Solid natural deposits (other than phosphate) on or in the earth are being extracted; and this material is leaving the property; for commercial, industrial or construction use. Includes site preparation, extraction, waste disposal, storage and reclamation. Does not include processing plants, cement plants, concrete plants, asphalt plants. Does not include prospecting. As the term is commonly used in the trade Excludes other development projects 2

No State Mining Permit Each agency can only regulate a portion of the project. 3

Many Regulatory Programs Counties - Land Use 67 different regulatory programs which can include wetlands, operating permits, reclamation, set backs from property lines, stormwater management, truck routes, noise, dust, hours of operation, performance bonding, garbage disposal, etc. Department of Health, County Health Departments - Private drinking water wells Sewage disposal systems Water Management Districts - Water Use Permit Environment Resource Permit (most mines) Department of Environmental Protection Bureau of Mining and Minerals Regulation - Environmental Resource Permit Reclamation Program DEP District Offices - Industrial Wastewater Permit Petroleum Storage Permit NPDES Stormwater Department of Community Affairs Coast Zone Consistency Department of State, Division of Historic Resources Historic and Archeological Sites Dept of Financial Services, Office of the State Fire Marshal - Handling & Storage of Explosives Limits on Blast Force Fish and Wildlife Conservation Commission - Takings Permit for State Listed Species US Army Corps of Engineers (US EPA & US FWS) - Dredging and filling in Waters of the US US Fish and Wildlife Service Federal Listed Species US Dept of Labor, Mine Safety and Health Administration - Worker Health and Safety 4

BMMR Regulatory Programs Environmental Resource Permitting Program Chapter 373, Florida Statutes Water Quality, Water Quantity, Wetlands, and Other Surface Waters Water Management Districts Reviews applications for sand, shell, and clay mines without processing other than scalping screens Land Reclamation Program Chapter 378, Florida Statutes Clean up when mining is complete 5

History 1961 Southwest Florida Water Management District Created Flood control, Works of District Permit, Wellfield Regulation 1970 s Management and Storage of Surface Water Permit (MSSW) - Consumptive Water Use Permit 1984 - Warren S. Henderson Wetlands Protection Act Department of Environmental Regulation Wetland Resource Permit October 1986, Resource Extraction Reclamation Statute Department of Natural Resources April 1990 Chapter 40D-45, F.A.C., Surface Water Management for Mining Materials Other Than Phosphate (MSSW) October 1995 Environmental Resource Permit Rules Merges MSSW and Wetland Resource Permits October 2001 - Chapter 40D-45, F.A.C., Repealed 6

An Environmental Resource Permit is required prior to construction, alteration, operation, maintenance, abandonment or removal of a surface water management system, including dredging or filling in, on or over wetlands or other surface waters, unless exempt. Mining is not mentioned. 7

Review and Approval Process Applicant conducts surveys and studies. Applicant may request a preapplication meeting. Application Submitted: Interagency notification Newspaper public notice Completeness review (mining & reclamation) Site inspections Request additional information or clarification. 8

Review and Approval Process Notice of Intent to Issue/Deny: Interagency notification Newspaper publication Parties requesting notification Affected parties may petition for administrative hearing. Permit issued or Denial. Periodic monitoring reports and compliance inspections. 9

Interagency Coordination Based on site location and conditions: US Army Corps of Engineers Florida Fish and Wildlife Conservation Commission Dept. of State, Div. of Historical Resources Dept. of Community Affairs, Div. Community Planning Dept. of Community Affairs, Areas of Critical State Concern DEP, Div. of Env. Assessment & Restoration DEP, Office of Greenways and Trails DEP, Division of Recreation and Parks DEP, Office of Environmental Services DEP, Springs Coordinator DEP, District Office, Submerged Lands & Env. Res. Permitting DEP, District Office, Industrial Wastewater Water Management District County Environmental Permitting Office Managers of nearby public lands 10

Application Can Contain Based on site location and conditions: Existing land cover, topography and drainage Existing drainage structures and water elevations Floodplains Fish, wildlife and listed species survey Wetland delineation and functional assessment Wetland mitigation costs Analysis of soils for contaminants from previous land uses Existing groundwater analysis to proposed depth of mining Mine phases and depths Proposed processing areas, roads, parking, maintenance areas Dewatering plan Best Management Practices for erosion control Best Management Practices for managing potential contaminants Proposed land cover, topography and drainage 11

Conditions for Issuance Applicant provides reasonable assurance that the project: Will not cause adverse water quantity impacts to receiving waters and adjacent lands. Will not adversely impact the maintenance of surface or ground water levels, or surface water flows. Will not adversely impact wetland and other surface water functions provided to fish and wildlife, and listed species. Will not adversely affect water quality. Will be capable of functioning as proposed, based on generally accepted engineering and scientific principles. And others. 12

Dredging, Filling, Mitigation No special wetland mitigation rules for sand and limestone mines Elimination and reduction of impacts required Current value and relative function Uniform Mitigation Assessment Method Creation, restoration, enhancement, preservation Financial assurances for completion of mitigation 13

Fish, Wildlife, Listed Species State listed animals and federal listed plants. Will not adversely impact the value of functions provided to fish and wildlife, and listed species by wetland and other surface waters. Will not cause adverse secondary impacts to the water resources including the ecological value of uplands to aquatic or wetland dependent listed animal species for enabling existing nesting and denning. 14

Historical & Archeological Resources Evaluate whether the regulated activity located in, on, or over wetlands or other surface waters will impact significant historical or archeological resources. 15

Floodplains No net encroachment into the floodplain, between the average wet season water table and that encompassed by the 100 year event, which will adversely affect the existing rights of others. 16

Stormwater Containment Very small percentage of project area impermeable Large capacity for onsite water storage, increasing daily A lot of material available for containment berms Required containment of 25-year, 24-hour storm Allow passage of drainage from offsite areas to downstream areas Separate containment for maintenance and petroleum storage areas 17

Depth of Mining Salt water intrusion or penetration of the freshwater salt water interface will not adversely impact existing legal water users. Excavation of the water body shall not penetrate a water-bearing formation exhibiting poorer water quality. 18

Depth of Mining Address potential long-term water quality impacts of constructed/altered water bodies due to depth dissolved oxygen in deep lakes. 373.414(6)(a), F.S., provides for a variance from the established dissolved oxygen standard within the lower layers of the reclaimed pit where mining activities otherwise meet the permitting criteria. 19

Water Quality Will not adversely affect the quality of receiving waters such that the water quality standards will be violated. Contain 25-year, 24-hour storm Discharges only though permitted industrial wastewater discharge point with water quality monitoring Limit depth of mining when necessary Groundwater quality monitoring Management of contaminated soils from previous land use Due to configuration - creation of debris traps or stagnant areas Best management practices to control erosion Best management practices to prevent or minimize potential release of pollutants Petroleum storage permit Well setbacks 20

Avoided Wetlands Perform analysis of drawdown, water storage, or diversion of water flows to provide reasonable assurance that the project will not adversely impact the functions that wetlands and other surface waters provide to fish and wildlife and listed species. Lakes which potentially may adversely affect wetland areas shall be separated from the wetland preservation, creation, or restoration areas by a minimum distance based on modeling. Permittees shall be required to monitor the wetland or other surface waters to demonstrate that such alteration has not resulted in adverse impacts. 21

Monitoring Dewatering Water Table Monitor Well GROUNDWATER RECHARGE DITCH STORMWATER PERIMETER BERM land surface ACTIVE MINEPIT water table lowered water table SURFICIAL AQUIFER CONFINING BED CONFINED AQUIFER 22

Overdrainage, Water Conservation Systems shall be designed to: Maintain existing water table elevations in existing wellfield cones of depression Preserve site environmental values Not waste freshwater Not lower water tables which would adversely affect the existing rights of others Preserve site groundwater recharge characteristics 23

Cumulative Impacts Each project is reviewed in its setting of existing conditions and permitted future construction. 373.414(8)(b), F.S. "If an applicant proposes mitigation within the same drainage basin as the adverse impacts to be mitigated, and if the mitigation offsets these adverse impacts, the governing board and department shall consider the regulated activity to meet the cumulative impact requirements of paragraph (a)." 24

What is Reclamation? Reclamation does not mean restoration. For nonphosphate mines, reclamation means, the reasonable rehabilitation of land where resource extraction has occurred. New mines after Oct 1, 1986. Existing mines after Jan 1, 1989 25

Reclamation Standards Sets deadlines for the start and completion of reclamation No reclamation performance bond At the time of release: Require removal of junk and equipment Sets standards for upland slopes and shoreline designs Sets standards for upland and shoreline revegetation Must meet water quality, water quantity, wetlands and surface waters rules 26

Lakes Regional Park 27

Reclamation Standards and the Environmental Resource Permit 28

Completed Reclamation 29

For more information: http://www.dep.state.fl.us/water/mines/index.htm Bureau of Mining and Minerals Regulation Department of Environmental Protection 2051 East Paul Dirac Drive Tallahassee, Florida 32310-3760 (850)488-8217, Fax: (850)488-1254 30